Attachment 0002 - Quality Assurance Surveillance Plan (QASP).doc
DOC document 151 KB Posted
- Attached to
- Construction Inspection Services (Amendment 0001) Federal contract opportunity
- Solicitation number
- 86615621Q00002
About this file
This document outlines a quality assurance surveillance plan (QASP) for construction inspection services. The Department of Housing and Urban Development will use the QASP to monitor contractor performance and ensure required standards are met. Key deliverables include construction start letters, inspection reports, requisition forms, and final construction records, which the contractor must submit electronically within specified timeframes. Acceptable quality levels are defined, and inspection methods such as 100% reviews are described. The roles of contracting personnel are identified, and performance assessment and corrective action processes are detailed. Documentation requirements and data analysis procedures are also specified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 86615621Q00002-0001.pdf | ||
| Attachment 0006 - Sample Labor Category - Hours Breakdown Worksheet Without Rates.xlsx | XLSX spreadsheet | |
| RFQ 86615621Q00002.pdf | ||
| Attachment 0007 - Sample Price Breakdown Worksheet with Rates.xlsx | XLSX spreadsheet | |
| Attachment 0005 - Description Region 3.doc | DOC document | |
| Attachment 0004 - Description Region 2.doc | DOC document | |
| Attachment 0003 - Description Region 1.doc | DOC document | |
| Attachment 0001 - Performance Work Statement.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE
86615621Q00002 Attachment 0002
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
CONSTRUCTION INSPECTION SERVICES
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
1 INTRODUCTION
This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statements (PWS) entitled: Task Order Construction Inspection Services Region 1, Task Order Construction Inspection Services Region 2, and Task Order Construction Inspection Services Region 3. This plan sets forth the procedures and guidelines the Department of Housing and Urban Development (HUD), Office of Healthcare Programs (OHP) will use in ensuring the required performance standards or services levels are achieved by the Contractor.
1.1 Purpose
1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the Contractor is meeting the performance standards/quality levels identified in the PWS and the Contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.
1.1.2 This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the Contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.
1.2 Performance Management Approach
1.2.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the Contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by OHP to monitor and manage the Contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the Contractor.
1.2.2 Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the Contractor to play a large role in how the work is performed, if the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the Contractor flexibility to continuously improve and innovate over the course of the contract if the critical outcomes expected are being achieved and/or the desired performance levels are being met.
1.3 Performance Management Strategy
1.3.1 The Contractor is responsible for the quality of all work performed. The Contractor measures that quality through the Contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by Contractor employees or by subcontractors. The Contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The Contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The Contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the Contractor’s QC program.
1.3.2 The government representative(s) will monitor performance and review performance reports furnished by the Contractor to determine how the Contractor is performing against communicated performance objectives. The Contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
2 ROLES AND RESPONSIBILITIES
2.1 The Contracting Officer
The contracting officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the Contracting Officer Representative (COR) or Subordinate Contracting Officer Representative (SCOR) and the Contractor. The CO will designate one full-time COR/SCOR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the Contractor’s performance, and must be identified and designated by the CO.
2.2 The Subordinate Contracting Officer Representative
The SCOR is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. SCOR limitations are contained in the written appointment letter. The COR or SCOR is responsible for technical administration of the project and ensures proper government surveillance of the Contractor’s performance. The COR or SCOR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the Contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action. The SCOR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the Contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
The required performance standards and/or quality levels are included in the PWS and in Attachment 1, “Performance Requirements Summary.” If the Contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract.
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
To minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate Contractor performance when appropriate. The primary methods of surveillance are:
· 100% Inspection – Each month, the SCOR shall review all deliverables per the Contract and PWS.
4.2 Customer Feedback
The Contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Performance management drives the Contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems, but the customer always has the option to communicate complaints to the CO, COR and/or SCOR, as opposed to the Contractor.
Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COR or SCOR.
Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.
4.3 Acceptable Quality Levels
The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for Contractor performance are structured to allow the Contractor to manage how the work is performed. For certain critical activities such as those involved with obtaining construction start letters, site visits coinciding with the Builder’s Draw, and submission of final construction records, the desired performance level is established at 100 percent. Other levels of performance are keyed to the relative importance of the task to the overall mission performance at OHP.
5 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1.
5.2 Monitoring Forms
The government’s QA surveillance accomplished by the SCOR will be reported using the monitoring form (aka – CDR Cover Letter) in Attachment 2. The forms, when completed, will document the government’s assessment of the Contractor’s performance under the contract to ensure that the required results for monthly site inspections, and related construction monitoring and reporting are being achieved.
5.2.1 The SCOR will retain a copy of all completed QA surveillance forms.
6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
6.1 Determining Performance
6.1.1 Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the Contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.
6.2 Reporting
6.2.1 On a quarterly basis, the SCOR will prepare a written report summarizing the overall results of the quality assurance surveillance of the Contractor’s performance. This written report, which includes the Contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the government to demonstrate whether the Contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
6.3 Reviews and Resolution
6.3.1 The COR may require the Contractor’s project manager, or a designated alternate, to meet with the SCOR and other government IPT personnel as deemed necessary to discuss performance evaluation. The COR or SCOR will define a frequency of in-depth reviews with the Contractor, including appropriate self-assessments by the Contractor; however, if the need arises, the Contractor will meet with the COR or SCOR as often as required or per the Contractor’s request. The agenda of the reviews may include:
· Monthly performance assessment data and trend analysis
· Issues and concerns of both parties
· Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis
· Recommendations for improved efficiency and/or effectiveness
· Issues arising from the performance monitoring processes
6.3.2 The CO, COR, or SCOR must coordinate and communicate with the Contractor to resolve issues and concerns regarding marginal or unacceptable performance.
