Attachment 0004-Price Model.xlsx

XLSX spreadsheet 97 KB Posted

Attached to
Security Surveillance Sytem SSS (formerly known as Tactical Security Sytem) TSS
Solicitation number
W909MY-20-R-A019
Issued by

About this file

This document provides details for an upcoming federal contract opportunity to procure Security Surveillance System equipment from the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground. The Solicitation Number is W909MY-20-R-A019 and seeks to meet the Army's need for perimeter security for theater Base Camps and Detention Facilities through the replacement of existing Force Protection Suite and Rapid Deployment Integrated Surveillance System Quick Reaction Capabilities with a new Security Surveillance System program. Questions regarding the opportunity and a signed Non-disclosure Agreement are due by October 22, 2020. The document references an Appendix 2 containing additional requirement details that is available upon request under NDA.

View the file

Other files

File Type Posted
UPDATED-Attachment 0006-Docs Requiring Signed NDA.docx DOCX document
UPDATED-Attachment 0002 QASP 12-7-2020.docx DOCX document
UPDATED-Attachment 0004-Price Model 9Dec20.xlsx XLSX spreadsheet
Questions Received 12-3-2020.docx DOCX document
UPDATED-Attachment 0001-PWS FINAL 8DEC2020.DOCX DOCX document
UPDATED-Attachment 0003-DD254 Signed.pdf PDF
UPDATED-SSS (TSS) Production Base PWS Appendix 3 - Acronyms - 17Aug20.docx DOCX document
UPDATED-W909MY21R0006-20201209.pdf PDF
Interested Vendors List-Updated.docx DOCX document
UPDATED-Exhibits.docx DOCX document
Interested Vendors List-Updated.docx DOCX document
TSS RFP Complete Questions and Answers for Posting 20201201.xlsx XLSX spreadsheet
Interested Vendors List-Updated.docx DOCX document
Interested Vendors List-Updated.docx DOCX document
Interested Vendors List-Updated.docx DOCX document
Interested Vendors List-Updated.docx DOCX document
Question and Answers Set 1.xlsx XLSX spreadsheet
Interested Vendors List.docx DOCX document
Industry Day Slides 11-04-2020.pdf PDF
NDA - TSS.docx DOCX document
W909MY20R0011-Draft.pdf PDF
Attachment 0003-DD254.pdf PDF
Attachment 0001-PWS.pdf PDF
Attachment 0002-QASP.pdf PDF
Attachment 0005-Past Performance Questionnaire.pdf PDF
Exhibit A-CDRLs.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Effort

