| Attachment 0007 – Sample Price Breakdown Worksheet with Rates 86615621Q00002 | | | | |
| BASE PERIOD: 12 Months | | | | |
| Task: 0001 - Routine Inspections- Group 1 (Region 1) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 25 | $ 475.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 25 | $ 475.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 950.00 |
| Task: 0002 - Routine Inspections- Group 2 (Region 1) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 5 | $ 95.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 3 | $ 57.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 152.00 |
| Task: 0003 - Routine Inspections - Group 3 (Region 1) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 6 | $ 114.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 8 | $ 152.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 266.00 |
| Task: 0004 - Routine Inspections - Group 4 (Region 2) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 9 | $ 171.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 3 | $ 57.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 228.00 |
| Task: 0005 - Routine Inspections - Group 5 (Region 2) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 6 | $ 114.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 7 | $ 133.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 247.00 |
| Task: 0006 - Routine Inspections - Group 6 (Region 2) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 8 | $ 152.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 3 | $ 57.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 209.00 |
| Task: 0007 - Routine Inspections - Group 7 (Region 3) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 6 | $ 114.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 8 | $ 152.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 266.00 |
| Task: 0008 - Routine Inspections - Group 8 (Region 3) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 5 | $ 95.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 2 | $ 38.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 133.00 |
| Task: 0009 - Incentives - Routine Inspections (3 percent) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 6 | $ 114.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 2 | $ 38.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 152.00 |
| Task: 0010 - Transition-In and Quality Assurance Control Plan | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 10 | $ 190.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 5 | $ 95.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 285.00 |
| Total Base Price | $ 2,888.00 |
| NOTE: | |
| Quoter must also provide a breakdown of costs by task (labor category, hours & rate) | |
| This list will be used to understand the contractor's methodology | |
| Rates must be fully loaded and must be inclusive of escalation rates per year, fringe, overhead, training, G&A, and fee/profit. | |
| ** Round total to whole numbers (example: $201,750.00); do not use decimals places (example: $201,750.50) | |
Sample Price Breakdown Worksheet &"-,Bold"With Rates Attachment 001
OPTION 1
| Attachment 0007 – Sample Price Breakdown Worksheet with Rates 86615621Q00002 | | | | |
| OPTION 1: 12 Months | | | | |
| Task: 0001 - Routine Inspections- Group 1 (Region 1) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 25 | $ 475.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 25 | $ 475.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 950.00 |
| Task: 0002 - Routine Inspections- Group 2 (Region 1) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 5 | $ 95.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 3 | $ 57.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 152.00 |
| Task: 0003 - Routine Inspections - Group 3 (Region 1) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 6 | $ 114.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 8 | $ 152.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 266.00 |
| Task: 0004 - Routine Inspections - Group 4 (Region 2) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 9 | $ 171.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 3 | $ 57.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 228.00 |
| Task: 0005 - Routine Inspections - Group 5 (Region 2) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 6 | $ 114.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 7 | $ 133.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 247.00 |
| Task: 0006 - Routine Inspections - Group 6 (Region 2) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 8 | $ 152.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 3 | $ 57.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 209.00 |
| Task: 0007 - Routine Inspections - Group 7 (Region 3) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 6 | $ 114.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 8 | $ 152.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 266.00 |
| Task: 0008 - Routine Inspections - Group 8 (Region 3) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 5 | $ 95.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 2 | $ 38.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 133.00 |
| Task: 0009 - Incentives - Routine Inspections (3 percent) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 6 | $ 114.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 2 | $ 38.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 152.00 |
| Total Base Price | $ 2,603.00 |
| NOTE: | |
| Quoter must also provide a breakdown of costs by task (labor category, hours & rate) | |
| This list will be used to understand the contractor's methodology | |
| Rates must be fully loaded and must be inclusive of escalation rates per year, fringe, overhead, training, G&A, and fee/profit. | |
| ** Round total to whole numbers (example: $201,750.00); do not use decimals places (example: $201,750.50) | |
OPTION 2
| Attachment 0007 – Sample Price Breakdown Worksheet with Rates 86615621Q00002 | | | | |
| OPTION 2: 12 Months | | | | |
| Task: 0001 - Routine Inspections- Group 1 (Region 1) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 25 | $ 475.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 25 | $ 475.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 950.00 |
| Task: 0002 - Routine Inspections- Group 2 (Region 1) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 5 | $ 95.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 3 | $ 57.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 152.00 |
| Task: 0003 - Routine Inspections - Group 3 (Region 1) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 6 | $ 114.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 8 | $ 152.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 266.00 |
| Task: 0004 - Routine Inspections - Group 4 (Region 2) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 9 | $ 171.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 3 | $ 57.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 228.00 |
| Task: 0005 - Routine Inspections - Group 5 (Region 2) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 6 | $ 114.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 7 | $ 133.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 247.00 |
