Attachment 03 Design Template.docx

DOCX document 55 KB Posted

Attached to
Technical and Programmatic Support Services (TPSS) III IDIQ MATOC
Solicitation number
PANHES-24-P-0000-003867
Issued by

About this file

This file is a design template for an Air Traffic Control Tower (ATCT) Facility-Related Control Systems (FRCS) cybersecurity design analysis project. The template is structured as Volume 1 of a multi-volume design analysis document to be submitted to the U.S. Army Corps of Engineers, Fictitious District, located in Omaha, Nebraska, with a solicitation number W55555-55-5-5555 and part number UHHZ555555, with a completion date of August 2026.

The template outlines fourteen major design narrative sections covering civil, structural, architectural, interior design, plumbing, mechanical, electrical, technology, fire protection, anti-terrorism/force protection, cybersecurity, and sustainability requirements. Section 13, the Cybersecurity Narrative, is the primary focus and requires contractors to provide detailed responses on project summary, general criteria and standards, design items to be resolved, existing conditions, and applicable FRCS control systems. This section mandates Risk Management Framework (RMF) Step 1 categorization, Confidentiality-Integrity-Availability (C-I-A) selections for multiple systems, system owner identification, FRCS levels, and eMASS nomenclature. Contractors must also develop security control selections including Control Correlation Identifiers (CCIs), assign responsible parties, and provide system descriptions with proposed diagrams. The template indicates multiple projects across different locations including Robins Air Force Base, Georgia (100% design analysis in October 2024) and Fort Crook, Nebraska (35% design analysis in August 2026), with all responses to be inserted into the bracketed placeholder sections.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN AIR TRAFFIC CONTROL TOWER (ATCT)FRCS CYBERSECURITY
ROBINS AIR FORCE BASE, GA100% DESIGN ANALYSIS

OCTOBER 2024

HARDENED OPERATIONSFRCS CYBERSECURITY
FORT CROOK, NE35% DESIGN ANALYSIS

AUGUST 2026

HARDENED OPERATIONSFRCS CYBERSECURITY
FORT CROOK, NE35% DESIGN ANALYSIS

AUGUST 2026

Fort Crook, Nebraska US Army Corps Of Engineers Fictitious District

Solicitation Number W55555-55-5-5555 Control Tower Volume 1 of X: Design Analysis Parts 1 – 14

PN UHHZ555555

August 2026

U.S. ARMY ENGINEER FICTITIOUS DISTRICT CORPS OF ENGINEERS

123 GENERAL GEORGE CROOK AVENUE OMAHA, NEBRASKA 68113

DESIGN ANALYSIS

AUGUST 2026

Table of Contents – Design Analysis – Volume 1 of X General Description

1.0General Project Requirements...................................................................................................Section 1-1
2.0Design Quality Control Plan ......................................................................................................Section 2-1
3.0Civil Narrative ...........................................................................................................................Section 3-1
4.0Structural Narrative ………………...............................................................................................Section 4-1
5.0Architectural Narrative………………............................................................................................Section 5-1
6.0Interior Design Narrative ..........................................................................................................Section 6-1
7.0Plumbing Narrative ..................................................................................................................Section 7-1

8.0 Mechanical Narrative ...................................................................................................................Section 8-1

8.1 Energy Analysis Narrative..........................................................................................................Section 8.1-1

9.0 Electrical Narrative ....................................................................................................................... Section 9-1

10.0 Technology Narrative .................................................................................................................Section 10-1

11.0 Fire Protection and Life Safety Narrative .................................................................................Section 11-1

12.0 Anti-Terrorism/Force Protection Narrative ..............................................................................Section 12-1

13.0 Cybersecurity Narrative ..........................................................................................................Section 13-1

14.0 Sustainability Narrative ..........................................................................................................Section 14-1

DESIGN AIR TRAFFIC CONTROL TOWER (ATCT)

ROBINS AIR FORCE BASE, GA

13.0 FRCS CYBERSECURITY NARRATIVE

13.1 PROJECT SUMMARY

[Insert response here.]

13.2 GENERAL CRITERIA AND STANDARDS

· [Insert response here in bullet point format.]

13.3 DESIGN ITEMS TO BE RESOLVED

[Insert response here.]

13.4 DESCRIPTION OF EXISTING CONDITIONS

[Insert response here.]

13.5 DESCRIPTION OF EXISTING WORK

13.5.1 APPLICABLE FRCS

A. The following are the control systems in scope:

I. [Insert response here in numeral point format.] II. [No exact number of points are expected.] B. The following are the control systems that have been deemed to likely be present and proposed to be out of scope.

I. [Insert response here in numeral format.] II. [No exact number of points are expected.]

13.5.2 OVERVIEW

[Insert response here.]

13.5.3 CATEGORIZATION SUMMARY

Initial proposed baseline control system categorization, as it relates to Risk Management Framework (RMF) Step 1 has been determined using [Insert response regarding rational in paragraph format here.].

13.5.4 [System 1] A. The proposed C-I-A selection is [Insert response here.] B. System Owner: [Insert response here.] C. FRCS Levels: [Insert response here.] D. eMASS Nomenclature: [Insert response here.] E. Criteria Reference: [Insert response here.]

Information Type
Confidentiality
Integrity
Availability

[Insert response here. No exact number of rows are required.]

Categorization

[Insert additional categorization rational here as/if required.]

13.5.5 [System 2] A. The proposed C-I-A selection is [Insert response here.] B. System Owner: [Insert response here.] C. FRCS Levels: [Insert response here.] D. eMASS Nomenclature: [Insert response here.] E. Criteria Reference: [Insert response here.]

Information Type
Confidentiality
Integrity
Availability

[Insert response here. No exact number of rows are required.]

Categorization

13.5.6 [System 3] A. The proposed C-I-A selection is [Insert response here.] B. System Owner: [Insert response here.] C. FRCS Levels: [Insert response here.] D. eMASS Nomenclature: [Insert response here.] E. Criteria Reference: [Insert response here.]

Information Type
Confidentiality
Integrity
Availability

[Insert response here. No exact number of rows are required.]

Categorization

15.5.6 [System #1] A. [Insert system description and other applicable information here.] [Insert proposed diagram here.]

B. [Insert additional information as/if required.] C. There are no known existing ATOs for this system.

15.5.7 [System #2]

[Insert proposed diagram here.]

C. There are no known existing ATOs for this system.

15.5.8 [System #3]

[Insert proposed diagram here.]

C. There are no known existing ATOs for this system.

15.5.9 SECURITY CONTROL SELECTIONS

A. A tailored listing of security controls (CCIs), that includes responsible party and inclusion determination, for each platform, is/will be [Insert response here.]

W912HN-21-D-2002SECTION 15- 1
W55555-55-5-5555SECTION 13- 1
W55555-55-5-5555SECTION 13- 1

image1.jpg

File details come from the government source that posted it. Updated .