Year 1Year 2Year 3Year 4Year 5
CLINPWSMaterial DescriptionQuantity DescriptionQuantity TypeWeightLot PriceExtended PriceWeightLot PriceExtended PriceWeightLot PriceExtended PriceWeightLot PriceExtended PriceWeightLot PriceExtended Price
6.1.1TSS EquipmentFixed Quantities ordered with range pricingLot8.018.018.018.014.0
Qty 1-52.0$0.004.5$0.004.5$0.004.5$0.003.5$0.0025%
Qty 6-104.0$0.009.0$0.009.0$0.009.0$0.007.0$0.0050%
Qty 11-202.0$0.004.5$0.004.5$0.004.5$0.003.5$0.0025%
Quantity TypeWeightLot PriceExtended PriceWeightLot PriceExtended PriceWeightLot PriceExtended PriceWeightLot PriceExtended PriceWeightLot PriceExtended Price
6.1.9Minor Repair - Field Level Repair (Man Hours)Lot8.448.448.448.448.44
Maintenance Category 10.7$0.000.7$0.000.7$0.000.7$0.000.7$0.008%
Maintenance Category 21.3$0.001.3$0.001.3$0.001.3$0.001.3$0.0015%
6.1.9Minor Repair - Depot Level Repair (Man Hours)Lot113.64113.64113.64113.64113.64
Maintenance Category 19.1$0.009.1$0.009.1$0.009.1$0.009.1$0.008%
Maintenance Category 217.0$0.0017.0$0.0017.0$0.0017.0$0.0017.0$0.0015%
6.1.9Moderate Repair - Depot Level Repair (Man Hours)Lot1,287.961,287.961,287.961,287.961,287.96
Maintenance Category 3244.71$0.00244.71$0.00244.71$0.00244.71$0.00244.71$0.0019%
Maintenance Category 4296.23$0.00296.23$0.00296.23$0.00296.23$0.00296.23$0.0023%
Maintenance Category 5360.63$0.00360.63$0.00360.63$0.00360.63$0.00360.63$0.0028%
Maintenance Category 6412.15$0.00412.15$0.00412.15$0.00412.15$0.00412.15$0.0032%
Maintenance Category 7463.67$0.00463.67$0.00463.67$0.00463.67$0.00463.67$0.0036%
Maintenance Category 8515.18$0.00515.18$0.00515.18$0.00515.18$0.00515.18$0.0040%
Quantity TypeWeightLot PriceExtended PriceWeightLot PriceExtended PriceWeightLot PriceExtended PriceWeightLot PriceExtended PriceWeightLot PriceExtended Price
6.1.6Spares
EOIR Pan/Tilt/Zoom Medium Range (Aeron)Lot1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
EOIR Pan/Tilt/Zoom Long Range (Aeron)Lot1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Electro-Optical Pan/Tilt/Zoom (Bosch)Lot1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Electro-Optical Pan/Tilt/Zoom Dome (Axis PTZ Dome)Lot1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Electro-Optical Camera Fixed (Axis Bullet)Lot1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Electro-Optical Camera Fixed Dome (Axis Fixed Dome)Includes Omnidirectional MicrophoneLot1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.3$0.000.3$0.000.3$0.000.3$0.000.3$0.0050%
Solid State Sector RADAR (Echodyne)Lot1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.3$0.000.3$0.000.3$0.000.3$0.000.3$0.0050%
Linear Sensor System Laser Interrogator (Sintela)Lot1.01.01.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00100%
Elevating Mast (Blue Sky)Lot1.01.01.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00100%
Tripod (MOOG)Lot1.01.01.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00100%
Point-to-Multipoint Access Point RadioLot1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Point-to-Multipoint Subscriber RadioLot1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.3$0.000.3$0.000.3$0.000.3$0.000.3$0.0050%
Power System
Power Management BoxLot1.01.01.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00100%
Battery BoxLot1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Solar ArrayLot1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
GeneratorLot1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Directional Acoustic AssemblyIncludes Integrated EO Camera Fixed wPTU and Directional MicrophoneLot1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Fixed Control Station (FCS)
FCS Processing Unit (Micro disc)Lot1.01.01.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00100%
FCS Router (Cisco)Lot1.01.01.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00100%
FCS UPS (Synqor)Lot1.01.01.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00100%
Portable Control Station (PCS)Includes AC Power Supply and DC Power Supply)Lot1.01.01.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00100%
T-HubLot1.01.01.01.01.0
Qty 1-50.3$0.000.3$0.000.3$0.000.3$0.000.3$0.0025%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 11-200.3$0.000.3$0.000.3$0.000.3$0.000.3$0.0025%
Cables (Combined)Includes all data and power cables for one kitLot1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Transit CasesIncludes all cases requires for one kit (not including Tricons)Lot1.01.01.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Ancillary Equipment (see definition tab)Lot1.01.01.01.01.0
Qty 1-50.3$0.000.3$0.000.3$0.000.3$0.000.3$0.0025%
Qty 6-100.5$0.000.5$0.000.5$0.000.5$0.000.5$0.0050%
Qty 11-200.3$0.000.3$0.000.3$0.000.3$0.000.3$0.0025%
CDRL #CDRL DescriptionQuantity DescriptionQuantity TypeQuantityUnit/Lot PriceExtended PriceQuantityUnit/Lot PriceExtended PriceQuantityUnit/Lot PriceExtended PriceQuantityUnit/Lot PriceExtended PriceQuantityUnit/Lot PriceExtended Price
A001Contractor’s Progress, Status and Management ReportMonthly reportLot/Each12.0$0.0012.0$0.0012.0$0.0012.0$0.0012.0$0.00
A002Briefing MaterialPriced per briefing material event.Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
A003Report, Record of Meetings/MinutesPriced per eventLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
A004Quality Assurance Program Plan1 in Year 1Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
A005Failure Analysis and Corrective Action ReportPriced per report, NSP, CPFFLot/Each
A006Acceptance Test PlanPriced per planLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
A007Acceptance Test ReportPriced concurrent with each TSS unitLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
A008Interface Control Document (ICD)priced for 1 in Year 1 and per ECPLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
A009Supplier’s Configuration Management PlanPriced concurrent with each TSS or component delivery.Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
A010Configuration Audit Plan1 in Year 1 and updates as requestedLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
A011Baseline Description Document (BDD)Priced concurrent with each TSS or component delivery.Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
A012Technical Data Package (TDP)Priced per package, NSP, CPFFLot/Each
A013Logistics Product Data (LPD)Priced per product, NSP, CPFFLot/Each
A014Data Accession ListPriced per product, NSP, CPFFLot/Each
A015Bill of Materials (BOM) For Logistics and Supply Chain Risk ManagementPriced upon first TSS delivery and as requestedLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
A016Diminishing Manufacturing Sources and Material Shortages (DMSMS) Implementation PlanPriced upon first TSS delivery and as requestedLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
A017Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Plan1 in Year 1Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
A018Obsolescence Alert NoticePriced per noticeLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
A019Failure Reporting, Analysis and Corrective Action Takenpriced per quarterLot/Each4.0$0.004.0$0.004.0$0.004.0$0.004.0$0.00
A020Product Support AnalysisPriced per analysisLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
A021Reliability and Maintenance Predictions ReportNSPLot/Each
A022Reliability-Centered Maintenance (RCM) Analysis ReportNSPLot/Each
A023Engineering Data for Provisioning (EDFP)1 in year 1Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
A024Depot Maintenance Study1 in Year 1Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
A025Safety Assessment ReportPriced concurrent with delivery of first TSS unitLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
A026Training Support Package and Training MaterialsNSP, CPFFLot/Each
A027System Technical ManualsNSP, CPFFLot/Each
A028Program Protection Implementation (PPIP)NSP, specified in individual TOs/DosLot/Each
A029Government Property Inventory Report (GFE/P)/ Contractor Acquired Property (CAP) Inventory ReportPriced per TSS unitLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
A030Item Unique Identification (IUID) Marking Plan4 per yearLot/Each4.0$0.004.0$0.004.0$0.004.0$0.004.0$0.00
A031Proposed Spare Parts ListPriced concurrent with delivery of first TSS unitLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
A032Contractor Field Service Reports1 per weekLot/Each52.0$0.0052.0$0.0052.0$0.0052.0$0.0052.0$0.00
A033Maintenance Support Plan1 in Year 1Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
A034Site Survey Report1 in Year 1, CPFFLot/Each
A035Site Work Package1 in Year 1, CPFFLot/Each
A036DoD Risk Management Framework Package DeliverablesPriced as requiredLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
