This is Amendment 0001 to solicitation 1282B125R0009, issued by the USDA Forest Service SPOC Intermountain office, providing a Web Soil Survey map/description and answers to contractor questions about an electrical system replacement project.

The amendment addresses key technical questions about the project, confirming that: the predominant soil is sand, HDPE conduit is acceptable if rated for electrical use, the period of performance is March 3-May 16, 2025, and the contractor is responsible for coordinating with Custer Public Power District (CPPD) regarding transformer upgrades and billing. It clarifies that RV pedestal specifications can be found in Section 262726 of the Statement of Work, and addresses Buy American Requirements for NEMA 3R panel boards. Contractors must acknowledge receipt of this amendment by either completing section 19 on SF-1442 or submitting a signed SF-30 to be considered responsible.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1282B125R0009 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

82B1

WASHINGTON DC 20250-0001

1400 INDEPENDENCE AVE SW MS-1138

SPOC INTERMOUNTAIN

USDA FOREST SERVICE

GAOA01/28/20250001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

01/06/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to:

- Provide Attachment 005- Map and Description - Web Soil Survey

- Provide questions and answers. (see page 2)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

JEFFREY R. BLACK

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Acknowledgment of this amendment is required in order for the contractor to be considered responsible. This can be accomplished by completing section 19 on the SF-1442 or by submitting the signed SF-30.

Period of Performance: 03/03/2025 to 05/16/2025

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

SF-30 Continuation

Question 1: Do you know what the soil conditions are? If it is all sand trenching is not practical, it would need to be dug in with an excavator or plowed.

Answer 1: Sand is the predominant soil. See Attachment 005- Map & Description from Web Soil Survey

Question 2: Does the conduit in the ground need to be PVC or can it be hdpe?

Answer 2: Conduit can be HDPE, as long as it is rated for electrical application.

Question 3: Do you know when the expected start date would be?

Answer 3: Period of Performance is March 3, 2025 – May 16, 2025.

Question 4: Do you know if the utility company (Custer Public Power) has been contacted about the project? CPPD mentioned they are aware of the project but have not received any specific information yet.

Answer 4: During project development, Custer Public Power was contacted by the designing engineer. They have not been provided with a final design.

Question 5: There is a note on the plans stating: "Any Aid-to-Construction' fees from the utility will be paid directly by the contractor." Could you please clarify if this means CPPD will be billing the contractor directly for the transformer and any upgrades associated with this project?

Answer 5: Contractor will be responsible for coordinating with CPPD for upgrades and billing for this project.

Question 6: I noticed that the specifications for the type of pedestals to be installed were not explicitly stated. Could you kindly confirm the specific requirements or direct me to the relevant section of the documentation if I may have overlooked it?

Answer 6: See Section 262726 - Wiring Devices, Part 2 – PRODUCTS, 2.2 RV Pedestal in Attachment 002- Statement of Work.

Question 7: There are three exterior panel boards listed as NEMA 3R. Our supplier has stated that they won’t be able to meet the FAR 52.225-9 and -10 that force all assembly in the USA with 65% US components. These particular items on this project are assembled in Mexico by a NAFTA trade partner.

Would this be acceptable for use on this project?

Answer 7: Please see FAR 52.225-10 Notice of Buy American Requirement- Construction Materials for details on submitting requests for determinations of inapplicability or alternate offers.

Question 8: Could you please confirm if we are responsible for handling the entire process with the utility company regarding the new transformer item? If we are, could you also let me know the cost of the transformer?

Answer 8: Yes, the Contractor is responsible for working with the utility company. The contractor will need to contact the utility company for transformer cost.