Attachment 001- Schedule of Items.pdf

PDF 235 KB Posted

Attached to
GAOA Bessey Group Electrical
Solicitation number
1282B125R0009
Issued by

About this file

This is a Schedule of Items document for electrical upgrades at the Bessey Ranger District's campgrounds, listing three line items that require contractor pricing. The work includes mobilization (Item 01), removal and replacement of ten existing electrical systems and pedestals at the Group Campsite (Item 02), and removal and replacement of eleven existing electrical systems and pedestals at Cedar Loop Campsite (Item 03). All items are to be priced as lump sum amounts.

The document specifies that bidders must provide pricing for all items to the nearest $0.01, with unit prices taking precedence over extended totals in case of discrepancies. The government reserves the right to request additional pricing information to evaluate reasonableness. This schedule appears to be part of solicitation number 1282B125R0009 for the Department of Agriculture Forest Service's Rocky Mountain Region.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GAOA Bessey Group Electrical Upgrades Bessey Ranger District

Schedule of Items

Item No.

Description Quantity Unit of Measure

Unit Price

Total

01 Mobilization 1 LS

02 Remove and replacement of ten

(10) existing electrical system and pedestals at Group Campsite per Specifications and Drawings

1 LS

03 Remove and replacement of eleven (11) existing electrical system and pedestals at Cedar Loop Campsite per Specifications and Drawings

1 LS

Total Price:

B.2 SCHEDULE NOTES

The bidder must bid on all items. Only unit prices to the nearest $0.01 will be accepted. Where extended unit prices do not agree with totals or subtotals shown by the bidder, the unit price governs except as provided under the Federal Acquisition Regulations (FAR) 14.407, Mistakes in bids.

The Government reserves the right to request additional information as required to fully understand the contractor’s pricing structure and determine its reasonableness.

Attachment 001- Schedule of Items

LS= Lump Sum

File details come from the government source that posted it. Updated .