A037Contactor’s Risk Management Plan1 in Year 1Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
A038Contractor’s Risk Management Status ReportMonthlyLot/Each12.0$0.0012.0$0.0012.0$0.0012.0$0.0012.0$0.00
A039Engineering Change ProposalsPriced per ECP NSPLot/Each
A040Notice of Revision (NOR)Priced per NOR, NSPLot/Each
A041Request for Variance (RFV)Priced per RFV, NSPLot/Each
A042Operations Security Reportpriced for trainingLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00
PWS #PWS DescriptionQuantity DescriptionQuantity TypeQuantityUnit/Lot PriceExtended PriceQuantityUnit/Lot PriceExtended PriceQuantityUnit/Lot PriceExtended PriceQuantityUnit/Lot PriceExtended PriceQuantityUnit/Lot PriceExtended PriceCDRLType
5.1Program ManagementA001FFP
5.1.1Key PersonnelFFP per year, key staffLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00FFP
5.1.2Program MeetingsFFP
5.1.3Contract Kickoff MeetingOne Post Award Meeting NLT 10 Days after order.Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A002, A003FFP
5.1.4Technical Interchange Meetings (TIM)Minimum of 1 and maximum of 6 per year.Lot/Each6.0$0.006.0$0.006.0$0.006.0$0.006.0$0.00A002, A003FFP
5.2Quality AssurancePriced for QA Plan and Monthly Reports which are Included in Contractors monthly report.A001, A004FFP
5.2.1Test Support-
5.2.2Integration/Regression Test SupportPriced to support integration and regression testing from changes directed by the Government (see PWS). NSP, CPFFNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPA005CPFF
5.2.3Government Acceptance Test SupportPriced to plan, develop, implement, and maintain a product acceptance system that demonstrates compliance with the technical and contractual requirements identified in this PWS.Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A006FFP
5.2.4First Article TestPriced for the first unit produced and shall cover, at a minimum, the P-Spec requirements marked for the FAT in Appendix 3 - Acceptance Test Requirements MatrixLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A006, A007
5.3Engineering SupportWill be specified in the individual TO/Dos.NSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPCPFF
5.3.1Interface Control Document (ICD)Priced per ECPLot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A008FFP
5.4Other Services-
5.4.1Configuration ManagementPriced to maintain a CM Process of which the Government reserves the right to review and approve (see PWS).Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A009, A010FFP
5.4.2Production ProceduresPriced to maintain detailed production assembly procedures and documentation to include assembly instructions in a baseline description. (see PWS).Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A011FFP
5.4.3Product DataPriced to update and maintain Product Data (see PWS), CPFF.NSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPA012, A013, A014CPFF
5.4.4Diminishing Manufacturing Sources and Material Shortages (DMSMS)Priced per minimizing materiel readiness risks and managing obsolescence during the POP (see PWS).Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A015, A016, A017, A018FFP
5.4.5Failure Reporting, Analysis and Corrective Action System (FRACAS)Priced to collect and analyze failure data to determine the cause of equipment failures (see PWS) plus implantation of FRACAS.Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A019FFP
5.4.6Product Support Analysis (PSA)Priced per Product Support Analysis plus Life Cycle Sustainment Plan.Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A020FFP
5.4.7Customer Wait TimeNegotiated at TO level. Contractor shall work with the Government to establish acceptable customer wait times (CWT) to support each phase of the contract.NSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPFFP
5.4.8Reliability, Availability and Maintainability (RAM) Program.Negotiated at the TO/DO level to include Reliability and Maintainability Predictions Report and Reliability-Centered Maintenance (RCM) Analysis Report.NSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPA021, A022FFP
5.4.9ProvisioningPriced for submission of Provisioning Parts Data.Lot/Each12.0$0.0012.0$0.0012.0$0.0012.0$0.0012.0$0.00A023FFP
5.4.10Reach-back SupportNegotiated at the individual TO/DO.NSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPFFP
5.4.11Asset VisibilityPriced to utilize the COLTS program management suite for providing asset visibility.Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00FFP
5.4.12Depot Maintenance Study/Organic Depot Assessment Data1 in Year 1A024FFP
5.4.13Human System Integration (HSI)Safety Assessment Report as changes to TSS are made.Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A025FFP
5.4.14TrainingPriced per training event (see PWS) not including Training Support Package and Training Materials, CPFF.NSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPA026CPFF
5.4.15Technical Manual UpdatesPriced per item (see PWS), CPFF.NSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPA027CPFF
5.4.16Program Protection PlanningPriced for multiple tasks (see PWS).Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A028FFP
5.4.17Travel15 trips (See PWSLot/Each15.0$0.0015.0$0.0015.0$0.0015.0$0.0015.0$0.00A001Cost
6.0Production Materials and Equipment-
6.1Government Property / EquipmentPriced for Government Property Inventory Reports and Acquired Property Inventory Reports (see PWS).NSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPA029FFP
6.1.1TSS EquipmentNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPFFP
6.1.2Bar-Coding, Serialization, and LabelingPriced as a component of TSS spares.NSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPA030FFP
6.1.3Packing, Handling, Storage, Transportation, and MarkingPriced as a component of TSS spares.NSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPFFP
6.1.4Warranty ItemsPriced as a component of TSS spares.NSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPFFP
6.1.5TSS SparesNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPA007, A031FFP
6.1.6Environmental, Safety, and Occupational HealthPriced to implement and maintain an ESOH evaluation Program (see PWS).Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A026FFP
6.1.7Field Service SupportNSP, CPFFNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPA032CPFF
6.1.8Readiness SustainmentPriced for Sustainment required to support the effort (see PWS).Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A033FFP
6.1.9Repair, Inspection, Evaluation Of Non-Warranty ItemsA019
6.1.10InstallationSegregated at TO level, CCFP, priced per yearNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPCPFF
6.1.11Site SurveyPriced to prepare a Site Survey Report and Site Work Package.NSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPA034, A035CPFF
6.2CybersecurityPriced to support the Assessment and Authorization process and enforce the security controls required to safeguard the data and software.Lot/Each1.0$0.001.0$0.001.0$0.001.0$0.001.0$0.00A036FFP
6.3Risk ManagementPriced for Contactor’s Risk Management Plan and Contractor’s Risk Management Status Report.A037, A038FFP
6.4Engineering Change Proposal (ECP)NSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSP-
6.4.1Class I Major ECPsPriced per ECP and NORNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPA039, A040-
6.4.2Class I Minor ECPsPriced per ECP and NORNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPA039, A040-
6.4.3Class II Administrative ECPsPriced per ECP and NORNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPA039, A040-
6.4.4Request for Variance (RFV)Priced per RFVNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPNSPA041-
7.0Security Requirements
8.0Special Security RequirementsA042
8.1.1Anti-Terrorism (At) Level I Awareness Training For Contractors Location In Continental United States (Conus)
8.1.2AT Awareness Training For Outside Conus (OCONUS)
8.1.3Access And General Protection/Security Policy And Procedures
8.1.4Contractors/Subcontractors Requiring Common Access Card (CAC)
8.1.5Contractors/Subcontractors Not Requiring CAC, But Require Access To A DoD Facility Or Installation
8.1.6IWATCH Training
8.1.7Army Training Certification Tracking System (ATCTS)
8.1.8Operations Security Source Standard Operating Procedure PlanA042
8.1.9OPSEC Training
8.1.10Information Assurance (IA)/It Training
8.1.111A/ IT Certification
8.1.12Threat Awareness Reporting Program (TARP) Training
8.1.13CONUS Replacement Center (CRC) Training
8.1.14Contractor Personnel Supporting U.S. Armed Forces Deployed OCONUS
8.1.15International Trafficking In Arms Regulations Compliance Program
9.0Contractor Manpower Reporting
10.0Government's Rights To Technical Data And Computer Software
11.0General Information
11.1.1Inspection And Acceptance
11.1.2Quality Assurance

