MAINTENANCE ENGINEERING ORDER
(AMCOM Reg. 750-2)
MEO NO.
DATE PAGE 1 of
TITLE Tolerances Unless otherwise noted, dimensions are in inches and tolerances are:
Fractional ………………… ± 1/32 Decimal ………………... ± 0.010 Angular ………………… ± ½°
APPLICABILITY CSI Critical Characteristic Affected?
Impact Statement Attached?
REFERENCES FOR RDECOM USE ONLY
DOCUMENT(S) AFFECTED
PURPOSE OR PROBLEM
PROJECT ENGINEER ENGINEERING REVIEW ENGINEERING RELEASE
MED FORM 15-DEC-09 1401-R-E
B 1222
Overhaul Inspection Procedure clarification for Piston Feedback Ring, P/N 70410-02506-101.
INTERIM USE OF THIS MEO IS AUTHORIZED
UNTIL AFFECTED DOCUMENT IS UPDATED.
NO
YES
UH60 DAA
DMWR 1-1560-290, dated 23 JULY 2010 MEC B160149
DOCUMENT CHANGE IS REQUIRED Verification: Hands-On Table-Top None
There is a measurement shown in OIP #12 that is not designated by a reference letter. This MEO will correct that.
LUU.DINH.Q
.1232215859
Digitally signed by
LUU.DINH.Q.1232215859
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=LUU.DINH.Q.1232215859 Date: 2013.05.13 08:11:17 -05'00'
GONZALEZ.JAC
OB.A.145582119
Digitally signed by
GONZALEZ.JACOB.A.1455821190
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=CONTRACTOR, cn=GONZALEZ.JACOB.A.1455821190 Date: 2013.05.10 13:30:45 -05'00'
Jacob Gonzalez
HORN.REINHOL
D.J.1087783495
Digitally signed by
HORN.REINHOLD.J.1087783495
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=HORN.REINHOLD.J.1087783495 Date: 2013.05.13 08:14:38 -05'00'
Dinh Luu Ron Horn PUBLICATION CHANGE REQUEST: REQUEST THAT THE FOLLOWING DATA BE INCLUDED IN THE NEXT
CHANGE OR REVISION TO THE PUBLICATION IDENTIFIED ABOVE.
WP NO. PAGE
NO.
PARA-
GRAPH
FIGURE/
TABLE
NO.
CHANGES
(EXACT WORDING OF CHANGES MUST BE GIVEN)
3-26 OIP #12 ADD the following to Overhaul Inspection Procedure #12 (for P/N 70410-02506-101):
NO.: 6
REF LTR: D
CHARACTERISTIC: Width INSP METHOD: Measure REQUISITE: Must be 0.015 to 0.020
ADD the letter "D" to the diagram per page 2 of this MEO:
Formatted Cont. Sheet
May 17 2013
MAINTENANCE ENGINEERING ORDER
(AMCOM Reg. 750-2) Continuation Sheet
MEO NO.
PAGE of
MED FORM 15-DEC-09 1401-R-E
Click to insert figure
B 1222
Formatted Cont. Sheet
Airworthiness/Readiness Impact – Implement as soon as possible
B 1222 DMWR 1-1560-290, dated 23 JULY 2010 UH60
NO
Clarifies an OIP.
Jacob Gonzalez, 361-961-4422, jacob.a.gonzalez42.ctr@mail.mil.
GONZALEZ.
JACOB.A.14
55821190
Digitally signed by
GONZALEZ.JACOB.A.1455821190
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=CONTRACTOR, cn=GONZALEZ.JACOB.A.14558211 Date: 2013.05.10 13:30:23 -05'00'
Jacob Gonzalez
File details come from the government source that posted it. Updated .