| Task: 0006 - Routine Inspections - Group 6 (Region 2) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 8 | $ 152.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 3 | $ 57.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 209.00 |
| Task: 0007 - Routine Inspections - Group 7 (Region 3) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 6 | $ 114.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 8 | $ 152.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 266.00 |
| Task: 0008 - Routine Inspections - Group 8 (Region 3) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 5 | $ 95.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 2 | $ 38.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 133.00 |
| Task: 0009 - Incentives - Routine Inspections (3 percent) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 6 | $ 114.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 2 | $ 38.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 152.00 |
| Total Base Price | $ 2,603.00 |
| NOTE: | |
| Quoter must also provide a breakdown of costs by task (labor category, hours & rate) | |
| This list will be used to understand the contractor's methodology | |
| Rates must be fully loaded and must be inclusive of escalation rates per year, fringe, overhead, training, G&A, and fee/profit. | |
| ** Round total to whole numbers (example: $201,750.00); do not use decimals places (example: $201,750.50) | |
OPTION 3
| Attachment 0007 – Sample Price Breakdown Worksheet with Rates 86615621Q00002 | | | | |
| OPTION 3: 12 Months | | | | |
| Task: 0001 - Routine Inspections- Group 1 (Region 1) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 25 | $ 475.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 25 | $ 475.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 950.00 |
| Task: 0002 - Routine Inspections- Group 2 (Region 1) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 5 | $ 95.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 3 | $ 57.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 152.00 |
| Task: 0003 - Routine Inspections - Group 3 (Region 1) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 6 | $ 114.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 8 | $ 152.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 266.00 |
| Task: 0004 - Routine Inspections - Group 4 (Region 2) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 9 | $ 171.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 3 | $ 57.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 228.00 |
| Task: 0005 - Routine Inspections - Group 5 (Region 2) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 6 | $ 114.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 7 | $ 133.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 247.00 |
| Task: 0006 - Routine Inspections - Group 6 (Region 2) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 8 | $ 152.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 3 | $ 57.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 209.00 |
| Task: 0007 - Routine Inspections - Group 7 (Region 3) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 6 | $ 114.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 8 | $ 152.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 266.00 |
| Task: 0008 - Routine Inspections - Group 8 (Region 3) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 5 | $ 95.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 2 | $ 38.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 133.00 |
| Task: 0009 - Incentives - Routine Inspections (3 percent) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 6 | $ 114.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 2 | $ 38.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 152.00 |
| Total Base Price | $ 2,603.00 |
| NOTE: | |
| Quoter must also provide a breakdown of costs by task (labor category, hours & rate) | |
| This list will be used to understand the contractor's methodology | |
| Rates must be fully loaded and must be inclusive of escalation rates per year, fringe, overhead, training, G&A, and fee/profit. | |
| ** Round total to whole numbers (example: $201,750.00); do not use decimals places (example: $201,750.50) | |
OPTION 4
| Attachment 0007 – Sample Price Breakdown Worksheet with Rates 86615621Q00002 | | | | |
| OPTION 4: 12 Months | | | | |
| Task: 0001 - Routine Inspections- Group 1 (Region 1) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 25 | $ 475.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 25 | $ 475.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 950.00 |
| Task: 0002 - Routine Inspections- Group 2 (Region 1) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 5 | $ 95.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 3 | $ 57.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 152.00 |
| Task: 0003 - Routine Inspections - Group 3 (Region 1) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 6 | $ 114.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 8 | $ 152.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 266.00 |
| Task: 0004 - Routine Inspections - Group 4 (Region 2) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 9 | $ 171.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 3 | $ 57.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 228.00 |
| Task: 0005 - Routine Inspections - Group 5 (Region 2) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 6 | $ 114.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 7 | $ 133.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 247.00 |
| Task: 0006 - Routine Inspections - Group 6 (Region 2) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 8 | $ 152.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 3 | $ 57.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 209.00 |
| Task: 0007 - Routine Inspections - Group 7 (Region 3) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 6 | $ 114.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 8 | $ 152.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 266.00 |
| Task: 0008 - Routine Inspections - Group 8 (Region 3) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 5 | $ 95.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 2 | $ 38.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 133.00 |
| Task: 0009 - Incentives - Routine Inspections (3 percent) | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 6 | $ 114.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 2 | $ 38.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 152.00 |
| Task: 0010 - Transition-Out | | | | |
| Labor Category: | Prime or Sub | Hourly Rate | Volume/Hours | Total Per Year |
| Example - Inspector | Prime | $ 19.00 | 10 | $ 190.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Example - Inspector | Subcontractor | $ 19.00 | 5 | $ 95.00 |
| | | | $ - 0 |
| | | | $ - 0 |
| | | | $ - 0 |
| Total Labor | | | | $ 285.00 |
| Total Base Price | | | | $ 2,888.00 |
| NOTE: | | | | |
| Quoter must also provide a breakdown of costs by task (labor category, hours & rate) | | | | |
| This list will be used to understand the contractor's methodology | | | | |
| Rates must be fully loaded and must be inclusive of escalation rates per year, fringe, overhead, training, G&A, and fee/profit. | | | | |
| ** Round total to whole numbers (example: $201,750.00); do not use decimals places (example: $201,750.50) | | | | |