About this file
Written by GovTribe AI
· Dec 19, 2025
The file is an Excel-based Bid Schedule for a fire hydrant and water infrastructure repair project. The solicitation is a 100% Small Business set-aside for NAICS 236220, with a construction magnitude between $250,000 and $500,000, issued by the Department of the Air Force Air Combat Command. The project, identified as VLSB 24-0104, involves potential work across four Contract Line Items (CLINs) that include tasks such as demolishing and installing fire hydrants, isolation valves, thrust blocks, painting, flow testing, and installing new water pipes.
Key procurement details include a period of performance not exceeding 111 days after the Notice to Proceed, with bids due by 30 January 2026 at 9:00 A.M. and bid opening at 1:00 P.M. EST. The solicitation notes that funds are not currently available, and the government's obligation is contingent on appropriated funds. Questions and clarification requests must be submitted by COB 7 January 2026, with responses provided by 16 January 2026. Bid submissions should be emailed to SSgt Braulio Ramirez Galvan and SrA Tariq Ellis. The bid schedule template is currently populated with zero quantities and costs, indicating it is a framework for potential bidders to complete.
Other files
File
Type
Posted
Solicitation Amendment FA480326B00050002 SF 30.pdf
PDF
Feb 10, 2026
Solicitation Amendment - FA480326B00050002.pdf
PDF
Feb 10, 2026
Solicitation Amendment FA480326B00050001 SF 30.pdf
PDF
Jan 15, 2026
Attachment 10 - Questions and Answers.pdf
PDF
Jan 15, 2026
Solicitation Amendment - FA480326B00050001.pdf
PDF
Jan 15, 2026
Solicitation - FA480326B0005.pdf
PDF
Jan 5, 2026
Attachment 06 - Shaw AFB HM_SW_HW_Refrigerant Requirements.pdf
PDF
Dec 19, 2025
Attachment 03 - Environmental Requirements.pdf
PDF
Dec 19, 2025
Attachment 04 - WDSC20250004.pdf
PDF
Dec 19, 2025
Attachment 09 - Shaw AFB Design Standards 21 Aug 2018.pdf
PDF
Dec 19, 2025
Attachment 01 - Statement of Work.pdf
PDF
Dec 19, 2025
Attachment 02 - Hydrant Locations.pdf
PDF
Dec 19, 2025
Attachment 07 - Hydrant Report Repair - July 2024.pdf
PDF
Dec 19, 2025
Attachment 08 - Submittal Register.xlsx
XLSX spreadsheet
Dec 19, 2025
Show all 14
On GovTribe
Work with this file
Download the original file
Contacts named in this file
Similar government files
Ask GovTribe AI about this file
Text version
The file's text, extracted by GovTribe without its formatting.
` CUI
Project: Repair valves VLSB 24-0104 Project Engineer:
Location: Department:
Contractor:
Address:
PR No.:
CUI
CLIN 01
Reference Line No. Item Unit of Measure Quantity Material Costs Labor Costs Direct Cost Line Total Notes
Unit Cost (Means) Total Labor Hours per Unit (Means) Labor Cost per Unit (Means) Labor-Hours Avg. Rate ($/hr) Total Notes
1 Demo Fire Hydrants EA 0 $0.00 $0.00 0 $0.00 $0.00
2 Demo Isolation Valve EA 0 $0.00 0 $0.00
3 Install New Fire Hydrant EA 0 $0.00 $0.00 0 $0.00 $0.00
4 Install Isolation Valve EA 0 $0.00 $0.00 0 $0.00
5 Install New Thrust Block EA 0 $0.00 $0.00 0 $0.00
6 Paint SF 0 $0.00 $0.00 0 $0.00
7 Flow Test EA 0 $0.00 $0.00 0 $0.00