6.3.3 The COR, SCOR, and Contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the CO.
6.4 Surveillance Matrix
The Surveillance Matrix (Appendix 1) is the list of performance objectives and standards that must be performed by the Contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.
Performance objectives define the desired outcomes. Performance standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performs surveillance, using this QASP, to determine the quality of the Contractor's performance as it relates to the performance element standards. The PRS should be used to form the foundation of the COR's inspection checklist.
In evaluating the quality of contractor’s performance, the following performance ratings may be used.
Performance
Rating Criteria
| Excellent / Outstanding |
| Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective. |
| Very Good |
| Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor was effective. |
| Satisfactory |
| Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
| Marginal |
| Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. |
| Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
APPENDIX 1 - SURVEILLANCE MATRIX
| Statements |
| Standards/AQLs |
| Inspections |
| Ratings |
5.2.1.3
Construction Start Letters
CDR 1
a) The Contractor shall obtain the start letter from the Builder and transmit it to the SCOR.
b) The Contractor shall transmit Construction Start Letters to the SCOR electronically via email.
AQL: Within 5 business days of receipt from the Builder.
What: Deliverables
How: COR will inspect for completion and review deliverable
Frequency: Randomly
Who: COR/Subject Matter Expert (SME) Standard(s): Inspection applies to all standards
5.2.1
5.2.2
5.2.3
5.2.4
HUD Representative Trip Report
(HUD-95379-ORCF)
CDR 2
a) The Contractor shall generate the HUD 95379-ORCF after each inspection and transmit it to the SCOR.
b) The Contractor shall transmit HUD Representative Trip Report and related attachments to the SCOR electronically via email.
AQL: Within 5 business days of the inspection.
What: Deliverables
How: COR will inspect for completion and review deliverable
Frequency: Randomly
5.2.1.4
Contractor’s Requisition
(HUD-92448-ORCF)
CDR 3
a) The Contractor shall review and sign the HUD-92448-ORCF.
b) The Contractor shall transmit the Contractor’s Requisition and related attachments to the SCOR electronically via email.
AQL: Within 5 business days of the inspection.
What: Deliverables
How: COR will inspect for completion and review deliverable
Frequency: After completion of task
Who: COR/SME
5.2.3.8
Final Construction Record
CDR 4
a. The Contractor shall assemble all previous deliverables and send them on CD-R to the SCOR.
b. The Contractor shall transmit the Construction Record to the SCOR via US Mail or overnight delivery.
AQL: Within 7 business days after the 12-Month or last warranty inspection.
What: Deliverables
How: Review deliverable
Frequency: After completion of task
Who: COR/SME
APPENDIX 2 – CORRECTIVE ACTION REPORT (CAR)
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY MINOR
MAJOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. COR DETERMINATION
REJECTED
ACCEPTED
12. CLOSE DATE
APPENDIX 3 – CUSTOMER COMPLAINT RECORD
| CUSTOMER COMPLAINT RECORD |
| DATE/TIME OF COMPLAINT |
SOURCE OF COMPLAINT
ORGANIZATION
BUILDING NUMBER
INDIVIDUAL
PHONE NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
APPENDIX 4 - PERFORMANCE ASSESSMENT REPORT (PAR)
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse, and identify by number)
| 1. CONTRACT/TASK ORDER NUMBER |
| 2. CONTRACTOR |
| 3. TYPE OF SERVICES |
4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE
| 5. COR PHONE |
| 6. SUSPENSE DATE |
I. PERFORMANCE
7. DEFICIENCY (CHECK ALL BOXES THAT APPLY)
NEW
REPEAT
NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED
| 9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS CHECKED) |
| 10. DETAILED PERFORMANCE ASSESSMENT |
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE NON-CONCUR
CONCUR
12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY
III. ACTION CORRECTED
14. NON-CONCUR COR SIGNATURE AND DATE
CONCUR
15. COR REMARKS (REQUIRED)
6. CONTRACTOR REPRESENTATIVE REMARKS
APPENDIX – 5 SAMPLE QUALITYASSURANCE MONITORING FORM
(aka – CDR Cover Letter)
Sample Cover Letter
COMPANY LETTERHEAD
TODAY’S DATE: __________ CONTRACT #: __________
TASK ORDER#: _________
TO SCOR/CM: ___________________
PROJECT NAME: _____________________________
CDR#: ___________
DATE OF INSPECTION: _____________ DATE DUE TO HUD: ___________
DESCRIPTION OF SUBMITTAL: _______________________________
For the description indicate type Contract Deliverable Requirement indicated for each CDR #1 through 4 in Technical Exhibit 3. When used for CDR #2, indicate the specific type of trip report: i.e. Draw Inspection, Non-Draw Inspection, Final Inspection, Delayed Items of Completion, 9-Month or 12-Month, Follow-up to 12-Month, and then indicate the applicable attachments below.
ATTACHMENTS:
Photos
Architects Supplemental Instructions
Employee Wage Interviews
Advance of Escrow Funds, Approval
Supv. Architect Field Reports
Occupancy Approval Forms
Construction Change Documents
Other: _____________________________
SUBMITTED BY: _____________________________________
TITLE: _________________________________________
Type or Print Name of Person Signing Above
DATE RECEIVED BY HUD: __________________
ACCEPTABLE / UNACCEPTABLE (circle one)
HUD COMMENTS: ___________________________________________________________________________________
CONTRACT INSPECTOR ACTION REQUIRED:__________________________________________________________________________
SIGNATURE OF SCOR/CM: _________________________________Date: ____________