Cost Price Abstract Tab 1a
| Fort Sill, OK | | | | | | | | |
| CLIN | | | | | | | | |
| Type | Description | CLIN | Base Year | OY1 | OY2 | OY3 | OY4 | Grand Total |
FFP Transition In 0001 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
FFP Project Management Office (PMO) 0002 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| CPFF | Installation Maintenance Division (IMD) | 0003 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Installation Maintenance Division - Labor | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Installation Maintanance Division - Fee | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| CPFF | Installation Supply Division (ISD) | 0004 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Installation Supply Division - Labor | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Installation Supply Division - Fee | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| CPFF | Installation Transportation Division (ITD) | 0005 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Installation Transportation Division - Labor | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Installation Transportation Division - Fee | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal - Proposed Labor / Fee | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| **COMPLIANCE WARNING** If CELL I22 (Subtotal-Proposed Labor/Fee on Cost Price Matrix Tab 1a) does not equal CELL F9 (Subtotal Proposed Labor/Fee on Teaming Matrix Tab 2) then per L.5.1.7(a), the Offeror's proposal will be non-compliant. | | | | | | | |
| Cost | Other Direct Costs (ODC) | 0006/0007 | $ 832,188.23 | $ 849,408.48 | $ 858,106.71 | $ 866,923.97 | $ 875,862.39 | $ 4,282,489.78 |
| NSP | Contractor Manpower Reporting Requirement | 0008 | | | | | | |
| NSP | Contract Data item list (CDRLS) | 0009 | | | | | | |
| Option to Extend Service IAW clause 52.217-8 | | | | | | | $ 437,931.19 |
| Total Proposed Price | | $ 832,188.23 | $ 849,408.48 | $ 858,106.71 | $ 866,923.97 | $ 875,862.39 | $ 4,720,420.97 |
Allocation Tab 1b
| FSOK | | | | | | | | |
| CLIN | | | | | | | | |
| Type | Description | CLIN | Base Year | OY1 | OY2 | OY3 | OY4 | Grand Total |
FFP Transition In 0001 $0.00 $0.00 $0.00 $0.00 $ - 0
| FFP | Project Management Office (PMO) Labor | 0002 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| PMO ASC Maintenance | 0002AA | | | | | | |
| PMO ASC Supply | 0002BA | | | | | | |
| PMO ASC Transportation | 0002CA | | | | | | |
| PMO NON-ACS 75th BDE | 0002DA | | | | | | |
| PMO NON-ASC TRADOC | 0002EA | | PMO allocation will be applied at award by the Government. | | | | |
| PMO NON-ASC USMC | 0002FA | | | | | | |
| PMO NON-ASC AIDPMO | 0002GA | | | | | | |
| PMO NON-ASC SINGAPORE | 0002HA | | | | | | |
| PMO ASC SUPPLY ASP | 0002JA | | | | | | |
| PMO ASC EVACUATION MAINTENANCE | 0002KA | | | | | | |
| PMO NON-ASC 30th ADA C-RAM MNT | 0002LA | | | | | | |
| CPFF | Installation Maintenance Division (IMD) | 0003 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| ASC BASE SUPPORT MAINTENANCE | 0003AA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| ASC BASE SUPPORT MAINTENANCE Fee | 0003AA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| ASC EVACUATION MAINTENANCE SUPPORT | 0003BA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| ASC EVACUATION MAINTENANCE SUPPORT Fee | 0003BA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| NON-ASC TRADOC MAINTENANCE SUPPORT | 0003CA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| NON-ASC TRADOC MAINTENANCE SUPPORT Fee | 0003CA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| NON-ASC USMC MAINTENANCE | 0003DA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| NON-ASC USMC MAINTENANCE Fee | 0003DA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| NON-ASC SINGAPORE COSIS MAINTENANCE | 0003EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| NON-ASC SINGAPORE COSIS MAINTENANCE Fee | 0003EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| NON-ASC SINGAPORE DARING WARRIOR MAINT | 0003FA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| NON-ASC SINGAPORE DARING WARRIOR MAINT Fee | 0003FA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| NON-ASC SINGAPORE ABOVE COSIS MAINT | 0003GA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| NON-ASC SINGAPORE ABOVE COSIS MAINT Fee | 0003GA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| NON-ASC 75th BDE MAINTENANCE SUPPORT | 0003HA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| NON-ASC 75th BDE MAINTENANCE SUPPORT Fee | 0003HA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| NON-ASC AIDPMO CONTAINER MAINTENANCE | 0003JA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| NON-ASC AIDPMO CONTAINER MAINTENANCE Fee | 0003JA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| NON-ASC 30TH ADA C-RAM | 0003KA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| NON-ASC 