About this file
This technical requirements document outlines specifications for replacing three high frequency antennas at a ground radio transmit and receive site on Tyndall Air Force Base. The work includes engineering, furnishing, installing, and testing three new triple-mode operation SPIRA-CONE antennas and installing new RF cabling and manhole and duct systems to connect the antennas. The antennas will replace two damaged existing antennas and provide a replacement for a demolished antenna. The document specifies requirements for the antennas, transmission lines, manhole and duct system, site security, grounding, and documentation. It also requires the contractor to meet all applicable standards for safety, non-ionizing radiation limits, and grounding systems.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
XLWU 20-8182
REPAIR GATR HF ANTENNAS
TRD
TECHNICAL REQURIEMENTS DOCUMENT
Tyndall AFB, FL GATR Site Building Number 1255
High Frequency Antenna Replacement Project
Technical Requirements Document
(TRD)
Table of Contents
1. Introduction
1.1. Purpose of TRD
1.2. HF Antenna Procurement Components
1.3. Manhole and Duct system Procurement Components
1.4. Solar Power System Procurement Components
1.4. References
2. Definitions
2.1. Tyndall HF Antenna Replacement
2.2. Manhole and Duct System
3. Requirements
3.1. HF Antenna Replacement Project General Description
4. Quality Assurance Provisions
4.1. General
4.2. Responsibility for Verification
4.3. Responsibility for Compliance
4.4. Test Equipment and Facilities
4.5. Methods of Verification
5. Tower Specifications
5.1. General
5.2. Detailed Specifications
5.3. Antenna Systems
5.4. Site Security
APPENDIX A
APPENDIX B
APPENDIX C
1. Introduction
1.1. Purpose of TRD
1.1.1. The purpose of this Technical Requirements Document (TRD) is to define and establish the performance, design, development, and functional test requirements for the HF Antenna Replacement Project. The Project will include the removal and replacement of two damaged High Frequency SPIRA- CONE® antennas, with new High Frequency Triple-Mode Operation SPIRA-CONE antennas and the replacement of all Radio Frequency (RF) coax cabling to the two new SPIRA-CONE® antennas.
Additionally, the installation of a third SPIRA-CONE antenna with new RF coax cabling is required, to replace a demolished HF Low Take Off antenna system at an existing antenna location near the GATR site Building 1255. In addition a Manhole and Duct system will be installed from the GATR site to each of the three HF Antennas to protect the HF coax runs.
1.1.1.1. The project’s systems will:
1.1.1.1.1. Be installed on Tyndall Air Force Base (AFB), FL (see Figure 1).
1.1.1.1.2. Be integrated into existing utility and infrastructure assets.
1.1.1.1.3. Include infrastructure modifications as necessary.
1.1.1.1.4. Work to be completed with zero down time.
1.1.1.1.5. Be a Turn Key Project
1.1.1.2. The replacement HF antenna will:
Figure 1 - Tyndall - Relative Building Location
Tyndall AFB, FL
Bldg
1.1.1.2.1. Meet all current wind load requirements for the location.
1.1.1.2.2. Meet all current FAA tower lighting and marking requirements.
1.1.1.3. The Manhole and Duct System will:
1.1.1.3.1. Meet all requirements of Customer-Owned Outside Plant Telecommunications Infrastructure
IAW ANSI/TIA-758-B.
1.1.1.3.2. Ducts installed IAW RUS Bulletin 1751F-643 and RUS Bulletin 1753F-151.
1.1.1.3.3. Hand-holes installed shall have an American Association of State Highway and Transportation Officials (AASHTO) rating of H-20 or equivalent.
1.1.2. The requirements described herein are provided to encourage maintainable and sustainable architectural approaches while still meeting by part number requirements where applicable. Maximum use of standard Commercial-off-the-shelf (COTS) items will be considered.
1.1.3. A brief summary of the subject TRD sections is provided below:
1.1.3.1. Section 1: Introduction
1.1.3.2. Section 2: Definitions
1.1.3.3. Section 3: Requirements
1.1.3.4. Section 4: Quality Assurance Provisions
1.1.3.5. Section 5: Tower Specifications
1.1.3.6. Section 6: Subcomponent Specifications
1.2. HF Antenna Procurement Components
1.2.1. The replacement HF Antenna Systems shall be a turnkey project that will include:
1.2.1.1. Antenna Tower Top Plate Height of 36 feet Above Ground Level (AGL).
1.2.1.2. Three Triple-Mode Operation Antenna Systems.
1.2.1.3. A Dissipative Grounding System for the Structure (Tower and Guy points if applicable).
1.2.1.4. Grounding Systems for three Antenna Systems and 12 coax transmission lines with entrance ground bar and surge suppressors.
1.2.1.5. Vertical and Horizontal Coax Management System.
1.2.1.6. Bird Control / Anti-Nesting to mitigate bird nesting at top of Antenna.
1.3. Manhole and Duct system Procurement Components
1.3.1. The Manhole and Duct system will include:
1.3.1.1. Two each 4’X5’x4’ concrete Hand-holes. One located behind GATR building 1255, second south of existing West SPIRA-CONE® Antenna. Approximate distances given below should be verified when exact placement of the Hand-holes is determined.
