Attachment 0004-Price Model.xlsx
XLSX spreadsheet 97 KB Posted
- Solicitation number
- W909MY-20-R-A019
About this file
This document provides details for an upcoming federal contract opportunity to procure Security Surveillance System equipment from the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground. The Solicitation Number is W909MY-20-R-A019 and seeks to meet the Army's need for perimeter security for theater Base Camps and Detention Facilities through the replacement of existing Force Protection Suite and Rapid Deployment Integrated Surveillance System Quick Reaction Capabilities with a new Security Surveillance System program. Questions regarding the opportunity and a signed Non-disclosure Agreement are due by October 22, 2020. The document references an Appendix 2 containing additional requirement details that is available upon request under NDA.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Effort
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | ||||||||||||||||
| CLIN | PWS | Material Description | Quantity Description | Quantity Type | Weight | Lot Price | Extended Price | Weight | Lot Price | Extended Price | Weight | Lot Price | Extended Price | Weight | Lot Price | Extended Price | Weight | Lot Price | Extended Price | |
| 6.1.1 | TSS Equipment | Fixed Quantities ordered with range pricing | Lot | 8.0 | 18.0 | 18.0 | 18.0 | 14.0 | ||||||||||||
| Qty 1-5 | 2.0 | $0.00 | 4.5 | $0.00 | 4.5 | $0.00 | 4.5 | $0.00 | 3.5 | $0.00 | 25% | |||||||||
| Qty 6-10 | 4.0 | $0.00 | 9.0 | $0.00 | 9.0 | $0.00 | 9.0 | $0.00 | 7.0 | $0.00 | 50% | |||||||||
| Qty 11-20 | 2.0 | $0.00 | 4.5 | $0.00 | 4.5 | $0.00 | 4.5 | $0.00 | 3.5 | $0.00 | 25% |
| Quantity Type | Weight | Lot Price | Extended Price | Weight | Lot Price | Extended Price | Weight | Lot Price | Extended Price | Weight | Lot Price | Extended Price | Weight | Lot Price | Extended Price | |||
| 6.1.9 | Minor Repair - Field Level Repair (Man Hours) | Lot | 8.44 | 8.44 | 8.44 | 8.44 | 8.44 | |||||||||||
| Maintenance Category 1 | 0.7 | $0.00 | 0.7 | $0.00 | 0.7 | $0.00 | 0.7 | $0.00 | 0.7 | $0.00 | 8% | |||||||
| Maintenance Category 2 | 1.3 | $0.00 | 1.3 | $0.00 | 1.3 | $0.00 | 1.3 | $0.00 | 1.3 | $0.00 | 15% |
| 6.1.9 | Minor Repair - Depot Level Repair (Man Hours) | Lot | 113.64 | 113.64 | 113.64 | 113.64 | 113.64 | ||||||
| Maintenance Category 1 | 9.1 | $0.00 | 9.1 | $0.00 | 9.1 | $0.00 | 9.1 | $0.00 | 9.1 | $0.00 | 8% | ||
| Maintenance Category 2 | 17.0 | $0.00 | 17.0 | $0.00 | 17.0 | $0.00 | 17.0 | $0.00 | 17.0 | $0.00 | 15% |
| 6.1.9 | Moderate Repair - Depot Level Repair (Man Hours) | Lot | 1,287.96 | 1,287.96 | 1,287.96 | 1,287.96 | 1,287.96 | ||||||
| Maintenance Category 3 | 244.71 | $0.00 | 244.71 | $0.00 | 244.71 | $0.00 | 244.71 | $0.00 | 244.71 | $0.00 | 19% | ||
| Maintenance Category 4 | 296.23 | $0.00 | 296.23 | $0.00 | 296.23 | $0.00 | 296.23 | $0.00 | 296.23 | $0.00 | 23% | ||
| Maintenance Category 5 | 360.63 | $0.00 | 360.63 | $0.00 | 360.63 | $0.00 | 360.63 | $0.00 | 360.63 | $0.00 | 28% | ||
| Maintenance Category 6 | 412.15 | $0.00 | 412.15 | $0.00 | 412.15 | $0.00 | 412.15 | $0.00 | 412.15 | $0.00 | 32% | ||
| Maintenance Category 7 | 463.67 | $0.00 | 463.67 | $0.00 | 463.67 | $0.00 | 463.67 | $0.00 | 463.67 | $0.00 | 36% | ||
| Maintenance Category 8 | 515.18 | $0.00 | 515.18 | $0.00 | 515.18 | $0.00 | 515.18 | $0.00 | 515.18 | $0.00 | 40% |
| Quantity Type | Weight | Lot Price | Extended Price | Weight | Lot Price | Extended Price | Weight | Lot Price | Extended Price | Weight | Lot Price | Extended Price | Weight | Lot Price | Extended Price | ||||
| 6.1.6 | Spares | ||||||||||||||||||
| EOIR Pan/Tilt/Zoom Medium Range (Aeron) | Lot | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | |||||||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| EOIR Pan/Tilt/Zoom Long Range (Aeron) | Lot | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | |||||||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Electro-Optical Pan/Tilt/Zoom (Bosch) | Lot | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | |||||||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Electro-Optical Pan/Tilt/Zoom Dome (Axis PTZ Dome) | Lot | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | |||||||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Electro-Optical Camera Fixed (Axis Bullet) | Lot | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | |||||||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Electro-Optical Camera Fixed Dome (Axis Fixed Dome) | Includes Omnidirectional Microphone | Lot | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | ||||||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Qty 6-10 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 50% | ||||||||
| Solid State Sector RADAR (Echodyne) | Lot | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | |||||||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Qty 6-10 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 50% | ||||||||
| Linear Sensor System Laser Interrogator (Sintela) | Lot | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | |||||||||||||
| Qty 1-5 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 100% | ||||||||
| Elevating Mast (Blue Sky) | Lot | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | |||||||||||||
| Qty 1-5 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 100% | ||||||||
| Tripod (MOOG) | Lot | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | |||||||||||||
| Qty 1-5 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 100% | ||||||||
| Point-to-Multipoint Access Point Radio | Lot | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | |||||||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Point-to-Multipoint Subscriber Radio | Lot | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | |||||||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Qty 6-10 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 50% | ||||||||
| Power System | |||||||||||||||||||
| Power Management Box | Lot | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | |||||||||||||
| Qty 1-5 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 100% | ||||||||
| Battery Box | Lot | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | |||||||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Solar Array | Lot | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | |||||||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Generator | Lot | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | |||||||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Directional Acoustic Assembly | Includes Integrated EO Camera Fixed wPTU and Directional Microphone | Lot | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | ||||||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Fixed Control Station (FCS) | |||||||||||||||||||
| FCS Processing Unit (Micro disc) | Lot | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | |||||||||||||
| Qty 1-5 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 100% | ||||||||
| FCS Router (Cisco) | Lot | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | |||||||||||||
| Qty 1-5 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 100% | ||||||||
| FCS UPS (Synqor) | Lot | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | |||||||||||||
| Qty 1-5 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 100% | ||||||||
| Portable Control Station (PCS) | Includes AC Power Supply and DC Power Supply) | Lot | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | ||||||||||||
| Qty 1-5 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 100% | ||||||||
| T-Hub | Lot | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | |||||||||||||
| Qty 1-5 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 25% | ||||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Qty 11-20 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 25% | ||||||||
| Cables (Combined) | Includes all data and power cables for one kit | Lot | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | ||||||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Transit Cases | Includes all cases requires for one kit (not including Tricons) | Lot | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | ||||||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Ancillary Equipment (see definition tab) | Lot | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | |||||||||||||
| Qty 1-5 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 25% | ||||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||||
| Qty 11-20 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 25% |
| CDRL # | CDRL Description | Quantity Description | Quantity Type | Quantity | Unit/Lot Price | Extended Price | Quantity | Unit/Lot Price | Extended Price | Quantity | Unit/Lot Price | Extended Price | Quantity | Unit/Lot Price | Extended Price | Quantity | Unit/Lot Price | Extended Price |
| A001 | Contractor’s Progress, Status and Management Report | Monthly report | Lot/Each | 12.0 | $0.00 | 12.0 | $0.00 | 12.0 | $0.00 | 12.0 | $0.00 | 12.0 | $0.00 | |||||
| A002 | Briefing Material | Priced per briefing material event. | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||||
| A003 | Report, Record of Meetings/Minutes | Priced per event | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||||
| A004 | Quality Assurance Program Plan | 1 in Year 1 | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||||
| A005 | Failure Analysis and Corrective Action Report | Priced per report, NSP, CPFF | Lot/Each | |||||||||||||||
| A006 | Acceptance Test Plan | Priced per plan | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||||
| A007 | Acceptance Test Report | Priced concurrent with each TSS unit | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||||
| A008 | Interface Control Document (ICD) | priced for 1 in Year 1 and per ECP | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||||
| A009 | Supplier’s Configuration Management Plan | Priced concurrent with each TSS or component delivery. | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||||
| A010 | Configuration Audit Plan | 1 in Year 1 and updates as requested | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||||
| A011 | Baseline Description Document (BDD) | Priced concurrent with each TSS or component delivery. | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||||
| A012 | Technical Data Package (TDP) | Priced per package, NSP, CPFF | Lot/Each | |||||||||||||||
| A013 | Logistics Product Data (LPD) | Priced per product, NSP, CPFF | Lot/Each | |||||||||||||||
| A014 | Data Accession List | Priced per product, NSP, CPFF | Lot/Each | |||||||||||||||
| A015 | Bill of Materials (BOM) For Logistics and Supply Chain Risk Management | Priced upon first TSS delivery and as requested | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||||
| A016 | Diminishing Manufacturing Sources and Material Shortages (DMSMS) Implementation Plan | Priced upon first TSS delivery and as requested | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||||
| A017 | Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Plan | 1 in Year 1 | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||||
| A018 | Obsolescence Alert Notice | Priced per notice | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||||
| A019 | Failure Reporting, Analysis and Corrective Action Taken | priced per quarter | Lot/Each | 4.0 | $0.00 | 4.0 | $0.00 | 4.0 | $0.00 | 4.0 | $0.00 | 4.0 | $0.00 | |||||
| A020 | Product Support Analysis | Priced per analysis | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||||
| A021 | Reliability and Maintenance Predictions Report | NSP | Lot/Each | |||||||||||||||
| A022 | Reliability-Centered Maintenance (RCM) Analysis Report | NSP | Lot/Each | |||||||||||||||
| A023 | Engineering Data for Provisioning (EDFP) | 1 in year 1 | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||||
| A024 | Depot Maintenance Study | 1 in Year 1 | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||||
| A025 | Safety Assessment Report | Priced concurrent with delivery of first TSS unit | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||||
| A026 | Training Support Package and Training Materials | NSP, CPFF | Lot/Each | |||||||||||||||
| A027 | System Technical Manuals | NSP, CPFF | Lot/Each | |||||||||||||||
| A028 | Program Protection Implementation (PPIP) | NSP, specified in individual TOs/Dos | Lot/Each | |||||||||||||||
| A029 | Government Property Inventory Report (GFE/P)/ Contractor Acquired Property (CAP) Inventory Report | Priced per TSS unit | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||||
| A030 | Item Unique Identification (IUID) Marking Plan | 4 per year | Lot/Each | 4.0 | $0.00 | 4.0 | $0.00 | 4.0 | $0.00 | 4.0 | $0.00 | 4.0 | $0.00 | |||||
| A031 | Proposed Spare Parts List | Priced concurrent with delivery of first TSS unit | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||||
| A032 | Contractor Field Service Reports | 1 per week | Lot/Each | 52.0 | $0.00 | 52.0 | $0.00 | 52.0 | $0.00 | 52.0 | $0.00 | 52.0 | $0.00 | |||||
| A033 | Maintenance Support Plan | 1 in Year 1 | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||||
| A034 | Site Survey Report | 1 in Year 1, CPFF | Lot/Each | |||||||||||||||
| A035 | Site Work Package | 1 in Year 1, CPFF | Lot/Each | |||||||||||||||
| A036 | DoD Risk Management Framework Package Deliverables | Priced as required | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||||
| A037 | Contactor’s Risk Management Plan | 1 in Year 1 | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||||
| A038 | Contractor’s Risk Management Status Report | Monthly | Lot/Each | 12.0 | $0.00 | 12.0 | $0.00 | 12.0 | $0.00 | 12.0 | $0.00 | 12.0 | $0.00 | |||||
| A039 | Engineering Change Proposals | Priced per ECP NSP | Lot/Each | |||||||||||||||
| A040 | Notice of Revision (NOR) | Priced per NOR, NSP | Lot/Each | |||||||||||||||
| A041 | Request for Variance (RFV) | Priced per RFV, NSP | Lot/Each | |||||||||||||||
| A042 | Operations Security Report | priced for training | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 |
| PWS # | PWS Description | Quantity Description | Quantity Type | Quantity | Unit/Lot Price | Extended Price | Quantity | Unit/Lot Price | Extended Price | Quantity | Unit/Lot Price | Extended Price | Quantity | Unit/Lot Price | Extended Price | Quantity | Unit/Lot Price | Extended Price | CDRL | Type |
| 5.1 | Program Management | A001 | FFP | |||||||||||||||||
| 5.1.1 | Key Personnel | FFP per year, key staff | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | FFP | ||||||
| 5.1.2 | Program Meetings | FFP | ||||||||||||||||||
| 5.1.3 | Contract Kickoff Meeting | One Post Award Meeting NLT 10 Days after order. | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A002, A003 | FFP | |||||
| 5.1.4 | Technical Interchange Meetings (TIM) | Minimum of 1 and maximum of 6 per year. | Lot/Each | 6.0 | $0.00 | 6.0 | $0.00 | 6.0 | $0.00 | 6.0 | $0.00 | 6.0 | $0.00 | A002, A003 | FFP | |||||
| 5.2 | Quality Assurance | Priced for QA Plan and Monthly Reports which are Included in Contractors monthly report. | A001, A004 | FFP | ||||||||||||||||
| 5.2.1 | Test Support | - | ||||||||||||||||||
| 5.2.2 | Integration/Regression Test Support | Priced to support integration and regression testing from changes directed by the Government (see PWS). NSP, CPFF | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A005 | CPFF | |||||
| 5.2.3 | Government Acceptance Test Support | Priced to plan, develop, implement, and maintain a product acceptance system that demonstrates compliance with the technical and contractual requirements identified in this PWS. | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A006 | FFP | |||||
| 5.2.4 | First Article Test | Priced for the first unit produced and shall cover, at a minimum, the P-Spec requirements marked for the FAT in Appendix 3 - Acceptance Test Requirements Matrix | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A006, A007 | ||||||
| 5.3 | Engineering Support | Will be specified in the individual TO/Dos. | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | CPFF | ||||||
| 5.3.1 | Interface Control Document (ICD) | Priced per ECP | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A008 | FFP | |||||
| 5.4 | Other Services | - | ||||||||||||||||||
| 5.4.1 | Configuration Management | Priced to maintain a CM Process of which the Government reserves the right to review and approve (see PWS). | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A009, A010 | FFP | |||||
| 5.4.2 | Production Procedures | Priced to maintain detailed production assembly procedures and documentation to include assembly instructions in a baseline description. (see PWS). | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A011 | FFP | |||||
| 5.4.3 | Product Data | Priced to update and maintain Product Data (see PWS), CPFF. | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A012, A013, A014 | CPFF | |||||
| 5.4.4 | Diminishing Manufacturing Sources and Material Shortages (DMSMS) | Priced per minimizing materiel readiness risks and managing obsolescence during the POP (see PWS). | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A015, A016, A017, A018 | FFP | |||||
| 5.4.5 | Failure Reporting, Analysis and Corrective Action System (FRACAS) | Priced to collect and analyze failure data to determine the cause of equipment failures (see PWS) plus implantation of FRACAS. | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A019 | FFP | |||||
| 5.4.6 | Product Support Analysis (PSA) | Priced per Product Support Analysis plus Life Cycle Sustainment Plan. | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A020 | FFP | |||||
| 5.4.7 | Customer Wait Time | Negotiated at TO level. Contractor shall work with the Government to establish acceptable customer wait times (CWT) to support each phase of the contract. | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | FFP | ||||||
| 5.4.8 | Reliability, Availability and Maintainability (RAM) Program. | Negotiated at the TO/DO level to include Reliability and Maintainability Predictions Report and Reliability-Centered Maintenance (RCM) Analysis Report. | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A021, A022 | FFP | |||||
| 5.4.9 | Provisioning | Priced for submission of Provisioning Parts Data. | Lot/Each | 12.0 | $0.00 | 12.0 | $0.00 | 12.0 | $0.00 | 12.0 | $0.00 | 12.0 | $0.00 | A023 | FFP | |||||
| 5.4.10 | Reach-back Support | Negotiated at the individual TO/DO. | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | FFP | ||||||
| 5.4.11 | Asset Visibility | Priced to utilize the COLTS program management suite for providing asset visibility. | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | FFP | ||||||
| 5.4.12 | Depot Maintenance Study/Organic Depot Assessment Data | 1 in Year 1 | A024 | FFP | ||||||||||||||||
| 5.4.13 | Human System Integration (HSI) | Safety Assessment Report as changes to TSS are made. | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A025 | FFP | |||||
| 5.4.14 | Training | Priced per training event (see PWS) not including Training Support Package and Training Materials, CPFF. | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A026 | CPFF | |||||
| 5.4.15 | Technical Manual Updates | Priced per item (see PWS), CPFF. | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A027 | CPFF | |||||
| 5.4.16 | Program Protection Planning | Priced for multiple tasks (see PWS). | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A028 | FFP | |||||
| 5.4.17 | Travel | 15 trips (See PWS | Lot/Each | 15.0 | $0.00 | 15.0 | $0.00 | 15.0 | $0.00 | 15.0 | $0.00 | 15.0 | $0.00 | A001 | Cost | |||||
| 6.0 | Production Materials and Equipment | - | ||||||||||||||||||
| 6.1 | Government Property / Equipment | Priced for Government Property Inventory Reports and Acquired Property Inventory Reports (see PWS). | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A029 | FFP | |||||
| 6.1.1 | TSS Equipment | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | FFP | |||||||
| 6.1.2 | Bar-Coding, Serialization, and Labeling | Priced as a component of TSS spares. | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A030 | FFP | |||||
| 6.1.3 | Packing, Handling, Storage, Transportation, and Marking | Priced as a component of TSS spares. | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | FFP | ||||||
| 6.1.4 | Warranty Items | Priced as a component of TSS spares. | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | FFP | ||||||
| 6.1.5 | TSS Spares | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A007, A031 | FFP | ||||||
| 6.1.6 | Environmental, Safety, and Occupational Health | Priced to implement and maintain an ESOH evaluation Program (see PWS). | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A026 | FFP | |||||
| 6.1.7 | Field Service Support | NSP, CPFF | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A032 | CPFF | |||||
| 6.1.8 | Readiness Sustainment | Priced for Sustainment required to support the effort (see PWS). | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A033 | FFP | |||||
| 6.1.9 | Repair, Inspection, Evaluation Of Non-Warranty Items | A019 | ||||||||||||||||||
| 6.1.10 | Installation | Segregated at TO level, CCFP, priced per year | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | CPFF | ||||||
| 6.1.11 | Site Survey | Priced to prepare a Site Survey Report and Site Work Package. | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A034, A035 | CPFF | |||||
| 6.2 | Cybersecurity | Priced to support the Assessment and Authorization process and enforce the security controls required to safeguard the data and software. | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A036 | FFP | |||||
| 6.3 | Risk Management | Priced for Contactor’s Risk Management Plan and Contractor’s Risk Management Status Report. | A037, A038 | FFP | ||||||||||||||||
| 6.4 | Engineering Change Proposal (ECP) | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | - | |||||||
| 6.4.1 | Class I Major ECPs | Priced per ECP and NOR | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A039, A040 | - | |||||
| 6.4.2 | Class I Minor ECPs | Priced per ECP and NOR | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A039, A040 | - | |||||
| 6.4.3 | Class II Administrative ECPs | Priced per ECP and NOR | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A039, A040 | - | |||||
| 6.4.4 | Request for Variance (RFV) | Priced per RFV | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A041 | - | |||||
| 7.0 | Security Requirements | |||||||||||||||||||
| 8.0 | Special Security Requirements | A042 | ||||||||||||||||||
| 8.1.1 | Anti-Terrorism (At) Level I Awareness Training For Contractors Location In Continental United States (Conus) | |||||||||||||||||||
| 8.1.2 | AT Awareness Training For Outside Conus (OCONUS) | |||||||||||||||||||
| 8.1.3 | Access And General Protection/Security Policy And Procedures | |||||||||||||||||||
| 8.1.4 | Contractors/Subcontractors Requiring Common Access Card (CAC) | |||||||||||||||||||
| 8.1.5 | Contractors/Subcontractors Not Requiring CAC, But Require Access To A DoD Facility Or Installation | |||||||||||||||||||
| 8.1.6 | IWATCH Training | |||||||||||||||||||
| 8.1.7 | Army Training Certification Tracking System (ATCTS) | |||||||||||||||||||
| 8.1.8 | Operations Security Source Standard Operating Procedure Plan | A042 | ||||||||||||||||||
| 8.1.9 | OPSEC Training | |||||||||||||||||||
| 8.1.10 | Information Assurance (IA)/It Training | |||||||||||||||||||
| 8.1.11 | 1A/ IT Certification | |||||||||||||||||||
| 8.1.12 | Threat Awareness Reporting Program (TARP) Training | |||||||||||||||||||
| 8.1.13 | CONUS Replacement Center (CRC) Training | |||||||||||||||||||
| 8.1.14 | Contractor Personnel Supporting U.S. Armed Forces Deployed OCONUS | |||||||||||||||||||
| 8.1.15 | International Trafficking In Arms Regulations Compliance Program | |||||||||||||||||||
| 9.0 | Contractor Manpower Reporting | |||||||||||||||||||
| 10.0 | Government's Rights To Technical Data And Computer Software | |||||||||||||||||||
| 11.0 | General Information | |||||||||||||||||||
| 11.1.1 | Inspection And Acceptance | |||||||||||||||||||
| 11.1.2 | Quality Assurance |
TOTAL COST $0.00 TOTAL COST $0.00 TOTAL COST $0.00 TOTAL COST $0.00 TOTAL COST $0.00
PWS 0727
| CDRL | PWS Ref. | Title | Type | ||
| A001 | 5.1 | Program Management | FFP | ||
| 5.1.1 | Key Personnel | FFP | |||
| 5.1.2 | Program Meetings | FFP | |||
| A002, A003 | 5.1.3 | Contract Kickoff Meeting | FFP | ||
| A002, A003 | 5.1.4 | Technical Interchange Meetings (TIM) | FFP | ||
| A001, A004 | 5.2 | Quality Assurance | FFP | ||
| 5.2.1 | Test Support | - | |||
| A005 | 5.2.2 | Integration/Regression Test Support | CPFF | ||
| A006 | 5.2.3 | Government Acceptance Test Support | FFP | ||
| A006, A007 | 5.2.4 | First Article Test | |||
| 5.3 | Engineering Support | CPFF | |||
| A008 | 5.3.1 | Interface Control Document (ICD) | FFP | ||
| 5.4 | Other Services | - | |||
| A009, A010 | 5.4.1 | Configuration Management | FFP | ||
| A011 | 5.4.2 | Production Procedures | FFP | ||
| A012, A013, A014 | 5.4.3 | Product Data | CPFF | ||
| A015, A016, A017, A018 | 5.4.4 | Diminishing Manufacturing Sources and Material Shortages (DMSMS) | FFP | ||
| A019 | 5.4.5 | Failure Reporting, Analysis and Corrective Action System (FRACAS) | FFP | ||
| A020 | 5.4.6 | Product Support Analysis (PSA) | FFP | ||
| 5.4.7 | Customer Wait Time | FFP | |||
| A021, A022 | 5.4.8 | Reliability, Availability and Maintainability (RAM) Program. | FFP | ||
| A023 | 5.4.9 | Provisioning | FFP | ||
| 5.4.10 | Reach-back Support | FFP | |||
| 5.4.11 | Asset Visibility | FFP | |||
| A024 | 5.4.12 | Depot Maintenance Study/Organic Depot Assessment Data | FFP | ||
| A025 | 5.4.13 | Human System Integration (HSI) | FFP | ||
| A026 | 5.4.14 | Training | CPFF | ||
| A027 | 5.4.15 | Technical Manual Updates | CPFF | ||
| A028 | 5.4.16 | Program Protection Planning | FFP | ||
| A001 | 5.4.17 | Travel | Cost | ||
| 6.0 | Production Materials and Equipment | - | |||
| A029 | 6.1 | Government Property / Equipment | FFP | mandatory | |
| 6.1.1 | TSS Equipment | FFP | |||
| A030 | 6.1.2 | Bar-Coding, Serialization, and Labeling | FFP | ||
| 6.1.3 | Packing, Handling, Storage, Transportation, and Marking | FFP | |||
| 6.1.4 | Warranty Items | FFP | |||
| A007, A031 | 6.1.5 | TSS Spares | FFP | ||
| A026 | 6.1.6 | Environmental, Safety, and Occupational Health | FFP | ||
| A032 | 6.1.7 | Field Service Support | CPFF | ||
| A033 | 6.1.8 | Readiness Sustainment | FFP | ||
| A019 | 6.1.9 | REPAIR, INSPECTION, EVALUATION OF NON-WARRANTY ITEMS | |||
| 6.1.10 | Installation | CPFF | |||
| A034, A035 | 6.1.11 | Site Survey | CPFF | ||
| A036 | 6.2 | Cybersecurity | FFP | ||
| A037, A038 | 6.3 | Risk Management | FFP | ||
| 6.4 | Engineering Change Proposal (ECP) | - | included in other sections including Engineering Support | ||
| A039, A040 | 6.4.1 | Class I Major ECPs | - | ||
| A039, A040 | 6.4.2 | Class I Minor ECPs | - | ||
| A039, A040 | 6.4.3 | Class II Administrative ECPs | - | ||
| A041 | 6.4.4 | Request for Variance (RFV) | - | ||
| 7.0 | Security Requirements | ||||
| A042 | 8.0 | Special Security Requirements | |||
| 8.1.1 | Anti-Terrorism (At) Level I Awareness Training For Contractors Location In Continental United States (Conus) | ||||
| 8.1.2 | AT Awareness Training For Outside Conus (Oconus) | ||||
| 8.1.3 | Access And General Protection/Security Policy And Procedures | ||||
| 8.1.4 | Contractors/Subcontractors Requiring Common Access Card (CAC) | ||||
| 8.1.5 | Contractors/Subcontractors Not Requiring CAC, But Require Access To A DoD Facility Or Installation | ||||
| 8.1.6 | Iwatch Training | ||||
| 8.1.7 | Army Training Certification Tracking System (ATCTS) | ||||
| A042 | 8.1.8 | Operations Security Source Standard Operating Procedure Plan | |||
| 8.1.9 | OPSEC Training | ||||
| 8.1.10 | Information Assurance (Ia)/It Training | ||||
| 8.1.11 | 1A/ IT Certification | ||||
| 8.1.12 | Threat Awareness Reporting Program (TARP) Training | ||||
| 8.1.13 | Conus Replacement Center (CRC) Training | ||||
| 8.1.14 | Contractor Personnel Supporting U.S. Armed Forces Deployed Oconus | ||||
| 8.1.15 | International Trafficking In Arms Regulations Compliance Program | ||||
| 9.0 | Contractor Manpower Reporting | ||||
| 10.0 | Government’S Rights To Technical Data And Computer Software | ||||
| 11.0 | General Information | ||||
| 11.1.1 | Inspection And Acceptance | ||||
| 11.1.2 | Quality Assurance |
Schedule
| New Procurement | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 | FY27 | FY28 | TOTAL |
| System Quantity Production | 8 | 8 | 8 | 8 | 4 | 36 | |||
| System Quantity Production - IBD | 10 | 10 | 10 | 10 | 40 | ||||
| Total | 8 | 18 | 18 | 18 | 14 | 0 | 0 | 0 | 76 |
| IGSSR-C Fixed Control Station | 2 | 2 | |||||||
| IGCE Total Cost | $14,699,794 | $35,001,756 | $34,818,656 | $37,986,337 | $34,825,920 | $11,165,104 | $11,431,267 | $11,709,147 | $191,637,980 |
| Repair % from TSS POE = 16.35% | $2,403,416 | $5,722,787 | $5,692,850 | $6,210,766 | $5,694,038 | $1,825,494 | $1,869,012 | $1,914,445 |
| TSS System BOM | Current POE | |||
| Materials Description | QTY per Kit | Price ($K) | Total Cost ($K) | Total Cost ($) |
| Mid Range PTZ EO/LWIR | 2 | $ 40.00 | $ 80.00 | $ 80,000.00 |
| Mid Range PTZ EO/MWIR | 2 | $ 70.00 | $ 140.00 | $ 140,000.00 |
| Perimeter Intrusion Sensor | 6 | $ 30.00 | $ 180.00 | $ 180,000.00 |
| Pan Tilt Zoom Camera (PTZ) | 10 | $ 3.25 | $ 32.50 | $ 32,500.00 |
| Linear Sensing System (LSS) | 1 | $ 200.00 | $ 200.00 | $ 200,000.00 |
| Tri Pod | 8 | $ 1.70 | $ 13.60 | $ 13,600.00 |
| Radio | 11 | $ 4.40 | $ 48.40 | $ 48,400.00 |
| Power System | 7 | $ 35.00 | $ 245.00 | $ 245,000.00 |
| Audio | 2 | $ 5.00 | $ 10.00 | $ 10,000.00 |
| Control/Command Station | 1 | $ 67.00 | $ 67.00 | $ 67,000.00 |
| Data & Power Distribution (DPD) | 8 | $ 16.80 | $ 134.40 | $ 134,400.00 |
| Fixed Imaging | 10 | $ 1.25 | $ 12.50 | $ 12,500.00 |
| $ 1,163.40 | $ 1,163,400.00 |
| IGSSR-C Fixed Control Station | ||||
| Current BOM (No Cross Domain Kit) | Current POE | |||
| Materials Description | QTY per Kit | Price ($K) | Total Cost ($K) | Total Cost ($) |
| Node | ||||
| Node Server / Switch OTC | 2 | $ 211.96 | $ 423.92 | $ 423,920.00 |
| Node UPS OTC | 2 | $ 38.37 | $ 76.74 | $ 76,740.00 |
| Node EBM OTC | 2 | $ 9.43 | $ 18.86 | $ 18,860.00 |
| $ 519.52 | $ 519,520.00 | |||
| Client Workstation (Populated Storage Case) | 2 | $ 42.56 | $ 85.12 | $ 85,120.00 |
| Sensor Connectivity Kit OTC | 2 | $ 25.47 | $ 50.94 | $ 50,940.00 |
| Time Provider | 1 | $ 29.29 | $ 29.29 | $ 29,290.00 |
| Kit SW License | 1 | $ 240.53 | $ 240.53 | $ 240,529.00 |
| Per System Cost | $ 925.40 | $ 925,399.00 |
Option Effort
| Year 6 | Year 7 | Year 8 | ||||||||||||
| CLIN | PWS | Material Description | Quantity Description | Quantity Type | Weight | Lot Price | Extended Price | Weight | Lot Price | Extended Price | Weight | Lot Price | Extended Price | |
| 6.1.1 | TSS Equipment | Fixed Quantities ordered with range pricing | Lot | 8.0 | 18.0 | 18.0 | ||||||||
| Qty 1-5 | 2.0 | $0.00 | 4.5 | $0.00 | 4.5 | $0.00 | 25% | |||||||
| Qty 6-10 | 4.0 | $0.00 | 9.0 | $0.00 | 9.0 | $0.00 | 50% | |||||||
| Qty 11-20 | 2.0 | $0.00 | 4.5 | $0.00 | 4.5 | $0.00 | 25% |
| Quantity Type | Weight | Lot Price | Extended Price | Weight | Lot Price | Extended Price | Weight | Lot Price | Extended Price | |||
| 6.1.9 | Minor Repair - Field Level Repair (Man Hours) | Lot | 8.44 | 8.44 | 8.44 | |||||||
| Maintenance Category 1 | 0.7 | $0.00 | 0.7 | $0.00 | 0.7 | $0.00 | 8% | |||||
| Maintenance Category 2 | 1.3 | $0.00 | 1.3 | $0.00 | 1.3 | $0.00 | 15% |
| 6.1.9 | Minor Repair - Depot Level Repair (Man Hours) | Lot | 113.64 | 113.64 | 113.64 | ||||
| Maintenance Category 1 | 9.1 | $0.00 | 9.1 | $0.00 | 9.1 | $0.00 | 8% | ||
| Maintenance Category 2 | 17.0 | $0.00 | 17.0 | $0.00 | 17.0 | $0.00 | 15% |
| 6.1.9 | Moderate Repair - Depot Level Repair (Man Hours) | Lot | 1,287.96 | 1,287.96 | 1,287.96 | ||||
| Maintenance Category 3 | 244.71 | $0.00 | 244.71 | $0.00 | 244.71 | $0.00 | 19% | ||
| Maintenance Category 4 | 296.23 | $0.00 | 296.23 | $0.00 | 296.23 | $0.00 | 23% | ||
| Maintenance Category 5 | 360.63 | $0.00 | 360.63 | $0.00 | 360.63 | $0.00 | 28% | ||
| Maintenance Category 6 | 412.15 | $0.00 | 412.15 | $0.00 | 412.15 | $0.00 | 32% | ||
| Maintenance Category 7 | 463.67 | $0.00 | 463.67 | $0.00 | 463.67 | $0.00 | 36% | ||
| Maintenance Category 8 | 515.18 | $0.00 | 515.18 | $0.00 | 515.18 | $0.00 | 40% |
| Quantity Type | Weight | Lot Price | Extended Price | Weight | Lot Price | Extended Price | Weight | Lot Price | Extended Price | ||||
| 6.1.6 | Spares | ||||||||||||
| EOIR Pan/Tilt/Zoom Medium Range (Aeron) | Lot | 1.0 | 1.0 | 1.0 | |||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| EOIR Pan/Tilt/Zoom Long Range (Aeron) | Lot | 1.0 | 1.0 | 1.0 | |||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Electro-Optical Pan/Tilt/Zoom (Bosch) | Lot | 1.0 | 1.0 | 1.0 | |||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Electro-Optical Pan/Tilt/Zoom Dome (Axis PTZ Dome) | Lot | 1.0 | 1.0 | 1.0 | |||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Electro-Optical Camera Fixed (Axis Bullet) | Lot | 1.0 | 1.0 | 1.0 | |||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Electro-Optical Camera Fixed Dome (Axis Fixed Dome) | Includes Omnidirectional Microphone | Lot | 1.0 | 1.0 | 1.0 | ||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Qty 6-10 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 50% | ||||||
| Solid State Sector RADAR (Echodyne) | Lot | 1.0 | 1.0 | 1.0 | |||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Qty 6-10 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 50% | ||||||
| Linear Sensor System Laser Interrogator (Sintela) | Lot | 1.0 | 1.0 | 1.0 | |||||||||
| Qty 1-5 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 100% | ||||||
| Elevating Mast (Blue Sky) | Lot | 1.0 | 1.0 | 1.0 | |||||||||
| Qty 1-5 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 100% | ||||||
| Tripod (MOOG) | Lot | 1.0 | 1.0 | 1.0 | |||||||||
| Qty 1-5 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 100% | ||||||
| Point-to-Multipoint Access Point Radio | Lot | 1.0 | 1.0 | 1.0 | |||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Point-to-Multipoint Subscriber Radio | Lot | 1.0 | 1.0 | 1.0 | |||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Qty 6-10 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 50% | ||||||
| Power System | |||||||||||||
| Power Management Box | Lot | 1.0 | 1.0 | 1.0 | |||||||||
| Qty 1-5 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 100% | ||||||
| Battery Box | Lot | 1.0 | 1.0 | 1.0 | |||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Solar Array | Lot | 1.0 | 1.0 | 1.0 | |||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Generator | Lot | 1.0 | 1.0 | 1.0 | |||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Directional Acoustic Assembly | Includes Integrated EO Camera Fixed wPTU and Directional Microphone | Lot | 1.0 | 1.0 | 1.0 | ||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Fixed Control Station (FCS) | |||||||||||||
| FCS Processing Unit (Micro disc) | Lot | 1.0 | 1.0 | 1.0 | |||||||||
| Qty 1-5 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 100% | ||||||
| FCS Router (Cisco) | Lot | 1.0 | 1.0 | 1.0 | |||||||||
| Qty 1-5 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 100% | ||||||
| FCS UPS (Synqor) | Lot | 1.0 | 1.0 | 1.0 | |||||||||
| Qty 1-5 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 100% | ||||||
| Portable Control Station (PCS) | Includes AC Power Supply and DC Power Supply) | Lot | 1.0 | 1.0 | 1.0 | ||||||||
| Qty 1-5 | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | 100% | ||||||
| T-Hub | Lot | 1.0 | 1.0 | 1.0 | |||||||||
| Qty 1-5 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 25% | ||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Qty 11-20 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 25% | ||||||
| Cables (Combined) | Includes all data and power cables for one kit | Lot | 1.0 | 1.0 | 1.0 | ||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Transit Cases | Includes all cases requires for one kit (not including Tricons) | Lot | 1.0 | 1.0 | 1.0 | ||||||||
| Qty 1-5 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Ancillary Equipment (see definition tab) | Lot | 1.0 | 1.0 | 1.0 | |||||||||
| Qty 1-5 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 25% | ||||||
| Qty 6-10 | 0.5 | $0.00 | 0.5 | $0.00 | 0.5 | $0.00 | 50% | ||||||
| Qty 11-20 | 0.3 | $0.00 | 0.3 | $0.00 | 0.3 | $0.00 | 25% |
| CDRL # | CDRL Description | Quantity Description | Quantity Type | Quantity | Unit/Lot Price | Extended Price | Quantity | Unit/Lot Price | Extended Price | Quantity | Unit/Lot Price | Extended Price |
| A001 | Contractor’s Progress, Status and Management Report | Monthly report | Lot/Each | 12.0 | $0.00 | 12.0 | $0.00 | 12.0 | $0.00 | |||
| A002 | Briefing Material | Priced per briefing material event. | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||
| A003 | Report, Record of Meetings/Minutes | Priced per event | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||
| A004 | Quality Assurance Program Plan | 1 in Year 1 | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||
| A005 | Failure Analysis and Corrective Action Report | Priced per report, NSP, CPFF | Lot/Each | |||||||||
| A006 | Acceptance Test Plan | Priced per plan | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||
| A007 | Acceptance Test Report | Priced concurrent with each TSS unit | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||
| A008 | Interface Control Document (ICD) | priced for 1 in Year 1 and per ECP | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||
| A009 | Supplier’s Configuration Management Plan | Priced concurrent with each TSS or component delivery. | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||
| A010 | Configuration Audit Plan | 1 in Year 1 and updates as requested | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||
| A011 | Baseline Description Document (BDD) | Priced concurrent with each TSS or component delivery. | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||
| A012 | Technical Data Package (TDP) | Priced per package, NSP, CPFF | Lot/Each | |||||||||
| A013 | Logistics Product Data (LPD) | Priced per product, NSP, CPFF | Lot/Each | |||||||||
| A014 | Data Accession List | Priced per product, NSP, CPFF | Lot/Each | |||||||||
| A015 | Bill of Materials (BOM) For Logistics and Supply Chain Risk Management | Priced upon first TSS delivery and as requested | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||
| A016 | Diminishing Manufacturing Sources and Material Shortages (DMSMS) Implementation Plan | Priced upon first TSS delivery and as requested | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||
| A017 | Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Plan | 1 in Year 1 | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||
| A018 | Obsolescence Alert Notice | Priced per notice | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||
| A019 | Failure Reporting, Analysis and Corrective Action Taken | priced per quarter | Lot/Each | 4.0 | $0.00 | 4.0 | $0.00 | 4.0 | $0.00 | |||
| A020 | Product Support Analysis | Priced per analysis | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||
| A021 | Reliability and Maintenance Predictions Report | NSP | Lot/Each | |||||||||
| A022 | Reliability-Centered Maintenance (RCM) Analysis Report | NSP | Lot/Each | |||||||||
| A023 | Engineering Data for Provisioning (EDFP) | 1 in year 1 | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||
| A024 | Depot Maintenance Study | 1 in Year 1 | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||
| A025 | Safety Assessment Report | Priced concurrent with delivery of first TSS unit | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||
| A026 | Training Support Package and Training Materials | NSP, CPFF | Lot/Each | |||||||||
| A027 | System Technical Manuals | NSP, CPFF | Lot/Each | |||||||||
| A028 | Program Protection Implementation (PPIP) | NSP, specified in individual TOs/Dos | Lot/Each | |||||||||
| A029 | Government Property Inventory Report (GFE/P)/ Contractor Acquired Property (CAP) Inventory Report | Priced per TSS unit | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||
| A030 | Item Unique Identification (IUID) Marking Plan | 4 per year | Lot/Each | 4.0 | $0.00 | 4.0 | $0.00 | 4.0 | $0.00 | |||
| A031 | Proposed Spare Parts List | Priced concurrent with delivery of first TSS unit | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||
| A032 | Contractor Field Service Reports | 1 per week | Lot/Each | 52.0 | $0.00 | 52.0 | $0.00 | 52.0 | $0.00 | |||
| A033 | Maintenance Support Plan | 1 in Year 1 | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||
| A034 | Site Survey Report | 1 in Year 1, CPFF | Lot/Each | |||||||||
| A035 | Site Work Package | 1 in Year 1, CPFF | Lot/Each | |||||||||
| A036 | DoD Risk Management Framework Package Deliverables | Priced as required | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||
| A037 | Contactor’s Risk Management Plan | 1 in Year 1 | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | |||
| A038 | Contractor’s Risk Management Status Report | Monthly | Lot/Each | 12.0 | $0.00 | 12.0 | $0.00 | 12.0 | $0.00 | |||
| A039 | Engineering Change Proposals | Priced per ECP NSP | Lot/Each | |||||||||
| A040 | Notice of Revision (NOR) | Priced per NOR, NSP | Lot/Each | |||||||||
| A041 | Request for Variance (RFV) | Priced per RFV, NSP | Lot/Each | |||||||||
| A042 | Operations Security Report | priced for training | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 |
| PWS # | PWS Description | Quantity Description | Quantity Type | Quantity | Unit/Lot Price | Extended Price | Quantity | Unit/Lot Price | Extended Price | Quantity | Unit/Lot Price | Extended Price | CDRL | Type |
| 5.1 | Program Management | A001 | FFP | |||||||||||
| 5.1.1 | Key Personnel | FFP per year, key staff | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | FFP | ||||
| 5.1.2 | Program Meetings | FFP | ||||||||||||
| 5.1.3 | Contract Kickoff Meeting | One Post Award Meeting NLT 10 Days after order. | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A002, A003 | FFP | |||
| 5.1.4 | Technical Interchange Meetings (TIM) | Minimum of 1 and maximum of 6 per year. | Lot/Each | 6.0 | $0.00 | 6.0 | $0.00 | 6.0 | $0.00 | A002, A003 | FFP | |||
| 5.2 | Quality Assurance | Priced for QA Plan and Monthly Reports which are Included in Contractors monthly report. | A001, A004 | FFP | ||||||||||
| 5.2.1 | Test Support | - | ||||||||||||
| 5.2.2 | Integration/Regression Test Support | Priced to support integration and regression testing from changes directed by the Government (see PWS). NSP, CPFF | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A005 | CPFF | |||
| 5.2.3 | Government Acceptance Test Support | Priced to plan, develop, implement, and maintain a product acceptance system that demonstrates compliance with the technical and contractual requirements identified in this PWS. | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A006 | FFP | |||
| 5.2.4 | First Article Test | Priced for the first unit produced and shall cover, at a minimum, the P-Spec requirements marked for the FAT in Appendix 3 - Acceptance Test Requirements Matrix | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A006, A007 | ||||
| 5.3 | Engineering Support | Will be specified in the individual TO/Dos. | NSP | NSP | NSP | NSP | NSP | NSP | NSP | CPFF | ||||
| 5.3.1 | Interface Control Document (ICD) | Priced per ECP | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A008 | FFP | |||
| 5.4 | Other Services | - | ||||||||||||
| 5.4.1 | Configuration Management | Priced to maintain a CM Process of which the Government reserves the right to review and approve (see PWS). | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A009, A010 | FFP | |||
| 5.4.2 | Production Procedures | Priced to maintain detailed production assembly procedures and documentation to include assembly instructions in a baseline description. (see PWS). | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A011 | FFP | |||
| 5.4.3 | Product Data | Priced to update and maintain Product Data (see PWS), CPFF. | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A012, A013, A014 | CPFF | |||
| 5.4.4 | Diminishing Manufacturing Sources and Material Shortages (DMSMS) | Priced per minimizing materiel readiness risks and managing obsolescence during the POP (see PWS). | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A015, A016, A017, A018 | FFP | |||
| 5.4.5 | Failure Reporting, Analysis and Corrective Action System (FRACAS) | Priced to collect and analyze failure data to determine the cause of equipment failures (see PWS) plus implantation of FRACAS. | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A019 | FFP | |||
| 5.4.6 | Product Support Analysis (PSA) | Priced per Product Support Analysis plus Life Cycle Sustainment Plan. | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A020 | FFP | |||
| 5.4.7 | Customer Wait Time | Negotiated at TO level. Contractor shall work with the Government to establish acceptable customer wait times (CWT) to support each phase of the contract. | NSP | NSP | NSP | NSP | NSP | NSP | NSP | FFP | ||||
| 5.4.8 | Reliability, Availability and Maintainability (RAM) Program. | Negotiated at the TO/DO level to include Reliability and Maintainability Predictions Report and Reliability-Centered Maintenance (RCM) Analysis Report. | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A021, A022 | FFP | |||
| 5.4.9 | Provisioning | Priced for submission of Provisioning Parts Data. | Lot/Each | 12.0 | $0.00 | 12.0 | $0.00 | 12.0 | $0.00 | A023 | FFP | |||
| 5.4.10 | Reach-back Support | Negotiated at the individual TO/DO. | NSP | NSP | NSP | NSP | NSP | NSP | NSP | FFP | ||||
| 5.4.11 | Asset Visibility | Priced to utilize the COLTS program management suite for providing asset visibility. | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | FFP | ||||
| 5.4.12 | Depot Maintenance Study/Organic Depot Assessment Data | 1 in Year 1 | A024 | FFP | ||||||||||
| 5.4.13 | Human System Integration (HSI) | Safety Assessment Report as changes to TSS are made. | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A025 | FFP | |||
| 5.4.14 | Training | Priced per training event (see PWS) not including Training Support Package and Training Materials, CPFF. | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A026 | CPFF | |||
| 5.4.15 | Technical Manual Updates | Priced per item (see PWS), CPFF. | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A027 | CPFF | |||
| 5.4.16 | Program Protection Planning | Priced for multiple tasks (see PWS). | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A028 | FFP | |||
| 5.4.17 | Travel | 15 trips (See PWS | Lot/Each | 15.0 | $0.00 | 15.0 | $0.00 | 15.0 | $0.00 | A001 | Cost | |||
| 6.0 | Production Materials and Equipment | - | ||||||||||||
| 6.1 | Government Property / Equipment | Priced for Government Property Inventory Reports and Acquired Property Inventory Reports (see PWS). | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A029 | FFP | |||
| 6.1.1 | TSS Equipment | NSP | NSP | NSP | NSP | NSP | NSP | NSP | FFP | |||||
| 6.1.2 | Bar-Coding, Serialization, and Labeling | Priced as a component of TSS spares. | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A030 | FFP | |||
| 6.1.3 | Packing, Handling, Storage, Transportation, and Marking | Priced as a component of TSS spares. | NSP | NSP | NSP | NSP | NSP | NSP | NSP | FFP | ||||
| 6.1.4 | Warranty Items | Priced as a component of TSS spares. | NSP | NSP | NSP | NSP | NSP | NSP | NSP | FFP | ||||
| 6.1.5 | TSS Spares | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A007, A031 | FFP | ||||
| 6.1.6 | Environmental, Safety, and Occupational Health | Priced to implement and maintain an ESOH evaluation Program (see PWS). | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A026 | FFP | |||
| 6.1.7 | Field Service Support | NSP, CPFF | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A032 | CPFF | |||
| 6.1.8 | Readiness Sustainment | Priced for Sustainment required to support the effort (see PWS). | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A033 | FFP | |||
| 6.1.9 | Repair, Inspection, Evaluation Of Non-Warranty Items | A019 | ||||||||||||
| 6.1.10 | Installation | Segregated at TO level, CCFP, priced per year | NSP | NSP | NSP | NSP | NSP | NSP | NSP | CPFF | ||||
| 6.1.11 | Site Survey | Priced to prepare a Site Survey Report and Site Work Package. | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A034, A035 | CPFF | |||
| 6.2 | Cybersecurity | Priced to support the Assessment and Authorization process and enforce the security controls required to safeguard the data and software. | Lot/Each | 1.0 | $0.00 | 1.0 | $0.00 | 1.0 | $0.00 | A036 | FFP | |||
| 6.3 | Risk Management | Priced for Contactor’s Risk Management Plan and Contractor’s Risk Management Status Report. | A037, A038 | FFP | ||||||||||
| 6.4 | Engineering Change Proposal (ECP) | NSP | NSP | NSP | NSP | NSP | NSP | NSP | - | |||||
| 6.4.1 | Class I Major ECPs | Priced per ECP and NOR | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A039, A040 | - | |||
| 6.4.2 | Class I Minor ECPs | Priced per ECP and NOR | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A039, A040 | - | |||
| 6.4.3 | Class II Administrative ECPs | Priced per ECP and NOR | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A039, A040 | - | |||
| 6.4.4 | Request for Variance (RFV) | Priced per RFV | NSP | NSP | NSP | NSP | NSP | NSP | NSP | A041 | - | |||
| 7.0 | Security Requirements | |||||||||||||
| 8.0 | Special Security Requirements | A042 | ||||||||||||
| 8.1.1 | Anti-Terrorism (At) Level I Awareness Training For Contractors Location In Continental United States (Conus) | |||||||||||||
| 8.1.2 | AT Awareness Training For Outside Conus (OCONUS) | |||||||||||||
| 8.1.3 | Access And General Protection/Security Policy And Procedures | |||||||||||||
| 8.1.4 | Contractors/Subcontractors Requiring Common Access Card (CAC) | |||||||||||||
| 8.1.5 | Contractors/Subcontractors Not Requiring CAC, But Require Access To A DoD Facility Or Installation | |||||||||||||
| 8.1.6 | IWATCH Training | |||||||||||||
| 8.1.7 | Army Training Certification Tracking System (ATCTS) | |||||||||||||
| 8.1.8 | Operations Security Source Standard Operating Procedure Plan | A042 | ||||||||||||
| 8.1.9 | OPSEC Training | |||||||||||||
| 8.1.10 | Information Assurance (IA)/It Training | |||||||||||||
| 8.1.11 | 1A/ IT Certification | |||||||||||||
| 8.1.12 | Threat Awareness Reporting Program (TARP) Training | |||||||||||||
| 8.1.13 | CONUS Replacement Center (CRC) Training | |||||||||||||
| 8.1.14 | Contractor Personnel Supporting U.S. Armed Forces Deployed OCONUS | |||||||||||||
| 8.1.15 | International Trafficking In Arms Regulations Compliance Program | |||||||||||||
| 9.0 | Contractor Manpower Reporting | |||||||||||||
| 10.0 | Government's Rights To Technical Data And Computer Software | |||||||||||||
| 11.0 | General Information | |||||||||||||
| 11.1.1 | Inspection And Acceptance | |||||||||||||
| 11.1.2 | Quality Assurance |
TOTAL COST $0.00 TOTAL COST $0.00 TOTAL COST $0.00
Definitions Below are ancillary items that are needed for TSS but due to their lower cost, are combined into one element for the Spares section of the Price Model
| Ancillary Equipment | Quantities | Description |
| Brackets/Mounts | All items required for 1 kit | Brackets and accessories to mount the sensors to the Blue Sky Mast, Tripods, wall, building, etc |
| POE to Fiber Media Converter | 1 | Custom integrated assembly that includes two converter boxes |
| Fixed Control Station Mouse w/scroll wheel | 1 | |
| Fixed Control Station Keyboard | 1 | |
| Fixed Control Station Monitor | 1 | |
| Fixed Control Station Hand Controller | 1 | |
| Fixed Control Station Headset | 1 | |
| Fixed Control Station Speaker | 1 | |
| POE Extender | 1 | |
| POE Switch | 1 | |
| Hub AC Power Supply | 1 | |
| SAASM GPS Receiver | 1 | |
| Sensor Location and Orientation Tool | 1 |
Repair Data MAINTENANCE FUNCTIONS REPAIR TYPE INSTALL INSPECT/FAULT ISOLATION REPAIR REPLACE TEST Total
Depot Minor 11.72 4.14 80.00 9.22 8.56 113.64
Depot Moderate 9.80 2.36 1248.00 6.90 20.90 1287.96
Field Minor 2.38 1.50 0.00 2.78 1.78 8.44
| Maintenance Category | Maintenance Category Description |
| 1 | Field (8%) |
| 2 | Field (15%) |
| 3 | Depot (19%) |
| 4 | Depot (23%) |
| 5 | Depot (28%) |
| 6 | Depot (32%) |
| 7 | Depot (36%) |
| 8 | Depot (40%) |
| 9 | Major (50%) |
| 10 | Major (60%) |
MAC Worksheet
| TACTICAL SECURITY SYSTEM (TSS) MAINTENANCE ALLOCATION CHART (MAC) | |||||||||
| LINE REPLACEABLE UNIT (LRU) | MAINTENANCE POLICY | MAINTENANCE FUNCTIONS # OF MAN HOURS | TOOLS/EQUIPMENT | REMARKS | Minor/Moderate | ||||
| INSTALL | INSPECT/FAULT ISOLATION | REPAIR | REPLACE | TEST | |||||
| TSS - CURRENT CONFIGURATION - 7-16-2020 | |||||||||
| Fixed Electo-Optic (EO) Sensor | Depot (Organic/Contractor) | 0.15 | 0.25 | NA | 0.15 | 0.50 | Common Tools | Diagnostics not performed through network | Depot Minor |
| Components of Fixed Electo-Optic (EO) Sensor | Depot (Organic/Contractor) | 0.15 | 0.25 | NA | 0.15 | 0.50 | Common Tools | Diagnostics not performed through network | Depot Minor |
| Fixed Electo-Optic (EO) Sensor Dome | Depot (Organic/Contractor) | 0.15 | 0.25 | NA | 0.15 | 0.50 | Common Tools | Diagnostics not performed through network | Depot Minor |
| Components of Fixed Electo-Optic (EO) Sensor Dome | Depot (Organic/Contractor) | 0.15 | 0.25 | NA | 0.15 | 0.50 | Common Tools | Diagnostics not performed through network | Depot Minor |
| Pan, Tilt, Zoom (PTZ) Electo-Optic (EO) Sensor | Depot (Organic/Contractor) | 0.15 | 0.25 | NA | 0.15 | 0.50 | Common Tools | Diagnostics not performed through network | Depot Minor |
| Components of Pan, Tilt, Zoom (PTZ) Electro-Optic (EO) Sensor | Depot (Organic/Contractor) | 0.15 | 0.25 | NA | 0.15 | 0.50 | Common Tools | Diagnostics not performed through network | Depot Minor |
| Electro-Optic Camera Acoustic Audio Pan Tilt Unit | |||||||||
| Depot (Organic/Contractor) | 0.75 | 0.25 | NA | 0.15 | 0.50 | Common Tools | Diagnostics not performed through network | Depot Minor | |
| Components of Pan, Tilt, Zoom (PTZ) Electro-Optic (EO) Speed Dome Sensor | Depot (Organic/Contractor) | 0.75 | 0.25 | NA | 0.15 | 0.50 | Common Tools | Diagnostics not performed through network | Depot Minor |
| Medium Range IR | Depot (Organic/Contractor) | 0.75 | 0.25 | 40.00 | 0.30 | 0.50 | Common Tools | Diagnostics not performed through network | Depot Moderate |
| Components of Medium Range IR | Depot (Organic/Contractor) | 0.75 | 0.25 | 40.00 | 0.30 | 0.50 | Common Tools | Diagnostics not performed through network | Depot Moderate |
| Long Range IR | Depot (Organic/Contractor) | 0.75 | 0.25 | 40.00 | 0.30 | 0.50 | Common Tools | Diagnostics not performed through network | Depot Moderate |
| Components of Long Range IR | Depot (Organic/Contractor) | 0.75 | 0.25 | 40.00 | 0.30 | 0.50 | Common Tools | Diagnostics not performed through network | Depot Moderate |
| Intrusion Detection Sensor Group (Ground Surveillance Radar) | Depot (Organic/Contractor) | 0.15 | 0.10 | 80.00 | 0.15 | 1.00 | Common Tools | OEM Repair only; Do not touch radar dome surface; Verify and requires compliance with the FCC prior to testing | Depot Moderate |
| Components of Intrusion Detection Sensor Group (Ground Surveillance Radar) | Depot (Organic/Contractor) | 0.15 | 0.10 | 80.00 | 0.15 | 1.00 | Common Tools | OEM Repair only; Do not touch radar dome surface; Verify and requires compliance with the FCC prior to testing | Depot Moderate |
| Acoustic Sensors (Microphone, Directional) | Depot (Organic/Contractor) | 0.75 | 0.10 | NA | 0.75 | 0.10 | Common Tools | Diagnostics not performed through network | Depot Minor |
| Components of Acoustic Sensors (Microphone, Directional) | Depot (Organic/Contractor) | 0.75 | 0.10 | NA | 0.75 | 0.10 | Common Tools | Diagnostics not performed through network | Depot Minor |
| Acoustic Sensors (Microphone, Omni-Directional) | Discard | 0.75 | 0.10 | NA | 0.75 | 0.10 | Common Tools | Diagnostics not performed through network | Field Minor |
| Components of Acoustic Sensors (Microphone, Omni-Directional) | Discard | 0.75 | 0.10 | NA | 0.75 | 0.10 | Common Tools | Diagnostics not performed through network | Field Minor |
| Subterranean Activity Sensors (Linear Sensing System) | Depot (Organic/Contractor) | 0.10 | 0.10 | 160.00 | 0.10 | 2.00 | Common Tools | Diagnostics performed through network | Depot Moderate |
| Components of Subterranean Activity Sensors (Linear Sensing System) | Depot (Organic/Contractor) | 0.10 | 0.10 | 160.00 | 0.10 | 2.00 | Common Tools | Diagnostics performed through network | Depot Moderate |
| T-Hub | Depot (Organic/Contractor) | 0.30 | 0.10 | 40.00 | 0.30 | 3.00 | Common Tools | Diagnostics performed through all communications network | Depot Moderate |
| Components of T-Hub | Depot (Organic/Contractor) | 0.30 | 0.10 | 40.00 | 0.30 | 3.00 | Common Tools | Diagnostics performed through all communications network | Depot Moderate |
| Enclosed Power Supply Unit | Discard | 0.05 | 0.15 | NA | 0.10 | 0.05 | Common Tools | Field Minor |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .