About this file

This combined synopsis/solicitation requests quotations for construction inspection services. The solicitation seeks a contractor to perform various construction inspection tasks at residential healthcare facilities across the continental United States for a one-year base period from March 1, 2021 to February 28, 2022, with four one-year option periods. The requirement is set aside for 8(a) small businesses and involves line items for routine inspections in different regions. Questions are due by November 24, 2020, with quotations due by December 14, 2020. The selected contractor will provide inspection services in accordance with the performance work statement and apply commercial items FAR clauses 52.212-1 through 52.212-5. The incumbent contractor is Maiden & Associates, PC.

View the file

Other files for this federal contract opportunity

Other files attached to Construction Inspection Services (Amendment 0001), newest first.
File Type Posted
Attachment 0006 - Sample Labor Category - Hours Breakdown Worksheet Without Rates.xlsx XLSX spreadsheet
RFQ 86615621Q00002.pdf PDF
Attachment 0002 - Quality Assurance Surveillance Plan (QASP).doc DOC document
Attachment 0007 - Sample Price Breakdown Worksheet with Rates.xlsx XLSX spreadsheet
Attachment 0005 - Description Region 3.doc DOC document
Attachment 0004 - Description Region 2.doc DOC document
Attachment 0003 - Description Region 1.doc DOC document
Attachment 0001 - Performance Work Statement.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

Solicitation Amendment 0001, 86615621Q00002

OHP Construction Inspection Services

Government's Responses to Industry Questions Solicitation #: 86615621Q00002

No. Reference Questions Answers

1 General Could we know the name of the incumbent contractor? The incumbent contractor is Maiden & Associates, PC.

Attachment 0001, the Performance

Work Statement

(PWS)

First in Section 1.9 of the PWS, the below is stated, The Contractor/Project Manager shall possess three years of recent experience in managing and overseeing employees who perform construction inspection activities, or a total of five years of experience in overseeing employees performing a combination of residential care facility, and commercial construction inspections, with a minimum of one of those five years being residential care facilities.

It appears there are two ways to accomplish the experience.

The first part of the statement says that, The Contractor/Project Manager shall possess three years of perform construction inspection activities [...]

And the later appears to state that if the Contractor/Project

Manager does not have "three years of recent experience" then they need, [A] total of five years of experience in overseeing employees performing a combination of residential care facility, and commercial construction inspections, with a minimum of one of those five years being residential care facilities.

Are we to understand that if the Contractor has three years of perform construction inspection activities that the latter is immaterial? In this, we possess over a decade in overseeing employees whom perform construction inspection activities verifiable vis-a-vis US Government contracts so is the residential care facility oversight experience necessary?

Per Section 1.9 of the PWS, the Contractor/Project Manager shall possess:

Three years of recent experience in managing and overseeing employees who perform construction inspection activities. The contract manager ... must also have at least three years of satisfactory experience in performing construction inspections which demonstrate the knowledge and experience listed below for inspectors. Also see

PWS Section 4.5.2.2 for additional required qualifications.

OR

A total of five years of experience in overseeing employees performing a combination of residential care facility, and commercial construction inspections with a minimum of one of those five years being residential care facilities. The contract manager ... must also have at least three years of satisfactory experience in performing construction inspections which demonstrate the knowledge and experience listed below for inspectors. Also see PWS Section 4.5.2.2 for additional required qualifications.

3 General What is the number of inspections that have been completed in years past?

Approximately 2,000 inspections were completed under the last contract.

4 General How many facilities have been inspected in the past? Approximately 80 facilities over the period of contract

5 General

There were several references to housing and multifamily housing. Please confirm the focus of this program is residential healthcare facilities.

Residential Healthcare Facilities only.

6 General

Historically, the inspections for this program have been completed in person. Will HUD allow remote inspections to be completed rather than in-person inspections? If so, would remote inspections be allowed long-term or only during

COVID-related restrictions?

Under the current contract, virtual inspections are being allowed by virtue of a Mortgagee Letter issued by HUD but are not considered to be the norm. Interim procedures were put in place to address site access issues related to Section 232 Mortgage Insurance Applications

During the COVID-19 Pandemic. On July 31, 2020, Mortgagee Letter

(ML) 2020-25 was issued to mortgagees notifying them of an extension of interim procedures detailed in ML 20-15 which address site access issues related to Section 232 mortgage insurance applications during the COVID-19 pandemic. Part of the ML states the following:

Inspections on New Construction, Substantial Rehabilitation and

Section 241(a)s

For monthly construction inspections on Section 232 new construction, substantial rehabilitation, or Section 241(a) within 60 days of the issuance of this Mortgagee Letter, ORCF will allow a deviation in the normal process for performing these meetings as follows:

• In lieu of an in-person inspection, a live, virtual inspection of building areas and construction that would normally be viewed in the inspection using a video app (e.g. FaceTime) will be allowed.

If this option is chosen, general contractor staff will direct the video from the construction site, and the supervisory architect and HUD contract inspector may participate virtually (if either or both are not attending the inspection in-person).

• The HUD-92448-ORCF (Contractor’s Requisition) may be signed electronically.

• Pictures must be sent electronically to the supervisory architect and the HUD contract inspector.

The program office will work with the contractor as issues such as

COVID-19 come to light.

Attachment 0001, the Performance

Work Statement

(PWS)

Section 5.2.1.4.2 refers to printed photographic records. Please clarify if this means printed, printable, or something else?

PWS Section 5.2.1.4.2. states, "Observe and report on construction activities of on-site and off-site construction."

8 General Will HUD provide inspection scheduling and tracking software, or will that be the contractor’s responsibility?

This is the responsibility of the contractor.

9 General

Will HUD provide all the required forms, checklists, and report templates or will those need to be developed by the contractor?

HUD forms are available on HUD Clips

(https://www.hud.gov/program_offices/administration/hudclips)

Checklists to be developed by Contractor

Examples of forms and cover letter will be provided by previous

Contractor during Transition-In period

Solicitation and

Attachment 0001, the PWS

Please clarify the meaning of the inspections listed in Item

0001 through Item 0046. Does the number of inspections described there refer to a facility or physical location for with multiple inspections will be required? (e.g. that will each require a site visit)

Routine Inspections in Line Item Numbers (LINs) 0001 - 0046 shall be performed in strict compliance with the Performance Work

Statement (PWS), Quality Assurance Surveillance Plan (QASP), Attachments 0003 - 0005, and all specifications, terms, conditions, clauses, and all other provisions contained in the solicitation and subsequently, in the contract. Routine inspections in LINs 0001 -

0046 tie back to the required work in the PWS and Attachments 0003

- 0005. For each of the LIN, the contractor shall perform routine inspection described in the PWS in the regions defined in

Attachments 0003 - 0005.

11 General

What has the typical duration of an inspection been in this program?

The number of inspections is defined by the scope and duration of the project. For a 223(a)(7) or 223(f), the project may only require one inspection. For all others the range of duration is 12-18 months with a

9 and 12-month warranty inspection after construction is completed.

12 Solicitation

On Group 7 of the solicitation, the bid sheet calls for 80 inspections for the base period. Are these 80 different projects with 6 different inspections each or a total of 80 inspections for the entire base period?

Under LIN 7 of the base period, up to 80 Route Inspections in Group

7 (Region 3) Arizona, Iowa, Kansas, Montana, Nebraska, North

Dakota, Oregon, South Dakota, and Washington are required.

13 General

Besides being an 8(a) company, do you require any special certifications to qualify for this contract?

This requirement is set-aside for 8(a) Small business concerns on a competitive basis. Interested quoters are required to read the requirements of the PWS and solicitation and must submit all requested items. The evaluation of this solicitation will utilize evaluation criteria pursuant to FAR 13.5 in conjunction with FAR

19.8 with the aim of achieving best value. The Government intends to make an award to the Lowest Price Technically Acceptable responsible offeror who represents the best value to the Government.

14 General

Clarify/confirm if this solicitation is for contractors and/or

MEP FP design engineering consultants?

