Attachment 02 - CSC-23604 QASP.pdf
PDF 91 KB Posted
- Solicitation number
- SP4702-23-Q-0019
- Issued by
-
Defense Logistics Agency
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SP4702-23-Q-0019 Amendment 001.pdf | ||
| Building 21 Sprinkler Photos.mp4 | MP4 file | |
| Building 21 Replace 350 Sprinklers - Questions and Answers.docx | DOCX document | |
| Drop Photo.jpg | JPG image | |
| SP4702-23-Q-0019.pdf | ||
| Attachment 01 - DLA BLDG 21 All Floors Deficiencies Appendix.pdf | ||
| Attachment 03 - Wage Rate Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE PLAN
CSC-23604 M&R to Fire Sprinkler Systems, Bldg 21
1. Pre-Performance Phase:
1.1 The Contracting Officer Representative (COR) will review and approve the contractor’s quality control plan.
1.2 COR will coordinate review and approval of safety plan through the Environmental Safety and Occupational Health Office.
1.3 COR will instruct contractor in procedures for obtaining contractor ID badges and building keys.
1.4 Establish points of contact and chain of command.
1.5. Schedule a face to face meeting with the contractor, COR and contracting to review the PWS and DSCC policies.
1.6 Verify contractor qualifications for employees to conduct inspection and repair services.
2. Performance Phase:
2.1 The COR will periodically inspection the contractor’s work to ensure all work is being performed according to the PWS requirements. Major items to be inspected or assessed include:
2.1.1 Monthly, quarterly, semi-annual, and annual inspection recording requirements.
2.1.2 Field verification of equipment inspection and repair.
2.1.3 Backflow preventer inspection completion and submission to City of Columbus.
2.1.4 Timely submission and completeness of required reports.
2.1.5 Timely scheduling and repair of system deficiencies.
2.2 The contractor will be notified in writing of all deficiencies to allow the COR and contractor to keep a written record of the contractor’s performance.
2.3 The COR will document and inform contracting if the contractor’s performance is not meeting the PWS requirements.
2.4 Review and accept the contractor’s WAWF invoice.
3. Post Phase:
3.1 Ensure all contractor badges and building keys are returned.