ATTACHMENT_06_-_140P8622Q0088_-_Table_2_0_Summary_of_Suspect_ACM_-_B.pdf
PDF 10 MB Posted
- Attached to
- HAZARDOUS MATERIALS SURVEY AND SPECIFICATION PACKA Federal contract opportunity
- Solicitation number
- 140P8622Q0088
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT_08_-_140P8622Q0088_-_SOW_-_REV_02_0001.pdf | ||
| Sol_140P8622Q0088_Amd_0001.pdf | ||
| ATTACHMENT_05_-_140P8622Q0088_-_Table_1_0_Summary_of_Suspect_ACM_-_A.pdf | ||
| Sol_140P8622Q0088.pdf | ||
| ATTACHMENT_04_-_140P8622Q0088_-_NIKE_MAGAZINE_PLAN_AND_SECTION_DESIGN.pdf | ||
| ATTACHMENT_03_-_140P8622Q0088_-_SOW.pdf | ||
| ATTACHMENT_02_-_140P8622Q0088_-__CONTRACT_BID_SCHEDULE.xlsx | XLSX spreadsheet | |
| ATTACHMENT_07_-_140P8622Q0088_-_DOL_WD_SCA_-_SAN_FRANCISCO_COUNTY.pdf | ||
| ATTACHMENT_01_-_140P8622Q0088_-_TERMS_AND_CONDITIONS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TABLE 1.0 - SUMMARY OF SUSPECT ACM
Golden Gate National Recreation Area
San Francisco, California
September 28, 2012
Table 1.0 - Page 218 of 220
Suspect Material Description Material Category
Associated Facility System
Homogeneous Material ID Substrate/Component
Suspect Material Classification
Building O - NIKE Battery B
Woven Gasket Material, Gray Misc.Air Handling UnitGOGA.O.001a HVAC Assumed ACM
Gasket, Gray Misc.Pipe FlangesGOGA.O.002a Various Pipe Systems Assumed ACM
2' x 4' Ceiling Tile (Lay-in), White Misc.Metal GridGOGA.O.003a Ceiling Assumed ACM
Suspect Material Description Material Category
Associated Facility System
Homogeneous Material ID Substrate/Component
Suspect Material Classification
Building P - Battery Spenor Tools & Rammers
Roofing Mastic, Black Misc.ConcreteGOGA.P.001a Roof Assumed ACM
Suspect Material Description Material Category
Associated Facility System
Homogeneous Material ID Substrate/Component
Suspect Material Classification
Building R - Debris Pile #3
Roofing Mastic, Black Misc.ConcreteGOGA.R.001a Roof Sampled
Window Glazing, White Misc.WindowsGOGA.R.002a Building Exterior Sampled
Plaster, Gray SurfacingLatheGOGA.R.003a Wall/Ceiling Sampled
Pipe Insulation (Non-Specific), White TSIPipe Runs and FittingsGOGA.R.004a Hot Water Sampled
Suspect Material Description Material Category
Associated Facility System
Homogeneous Material ID Substrate/Component
Suspect Material Classification
Building S - Debris Pile Alcatraz #2
Built-Up Roofing, Black Misc.Roof DeckGOGA.S.001a Roof Sampled
Roofing Mastic, Black Misc.Roof DeckGOGA.S.002a Roof Sampled
Plaster, White SurfacingLatheGOGA.S.003a Wall Sampled
Packed Pipe Insulation (Mud), White TSIPipe FittingsGOGA.S.004a Various Bldg. Systems Sampled
TABLE 2.0 - SUMMARY OF IDENTIFIED ACM
San Francisco, California
September 28, 2012
Table 2.0 - Page 86 of 87
Suspect Material Description Material Category
Associated Facility System
Homogeneous Material ID Substrate/Component
Suspect Material Classification
Building N - NIKE Battery A
Friability
Woven Gasket Material, Gray Misc.Air Handling UnitGOGA.N.001a HVAC Assumed ACMFriable
Gasket, Gray Misc.Pipe FlangesGOGA.N.002a Various Pipe Systems Assumed ACMFriable
Suspect Material Description Material Category
Associated Facility System
Homogeneous Material ID Substrate/Component
Suspect Material Classification
Building O - NIKE Battery B
Friability
Woven Gasket Material, Gray Misc.Air Handling UnitGOGA.O.001a HVAC Assumed ACMFriable
Gasket, Gray Misc.Pipe FlangesGOGA.O.002a Various Pipe Systems Assumed ACMFriable
2' x 4' Ceiling Tile (Lay-in), White Misc.Metal GridGOGA.O.003a Ceiling Assumed ACMFriable
Suspect Material Description Material Category
Associated Facility System
Homogeneous Material ID Substrate/Component
Suspect Material Classification
Building P - Battery Spenor Tools & Rammers
Friability
Roofing Mastic, Black Misc.ConcreteGOGA.P.001a Roof Assumed ACMNon-Friable
Suspect Material Description Material Category
Associated Facility System
Homogeneous Material ID Substrate/Component
Suspect Material Classification
Building R - Debris Pile #3
Friability
Pipe Insulation (Non-Specific), White TSIPipe Runs and FittingsGOGA.R.004a Hot Water SampledFriable
Suspect Material Description Material Category
Associated Facility System
Homogeneous Material ID Substrate/Component
Suspect Material Classification
Building S - Debris Pile Alcatraz #2
Friability
Built-Up Roofing, Black Misc.Roof DeckGOGA.S.001a Roof SampledNon-Friable
Packed Pipe Insulation (Mud), White TSIPipe FittingsGOGA.S.004a Various Bldg. Systems SampledFriable
Pipe Insulation, White TSIPipe RunsGOGA.S.005a Various Bldg. Systems SampledFriable
APPENDIX A - BUILDING SUMMARY
San Francisco, California
September 28, 2012
Building Size: 3186 SF
ACM Assumed
Construction Date: 1959
Building Use: NIKE Battery A
Building N - NIKE Battery A
Previous Expense:
Current Expense:
Future Asbestos Clean-up Costs:
$0
$1,439
$1,500
Building Size: 3186 SF
ACM Assumed
Construction Date: 1959
Building Use: NIKE Battery B
Building O - NIKE Battery B
Previous Expense:
Current Expense:
Future Asbestos Clean-up Costs:
$0
$1,439
$3,000
File details come from the government source that posted it. Updated .