ATTACHMENT_05_-_140P8622Q0088_-_Table_1_0_Summary_of_Suspect_ACM_-_A.pdf

PDF 10 MB Posted

Attached to
HAZARDOUS MATERIALS SURVEY AND SPECIFICATION PACKA Federal contract opportunity
Solicitation number
140P8622Q0088
Issued by
Department of the Interior National Park Service Pacific West Region

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE 1.0 - SUMMARY OF SUSPECT ACM

Golden Gate National Recreation Area

San Francisco, California

September 28, 2012

Table 1.0 - Page 217 of 220

Suspect Material Description Material Category

Associated Facility System

Homogeneous Material ID Substrate/Component

Suspect Material Classification

Building K - NIKE Van

Resilient Sheet Flooring, Dark Gray, Concealed Misc.MetalGOGA.K.001b Floor Assumed ACM

Built-Up Roofing System Materials, Black Misc.MetalGOGA.K.002a Roof Assumed ACM

Suspect Material Description Material Category

Associated Facility System

Homogeneous Material ID Substrate/Component

Suspect Material Classification

Building L - NIKE Van

Built-Up Roofing System Materials, Black Misc.MetalGOGA.L.001a Roof Assumed ACM

Suspect Material Description Material Category

Associated Facility System

Homogeneous Material ID Substrate/Component

Suspect Material Classification

Building M - NIKE Van

12" x 12" Floor Tile, Light Green, Mottled Misc.MetalGOGA.M.001a Floor Assumed ACM

Floor Tile Mastic, Concealed Misc.MetalGOGA.M.001b Floor Assumed ACM

Resilient Sheet Flooring, Concealed Misc.MetalGOGA.M.001c Floor Assumed ACM

Resilient Sheet Flooring, Concealed Misc.MetalGOGA.M.001d Floor Assumed ACM

Suspect Material Description Material Category

Associated Facility System

Homogeneous Material ID Substrate/Component

Suspect Material Classification

Building N - NIKE Battery A

Woven Gasket Material, Gray Misc.Air Handling UnitGOGA.N.001a HVAC Assumed ACM

Gasket, Gray Misc.Pipe FlangesGOGA.N.002a Various Pipe Systems Assumed ACM

TABLE 2.0 - SUMMARY OF IDENTIFIED ACM

San Francisco, California

September 28, 2012

Table 2.0 - Page 86 of 87

Suspect Material Description Material Category

Associated Facility System

Homogeneous Material ID Substrate/Component

Suspect Material Classification

Building N - NIKE Battery A

Friability

Woven Gasket Material, Gray Misc.Air Handling UnitGOGA.N.001a HVAC Assumed ACMFriable

Gasket, Gray Misc.Pipe FlangesGOGA.N.002a Various Pipe Systems Assumed ACMFriable

Suspect Material Description Material Category

Associated Facility System

Homogeneous Material ID Substrate/Component

Suspect Material Classification

Building O - NIKE Battery B

Friability

Woven Gasket Material, Gray Misc.Air Handling UnitGOGA.O.001a HVAC Assumed ACMFriable

Gasket, Gray Misc.Pipe FlangesGOGA.O.002a Various Pipe Systems Assumed ACMFriable

2' x 4' Ceiling Tile (Lay-in), White Misc.Metal GridGOGA.O.003a Ceiling Assumed ACMFriable

Suspect Material Description Material Category

Associated Facility System

Homogeneous Material ID Substrate/Component

Suspect Material Classification

Building P - Battery Spenor Tools & Rammers

Friability

Roofing Mastic, Black Misc.ConcreteGOGA.P.001a Roof Assumed ACMNon-Friable

Suspect Material Description Material Category

Associated Facility System

Homogeneous Material ID Substrate/Component

Suspect Material Classification

Building R - Debris Pile #3

Friability

Pipe Insulation (Non-Specific), White TSIPipe Runs and FittingsGOGA.R.004a Hot Water SampledFriable

Suspect Material Description Material Category

Associated Facility System

Homogeneous Material ID Substrate/Component

Suspect Material Classification

Building S - Debris Pile Alcatraz #2

Friability

Built-Up Roofing, Black Misc.Roof DeckGOGA.S.001a Roof SampledNon-Friable

Packed Pipe Insulation (Mud), White TSIPipe FittingsGOGA.S.004a Various Bldg. Systems SampledFriable

Pipe Insulation, White TSIPipe RunsGOGA.S.005a Various Bldg. Systems SampledFriable

APPENDIX A - BUILDING SUMMARY

San Francisco, California

September 28, 2012

Building Size: 3186 SF

ACM Assumed

Construction Date: 1959

Building Use: NIKE Battery A

Building N - NIKE Battery A

Previous Expense:

Current Expense:

Future Asbestos Clean-up Costs:

$0

$1,439

$1,500

Building Size: 3186 SF

ACM Assumed

Construction Date: 1959

Building Use: NIKE Battery B

Building O - NIKE Battery B

Previous Expense:

Current Expense:

Future Asbestos Clean-up Costs:

$0

$1,439

$3,000

File details come from the government source that posted it. Updated .