TOTAL COST $0.00 TOTAL COST $0.00 TOTAL COST $0.00 TOTAL COST $0.00 TOTAL COST $0.00

PWS 0727

CDRLPWS Ref.TitleType
A0015.1Program ManagementFFP
5.1.1Key PersonnelFFP
5.1.2Program MeetingsFFP
A002, A0035.1.3Contract Kickoff MeetingFFP
A002, A0035.1.4Technical Interchange Meetings (TIM)FFP
A001, A0045.2Quality AssuranceFFP
5.2.1Test Support-
A0055.2.2Integration/Regression Test SupportCPFF
A0065.2.3Government Acceptance Test SupportFFP
A006, A0075.2.4First Article Test
5.3Engineering SupportCPFF
A0085.3.1Interface Control Document (ICD)FFP
5.4Other Services-
A009, A0105.4.1Configuration ManagementFFP
A0115.4.2Production ProceduresFFP
A012, A013, A0145.4.3Product DataCPFF
A015, A016, A017, A0185.4.4Diminishing Manufacturing Sources and Material Shortages (DMSMS)FFP
A0195.4.5Failure Reporting, Analysis and Corrective Action System (FRACAS)FFP
A0205.4.6Product Support Analysis (PSA)FFP
5.4.7Customer Wait TimeFFP
A021, A0225.4.8Reliability, Availability and Maintainability (RAM) Program.FFP
A0235.4.9ProvisioningFFP
5.4.10Reach-back SupportFFP
5.4.11Asset VisibilityFFP
A0245.4.12Depot Maintenance Study/Organic Depot Assessment DataFFP
A0255.4.13Human System Integration (HSI)FFP
A0265.4.14TrainingCPFF
A0275.4.15Technical Manual UpdatesCPFF
A0285.4.16Program Protection PlanningFFP
A0015.4.17TravelCost
6.0Production Materials and Equipment-
A0296.1Government Property / EquipmentFFPmandatory
6.1.1TSS EquipmentFFP
A0306.1.2Bar-Coding, Serialization, and LabelingFFP
6.1.3Packing, Handling, Storage, Transportation, and MarkingFFP
6.1.4Warranty ItemsFFP
A007, A0316.1.5TSS SparesFFP
A0266.1.6Environmental, Safety, and Occupational HealthFFP
A0326.1.7Field Service SupportCPFF
A0336.1.8Readiness SustainmentFFP
A0196.1.9REPAIR, INSPECTION, EVALUATION OF NON-WARRANTY ITEMS
6.1.10InstallationCPFF
A034, A0356.1.11Site SurveyCPFF
A0366.2CybersecurityFFP
A037, A0386.3Risk ManagementFFP
6.4Engineering Change Proposal (ECP)-included in other sections including Engineering Support
A039, A0406.4.1Class I Major ECPs-
A039, A0406.4.2Class I Minor ECPs-
A039, A0406.4.3Class II Administrative ECPs-
A0416.4.4Request for Variance (RFV)-
7.0Security Requirements
A0428.0Special Security Requirements
8.1.1Anti-Terrorism (At) Level I Awareness Training For Contractors Location In Continental United States (Conus)
8.1.2AT Awareness Training For Outside Conus (Oconus)
8.1.3Access And General Protection/Security Policy And Procedures
8.1.4Contractors/Subcontractors Requiring Common Access Card (CAC)
8.1.5Contractors/Subcontractors Not Requiring CAC, But Require Access To A DoD Facility Or Installation
8.1.6Iwatch Training
8.1.7Army Training Certification Tracking System (ATCTS)
A0428.1.8Operations Security Source Standard Operating Procedure Plan
8.1.9OPSEC Training
8.1.10Information Assurance (Ia)/It Training
8.1.111A/ IT Certification
8.1.12Threat Awareness Reporting Program (TARP) Training
8.1.13Conus Replacement Center (CRC) Training
8.1.14Contractor Personnel Supporting U.S. Armed Forces Deployed Oconus
8.1.15International Trafficking In Arms Regulations Compliance Program
9.0Contractor Manpower Reporting
10.0Government’S Rights To Technical Data And Computer Software
11.0General Information
11.1.1Inspection And Acceptance
11.1.2Quality Assurance

Schedule

New ProcurementFY21FY22FY23FY24FY25FY26FY27FY28TOTAL
System Quantity Production8888436
System Quantity Production - IBD1010101040
Total81818181400076
IGSSR-C Fixed Control Station22
IGCE Total Cost$14,699,794$35,001,756$34,818,656$37,986,337$34,825,920$11,165,104$11,431,267$11,709,147$191,637,980
Repair % from TSS POE = 16.35%$2,403,416$5,722,787$5,692,850$6,210,766$5,694,038$1,825,494$1,869,012$1,914,445
TSS System BOMCurrent POE
Materials DescriptionQTY per KitPrice ($K)Total Cost ($K)Total Cost ($)
Mid Range PTZ EO/LWIR2$ 40.00$ 80.00$ 80,000.00
Mid Range PTZ EO/MWIR2$ 70.00$ 140.00$ 140,000.00
Perimeter Intrusion Sensor6$ 30.00$ 180.00$ 180,000.00
Pan Tilt Zoom Camera (PTZ)10$ 3.25$ 32.50$ 32,500.00
Linear Sensing System (LSS)1$ 200.00$ 200.00$ 200,000.00
Tri Pod8$ 1.70$ 13.60$ 13,600.00
Radio11$ 4.40$ 48.40$ 48,400.00
Power System7$ 35.00$ 245.00$ 245,000.00
Audio2$ 5.00$ 10.00$ 10,000.00
Control/Command Station1$ 67.00$ 67.00$ 67,000.00
Data & Power Distribution (DPD)8$ 16.80$ 134.40$ 134,400.00
Fixed Imaging10$ 1.25$ 12.50$ 12,500.00
$ 1,163.40$ 1,163,400.00
IGSSR-C Fixed Control Station
Current BOM (No Cross Domain Kit)Current POE
Materials DescriptionQTY per KitPrice ($K)Total Cost ($K)Total Cost ($)
Node
Node Server / Switch OTC2$ 211.96$ 423.92$ 423,920.00
Node UPS OTC2$ 38.37$ 76.74$ 76,740.00
Node EBM OTC2$ 9.43$ 18.86$ 18,860.00
$ 519.52$ 519,520.00
Client Workstation (Populated Storage Case)2$ 42.56$ 85.12$ 85,120.00
Sensor Connectivity Kit OTC2$ 25.47$ 50.94$ 50,940.00
Time Provider1$ 29.29$ 29.29$ 29,290.00
Kit SW License1$ 240.53$ 240.53$ 240,529.00
Per System Cost$ 925.40$ 925,399.00

