Attachment 0010 Request for Use of Prohibited Material.pdf
PDF 144 KB Posted
- Solicitation number
- W56HZV-19-R-0023
About this file
This solicitation requests proposals for an Advanced Multi-Purpose Round Gunner's Auxiliary Sight in support of the Abrams Family of Vehicles. The Department of the Army Materiel Command TACOM Life Cycle Management Command will award a new requirements contract containing a base year and four option years as a firm fixed price contract. The contract aims to support Program Directorate Main Battle Tank Systems, Integrated Logistics Support Center, and Foreign Military Sales requirements. A single award is anticipated to the offer representing the best value determined through a tradeoff process evaluating factors including price, technical approach, and past performance. Proposals are due no later than 18 December 2020, with questions accepted until 12:00 PM that day. Award will be made to the responsible offeror providing the best overall value to the government, not necessarily the lowest price.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 0010
Request for Use of Prohibited Materials
Distribution Statement A – Approved for Public Release; distribution unlimited
1. General Information Requesting Company Date of Request Point of Contact
Prohibited material for which waiver is requested
2. Explanation of Use Instructions: Provide a description of the parts/processes where the prohibited material will be used. Identify all components/parts which will contain the prohibited materials upon vehicle delivery. Indicate the specific variant(s) the components/parts are on. Identify whether or not the material will be required for operation or maintenance (including during vehicle rebuild). A separate spreadsheet may be attached listing the specific parts/processes, if needed.
3. Health Hazard Instructions: Provide an explanation of any health hazards associated with the use or presence of the prohibited material. Include likely routes of exposure to both the operator and the maintainer. Identify if any personal protective equipment (PPE) would be required as a result of using this material. Include the type of PPE and under what circumstances it would be required (manufacturing, operation, maintenance, etc.).
4. Analysis of Alternatives Instructions: Identify all alternatives which were considered for the prohibited material. If the alternative is only for specific applications, identify what type of parts it is a potential alternative for. Include explanation as to why each cannot be implemented.
5. Technical Justification
Instructions: Provide technical justification for the use of prohibited material. Explain why it is necessary and why it cannot be eliminated.
6. Program Risk Instructions: Describe the program risk(s) (cost, schedule, and performance) associated with denial of this request by the Government.
7. Get Well Plan Instructions: Explain if and how you would eliminate the use of this prohibited material during the production phase of the program.
| 1 General Information: |
| Requesting Company: |
| Date of Request: |
| Point of Contact: |
| Prohibited material for which waiver is requested: |
| 2 Explanation of Use: |
| Instructions Provide a description of the partsprocesses where the prohibited material will be used Identify all componentsparts which will contain the prohibited materials upon vehicle delivery Indicate the specific variants the componentsparts are on Identify whether or not the material will be required for operation or maintenance including during vehicle rebuild A separate spreadsheet may be attached listing the specific partsprocesses if neededRow1: |
| 3 Health Hazard: |
| Instructions Provide an explanation of any health hazards associated with the use or presence of the prohibited material Include likely routes of exposure to both the operator and the maintainer Identify if any personal protective equipment PPE would be required as a result of using this material Include the type of PPE and under what circumstances it would be required manufacturing operation maintenance etcRow1: |
| 4 Analysis of Alternatives: |
| Instructions Identify all alternatives which were considered for the prohibited material If the alternative is only for specific applications identify what type of parts it is a potential alternative for Include explanation as to why each cannot be implementedRow1: |
| 5 Technical Justification: |
| why it is necessary and why it cannot be eliminatedRow1: |
| 6 Program Risk: |
| Instructions Describe the program risks cost schedule and performance associated with denial of this request by the GovernmentRow1: |
| 7 Get Well Plan: |
| Instructions Explain if and how you would eliminate the use of this prohibited material during the production phase of the programRow1: |
File details come from the government source that posted it. Updated .