30TH ADA C-RAM Fee | 0003KA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| CPFF | Installation Supply Division (ISD) | 0004 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| ASC CLOTHING INITIAL ISSUE POINT | 0004AA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| ASC CLOTHING INITIAL ISSUE POINT Fee | 0004AA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| ASC RETAIL SUPPLY | 0004BA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| ASC RETAIL SUPPLY Fee | 0004BA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| ASC AMMUNITION SUPPLY POINT | 0004CA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| ASC AMMUNITION SUPPLY POINT Fee | 0004CA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| ASC SUBSISTENCE SUPPLY MANAGEMENT OFFICE | 0004DA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| ASC SUBSISTENCE SUPPLY MANAGEMENT OFFICE Fee | 0004DA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| NON-ASC USMC SUPPLY | 0004EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| NON-ASC USMC SUPPLY Fee | 0004EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| CPFF | Installation Transportation Division (ITD) | 0005 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| ASC TRANSPORTATION MOTOR POOL | 0005AA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| ASC TRANSPORTATION MOTOR POOL Fee | 0005AA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| ASC PERSONAL PROPERTY/TRANSPORTATION SUPPORT | 0005BA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| ASC PERSONAL PROPERTY/TRANSPORTATION SUPPORT Fee | 0005BA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| ASC RAIL SUPPORT | 0005CA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| ASC RAIL SUPPORT Fee | 0005CA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| ASC FREIGHT/CARGO | 0005DA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| ASC FREIGHT/CARGO Fee | 0005DA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| NON-ASC TRADOC AIT SHUTTLE | 0005EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| NON-ASC TRADOC AIT SHUTTLE Fee | 0005EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Cost No Fee | Other Direct Costs (ODC) | 0006 | $ 832,188.23 | $ 849,408.48 | $ 858,106.71 | $ 866,923.97 | $ 875,862.39 | $ 4,282,489.78 |
| ASC BASE SUPPORT MAINTENANCE ODC | 0006AA | $ 357,510.68 | $ 361,085.79 | $ 364,696.64 | $ 368,343.61 | $ 372,027.05 | |
| ASC EVACUATION MAINTENANCE SUPPORT ODC | 0006BA | $ 30,261.56 | $ 30,564.18 | $ 30,869.82 | $ 31,178.52 | $ 31,490.30 | |
| ASC CLOTHING INITIAL ISSUE POINT ODC | 0006CA | $ 14,170.41 | $ 17,514.63 | $ 18,040.07 | $ 18,581.27 | $ 19,138.71 | |
| ASC RETAIL SUPPLY ODC | 0006DA | $ 51,160.86 | $ 51,672.47 | $ 52,189.19 | $ 52,711.09 | $ 53,238.20 | |
| ASC AMMUNITION SUPPLY POINT ODC | 0006EA | $ 41,133.58 | $ 41,544.92 | $ 41,960.36 | $ 42,379.97 | $ 42,803.77 | |
| ASC SUBSISTENCE SUPPLY MANAGEMENT OFFICE ODC | 0006FA | $ 2,252.79 | $ 2,784.45 | $ 2,867.98 | $ 2,954.02 | $ 3,042.64 | |
| ASC TRANSPORTATION MOTOR POOL ODC | 0006GA | $ 23,402.86 | $ 28,925.93 | $ 29,793.71 | $ 30,687.52 | $ 31,608.14 | |
| ASC PERSONAL PROPERTY/TRANSPORTATION SUPPORT ODC | 0006HA | $ 86,361.90 | $ 86,361.90 | $ 86,361.90 | $ 86,361.90 | $ 86,361.90 | |
| ASC RAIL SUPPORT ODC | 0006JA | $ 16,265.04 | $ 16,427.69 | $ 16,591.97 | $ 16,757.89 | $ 16,925.47 | |
| ASC FREIGHT/CARGO ODC | 0006KA | $ 3,368.55 | $ 4,163.53 | $ 4,288.44 | $ 4,417.09 | $ 4,549.60 | |
| NON-ASC TRADOC MAINTENANCE SUPPORT ODC | 0007AA | $ 150,000.00 | $ 151,500.00 | $ 153,015.00 | $ 154,545.15 | $ 156,090.60 | |
| NON-ASC USMC MAINTENANCE ODC | 0007BA | $ 1,500.00 | $ 1,515.00 | $ 1,530.15 | $ 1,545.45 | $ 1,560.91 | |
| NON-ASC SINGAPORE ABOVE COSIS MAINT ODC | 0007EA | $ 300.00 | $ 303.00 | $ 306.03 | $ 309.09 | $ 312.18 | |
| NON-ASC 75th BDE MAINTENANCE SUPPORT ODC | 0007FA | $ 45,000.00 | $ 45,450.00 | $ 45,904.50 | $ 46,363.55 | $ 46,827.18 | |
| NON-ASC AIDPMO CONTAINER MAINTENANCE ODC | 0007GA | $ 1,500.00 | $ 1,515.00 | $ 1,530.15 | $ 1,545.45 | $ 1,560.91 | |
| NON-ASC USMC SUPPLY ODC | 0007HA | $ 500.00 | $ 505.00 | $ 510.05 | $ 515.15 | $ 520.30 | |
| NON-ASC TRADOC AIT SHUTTLE ODC | 0007JA | $ 500.00 | $ 505.00 | $ 510.05 | $ 515.15 | $ 520.30 | |
| NON-ASC 30th ADA C-RAM | 0007KA | $ 7,000.00 | $ 7,070.00 | $ 7,140.70 | $ 7,212.11 | $ 7,284.23 | |
| Contractor Manpower Reporting Requirement | 0009 | | | | | | |
| Contract Data item list (CDRLS) | 0010 | | | | | | |
| Option to Extend Service IAW clause 52.217-8 | | | | | | | $ 437,931.19 |
| Total Proposed Price | | $ 832,188.23 | $ 849,408.48 | $ 858,106.71 | $ 866,923.97 | $ 875,862.39 | $ 4,720,420.97 |
| | | | | | | $ 4,720,420.97 |
** NOTE: The "Cost Price Abstract Tab 1a" tab is provided specifically for use during the cost/price evaluation phase of the contract proposal evaluation (source selection) process.