1.3.1.2. Four runs of 5 inch Schedule 80 PVC duct from the Stainless Steel Junction Box to the first Hand-hole location.
1.3.1.3. Two each 5 inch HDPE (SIDR 11.5) ducts to North West SPIRA-CONE® Antenna, approximately 1000 feet.
1.3.1.4. Two 4 inch HDPE (SIDR 11.5) ducts to existing West SPIRA-CONE® Antenna, approximately 525 feet. Ducts shall run with the above 5 inch ducts to the second Hand-hole and then to antenna location.
1.3.1.5. Two 4 inch HDPE (SIDR 11.5) ducts to existing East SPIRA-CONE® Antenna, approximately 650 feet.
1.3.1.6. A weatherproof coax cable entry boot with stainless steel securing band for all six duct terminations at the Antenna locations.
1.4. References
The documents listed in this section form a part of this TRD to the extent invoked by specific reference in other paragraphs of this TRD. In the event of conflict between the documents referenced below and the contents of this TRD, the contents of this TRD will supersede.
Classification Standard Title Date/Rev Controlling Organization
Government Occupational Safety and Health (OSH) Standard 1910.97
Non-ionizing Radiation 7 Mar 1996 Rev: N/A
U.S. Department of Labor, Occupational Safety and Health Administration (OSHA)
Military AFI 32-1065 Air Force Instruction – Grounding Systems
1 Oct 1998 Rev: N/A
Secretary of the Air Force, HQ AFCESA/CESE
Industry TIA-222-G Standard
Antenna System Grounding 2006/G Telecommunications Industry Association (TIA)
Industry ACI 315 Details and Detailing of Concrete Reinforcement
Latest Edition American Concrete Institute
Industry ACI 318 Building Code For Structural Concrete
Latest Edition American Concrete Institute
Industry NEMA TC-2 Electrical Polyvinyl Chloride (PVC) Tubing and Conduit
Latest Edition National Electrical Manufacturers Association
Classification Standard Title Date/Rev Controlling Organization
Industry ANSI/TIA-758-B Customer-owned Outside Plant Telecommunications Infrastructure Standard
2012 Telecommunications Industry Association (TIA)
Industry BICSI OSPDRM Outside Plant Design Reference Manual
6th Ed Building Industry Consulting Service International
Military MIL-HDBK- 419A
Grounding Bonding, and Shielding for Electronic Equipment and Facilities
Latest Edition DOD
Military Tyndall AFI 31-
Air Force Installation Security
Latest Edition 325th Security Forces
2. Definitions
2.1. Tyndall HF Antenna Replacement
The HF Antenna Replacement consists of a central steel tower with fiberglass compression booms.
Antenna elements use a conical logarithmic spiral arrays providing two high takeoff (HTO) angle and one low takeoff (LTO) angle antenna elements. This antenna system will replace the demolished LTO inverted cone antenna located NW the GATR site (building number 1255) located on Tyndall AFB, FL.
This antenna system will also, replace the existing damaged SPIRA-CONE antenna systems located East and West of the GATR site (building number 1255) located on Tyndall AFB, FL.
2.2. Manhole and Duct System
The Manhole and duct system consists of two 4’x5’x4’ hand-hole and two 5 inch ducts to new antenna location and two each duct runs to the two existing SPIRA-CONE® antenna locations. Manhole and duct system will be tied into GATR building through the Junction Box at the rear of the building.
3. Requirements
3.1. HF Antenna Replacement Project General Description
3.1.1. Operational/Organizational Concepts
3.1.1.1. The Government provides support to Operation Noble Eagle; Homeland Defense and other missions tasked in support of POTUS, Defense support of civilian authorities as well as security cooperation with our international partners.
3.1.1.2. The HF Antennas with the HF radios provide the link between ground and air in support for primary air defense support over the Gulf of Mexico. Platforms supported are AWACS, US Navy and Civil Air Patrol and are used in order to meet essential mission tasking from the Secretary of Defense. These radios support both secure voice and data for the 601st AOC, 101 ACOMS, and the Eastern Air Defense Sector.
3.1.2. Procurement Description
3.1.2.1. The HF Antenna replacement project will result in three new SPIRA-CONE® antennas with integrated 36 foot center tower which supports three independent antenna elements. A Manhole and Duct system will be installed to the three new SPIRA-CONE® antennas. New coax HF transmission lines will be installed to each of three SPIRA-CONE® antennas.
3.1.2.2. In addition, the procurement will include applicable:
3.1.2.2.1. Technical, safety, and as built documents and drawings.
3.1.2.2.2. Maintenance instructions as applicable.
3.1.3. General System Description
3.1.3.1. The antenna replacement is comprised of the system components listed below:
3.1.3.1.1. Replacement HF SPIRA-CONE® Antennas – See Section 3.1.4
3.1.3.1.2. Manhole and Duct System – See Section 3.1.5
3.1.4. HF Antenna Replacement General Description
3.1.4.1. The HF Antenna replacement is comprised of the system components listed below. The Transmitter systems are shown for illustration of functionality, the contractor will not be required to provide the transmitter-receivers as they will be existing government owned and operated items. Whereas, the complete antenna system will be provided and installed by the contractor.
3.1.4.1.1. Transmitter Systems – See Section 3.1.4.2
3.1.4.1.2. Antenna Systems – See Section 3.1.4.3
3.1.4.2. Transmitter Systems
3.1.4.2.1. Transmitter Systems Definition
3.1.4.2.1.1. The Transmitter System (see Figure 2, below) is comprised of:
3.1.4.2.1.1.1. Six (6) Sun Air radio with LPA-9600 Power Amp
3.1.4.2.1.1.2. Three (3) URC-III Radio Systems w/Rockwell Collins RT-2200 Radio
3.1.4.2.2. Transmitter Operating Frequency
The HF transmitters operates at 3-30 Megahertz (MHz). The government test plan will specify specific frequencies for the live antenna system tests.