This requirement is set-aside for 8(a) Small business concerns on a competitive basis. The assigned NAICS is 541350 – “Building

Inspection Services”/541611 – “Administrative Management and

General Management Consulting Services” with a size standard of

$8M and $16.5M, respectively. The anticipated contract type is a

Firm Fixed Price (FFP).

15 General

Is this a new requirement or was there a previous HUD requirement? (if there was a previous requirement contract, what was that contract number?)

The requirement is not new. The requirement is a follow-on to the existing contract, DU100R-15-D-02. DU100R-15-D-02 was awarded as a Single Award Indefinite Delivery, Indefinite Quantity (IDIQ) contract to Maiden & Associates, PC on September 25, 2015.

https://www.hud.gov/program_offices/administration/hudclips

16 General

Could you please tell me if the Combined

Synopsis/Solicitation posted as solicitation number

86615621Q00002 will be a follow-on requirement to any work performed currently or in the past, or will this be a new requirement?

Please see response to question 15 above.

17 General If possible, can you please provide the most recent contract or task order number?

Please see response to question 15 above.

18 General Please confirm that no bonding is required under this contract. This requirement is for a service contract and not for a construction contract; bonding is not required.

19 General

As an 8(a) contract, are there any limitations on subcontracting and/or teaming agreements?

See the solicitation regarding required subcontracting arrangements.

See 13 CFR § 125.6 for the prime contractor's limitations on subcontracting, and specifically for an limitations on subcontracting relevant to 8(a) contracts.

Also see FAR 52.219-14, "Limitations on Subcontracting" regarding contracts that have been set aside for small business concerns or 8(a) participants.

20 General Does the government intend to award one or multiple awards as a result of this solicitation?

The government intends to award a single FFP contract

21 General Is there an incumbent contractor in place for this contract? If so, can you please provide the existing contract amount?

Please see response to question 15 above.

22 General

Please clarify what the government means by periodic inspections. Is it possible to get an accurate number of the inspections that will be required under this contract?

Monthly inspections will be required for each facility. In addition, a

9- and 12-month warranty inspection will be required for each facility.

Attachment 0001, the Performance

Work Statement

(PWS)

Paragraphs 1.2 Background and 1.9 Special Qualifications appears to have contradictory information regarding who is required to assist other parties in utilizing HUD forms and procedures relative to the construction of OHP project development. 1.2 states that HUD is, while 1.9 states that the contractor is. Please clarify.

Section 1.2 provides historical and projected context for the requirement. The contractor will be required to assist as required in

Section 1.9 while performing inspections. HUD Construction

Manager will also assist as needed any other time.

24 Solicitation

Page 18, HUDAR 2452.208-71 states requirements for reproduction of reports. Would the government consider allowing electronic submissions of HUDAR 2452.208-71

Reproduction of Reports?

Note that HUDAR 2408.802-70, is required in solicitations and contracts where the Contractor is required to produce, as an end product, publications or other written materials. This clause does not limit reproduction of reports and/or documents solely to print or written format. For specifics regarding submission and/or production of reports, please see Attachment 0001, the PWS and the 508

Compliance Statement in the solicitation.

Solicitation and

General

The Pricing sheet based on number of individual inspections

(for example area 1) in Base year references a quantity of 147;

are those quantities including the individual inspections per facility or are they for each facility?

Attachment 0001, the Performance

Work Statement

(PWS)

With regards to inspector's experience, Section 4.5.2.2 states that:

three years of recent residential care facility construction inspection activities or five years of experience in a combination of residential care facility, and commercial construction inspections, with a minimum of one of those five years being residential care facilities.

A) Would the government consider allowing inspectors with substantial experience in the field of construction but not specific to experience in residential care facilities in remote hard to reach areas?

B) Would the government consider allowing an in-house residential care facility inspector expert and/or PM to review and approve the inspections of qualified construction inspectors when an experienced residential care facility inspector is not available in certain remote areas?

For qualification and experience requirements, contractors shall adhere to the requirements of the Solicitation and PWS. Interested

Quoters are to respond with their proposed Technical Approach:

that demonstrates logical and feasible methods for meeting the requirements described in PWS task 1.13, 4.5.2.2, and 5.2.1 through

5.2.5.

