This file is a design template for an Air Traffic Control Tower (ATCT) Facility-Related Control Systems (FRCS) cybersecurity design analysis project. The template is structured as Volume 1 of a multi-volume design analysis document to be submitted to the U.S. Army Corps of Engineers, Fictitious District, located in Omaha, Nebraska, with a solicitation number W55555-55-5-5555 and part number UHHZ555555, with a completion date of August 2026.
The template outlines fourteen major design narrative sections covering civil, structural, architectural, interior design, plumbing, mechanical, electrical, technology, fire protection, anti-terrorism/force protection, cybersecurity, and sustainability requirements. Section 13, the Cybersecurity Narrative, is the primary focus and requires contractors to provide detailed responses on project summary, general criteria and standards, design items to be resolved, existing conditions, and applicable FRCS control systems. This section mandates Risk Management Framework (RMF) Step 1 categorization, Confidentiality-Integrity-Availability (C-I-A) selections for multiple systems, system owner identification, FRCS levels, and eMASS nomenclature. Contractors must also develop security control selections including Control Correlation Identifiers (CCIs), assign responsible parties, and provide system descriptions with proposed diagrams. The template indicates multiple projects across different locations including Robins Air Force Base, Georgia (100% design analysis in October 2024) and Fort Crook, Nebraska (35% design analysis in August 2026), with all responses to be inserted into the bracketed placeholder sections.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit A CDRLS TPSS 3 MATOC 5 Aug 26.zip | ZIP file | |
| Attachment 01 PWS TPSS III MATOC - 30 Jul 2026.docx | DOCX document | |
| Attachment 05 Individual Subcontracting Plan Template V2.1 June 2025.docx | DOCX document | |
| Attachment 02 Element 2 - Sample TO info 5 Aug 26.docx | DOCX document | |
| Attachment 04 - past performance questionnaire.docx | DOCX document | |
| RFP TPSS III MATOC W912DY27RA014 7 Aug 2026.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| DESIGN AIR TRAFFIC CONTROL TOWER (ATCT) | FRCS CYBERSECURITY |
| ROBINS AIR FORCE BASE, GA | 100% DESIGN ANALYSIS |
OCTOBER 2024
| HARDENED OPERATIONS | FRCS CYBERSECURITY |
| FORT CROOK, NE | 35% DESIGN ANALYSIS |
AUGUST 2026
| HARDENED OPERATIONS | FRCS CYBERSECURITY |
| FORT CROOK, NE | 35% DESIGN ANALYSIS |
AUGUST 2026
Fort Crook, Nebraska US Army Corps Of Engineers Fictitious District
Solicitation Number W55555-55-5-5555 Control Tower Volume 1 of X: Design Analysis Parts 1 – 14
PN UHHZ555555
August 2026
U.S. ARMY ENGINEER FICTITIOUS DISTRICT CORPS OF ENGINEERS
123 GENERAL GEORGE CROOK AVENUE OMAHA, NEBRASKA 68113
DESIGN ANALYSIS
AUGUST 2026
Table of Contents – Design Analysis – Volume 1 of X General Description
| 1.0 | General Project Requirements...................................................................................................Section 1-1 |
| 2.0 | Design Quality Control Plan ......................................................................................................Section 2-1 |
| 3.0 | Civil Narrative ...........................................................................................................................Section 3-1 |
| 4.0 | Structural Narrative ………………...............................................................................................Section 4-1 |
| 5.0 | Architectural Narrative………………............................................................................................Section 5-1 |
| 6.0 | Interior Design Narrative ..........................................................................................................Section 6-1 |
| 7.0 | Plumbing Narrative ..................................................................................................................Section 7-1 |
8.0 Mechanical Narrative ...................................................................................................................Section 8-1
8.1 Energy Analysis Narrative..........................................................................................................Section 8.1-1
9.0 Electrical Narrative ....................................................................................................................... Section 9-1
10.0 Technology Narrative .................................................................................................................Section 10-1
11.0 Fire Protection and Life Safety Narrative .................................................................................Section 11-1
12.0 Anti-Terrorism/Force Protection Narrative ..............................................................................Section 12-1
13.0 Cybersecurity Narrative ..........................................................................................................Section 13-1
14.0 Sustainability Narrative ..........................................................................................................Section 14-1
DESIGN AIR TRAFFIC CONTROL TOWER (ATCT)
ROBINS AIR FORCE BASE, GA
13.0 FRCS CYBERSECURITY NARRATIVE
13.1 PROJECT SUMMARY
[Insert response here.]
13.2 GENERAL CRITERIA AND STANDARDS
· [Insert response here in bullet point format.]
13.3 DESIGN ITEMS TO BE RESOLVED
[Insert response here.]
13.4 DESCRIPTION OF EXISTING CONDITIONS
[Insert response here.]
13.5 DESCRIPTION OF EXISTING WORK
13.5.1 APPLICABLE FRCS
A. The following are the control systems in scope:
I. [Insert response here in numeral point format.] II. [No exact number of points are expected.] B. The following are the control systems that have been deemed to likely be present and proposed to be out of scope.
I. [Insert response here in numeral format.] II. [No exact number of points are expected.]
13.5.2 OVERVIEW
[Insert response here.]
13.5.3 CATEGORIZATION SUMMARY
Initial proposed baseline control system categorization, as it relates to Risk Management Framework (RMF) Step 1 has been determined using [Insert response regarding rational in paragraph format here.].
13.5.4 [System 1] A. The proposed C-I-A selection is [Insert response here.] B. System Owner: [Insert response here.] C. FRCS Levels: [Insert response here.] D. eMASS Nomenclature: [Insert response here.] E. Criteria Reference: [Insert response here.]
| Information Type |
| Confidentiality |
| Integrity |
| Availability |
[Insert response here. No exact number of rows are required.]
Categorization
[Insert additional categorization rational here as/if required.]
13.5.5 [System 2] A. The proposed C-I-A selection is [Insert response here.] B. System Owner: [Insert response here.] C. FRCS Levels: [Insert response here.] D. eMASS Nomenclature: [Insert response here.] E. Criteria Reference: [Insert response here.]
| Information Type |
| Confidentiality |
| Integrity |
| Availability |
[Insert response here. No exact number of rows are required.]
Categorization
13.5.6 [System 3] A. The proposed C-I-A selection is [Insert response here.] B. System Owner: [Insert response here.] C. FRCS Levels: [Insert response here.] D. eMASS Nomenclature: [Insert response here.] E. Criteria Reference: [Insert response here.]
| Information Type |
| Confidentiality |
| Integrity |
| Availability |
[Insert response here. No exact number of rows are required.]
Categorization
15.5.6 [System #1] A. [Insert system description and other applicable information here.] [Insert proposed diagram here.]
B. [Insert additional information as/if required.] C. There are no known existing ATOs for this system.
15.5.7 [System #2]
[Insert proposed diagram here.]
C. There are no known existing ATOs for this system.
15.5.8 [System #3]
[Insert proposed diagram here.]
C. There are no known existing ATOs for this system.
15.5.9 SECURITY CONTROL SELECTIONS
A. A tailored listing of security controls (CCIs), that includes responsible party and inclusion determination, for each platform, is/will be [Insert response here.]
| W912HN-21-D-2002 | SECTION 15- 1 |
| W55555-55-5-5555 | SECTION 13- 1 |
| W55555-55-5-5555 | SECTION 13- 1 |
image1.jpg
File details come from the government source that posted it. Updated .