3.1.4.2.3. Transmitter Output Power
3.1.4.2.3.1. HF Transmitters will have a maximum transmitter output power of 1000 EIRP (Watts).
3.1.4.2.3.2. The test plan will define a stepped approach to reach maximum power for live antenna system tests.
3.1.4.3. Antenna Systems
3.1.4.3.1. Antenna System Definition
3.1.4.3.1.1. The HF Antenna System (see Figure 2) shall be comprised of:
3.1.4.3.1.1.1. Three new Communications and Power Industries (CPI) 3002A-36HE-41 HF SPIRA- CONE® antenna.
3.1.4.3.1.1.2. Four (4) High Power, Low Loss Transmission Line, associated Connectors, Surge suppressors and Grounding. Three active lines and one spare.
3.1.4.3.1.1.3. Removal and replacement of two existing CPI 3002A-36HE-41 HF SPIRA-CONE® antennas.
3.1.4.3.1.1.4. Eight (8) High Power, Low Loss Transmission Line, associated Connectors, Surge suppressors and Grounding. Three active lines and one spare to each of the existing antennas.
3.1.4.3.1.2. The contractor shall consider maximum use of standard COTS items in their design and implementation of the HF Antenna replacement System.
3.1.4.3.2. Antenna Type
3.1.4.3.2.1. The HF replacement antennas shall be a Triple-Mode Operation 3002A-36HE-41 HF SPIRA- CONE® manufactured by Communications and Power Industries (CPI)
3.1.4.3.2.2. For each complete Antenna System, the contractor shall ensure and document a Voltage Standing Wave Ratio (VSWR) test across the transmitter operating frequency bands specified in Para
3.1.4.2.2. The VSWR shall not exceed 2:1.
3.1.4.3.3. Antenna System Locations and Quantities
3.1.4.3.3.1. The HF Antenna Replacement Project will include installation of three (3) Triple-Mode Operation Antenna Systems near the GATR Building 1255 as specified in Para 3.1.4.3. In addition new RF coax cabling will be provided for two existing antennas. Antenna locations are as follows:
Existing Antenna GPS Coordinates Remarks West LTO (Inverted Cone) 30.083727, -85.621341 Will be removed by CE.
Contractor will replace with new
SPIRA-CONE®
West SPIRA-CONE® 30.082864, -85.620343 Contractor will install new RF cables
East c 30.082260, -85.616899 Contractor will install new RF cables
East LTO (Inverted Cone) 30.080989, -85.616620 Will be removed by CE
3.1.4.3.3.2. Each antenna port will be cabled back to the manual RF patch panel inside the GATR building 1255 and terminated to the rear of the panel. The RF patch panel is located in Cabinet labeled FPI-64. Any antenna element will be able to be patched to any of the nine HF radios.
3.1.4.3.3.3. The procurement will include four (4) Transmitter Antenna Systems. These Antenna Systems shall be comprised of:
3.1.4.3.3.3.1. Three (3) each “transmit/receive” antennas
3.1.4.3.3.3.2. Twelve (12) each Transmission Lines.
3.1.4.3.4. RF Transmission Lines
3.1.4.3.4.1. The contractor shall provide and install four (4) high power transmission lines (Andrews AVA7-50) between the RF patch panel to each of the new Northwest and East SPIRA-CONE® antennas.
The transmission lines shall be terminated with N-type female RF connectors compatible to the transmission line at the antenna. Termination at the building entry J-box will be to a surge suppresser.
The same manufacturer shall be used for the transmission line (coax) and the connectors. The transmission line shall be mounted to the tower and terminated at the antenna coupler. The total insertion loss between the RF patch panel and the antenna for this high power transmission line shall not exceed 1.8 dB across the operating range of 3Mhz to 30MHz.
3.1.4.3.4.2. The contractor shall provide and install four (4) high power transmission lines (Andrews AVA7-50) between the RF patch panel to each of the new East SPIRA-CONE® antennas. The transmission lines shall be terminated with N-type female RF connectors compatible to the transmission line at the antenna. Termination at the building entry J-box will be to a surge suppresser. The same manufacturer shall be used for the transmission line (coax) and the connectors. The transmission line shall be mounted to the tower and terminated at the antenna coupler. The total insertion loss between the RF patch panel and the antenna for this high power transmission line shall not exceed 1.4 dB across the operating range of 3Mhz to 30MHz.
3.1.4.3.4.3. The contractor shall provide and install four (4) high power transmission lines (Andrews AVA5-50) between the RF patch panels to the new West SPIRA-CONE® antennas. The transmission lines shall be terminated with N-type female RF connectors compatible to the transmission line at the antenna. Termination at the building entry J-box will be to a surge suppresser. The same manufacturer shall be used for the transmission line (coax) and the connectors. The transmission line shall be mounted to the tower and terminated at the antenna coupler. The total insertion loss between the RF patch panel and the antenna for this high power transmission line shall not exceed 1.8 dB across the operating range of 3Mhz to 30MHz.
3.1.5. Manhole and Duct System General System Description
3.1.5.1. The Manhole and duct system consists of two 4’x5’x4’ hand-holes (HH) and two 5 inch ducts to NW antenna location and two each 4 inch duct runs to the East and West SPIRA-CONE® antennas.
Manhole and duct system will be tied into GATR building through the Junction Box at the rear of the building.
3.1.5.2. The current GATR site has an existing stainless steel junction box with polyphasers for lightning protection that connects to the demolished NW LTO inverted cone and SPIRA-CONE® antennas. There are 4 each 4” PVC pipes already installed from the base of the junction box and stubbed out underground. The two pipes on the right are connected to the East SPIRA-CONE® and the West LTO antenna. The 2 pipes on the left are stubbed off below ground and are connected to the demolished East LTO antenna and the West SPIRA-CONE®. Contractor shall replace these with new runs out to at least a 4’X5’X4’ concrete hand-hole. Hand-hole should be placed far enough from the building to provide straight runs to the East and West SPIRA-CONE® antennas. From the Hand-hole two each four inch (4”) ducts shall be installed to the existing East SPIRA-CONE®. Two runs of four inch (4”) duct and two runs of five inch (5”) ducts shall be ran to another 4’X5’X4’ concrete hand-hole located to the south of the existing West SPIRA-CONE®. The two runs of four inch (4”) duct will continue on to the West SPIRA-CONE® and the two runs of five inch duct shall continue on to the West LTO antenna location where the new SPIRA-CONE® antenna will be installed. Conduits shall be new 4” or 5” (schedule 40 or better) PVC or HDPE conduits to house the RF cable runs. All open pipes at the antenna end will be weather sealed with both suitable sealant and a rubber cover boot with stainless steel securing band after cables are installed.
3.1.5.2.1. New Maintenance Holes/Hand-holes: Maintenance holes installed shall have an American Association of State Highway and Transportation Officials (AASHTO) rating of H-20 or equivalent. Unless otherwise stated, HHs shall have a minimum interior dimension of 4’W x 5’L x 4’H. New Hand-holes shall have a self-latching torsion assisted full-opening diamond plate stainless steel 2-piece lid. Hand holes shall be furnished with cable rack hardware, pulling irons, a sump, water resistance gaskets, bonding ribbon and a grounding system. HHs shall meet the requirements of TIA-758-B, paragraph 5.2.2.
Prefabricated HHs are preferred.
3.1.5.2.2. It is understood that some Maintenance Holes are precast with bonding ribbons or some similar connection, to the maintenance hole rebar and therefore do not require a ground rod. This method of grounding in lieu of a ground rod is satisfactory just as long as the achieved impedance to ground is twenty five (25) ohms or less.
3.1.5.2.3. HH shall be installed so that they are reasonably level on a gravel bed of 6 inches to allow drainage of water from the walls. The gravel bed should extend 8 inches to 12 inches beyond the outer edges of the MH/HH. MH/HH covers shall be labeled with 1/8” raised letters stating “COMMUNICATIONS”. Maintenance holes shall be stenciled on the inside with a number designated to the contractor by 325CS.
3.1.5.3. Underground Conduit System: The Contractor shall be responsible for any required trenching and/or boring necessary to lay the duct system. Contractor is also responsible for backfilling ditch lines and compaction of fill materials with appropriate compaction tools. Provide a minimum of 12" cover of clean fill above the conduit. Backfill material shall be clean and free from all organic material, clay, marl or unstable materials, debris, lumps, or broken paving. No rocks or stones larger than 3 inches in diameter shall be allowed in backfill. Material for backfill may be material resulting from excavation, if it meets the above requirements.
3.1.5.3.1. Composition: All new ducts shall be corrosion resistant and 4-inch inside diameter (I.D.)
round or metric equivalent or 5” as specified for runs to the new SPIRA-CONE® antenna. HDPE will be installed instead of PVC for all new conduit/duct runs unless PVC is required for compatibility with existing materials. When possible, new ducts shall be made of high density polyethylene (HDPE) SIDR 11.5.
Schedule 80 shall be limited to risers. The ducts shall be appropriately labeled indicating the composition material. Ducts shall have a sleeve or bell end type coupling and shall be watertight when assembled
3.1.5.3.2. Installation: Installation of underground conduits/ducts shall be IAW RUS Bulletin 1751F-643 and RUS Bulletin 1753F-151. In maintenance holes (MH) with knockouts, conduits shall start at the bottom knockout, allowing for upward future expansion. All conduits not installed beneath roads, sidewalks, parking areas, etc. shall have a minimum of 36 inches of ground cover, wherever possible.
The Contractor shall provide other protective measures (at least a 4” pre-mixed concrete cap, etc.), in those areas where the minimum ground cover cannot be achieved. Grading of ducts shall be accomplished IAW RUS Bulletin 1751F-643. Do not allow the ducts to twist or tangle between Maintenance holes.
3.1.5.3.3. Utility Separation: When communications ducts cross either power duct or buried power cable, maintain a minimum separation of three (3) inches of concrete or twelve (12) inches of well-tamped earth between the two. When parallel maintain two (2) inches of concrete or twelve (12) inches of well tamped earth between the two. For pipes (e.g., gas, water, oil) maintain six inches when crossing or twelve (12) inches when parallel.