8 New Water Pipe LF 0 $0.00 $0.00 0 $0.00
SUPERVISION
9 Project Manager days 0 $0.00 0 $0.00
10 Project Superintendant days 0 $0.00 0 $0.00
Totals: $0.00 $0.00 $0.00 $0.00
CLIN 01
Total Material Cost: $0.00
Total Labor Cost: $0.00
Direct Cost: $0.00
Total Line Item Cost: $0.00
Overhead: 0% $0.00
Subtotal: $0.00
Bond: 0.0%
Total Contract Price:
CLIN 02
Reference Line No. Item Unit of Measure Quantity Material Costs Labor Costs Direct Cost Line Total Notes
Unit Cost (Means) Total Labor Hours per Unit (Means) Labor Cost per Unit (Means) Labor-Hours Avg. Rate ($/hr) Total Notes
1 Abate concrete asbestos SQ 0 $0.00 $0.00 0 $0.00 $0.00
2 Demo Fire Hydrants EA 0 $0.00 $0.00 0 $0.00 $0.00
Demo Isolation Valve EA 0 $0.00 $0.00 0 $0.00
3 Install New Fire Hydrant EA 0 $0.00 $0.00 0 $0.00 $0.00
4 Install Isolation Valve EA 0 $0.00 $0.00 0 $0.00
5 Install New Thrust Block EA 0 $0.00 $0.00 0 $0.00
6 Paint SF 0 $0.00 $0.00 0 $0.00
7 Flow Test EA 0 $0.00 $0.00 0 $0.00
8 New Water Pipe LF 0 $0.00 $0.00 0 $0.00
SUPERVISION
9 Project Manager days 0 $0.00 0 $0.00
10 Project Superintendant days 0 $0.00 0 $0.00
Totals: $0.00 $0.00 $0.00 $0.00
CLIN 02
Total Material Cost: $0.00
Total Labor Cost: $0.00
Direct Cost: $0.00
Total Line Item Cost: $0.00
Overhead: 0% $0.00
Subtotal: $0.00
Bond: 0.0%
Total Contract Price:
CLIN 03
Reference Line No. Item Unit of Measure Quantity Material Costs Labor Costs Direct Cost Line Total Notes
Unit Cost (Means) Total Labor Hours per Unit (Means) Labor Cost per Unit (Means) Labor-Hours Avg. Rate ($/hr) Total Notes
1 Demo Fire Hydrants EA 0 $0.00 $0.00 0 $0.00 $0.00
2 Install New Fire Hydrant EA 0 $0.00 $0.00 0 $0.00 $0.00
3 Install Isolation Valve EA 0 $0.00 $0.00 0 $0.00
4 Install New Thrust Block EA 0 $0.00 $0.00 0 $0.00
5 Paint SF 0 $0.00 $0.00 0 $0.00
6 Flow Test EA 0 $0.00 $0.00 0 $0.00
7 New Water Pipe LF 0 $0.00 $0.00 0 $0.00
SUPERVISION
8 Project Manager days 0 $0.00 0 $0.00
9 Project Superintendant days 0 $0.00 0 $0.00
Totals: $0.00 $0.00 $0.00 $0.00
CLIN 03
Total Material Cost: $0.00
Total Labor Cost: $0.00
Direct Cost: $0.00
Total Line Item Cost: $0.00
Overhead: 0% $0.00
Subtotal: $0.00
Bond: 0.0%
Total Contract Price:
CLIN 04
Reference Line No. Item Unit of Measure Quantity Material Costs Labor Costs Direct Cost Line Total Notes
Unit Cost (Means) Total Labor Hours per Unit (Means) Labor Cost per Unit (Means) Labor-Hours Avg. Rate ($/hr) Total Notes
Abate concrete asbestos SQ 0 $0.00 $0.00 0 $0.00 $0.00
1 Demo Fire Hydrants EA 0 $0.00 $0.00 0 $0.00 $0.00
2 Install New Fire Hydrant EA 0 $0.00 $0.00 0 $0.00 $0.00
3 Install Isolation Valve EA 0 $0.00 $0.00 0 $0.00
4 Install New Thrust Block EA 0 $0.00 $0.00 0 $0.00
5 Paint SF 0 $0.00 $0.00 0 $0.00
6 Flow Test EA 0 $0.00 $0.00 0 $0.00
7 New Water Pipe LF 0 $0.00 $0.00 0 $0.00
SUPERVISION
8 Project Manager days 0 $0.00 0 $0.00
9 Project Superintendant days 0 $0.00 0 $0.00
Totals: $0.00 $0.00 $0.00 $0.00
CLIN 04
Total Material Cost: $0.00
Total Labor Cost: $0.00
Direct Cost: $0.00
Total Line Item Cost: $0.00
Overhead: 0% $0.00
Subtotal: $0.00
Bond: 0.0%
Total Contract Price:
Total Contract Price: ERROR:#VALUE!