27 General Would the government be able to share a sample of each completed report to the government's satisfaction?

An example of previous reports will be provided to the incoming contractor during the transition-In period.

28 General

I know that this RFQ is a SBA 8a compete requirement. Is a company that is currently in the 8a program eligible to be considered for award of this solicitation/contract if it teams through a teaming agreement with a company which has already graduated from the 8a program?

This requirement is set-aside for 8(a) small business concerns on a competitive basis. A company currently in the 8(a) programs can team with a company who is not in the 8(a) program. Ensure to adhere to any limitations on subcontracting and/or any SBA requirements regarding Joint Ventures.

29 General

I am researching Solicitation # 86615621Q00002

“Construction Inspection Services” and was attempting to identify the correct incumbent contract. Is the correct incumbent contract # DU100R15D02 with MAIDEN AND

ASSOCIATES ARCHITECTS ENGINEERS AND

PLANNING”?

If not, could you kindly identify the correct incumbent contract for these services?

Please see response to question 15 above.

RFQ Amendment 000001, NIHES201800011, Laboratory Animal Diagnostic Testing Services
1
RFQ Amendment 000001, NIHES201800013, Language Translation Scientific Services
Amendment 000001 NIHES201800013 Other
one
Page 1
2-42
This solicitation is being accomplished under FAR Subpart 12.6 – Streamlined Procedures for Evaluation and Solicitations for Commercial Items in conjunction with FAR Subpart 13.5 - Simplified Procedures for Certain Commercial Items.
SUPPLY AND SERVICES: The Contractor shall provide the supplies and services in accordance with the Line Item Numbers in the SOW.
7.0 Hours of Operation
8.0 Special Qualifications
NOT APPLICABLE
9.0 Post Award/Kickoff Conference
FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
Questions from Offerors concerning the Solicitation
SOCIOECONOMIC PARTICIPATION
SOCIOECONOMIC PARTICIPATION
topmostSubform[0]:
Page1[0]:
IDCode[0]:
Page[0]: 1
Pages[0]: 6
AmendNo[0]: 0001
EffDate[0]: 12/08/2020
ReqNo[0]: RCS-H-2020-00041
ProjNo[0]:
IssCode[0]:
IssuedBy[0]: US DEPARTMENT OF HUD

OFFICE OF THE CHIEF PROCUREMENT OFFICE

451 SEVENTH STREET SW

AdmCode[0]:
AdminBy[0]: US DEPARTMENT OF HUD

OFFICE OF THE CHIEF PROCUREMENT OFFICER

451 SEVENTH STREET SW

ContName[0]:
ContStrt[0]:
ContCnty[0]:
ContSt[0]:
ContZIP[0]:
Code[0]:
FacCode[0]:
SolChgYs[0]: Yes
SolChgNo[0]: Off
SolAmdNo[0]: 86615621Q00002
AmendDate[0]: 11/19/2020
ModNo[0]:
ModDate[0]:
NoCopies[0]: 1
Amended[0]: Yes
OffrExt[0]: Yes
OffrNoEx[0]: Off
ApprData[0]:
ChgeOrd[0]: Off
ChgeOrder[0]:
Modify[0]: Off
SuppAgre[0]: Off
SuppAuth[0]:
ModOthr[0]: Off
OthrSpec[0]:
NoReq[0]: Off
Require[0]: Off
Copies[0]:
Descript[0]: The purpose of this Amendment is to: (1) provide the Government's responses to industry questions and (2) extend the solicitation closing date The following changes are made as a result of this amendment:

- The Government's responses to industry questions are provided on pages 2 to 7, herein.

- The solicitation closing date is hereby extended from December 14, 2020, 2:00PM EST to December 17, 2020, 2:00PM EST.

*** There are no changes to the solicitation as a result of this amendment.***

SignName[0]:
SignTitl[0]:
ContDate[0]:
CoName[0]: UCHE CHE LOGAN
CoTitle[0]:
CODate[0]: 12/08/2020

File details come from the government source that posted it. Updated .