3.1.5.3.4. Spacers and Tracer Wire: Along the length of the duct run, if the ducts are installed by trenching, spacers shall be placed at an interval of four (4) spacers per twenty (20) feet. At least one (1) conduit, inner-duct or roll pipe in each duct bank shall have tracer wire or be otherwise locatable from the surface. All new tracer wire installed for this project needs to have a wire nut and label installed at all wire ends, and those wire ends secured but not connected to grounds. The tracer wire shall be exposed; free from the conduit and capped (insulated). The tracer shall be secured and routed to the maintenance hole or hand-hole neck to a point where maintenance personnel may access the wire without having to enter the maintenance hole/hand-hole, and tagged with a label so indicating it as a “Duct Tracer Wire to xxx – Do Not Remove (where xxx is the other end of the wire).” Tracer wires shall not be connected to any grounding system. Tracer wire shall be pulled back from building entrances until it is underground to prevent lightning damage. Tracer shall have 1-foot of slack protruding into the maintenance hole, tagged with to/from designators and fasten to Maintenance hole wall 3-inches below lid opening.
3.1.5.3.5. Warning tape: Cable warning tape shall be buried one (1) foot below the surface and shall follow the duct/buried cable route. The tape shall be a minimum of three inches wide and orange in color with the appropriate warning message.
3.1.5.4. Entrance Conduits into Existing Manholes: When new entrance conduits/ducts or sleeves are required, and knockouts do not exist, the Contractor shall core and install the necessary holes to install the ducts or sleeves. The precise location of new cores will be coordinated with 325CS/SCX. Penetration shall not be in such a location through the wall as to block use of existing ducts in the maintenance hole and must not block other infrastructure. Terminators shall be installed and secured in the openings to prevent conduits from detaching and allowing water or debris into the infrastructure. Each new conduit shall enter a MH perpendicular to the surface of the wall through which it is entering and be flush with the interior wall of the maintenance hole or vault. New cores for conduits will be a minimum of eighteen (18) inches from either the manhole floor or ceiling, if practical. The minimum bending radius for entry conduit/ducts shall be no less than ten (10) times the inside diameter of the conduit. Ducts and openings around ducts shall be sealed to prevent moisture from entering the manholes
3.1.5.5. The Contractor shall label all equipment and cables they install IAW ANSI/TIA-606-B and as directed by 325CS/SCXP. All tags shall be permanently labeled, easily visible and corrosion resistant. Install cable tags in all maintenance holes/handholes and Junction Box locations.
When cables pass through a maintenance hole, put a tag on the cable, approximately 2 feet from each duct entrance. Information on the cable tag shall identify cable by size, type, and cable number. The same information shall appear on the Contractor’s completed as-built-drawings.
3.1.6. RF Authorization
The HF emitters at GATR Site are covered by the current Tyndall AFB and 1st Air Force Host Base and Tenant Unit agreement.
3.1.7. Personnel Safety
3.1.7.1. The contractor shall comply with U.S. Department of Labor standard OSHA 1910.97 (Non-ionizing Radiation), for personnel during the live high power system tests by ensuring personnel are not on the tower.
3.1.7.2. In addition, the contractor shall comply with AFI 32-1065 (AFI - Grounding Systems) for communications facilities.
3.1.8. Government-Furnished Property (GFP)
As specified throughout the TRD, the Government will provide to the contractor certain GFP items (as listed below) that require integration into the RWE Tower Replacement project.
HF Manual Patch Panel
Nine each HF Transmitter/receiver
Building entrance Stainless Steel Junction Box with Ground point and surge suppressors
3.1.9. Installation
3.1.9.1. Proposed antenna and Manhole and Duct system shall be located near the GATR building, see above table for GPS coordinates. The contractor shall install all HF Antenna Replacement components at the locations specified within Section 3.1.4 "HF Antenna Replacement General D".
3.1.9.2. The Antenna System, and Manhole and Duct System will be installed outdoors on designated Government property, in a moderate salt spray environment that (tower, each antenna, power transmission line, associated mounting hardware, and solar power system components) shall require where applicable the use of non-corrosive materials and the application of appropriate corrosion prevention. The antenna shall be mounted IAW manufacturer’s installation instructions.
3.1.10. Tools
3.1.10.1. The contractor shall provide a list of all specialty tools required to maintain the Antenna Systems
3.1.11. Documentation
3.1.11.1. For the HF Antenna Systems procurement, the project TRD will address the system documentation requirements, while the program Contract Data Requirements List (CDRL) Package will designate the documentation delivery requirements.
3.1.11.2. Drawings and schematics shall be provided in paper and electronic format. Two full size paper copies shall be provided plus one engineer’s copy. Paper copies will be no smaller than ANSI/ASME Y14.1 standard B or ISO standard A3 size. Two electronic copies shall be provided in PDF format and the native format on CD or DVD. An example of native format would be a “dwg” if AutoCAD was used to generate the drawing.
3.1.11.3. A list of all software titles (and revision) that were used to generate the drawings shall be provided.
3.1.11.4. The program documentation will include at a minimum:
3.1.11.4.1. Design review agendas, briefing charts, and related meeting minutes.
3.1.11.4.2. Design documents:
3.1.11.4.2.1. Hardware: Tower and Subcomponent Design Specifications
3.1.11.4.2.2. Construction Documents
3.1.11.4.2.2.1. Prior to the preparation of the new Antenna tower Erection Documents, the Contractor shall prepare Construction Documents for Government approval. Construction documents shall include drawings and specifications as necessary to illustrate the complete tower design, including all structural components (super structure and substructure), utilities, equipment, hardware, devices and finishes.
Control dimensions, member sizes and other details shall be included as necessary for the development of Erection Documents.
