Attachment_02_Bid_Schedule.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- GEWA-REPLACE HVAC EQUIPMENT Federal contract opportunity
- Solicitation number
- 140P4325Q0061
About this file
The file is a Bid Schedule Excel spreadsheet for a HVAC replacement project at George Washington Memorial Parkway (GEWA) and Theodore Roosevelt Sites (THST) Visitor Centers. The base bid and three optional bid sections detail specific HVAC equipment replacements and modifications, including heat pumps, gas furnaces, circulation pumps, and ductwork improvements across multiple locations. Specific equipment includes various tonnage heat pumps (2.5 to 10 ton), dual fuel systems, and a mini-split HVAC system for an interpretation office, with additional work involving duct sealing, register replacement, and system zoning.
The solicitation is associated with the Department of the Interior National Park Service Northeast Region, with the solicitation number 140P4325Q0061. While the bid schedule contains detailed equipment specifications, no pricing has been entered into the spreadsheet, with all labor and material prices showing as zero. The optional bid sections provide additional scope for enhanced HVAC system improvements, including air return installations, ductwork replacement, zoning system implementation, and comprehensive ductwork cleaning and modification.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P4325Q0061_Amd_0001.pdf | ||
| Attachment_05_Construction_Contract_Administration.pdf | ||
| Attachment_01_Statement_of_Work.pdf | ||
| Sol_140P4325Q0061.pdf | ||
| Attachment_03_Wage_Determination_MD20250113_27_June_2025_THST.pdf | ||
| Attachment_04_Wage_Determination_VA_20250007_28_March_2025_GEWA.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BID SHEET - GEWA & THST REPLACE HVAC UNITS | ||||||||
| Description | Quantity | Unit | Labor Price | Labor Amount | Material Price | Total Amount | ||
| BASE-BID | ||||||||
| Heat pump, selective demolition | 7 | ea | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| GEWA Visitor Center - 2.5 Ton Heat Pump, 70,000 btu 90% LP gas furnace | 1 | ea | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| GEWA Visitor Center - 5 Ton Heat Pump, 110,000 btu 90% LP gas furnace | 1 | ea | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| GEWA Visitor Center - 6 Ton Heat Pump, 130,000 btu 90% LP gas furnace 3-phase | 1 | ea | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| GEWA Visitor Center - 10 Ton Heat Pump, twin (2) 130,000 btu 90% LP gas furnace 3-phase | 2 | ea | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| THST Visitor Center - 2 Ton Heat pump, dual fuel 90% LP gas furnace. Add air supply trunk to both men and women’s bathrooms. Install air supply trunk with 3 air supply registers, and zoning system to the Main Lobby. Apply duct mastic to all connections. | 1 | ea | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| THST Visitor Center - 3 Ton Heat pump, dual fuel 90% LP gas furnace. Modify unit duct work to provide adequate CFM to the office area. Apply duct mastic to all connections. | 1 | ea | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| THST House - Install circulation pumps. | 2 | ea | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Controls and Thermostats | 7 | ea | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| LABOR COST: | $ - 0 | MATERIAL COST: | $ - 0 | |||||
| BASE-BID TOTAL: | $ - 0 |
| Description | Quantity | Unit | Labor Price | Labor Amount | Material Price | Total Amount | ||||
| OPTION BID-1 | ||||||||||
| GEWA Visitor Center - Add air returns in the basement area. | 1 | ea | $ - 0 | $ - 0 | $ - 0 | |||||
| GEWA Visitor Center - Remove and replace rusty 8-inch x 8-inch duct work located in the mechanical room. | 1 | ea | $ - 0 | $ - 0 | $ - 0 | |||||
| GEWA Visitor Center - Install zoning system for the office and theater room hvac units (offices on exterior walls and women’s restroom stay cooler/hotter than rest of spaces in the visitor center). | 1 | ea | $ - 0 | $ - 0 | $ - 0 | |||||
| LABOR COST: | $ - 0 | MATERIAL COST: | $ - 0 | |||||||
| OPTION BID-1 TOTAL: | $ - 0 | |||||||||
| Description | Quantity | Unit | Labor Price | Labor Amount | Material Price | Total Amount | ||||
| OPTION BID-2 | ||||||||||
| GEWA Visitor Center - Remove all tape from trunk connections and seal ductwork with duct mastic. | 1 | all | $ - 0 | $ - 0 | $ - 0 | |||||
| GEWA Visitor Center - Perform duck cleaning of all existing ductwork. | 1 | all | $ - 0 | $ - 0 | $ - 0 | |||||
| GEWA Visitor Center - Replace all supply and return registers. | 1 | all | $ - 0 | $ - 0 | $ - 0 | |||||
| LABOR COST: | $ - 0 | MATERIAL COST: | $ - 0 | |||||||
| OPTION BID-2 TOTAL: | $ - 0 | |||||||||
| Description | Quantity | Unit | Labor Price | Labor Amount | Material Price | Total Amount | ||||
| OPTION BID-3 | ||||||||||
| GEWA Interpretation Office - Disconnect and remove existing HVAC system and associated components in the building. | 1 | ea | $ - 0 | $ - 0 | $ - 0 | |||||
| GEWA Interpretation Office - Install 2-zone mini split HVAC system. | 1 | ea | $ - 0 | $ - 0 | $ - 0 | |||||
| GEWA Interpretation Office - o | Install air share vent between main room of interpretation office and small closet. | 1 | ea | $ - 0 | $ - 0 | $ - 0 | ||||
| LABOR COST: | $ - 0 | MATERIAL COST: | $ - 0 | |||||||
| OPTION BID-3 TOTAL: | $ - 0 |
BASE + OPTIONS TOTAL: $ - 0