Option Effort

Year 6Year 7Year 8
CLINPWSMaterial DescriptionQuantity DescriptionQuantity TypeWeightLot PriceExtended PriceWeightLot PriceExtended PriceWeightLot PriceExtended Price
6.1.1TSS EquipmentFixed Quantities ordered with range pricingLot8.018.018.0
Qty 1-52.0$0.004.5$0.004.5$0.0025%
Qty 6-104.0$0.009.0$0.009.0$0.0050%
Qty 11-202.0$0.004.5$0.004.5$0.0025%
Quantity TypeWeightLot PriceExtended PriceWeightLot PriceExtended PriceWeightLot PriceExtended Price
6.1.9Minor Repair - Field Level Repair (Man Hours)Lot8.448.448.44
Maintenance Category 10.7$0.000.7$0.000.7$0.008%
Maintenance Category 21.3$0.001.3$0.001.3$0.0015%
6.1.9Minor Repair - Depot Level Repair (Man Hours)Lot113.64113.64113.64
Maintenance Category 19.1$0.009.1$0.009.1$0.008%
Maintenance Category 217.0$0.0017.0$0.0017.0$0.0015%
6.1.9Moderate Repair - Depot Level Repair (Man Hours)Lot1,287.961,287.961,287.96
Maintenance Category 3244.71$0.00244.71$0.00244.71$0.0019%
Maintenance Category 4296.23$0.00296.23$0.00296.23$0.0023%
Maintenance Category 5360.63$0.00360.63$0.00360.63$0.0028%
Maintenance Category 6412.15$0.00412.15$0.00412.15$0.0032%
Maintenance Category 7463.67$0.00463.67$0.00463.67$0.0036%
Maintenance Category 8515.18$0.00515.18$0.00515.18$0.0040%
Quantity TypeWeightLot PriceExtended PriceWeightLot PriceExtended PriceWeightLot PriceExtended Price
6.1.6Spares
EOIR Pan/Tilt/Zoom Medium Range (Aeron)Lot1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
EOIR Pan/Tilt/Zoom Long Range (Aeron)Lot1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
Electro-Optical Pan/Tilt/Zoom (Bosch)Lot1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
Electro-Optical Pan/Tilt/Zoom Dome (Axis PTZ Dome)Lot1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
Electro-Optical Camera Fixed (Axis Bullet)Lot1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
Electro-Optical Camera Fixed Dome (Axis Fixed Dome)Includes Omnidirectional MicrophoneLot1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.3$0.000.3$0.000.3$0.0050%
Solid State Sector RADAR (Echodyne)Lot1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.3$0.000.3$0.000.3$0.0050%
Linear Sensor System Laser Interrogator (Sintela)Lot1.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.00100%
Elevating Mast (Blue Sky)Lot1.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.00100%
Tripod (MOOG)Lot1.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.00100%
Point-to-Multipoint Access Point RadioLot1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
Point-to-Multipoint Subscriber RadioLot1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.3$0.000.3$0.000.3$0.0050%
Power System
Power Management BoxLot1.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.00100%
Battery BoxLot1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
Solar ArrayLot1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
GeneratorLot1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
Directional Acoustic AssemblyIncludes Integrated EO Camera Fixed wPTU and Directional MicrophoneLot1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
Fixed Control Station (FCS)
FCS Processing Unit (Micro disc)Lot1.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.00100%
FCS Router (Cisco)Lot1.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.00100%
FCS UPS (Synqor)Lot1.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.00100%
Portable Control Station (PCS)Includes AC Power Supply and DC Power Supply)Lot1.01.01.0
Qty 1-51.0$0.001.0$0.001.0$0.00100%
T-HubLot1.01.01.0
Qty 1-50.3$0.000.3$0.000.3$0.0025%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
Qty 11-200.3$0.000.3$0.000.3$0.0025%
Cables (Combined)Includes all data and power cables for one kitLot1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
Transit CasesIncludes all cases requires for one kit (not including Tricons)Lot1.01.01.0
Qty 1-50.5$0.000.5$0.000.5$0.0050%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
Ancillary Equipment (see definition tab)Lot1.01.01.0
Qty 1-50.3$0.000.3$0.000.3$0.0025%
Qty 6-100.5$0.000.5$0.000.5$0.0050%
Qty 11-200.3$0.000.3$0.000.3$0.0025%
CDRL #CDRL DescriptionQuantity DescriptionQuantity TypeQuantityUnit/Lot PriceExtended PriceQuantityUnit/Lot PriceExtended PriceQuantityUnit/Lot PriceExtended Price
A001Contractor’s Progress, Status and Management ReportMonthly reportLot/Each12.0$0.0012.0$0.0012.0$0.00
A002Briefing MaterialPriced per briefing material event.Lot/Each1.0$0.001.0$0.001.0$0.00
A003Report, Record of Meetings/MinutesPriced per eventLot/Each1.0$0.001.0$0.001.0$0.00
A004Quality Assurance Program Plan1 in Year 1Lot/Each1.0$0.001.0$0.001.0$0.00
A005Failure Analysis and Corrective Action ReportPriced per report, NSP, CPFFLot/Each
A006Acceptance Test PlanPriced per planLot/Each1.0$0.001.0$0.001.0$0.00
A007Acceptance Test ReportPriced concurrent with each TSS unitLot/Each1.0$0.001.0$0.001.0$0.00
A008Interface Control Document (ICD)priced for 1 in Year 1 and per ECPLot/Each1.0$0.001.0$0.001.0$0.00