Teaming Matrix Tab 2
| Company Name | CAGE Code | Role | Functional Area(s) to Perform | Proposed Labor/Fee | Percentage of Participation | Cost Information Submittal Method | SECRET Facility | Performing ASP |
| 1 | BOA Holder | | P | | $0.00 | ERROR:#NAME? | DIR | YES | |
| 2 | Subcontractor 1 | | | | $0.00 | ERROR:#NAME? | | | |
| 3 | Subcontractor 2 | | | | $0.00 | ERROR:#NAME? | | | |
| 4 | Subcontractor 3 | | | | $0.00 | ERROR:#NAME? | | | |
| 5 | Subcontractor 4 | | | | $0.00 | ERROR:#NAME? | | | |
| 6 | Subcontractor 5 | | | | $0.00 | ERROR:#NAME? | | | |
| 7 | Subcontractor 6 | | | | $0.00 | ERROR:#NAME? | | | |
| | | | *Total: | ERROR:#NAME? | ERROR:#NAME? | | | |
| | | | Subtotal Proposed Labor/Fee | $0 | ** COMPLIANCE WARNING ** If CELL F9 (Total Proposed Labor/Fee on Teaming Matrix Tab 2) does not equal yellow CELL I22 (Subtotal-Proposed Labor/Fee on Cost Price Matrix Tab 1a), then per L.5.1.7(a), the Offeror's proposal will be non-compliant. | | | |
(A) Offeror may NOT add or delete rows to accommodate the total number of participants.
(B) Company Name: list the name of the Offeror and all proposed subcontractors and Joint Venture members (as applicable) See L.5.1.8.
(C) CAGE Code: list the corresponding CAGE code for the Offeror and all proposed subcontractors and Joint Venture members as applicable (See L.5.1.8). The listed CAGE Code shall remain consistent throughout the Offeror’s entire proposal.
| (D) Role: fill in with either: P, S or an O (defined below) for each participant. |
| P - Offeror (Defaut for BOA Holder) |
| S - Major Subcontractor performing 20% or more for the total value of the contract. |
| O - Other Subcontractor performing less than 20% for the total value of the contract. |
| (E) Offeror to identify which functional area(s) will be performed for each participant as follows: | |
| M - Maintenance |
| S - Supply |
| T - Transportation |
| MS - Maintenance and Supply |
| ST - Supply and Transportation |
| MT - Maintenance and Transportation |
| MST - Maintenance, Supply and Transportation |
| (F) Proposed Labor / Fee for each participant for the entire Period of Performance (excluding ODCs and the option to extend.) | |
| * Formatting is set to only allow for whole dollars (no cents (i.e. decimals) are allowed) |
| * The Tab 2 Total in column F is a locked cell with a SUM formula of the values entered in the column F blue cells. |
| (G) Percentage of participation for each participant for the entire Period of Performance. The total in this column should equal 100%. | |
| * Formatting is set to only allow for whole percentages |
| (H) Offeror to identify cost information Submittal Method each Subcontractor as follows: | |
| D I R - Subcontractor submitting independently, Default for BOA Holder. |
| W I O S - Subcontractor submitting cost information within Offeror’s submission |
| Note: Columns D-H are not applicable to Joint Venture members |
| (I) Offeror to identify each participant performing contract requirements which necessitate SECRET facility clearance as follows: | |
| YES - Offeror/Subcontractor will perform contract requirements that necessitiate SECRET facility clearance. NOTE: All Joint Venture members shall possess a SECRET Clearance regardless of the work the member will be performing (See L.5.1.8) |
| NO - Offeror/Subcontractor will NOT perform contract requirements that necessitiate SECRET facility clearance |
| (J) Offeror to identify which participants will perform critical performance task Ammunition Supply Point (ASP). | |
| YES - Offeror/Subcontractor will perform ASP tasks. |
| NO - Offeror/Subcontractor will NOT perform ASP tasks. |
| Note: Column J is not applicable to Joint Venture members. |