The document is a Schedule of Items (SOI) for the Pagosa Ranger District Security Upgrade project for the U.S. Forest Service. The project involves security improvements to the Pagosa RD Office, with a base bid and optional items totaling multiple line items. Base bid work includes installing 1-hour rated walls in the lobby/VIS area, two 1-hour rated security doors, Lenel system security integration with two card readers, demolition of ceiling tiles/flooring, electrical wiring, a remote lock mechanism, and an additional card reader. Optional items include supplemental electrical work and installation of four security cameras.

The solicitation (Number 1145939) is anticipated to be a firm fixed-price contract with a period of performance to be determined. The project addresses security concerns at the Pagosa Ranger District Office, which has experienced increased visitation and lacks proper separation between public and employee spaces. The site visit is scheduled for March 27, 2025, at 10:00 a.m. Mountain Time in Pagosa Springs, CO. The government reserves the right to request additional pricing information and requires bidders to submit unit prices to the nearest $0.01, with the expectation that all line items will be bid upon.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOI

Schedule of Items
USFS - San Juan National Forest

PROJECT TITLE: Pagosa RD Security Upgrade

Award anticipated to be a firm fixed price contract.
Period of Performance: TBD
INSTRUCTIONS: FILL OUT ALL ITEMS BELOW HIGHTLIGHTED IN YELLOW, WORKSHEET WILL AUTOFILL ALL OTHER VALUES. BASE BID ITEMS ARE HIGHLIGHTED IN BLUE AND OPTIONAL ITEMS ARE HIGHLIGHTED IN ORANGE.
LINE ITEMDESCRIPTIONMATERIALS/ TOOLSPAY UNITQTYUNIT COSTTOTAL
BASE ITEMS
1.11-Hour Rated Walls (Lobby/VIS Area)Steel studs, gypsum board (fire resitant), insulation (fire resitant), frame/hardware, lumber, screws, sealent/caulk, joint compound/tape, paintLS1
1.21-Hour Rated Security Doors (2 Total)
(3' x 7')Door frames, Two 1-hour fire rated doors (w/window), accessible hardwareLS1
1.3Security IntegrationIntegration with existing Lenel System, 2 card readersLS1
1.4Demolition of Ceiling Tiles/FlooringLabor and toolsLS1
1.5ElectricalWiring, breakers, connections, etc.LS1
1.6Remote LockRemote lock mechanism for front doorLS1
1.7Additional Lenel Card Reader1 Lenel card reader for front door, integration with existing systemLS1
SUB-TOTAL (BASE):
OPTIONAL ITEMS
1.8Additional Electrical WorkWiring, breakers, connections, etc.LS1
1.9Security Cameras and Installation (4 Cameras)Labor and equipmentLS1
SUB-TOTAL (OPTIONAL):
TOTAL (BASE+OPTIONAL):
SCHEDULE NOTES:

The bidder must bid on all items. Only unit prices to the nearest $0.01 will be accepted. Where extended unit prices do not agree with totals or subtotals shown by the bidder, the unit price governs except as provided under the Federal Acquisition Regulations (FAR) 14.407, Mistakes in bids.