A009Supplier’s Configuration Management PlanPriced concurrent with each TSS or component delivery.Lot/Each1.0$0.001.0$0.001.0$0.00
A010Configuration Audit Plan1 in Year 1 and updates as requestedLot/Each1.0$0.001.0$0.001.0$0.00
A011Baseline Description Document (BDD)Priced concurrent with each TSS or component delivery.Lot/Each1.0$0.001.0$0.001.0$0.00
A012Technical Data Package (TDP)Priced per package, NSP, CPFFLot/Each
A013Logistics Product Data (LPD)Priced per product, NSP, CPFFLot/Each
A014Data Accession ListPriced per product, NSP, CPFFLot/Each
A015Bill of Materials (BOM) For Logistics and Supply Chain Risk ManagementPriced upon first TSS delivery and as requestedLot/Each1.0$0.001.0$0.001.0$0.00
A016Diminishing Manufacturing Sources and Material Shortages (DMSMS) Implementation PlanPriced upon first TSS delivery and as requestedLot/Each1.0$0.001.0$0.001.0$0.00
A017Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Plan1 in Year 1Lot/Each1.0$0.001.0$0.001.0$0.00
A018Obsolescence Alert NoticePriced per noticeLot/Each1.0$0.001.0$0.001.0$0.00
A019Failure Reporting, Analysis and Corrective Action Takenpriced per quarterLot/Each4.0$0.004.0$0.004.0$0.00
A020Product Support AnalysisPriced per analysisLot/Each1.0$0.001.0$0.001.0$0.00
A021Reliability and Maintenance Predictions ReportNSPLot/Each
A022Reliability-Centered Maintenance (RCM) Analysis ReportNSPLot/Each
A023Engineering Data for Provisioning (EDFP)1 in year 1Lot/Each1.0$0.001.0$0.001.0$0.00
A024Depot Maintenance Study1 in Year 1Lot/Each1.0$0.001.0$0.001.0$0.00
A025Safety Assessment ReportPriced concurrent with delivery of first TSS unitLot/Each1.0$0.001.0$0.001.0$0.00
A026Training Support Package and Training MaterialsNSP, CPFFLot/Each
A027System Technical ManualsNSP, CPFFLot/Each
A028Program Protection Implementation (PPIP)NSP, specified in individual TOs/DosLot/Each
A029Government Property Inventory Report (GFE/P)/ Contractor Acquired Property (CAP) Inventory ReportPriced per TSS unitLot/Each1.0$0.001.0$0.001.0$0.00
A030Item Unique Identification (IUID) Marking Plan4 per yearLot/Each4.0$0.004.0$0.004.0$0.00
A031Proposed Spare Parts ListPriced concurrent with delivery of first TSS unitLot/Each1.0$0.001.0$0.001.0$0.00
A032Contractor Field Service Reports1 per weekLot/Each52.0$0.0052.0$0.0052.0$0.00
A033Maintenance Support Plan1 in Year 1Lot/Each1.0$0.001.0$0.001.0$0.00
A034Site Survey Report1 in Year 1, CPFFLot/Each
A035Site Work Package1 in Year 1, CPFFLot/Each
A036DoD Risk Management Framework Package DeliverablesPriced as requiredLot/Each1.0$0.001.0$0.001.0$0.00
A037Contactor’s Risk Management Plan1 in Year 1Lot/Each1.0$0.001.0$0.001.0$0.00
A038Contractor’s Risk Management Status ReportMonthlyLot/Each12.0$0.0012.0$0.0012.0$0.00
A039Engineering Change ProposalsPriced per ECP NSPLot/Each
A040Notice of Revision (NOR)Priced per NOR, NSPLot/Each
A041Request for Variance (RFV)Priced per RFV, NSPLot/Each
A042Operations Security Reportpriced for trainingLot/Each1.0$0.001.0$0.001.0$0.00
PWS #PWS DescriptionQuantity DescriptionQuantity TypeQuantityUnit/Lot PriceExtended PriceQuantityUnit/Lot PriceExtended PriceQuantityUnit/Lot PriceExtended PriceCDRLType
5.1Program ManagementA001FFP
5.1.1Key PersonnelFFP per year, key staffLot/Each1.0$0.001.0$0.001.0$0.00FFP
5.1.2Program MeetingsFFP
5.1.3Contract Kickoff MeetingOne Post Award Meeting NLT 10 Days after order.Lot/Each1.0$0.001.0$0.001.0$0.00A002, A003FFP
5.1.4Technical Interchange Meetings (TIM)Minimum of 1 and maximum of 6 per year.Lot/Each6.0$0.006.0$0.006.0$0.00A002, A003FFP
5.2Quality AssurancePriced for QA Plan and Monthly Reports which are Included in Contractors monthly report.A001, A004FFP
5.2.1Test Support-
5.2.2Integration/Regression Test SupportPriced to support integration and regression testing from changes directed by the Government (see PWS). NSP, CPFFNSPNSPNSPNSPNSPNSPNSPA005CPFF
5.2.3Government Acceptance Test SupportPriced to plan, develop, implement, and maintain a product acceptance system that demonstrates compliance with the technical and contractual requirements identified in this PWS.Lot/Each1.0$0.001.0$0.001.0$0.00A006FFP
5.2.4First Article TestPriced for the first unit produced and shall cover, at a minimum, the P-Spec requirements marked for the FAT in Appendix 3 - Acceptance Test Requirements MatrixLot/Each1.0$0.001.0$0.001.0$0.00A006, A007
5.3Engineering SupportWill be specified in the individual TO/Dos.NSPNSPNSPNSPNSPNSPNSPCPFF
5.3.1Interface Control Document (ICD)Priced per ECPLot/Each1.0$0.001.0$0.001.0$0.00A008FFP
5.4Other Services-
5.4.1Configuration ManagementPriced to maintain a CM Process of which the Government reserves the right to review and approve (see PWS).Lot/Each1.0$0.001.0$0.001.0$0.00A009, A010FFP
5.4.2Production ProceduresPriced to maintain detailed production assembly procedures and documentation to include assembly instructions in a baseline description. (see PWS).Lot/Each1.0$0.001.0$0.001.0$0.00A011FFP
5.4.3Product DataPriced to update and maintain Product Data (see PWS), CPFF.NSPNSPNSPNSPNSPNSPNSPA012, A013, A014CPFF