3.1.11.4.2.3. Erection Documents
3.1.11.4.2.3.1. Upon approval of the Construction Documents by the Contracting Officer's Representative (COR), the Contractor shall generate Tower Erection Drawings. Tower Erection Drawings shall indicate anchor bolts, member locations, bolt sizes and numbers, and all other information to clearly depict requirements for erection of the tower. A parts list showing the member number, size and length shall be provided with the Erection Drawings.
3.1.11.4.2.4. Design Data
3.1.11.4.2.4.1. All construction and erection drawings and specifications shall be prepared to comply with this specification. This specification describes the design work that shall not be changed, without prior approval of the Government, and shall be included in the construction documents. All remaining design work shall be performed by the Contractor based on the design criteria as required herein. No deviations from the criteria will be allowed unless prior approval is obtained from the Contracting Officer's Representative. All questions or problems encountered by the Contractor shall be promptly submitted with recommendations for resolution to the Contracting Officer's Representative for approval. Contents of this specification shall not be construed as limiting in any way the responsibilities of the DOR to comply with all code requirements.
3.1.11.4.2.5. Certificates, Engineer and Manufacturer Qualifications
3.1.11.4.2.5.1. Identify the designer of Record (DOR) and submit written qualifications of the DOR providing evidence that he/she is a Professional Engineer registered in the state of Florida and has a minimum of 5 years’ experience in the design of steel tower structures of similar height and performance.
3.1.11.4.2.5.2. Identify the tower manufacturer and submit written qualifications providing evidence that the manufacturer has a minimum of 10 years’ experience fabricating steel tower structures of similar height and performance. The manufacturer shall have completed a minimum of 3 similar projects within the past 5 years.
3.1.11.4.3. Test procedures/reports:
3.1.11.4.3.1. For the subcomponents:
3.1.11.4.3.1.1. Subsystem ATP and Subsystem ATP Report
3.1.11.4.3.1.2. Antenna VSWR Test Procedures and related Test Report
3.1.11.4.3.2. Grounding:
3.1.11.4.3.2.1. Measurement of antenna tower primary ground to earth ground in ohms.
3.1.11.4.3.2.2. Measurement of antenna tower and guy point lightning ground to earth ground in ohms.
3.1.11.4.3.2.3. Measurement of tower signal ground to earth ground in ohms.
3.1.11.4.4. Drawings, Bill of Materials, and Component Data Sheets (to include any referenced materials)
3.1.11.4.5. Schematics
3.1.12. Maintenance and Sustainment
During installation and test, the HF Antenna replacement components and associated systems' maintenance and sustainment will be the contractor's responsibility until successfully completed and turned over to the Government.
3.1.12.1. Maintenance Concept
The contractor shall provide technical documentation that enables the Government to perform organizational (field-level) preventative maintenance and repair.
3.1.12.2. Maintainability/Sustainment Design
The contractor shall design the HF Antenna replacement and subsystems ease of maintenance and to sustain a projected minimum 15-year life span.
4. Quality Assurance Provisions
4.1. General
4.1.1. The Quality Assurance (QA) verification provisions described herein include the verification methods necessary to verify the ability of the antenna systems (and/or components) to meet the performance, design, development, and functional test requirements specified herein.
4.1.2. To verify conformance to the system requirements, QA verifications shall be (as approved by the Government) accomplished via:
4.1.2.1. Analysis (Reference 4.5.1
4.1.2.2. Inspection (Reference 4.5.2
4.1.2.3. Functional Test (Reference Para 4.5.3
4.1.3. Systems under Functional Test shall not be adjusted, repaired or maintained unless specifically permitted by the Government. When authorized by the Government to make corrections and after corrections are made, all tests deemed necessary by the Government shall be performed to verify that the system meets the specification requirements.
4.1.4. At the program PDR, the contractor shall present/document (and the Government will approve) the proposed verification method (IAW the QA verifications defined within Section 4.2) for each of the subject TRD requirements.
4.2. Responsibility for Verification
4.2.1. Unless specified otherwise, the contractor:
4.2.1.1. Shall be responsible for performance of all verification requirements proposed.
4.2.1.2. May use their own or any other facilities suitable for the performance of the inspection or test requirements specified herein, unless disapproved by the Government.
4.2.2. The Government reserves the right to perform any of the inspections or tests proposed by the contractor where such inspections or tests are deemed necessary to ensure that supplies and services conform to prescribed requirements.
4.3. Responsibility for Compliance
4.3.1. The system design shall meet all requirements specified.
4.3.2. The inspections set forth in this specification shall become a part of the contractor's overall inspection system or quality program.
4.3.3. The absence of any inspection requirement in this specification shall not relieve the contractor of the responsibility of ensuring that all products or supplies submitted to the procuring activity for acceptance comply with all requirements of the contract.
4.4. Test Equipment and Facilities
4.4.1. Calibration of all measuring and inspection equipment, which control the accuracy of test equipment and facilities, shall be traceable to the National Institute of Standards and Technology.
4.4.2. The contractor shall ensure that test facilities of sufficient quality and quantity are established and maintained to permit performance of required inspections.
4.5. Methods of Verification
The requirements of Section 3.1.4.3.4 and 3.1.5 shall be verified by the method(s) summarized in the sub-paragraphs, below
4.5.1. Analysis
4.5.1.1. The disciplines and processes involving the evaluation, comparison, and correlation of data generated mathematically with the applicable design requirements, or the application of test and/or statistical data to mathematical analyses for comparison with the applicable design requirements.
4.5.1.2. Requirements being verified by analysis shall, in whole or part, be verified by the results of analyses which are of sufficient scope, depth, and level of detail to assure the accuracy of the conclusions reached. This analysis is subject to approval by the Government.
4.5.1.3. Where applicable, the results of analytical tasks performed during the engineering test and evaluation phase may be utilized. Also, data obtained from the evaluation of a similar item may be utilized, provided the work was accomplished on a configuration sufficiently representative of the final design.
4.5.2. Inspection (Examination of Product)
4.5.2.1. Inspection is the verification of requirements by visual examination of the physical features of a non-operating system, physical measurements and/or comparison of the system with applicable drawings and specifications.
4.5.2.2. The inspection may be conducted with or without the aid of standard tools. The tower, grounding and each antenna system presented for acceptance will be physically examined to ensure that the meet all requirements specified herein and on the drawings for the system. Failure to pass this examination shall cause the tower and associated systems to be rejected.
4.5.3. Acceptance Tests
4.5.3.1. The contractor shall ensure acceptance test of the following features, parameters, or characteristics.
4.5.3.2. Any personnel radiation hazards on expected work surfaces (i.e. ground, nearby roof tops, etc.), as determined by OSHA standard 1910.97, shall be mitigated. Posting a warning sign shall not constitute adequate mitigation
4.5.3.3. Grounding (per ANSI/TIA 222-G)
4.5.3.3.1. Primary antenna system ground documented by the contractor to demonstrate 10 Ohms or less.
4.5.3.3.2. Lightning protection system ground documented by the contractor to demonstrate 10 Ohms or less.
4.5.3.4. Antenna System VSWR.
4.5.3.4.1. By the Government using GFE test equipment without GFE RF transmitters connected.
4.5.3.4.2. By the Government using GFE test equipment with GFE RF transmitters connected.
5. Tower Specifications
5.1. General
5.1.1. The tower furnished by the manufacturer shall be complete in accordance with all specification requirements including anchor bolts, safety climbing device and all other hardware essential for erecting the tower. The contractor shall provide all materials, supplies, equipment and services necessary to design, detail, fabricate and install the tower.
5.1.2. The structural information provided herein is intended to illustrate the design intent for the tower.
The structural design provided herein shall be utilized as a conceptual design. Materials provided serve to illustrate the relationships of volumes, architectural, structural, mechanical, and electrical systems. The contractor is solely responsible for the determination and complete design of the structural system. The final structural system design decisions shall not reduce the net square footage requirement as defined in this document.
5.1.3. The tower designed for Exposure "C" to the TIA-222-G Standard
5.1.4. Shall be designed for 140 MPH basic wind in accordance with TIA-222-G Standard.
5.1.5. Shall be designed for 30 MPH basic wind with 0.25 inches of ice.
5.1.6. The tower framing shall consist of structural steel (angle, tube or pipe) framing. Any closed members (tubes or pipes) must have appropriately detailed weep holes or other consideration for drainage.
5.2. Detailed Specifications
5.2.1. The following specifications address facets of the tower, equipment and cable rack, and equipment enclosures which will become real property and are considered part of the structure.
5.2.1.1. Concrete
5.2.1.1.1. Specified minimum compressive strength shall be 4000 psi at 28 days for all concrete.
5.2.1.1.2. All detailing and materials used for concrete reinforcement shall be in accordance with ACI 315 and ACI 318, latest revisions.
5.2.1.1.3. Exterior steel embedded in concrete for such purposes as base plates, anchor bolts, guy anchors, etc. shall be hot-dipped galvanized unless otherwise directed.
5.2.1.2. Steel
5.2.1.2.1. Shop connections for structural steel shall be welded, and field connections shall be made with high strength bolts in bearing type connections.
5.2.1.2.2. The structural design documents and erection plan shall be reviewed and signed by a licensed structural engineer.
5.2.1.2.3. Anchor bolts shall be a weldable type for the guyed structure.
5.2.1.2.4. Galvanizing: All ferrous structural steel shall be hot dip galvanized after fabrication in conformance with ASTM Specification A-123 and A-385. Hardware (nuts, bolts, washers and other minor items) shall be galvanized by the hot dip method. Anchor bolts shall be galvanized in the area which will extends above the concrete foundation
5.2.1.3. Grounding
5.2.1.3.1. Grounding electrode systems shall be provided for power, lightning protection and signals.
5.2.1.3.2. Grounding shall meet the requirements of MIL-HDBK-419A Grounding Bonding, and Shielding for Electronic Equipment and Facilities and AFI-32-1065 Grounding Systems.
5.2.1.3.3. Bonding shall be provided to tower steel, tower foundation rebar, guy wires/points, driven ground rods and the lightning protection system.
5.2.1.3.4. Ground rods shall be a minimum of ¾-inch x 20 feet and be tied together with 4/0 copper cables. A grounding counterpoise consisting of 4/0 copper cable shall be provided around the tower foundation. All grounding electrode systems shall be bonded to the grounding counterpoise.
5.2.1.3.5. All grounding electrode systems will have a maximum resistance to ground of 5 ohms or less and be interconnected at a single point. The grounding system will be a common grounding system and can be utilized when practical for all grounding needs.
5.2.1.4. Lightning Protection
5.2.1.4.1. A conventional lightning protection system shall be provided, including strike termination devices, conductors, ground terminals, interconnecting conductors and other connectors and fittings required to provide a full coverage for antenna systems.
5.2.1.4.2. Grounding shall meet the requirements of MIL-HDBK-419A Grounding Bonding, and Shielding for Electronic Equipment and Facilities and AFI-32-1065 Grounding Systems.
5.2.1.5. Lighting: Lighting for Antenna structure is not required.
5.2.2. Access.
5.2.2.1.1. All maintenance functions will be accomplished by use of a bucket truck or other lift device.
Safety Clime and climbing ladder are not required due to the configuration of the antenna.
5.2.2.2. Security Fence N/A
5.2.2.2.1.
5.2.2.3. Subcomponent Specifications
5.3. Antenna Systems The following specifications address antenna systems which will become user owned and maintained items after installation. The user for these systems is the 601st AOC, SSF and Eastern Air Defense Sector at Rome New York.
5.3.1. Transmission Line
5.3.1.1. For new NW SPIRA-CONE® antenna: Shall provide four (4) 1 5/8-inch Transmission Lines, Andrew Part # AVA7-50, between the RF patch panel and the antenna coupler located on the tower. The transmission lines shall be terminated with N-type female RF connectors compatible to the transmission line. Termination at the building entry J-box will be to a surge suppresser. The same manufacturer shall be used for the transmission line (coax) and the connectors. The transmission line shall be mounted to the tower and terminated at the antenna coupler. The total insertion loss between the RF patch panel and the antenna for this high power transmission line shall not exceed 1.8 dB across the operating range of 3Mhz to 30MHz.
5.3.1.2. For new East SPIRA-CONE® antenna: Shall provide four (4) 1 5/8-inch Transmission Lines, Andrew Part # AVA7-50, between the RF patch panel and the antenna coupler located on the tower. The transmission lines shall be terminated with N-type female RF connectors compatible to the transmission line. Termination at the building entry J-box will be to a surge suppresser. The same manufacturer shall be used for the transmission line (coax) and the connectors. The transmission line shall be mounted to the tower and terminated at the antenna coupler. The total insertion loss between the RF patch panel and the antenna for this high power transmission line shall not exceed 1.4 dB across the operating range of 3MHz to 30MHz.
5.3.1.3. For new West SPIRA-CONE® antenna: : Shall provide four (4) 7/8-inch Transmission Lines, Andrew Part # AVA5-50, between the RF patch panel and West SPIRA-CONE® antenna. The transmission lines shall be terminated with N-type female RF connectors compatible to the transmission line at the antenna coupler. Termination at the building entry J-box will be to a surge suppresser. The same manufacturer shall be used for the transmission line (coax) and the connectors. The transmission line shall be mounted to the tower and terminated at the antenna coupler. The total insertion loss between the RF patch panel and the antenna for this high power transmission line shall not exceed 1.8 dB across the operating range of 3Mhz to 30MHz.
5.3.1.4. The RF transmission lines shall be continuous with no splices or adapters. A short jumper of 1/2” heliax (LDF4-50, or equivalent) may be used, if needed, to make the final connection at the antenna due to rigidity of the 7/8” and 1 5/8 “cables.
5.3.1.5. All outdoor connections shall be sealed and weatherproofed. Andrew part # 221213 or equivalent sealing method.
5.3.1.6. Shall be secured to the tower at least every three feet using Andrews Wraplock, 12395-1 or equivalent.
5.3.1.7. Shall comply with manufacturer's installation instructions for minimum bend radius.
5.3.1.8. Shall be grounded at the top near the antenna and on the bottom of the tower immediately above the vertical to horizontal transition point.
5.3.1.9. Ground kits shall be Site Pro 1 part # GK-C158 and part # GK-C78, or equivalent.
5.3.1.10. Shall be hoisted and installed using Andrew part # L7SGRIP and Andrew part # L5SGRIP, as applicable using the manufacturers recommended installation guidelines for support hoisting grip.
5.4. Site Security
Contractor will be required to provide construction security locks in line with existing locks at the construction site as well as forest road access where applicable.
APPENDIX A: Acronyms
Acronym Description
ACI American Concrete Institute
AFB Air Force Base
AGL Above Ground Level
ANSI American National Standards Institute
ATP Acceptance Test Procedure
CDR Critical Design Review
CDRL Contract Data Requirements List
COTS Commercial Off The Shelf dB Decibel
N Type N 50 OHM RF Connector (Connector Standard)
DoD Department of Defense
EIA Electronic Industries Alliance
GFE Government-Furnished Equipment
GFP Government-Furnished Property
HDPE High Density Polyethylene
HF High Frequency
IAW In Accordance With
ID Identification
LHC Left Hand Circular
MHz Megahertz
OSH Occupational Safety and Health
OSHA Occupational Safety and Health Administration
OT Operational Test
OT&E Operational Test & Evaluation
PDR Preliminary Design Review
QA Quality Assurance
RF Radio Frequency
SPS Subsystem Performance Specification
SRR System Requirements Review
TRD Technical Requirements Document
UHF Ultra High Frequency
VSWR Voltage Standing Wave Ratio
WSEP Weapon System Evaluation Program
Appendix B: Site Layout
Appendix B: Approximated RF Path
Appendix C
Typical-Configuration, Mounting, and Grounding Of Building Junction Box (J-Box)
38 EIG STD SKT-JBOX-001
Appendix C