5.4.4Diminishing Manufacturing Sources and Material Shortages (DMSMS)Priced per minimizing materiel readiness risks and managing obsolescence during the POP (see PWS).Lot/Each1.0$0.001.0$0.001.0$0.00A015, A016, A017, A018FFP
5.4.5Failure Reporting, Analysis and Corrective Action System (FRACAS)Priced to collect and analyze failure data to determine the cause of equipment failures (see PWS) plus implantation of FRACAS.Lot/Each1.0$0.001.0$0.001.0$0.00A019FFP
5.4.6Product Support Analysis (PSA)Priced per Product Support Analysis plus Life Cycle Sustainment Plan.Lot/Each1.0$0.001.0$0.001.0$0.00A020FFP
5.4.7Customer Wait TimeNegotiated at TO level. Contractor shall work with the Government to establish acceptable customer wait times (CWT) to support each phase of the contract.NSPNSPNSPNSPNSPNSPNSPFFP
5.4.8Reliability, Availability and Maintainability (RAM) Program.Negotiated at the TO/DO level to include Reliability and Maintainability Predictions Report and Reliability-Centered Maintenance (RCM) Analysis Report.NSPNSPNSPNSPNSPNSPNSPA021, A022FFP
5.4.9ProvisioningPriced for submission of Provisioning Parts Data.Lot/Each12.0$0.0012.0$0.0012.0$0.00A023FFP
5.4.10Reach-back SupportNegotiated at the individual TO/DO.NSPNSPNSPNSPNSPNSPNSPFFP
5.4.11Asset VisibilityPriced to utilize the COLTS program management suite for providing asset visibility.Lot/Each1.0$0.001.0$0.001.0$0.00FFP
5.4.12Depot Maintenance Study/Organic Depot Assessment Data1 in Year 1A024FFP
5.4.13Human System Integration (HSI)Safety Assessment Report as changes to TSS are made.Lot/Each1.0$0.001.0$0.001.0$0.00A025FFP
5.4.14TrainingPriced per training event (see PWS) not including Training Support Package and Training Materials, CPFF.NSPNSPNSPNSPNSPNSPNSPA026CPFF
5.4.15Technical Manual UpdatesPriced per item (see PWS), CPFF.NSPNSPNSPNSPNSPNSPNSPA027CPFF
5.4.16Program Protection PlanningPriced for multiple tasks (see PWS).Lot/Each1.0$0.001.0$0.001.0$0.00A028FFP
5.4.17Travel15 trips (See PWSLot/Each15.0$0.0015.0$0.0015.0$0.00A001Cost
6.0Production Materials and Equipment-
6.1Government Property / EquipmentPriced for Government Property Inventory Reports and Acquired Property Inventory Reports (see PWS).NSPNSPNSPNSPNSPNSPNSPA029FFP
6.1.1TSS EquipmentNSPNSPNSPNSPNSPNSPNSPFFP
6.1.2Bar-Coding, Serialization, and LabelingPriced as a component of TSS spares.NSPNSPNSPNSPNSPNSPNSPA030FFP
6.1.3Packing, Handling, Storage, Transportation, and MarkingPriced as a component of TSS spares.NSPNSPNSPNSPNSPNSPNSPFFP
6.1.4Warranty ItemsPriced as a component of TSS spares.NSPNSPNSPNSPNSPNSPNSPFFP
6.1.5TSS SparesNSPNSPNSPNSPNSPNSPNSPA007, A031FFP
6.1.6Environmental, Safety, and Occupational HealthPriced to implement and maintain an ESOH evaluation Program (see PWS).Lot/Each1.0$0.001.0$0.001.0$0.00A026FFP
6.1.7Field Service SupportNSP, CPFFNSPNSPNSPNSPNSPNSPNSPA032CPFF
6.1.8Readiness SustainmentPriced for Sustainment required to support the effort (see PWS).Lot/Each1.0$0.001.0$0.001.0$0.00A033FFP
6.1.9Repair, Inspection, Evaluation Of Non-Warranty ItemsA019
6.1.10InstallationSegregated at TO level, CCFP, priced per yearNSPNSPNSPNSPNSPNSPNSPCPFF
6.1.11Site SurveyPriced to prepare a Site Survey Report and Site Work Package.NSPNSPNSPNSPNSPNSPNSPA034, A035CPFF
6.2CybersecurityPriced to support the Assessment and Authorization process and enforce the security controls required to safeguard the data and software.Lot/Each1.0$0.001.0$0.001.0$0.00A036FFP
6.3Risk ManagementPriced for Contactor’s Risk Management Plan and Contractor’s Risk Management Status Report.A037, A038FFP
6.4Engineering Change Proposal (ECP)NSPNSPNSPNSPNSPNSPNSP-
6.4.1Class I Major ECPsPriced per ECP and NORNSPNSPNSPNSPNSPNSPNSPA039, A040-
6.4.2Class I Minor ECPsPriced per ECP and NORNSPNSPNSPNSPNSPNSPNSPA039, A040-
6.4.3Class II Administrative ECPsPriced per ECP and NORNSPNSPNSPNSPNSPNSPNSPA039, A040-
6.4.4Request for Variance (RFV)Priced per RFVNSPNSPNSPNSPNSPNSPNSPA041-
7.0Security Requirements
8.0Special Security RequirementsA042
8.1.1Anti-Terrorism (At) Level I Awareness Training For Contractors Location In Continental United States (Conus)
8.1.2AT Awareness Training For Outside Conus (OCONUS)
8.1.3Access And General Protection/Security Policy And Procedures
8.1.4Contractors/Subcontractors Requiring Common Access Card (CAC)
8.1.5Contractors/Subcontractors Not Requiring CAC, But Require Access To A DoD Facility Or Installation
8.1.6IWATCH Training
8.1.7Army Training Certification Tracking System (ATCTS)
8.1.8Operations Security Source Standard Operating Procedure PlanA042
8.1.9OPSEC Training
8.1.10Information Assurance (IA)/It Training
8.1.111A/ IT Certification
8.1.12Threat Awareness Reporting Program (TARP) Training
8.1.13CONUS Replacement Center (CRC) Training
8.1.14Contractor Personnel Supporting U.S. Armed Forces Deployed OCONUS
8.1.15International Trafficking In Arms Regulations Compliance Program
9.0Contractor Manpower Reporting
10.0Government's Rights To Technical Data And Computer Software
11.0General Information
11.1.1Inspection And Acceptance
11.1.2Quality Assurance

TOTAL COST $0.00 TOTAL COST $0.00 TOTAL COST $0.00

Definitions Below are ancillary items that are needed for TSS but due to their lower cost, are combined into one element for the Spares section of the Price Model

Ancillary EquipmentQuantitiesDescription
Brackets/MountsAll items required for 1 kitBrackets and accessories to mount the sensors to the Blue Sky Mast, Tripods, wall, building, etc
POE to Fiber Media Converter1Custom integrated assembly that includes two converter boxes
Fixed Control Station Mouse w/scroll wheel1
Fixed Control Station Keyboard1
Fixed Control Station Monitor1
Fixed Control Station Hand Controller1
Fixed Control Station Headset1
Fixed Control Station Speaker1
POE Extender1
POE Switch1
Hub AC Power Supply1
SAASM GPS Receiver1
Sensor Location and Orientation Tool1

Repair Data MAINTENANCE FUNCTIONS REPAIR TYPE INSTALL INSPECT/FAULT ISOLATION REPAIR REPLACE TEST Total

Depot Minor 11.72 4.14 80.00 9.22 8.56 113.64

Depot Moderate 9.80 2.36 1248.00 6.90 20.90 1287.96

Field Minor 2.38 1.50 0.00 2.78 1.78 8.44

Maintenance CategoryMaintenance Category Description
1Field (8%)
2Field (15%)
3Depot (19%)
4Depot (23%)
5Depot (28%)
6Depot (32%)
7Depot (36%)
8Depot (40%)
9Major (50%)
10Major (60%)

MAC Worksheet

TACTICAL SECURITY SYSTEM (TSS) MAINTENANCE ALLOCATION CHART (MAC)
LINE REPLACEABLE UNIT (LRU)MAINTENANCE POLICYMAINTENANCE FUNCTIONS # OF MAN HOURSTOOLS/EQUIPMENTREMARKSMinor/Moderate
INSTALLINSPECT/FAULT ISOLATIONREPAIRREPLACETEST
TSS - CURRENT CONFIGURATION - 7-16-2020
Fixed Electo-Optic (EO) SensorDepot (Organic/Contractor)0.150.25NA0.150.50Common ToolsDiagnostics not performed through networkDepot Minor
Components of Fixed Electo-Optic (EO) SensorDepot (Organic/Contractor)0.150.25NA0.150.50Common ToolsDiagnostics not performed through networkDepot Minor
Fixed Electo-Optic (EO) Sensor DomeDepot (Organic/Contractor)0.150.25NA0.150.50Common ToolsDiagnostics not performed through networkDepot Minor
Components of Fixed Electo-Optic (EO) Sensor DomeDepot (Organic/Contractor)0.150.25NA0.150.50Common ToolsDiagnostics not performed through networkDepot Minor
Pan, Tilt, Zoom (PTZ) Electo-Optic (EO) SensorDepot (Organic/Contractor)0.150.25NA0.150.50Common ToolsDiagnostics not performed through networkDepot Minor
Components of Pan, Tilt, Zoom (PTZ) Electro-Optic (EO) SensorDepot (Organic/Contractor)0.150.25NA0.150.50Common ToolsDiagnostics not performed through networkDepot Minor
Electro-Optic Camera Acoustic Audio Pan Tilt Unit
Depot (Organic/Contractor)0.750.25NA0.150.50Common ToolsDiagnostics not performed through networkDepot Minor
Components of Pan, Tilt, Zoom (PTZ) Electro-Optic (EO) Speed Dome SensorDepot (Organic/Contractor)0.750.25NA0.150.50Common ToolsDiagnostics not performed through networkDepot Minor
Medium Range IRDepot (Organic/Contractor)0.750.2540.000.300.50Common ToolsDiagnostics not performed through networkDepot Moderate
Components of Medium Range IRDepot (Organic/Contractor)0.750.2540.000.300.50Common ToolsDiagnostics not performed through networkDepot Moderate
Long Range IRDepot (Organic/Contractor)0.750.2540.000.300.50Common ToolsDiagnostics not performed through networkDepot Moderate
Components of Long Range IRDepot (Organic/Contractor)0.750.2540.000.300.50Common ToolsDiagnostics not performed through networkDepot Moderate
Intrusion Detection Sensor Group (Ground Surveillance Radar)Depot (Organic/Contractor)0.150.1080.000.151.00Common ToolsOEM Repair only; Do not touch radar dome surface; Verify and requires compliance with the FCC prior to testingDepot Moderate
Components of Intrusion Detection Sensor Group (Ground Surveillance Radar)Depot (Organic/Contractor)0.150.1080.000.151.00Common ToolsOEM Repair only; Do not touch radar dome surface; Verify and requires compliance with the FCC prior to testingDepot Moderate
Acoustic Sensors (Microphone, Directional)Depot (Organic/Contractor)0.750.10NA0.750.10Common ToolsDiagnostics not performed through networkDepot Minor
Components of Acoustic Sensors (Microphone, Directional)Depot (Organic/Contractor)0.750.10NA0.750.10Common ToolsDiagnostics not performed through networkDepot Minor
Acoustic Sensors (Microphone, Omni-Directional)Discard0.750.10NA0.750.10Common ToolsDiagnostics not performed through networkField Minor
Components of Acoustic Sensors (Microphone, Omni-Directional)Discard0.750.10NA0.750.10Common ToolsDiagnostics not performed through networkField Minor
Subterranean Activity Sensors (Linear Sensing System)Depot (Organic/Contractor)0.100.10160.000.102.00Common ToolsDiagnostics performed through networkDepot Moderate
Components of Subterranean Activity Sensors (Linear Sensing System)Depot (Organic/Contractor)0.100.10160.000.102.00Common ToolsDiagnostics performed through networkDepot Moderate
T-HubDepot (Organic/Contractor)0.300.1040.000.303.00Common ToolsDiagnostics performed through all communications networkDepot Moderate
Components of T-HubDepot (Organic/Contractor)0.300.1040.000.303.00Common ToolsDiagnostics performed through all communications networkDepot Moderate
Enclosed Power Supply UnitDiscard0.050.15NA0.100.05Common ToolsField Minor

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .