Attachment 0004 Packaging Requirement.doc
DOC document 61 KB Posted
- Solicitation number
- W56HZV19R0293
About this file
This document provides packaging requirements and special instructions for multiple federal supply classes of electronic components. Key details include specific preservation, packing, and marking requirements in accordance with MIL-STD-2073-1 and various Special Packaging Instructions. Unitization, hazardous materials handling, and heat treatment of wood packaging are also outlined. Supplemental instructions specify placing markings on any boxes with short quantities. The related federal contract opportunity seeks information on potential industry capabilities to produce spare components for the M50, M51, M53, and M53A1 family of Joint Service General Protective Masks.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 0001 Range Pricing Worksheet.xlsx | XLSX spreadsheet | |
| Attachment 0006 Special Contract Requirements.docx | DOCX document | |
| Attachment 0009 GFP Attachment.xlsx | XLSX spreadsheet | |
| Attachment 0005 Production Lot Testing.docx | DOCX document | |
| Attachment 0002 FAT Pricing Worksheet.xlsx | XLSX spreadsheet | |
| Attachment 0007 FAT Report and Testing Requirements.docx | DOCX document | |
| Attachment 0003 Engineering_Exceptions.docx | DOCX document | |
| W56HZV19R0293.pdf | ||
| Attachment 0008 FAT Waiver.pdf | ||
| Request_For_Information_Chemical_Mask_Systems_LTC_Final.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 0004 - PACKAGING REQUIREMENTS
D.1 PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS)
(a) Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1, and the Special Packaging Instruction, see below.
PRON NSN PRES
Level of QTY Per SPI # Packing Unit Package EH9L0135EH 4240-01-512-4429 MIL B 001 P5-1-3527-10, dated 16 Jan 2020, REV A EH9L0128EH 4240-01-512-4431 MIL B 001 P5-1-3526-10, dated 14 DEC 2018, REV EH9L0129EH 4240-01-512-4434 MIL B 001 P5-1-3526-20, dated 14 Dec 2018, REV B
EH9L0133EH 4240-01-512-4435 MIL B 001 P5-1-3527-20, dated 16 JAN 2020, REV B
EH9L0134EH 4240-01-512-4436 MIL B 001 P5-1-3527-30, dated 16 JAN 2020, REV B
EH9L0130EH 4240-01-512-4437 MIL B 001 P5-1-3526-30, dated 14 DEC 2018, REV B
EH9L0028EH 4240-01-529-0593 MIL B 001 P71000-3, dated 20 AUG 2017, REV EH0TD015EH 4240-01-529-0601 MIL B 001 P71000-2, dated 20 AUG 2017, REV A
EH9L0029EH 4240-01-529-0602 MIL B 001 P71000-1, dated 20 AUG 2017, REV A
EH9L0031EH 4240-01-529-1399 MIL B 001 P71008-1-17, dated 14 JAN 2020, REV A EH9L0032EH 4240-01-539-5593 MIL B 001 P71006-1, dated 23 DEC 2019, REV A
EH9L0038EH 4720-01-528-9285 MIL B 001 P71012-1, see NOR 276-0018-002 08 EH0TD003EH 4820-01-528-9291 MIL B 001 P5-1-4210, see NOR 275-0113-002
EH0TD004EH 4820-01-528-9292 MIL B 001 P5-1-4209, see NOR 275-0110-002
EH0L0084EH 8465-01-529-0599 MIL B 001 P71021-1, dated 17 DEC 2018, REV B
EH9L0360EH 8465-01-529-1397 MIL B 001 P71021-2, dated 21 DEC 2017, REV B
EH0TD005EH 4240-01-539-3426 MIL B 001 P71003-2, dated 09 JAN 2020, REV B
EH0L0073EH 5330-01-530-1002 MIL B 001 P72003-4, dated 23 DEC 2019, REV D
EH9L0543EH 4240-01-529-8323 MIL B 001 P5-1-4342-10, dated 10 SEP 2019, REV
EH0L0075EH 4240-01-529-8324 MIL B 001 P5-1-4342-20, dated 10 SEP 2019, REV
EH9L0545EH 4240-01-529-8328 MIL B 001 P5-1-4342-70, dated 10 SEP 2019, REV
EH9L0546EH 4240-01-529-8329 MIL B 001 P5-1-4342-40, dated 10 SEP 2019, REV
EH9L0547EH 4240-01-529-8330 MIL B 001 P5-1-4342-30, dated 10 SEP 2019, REV
EH9L0548EH 4240-01-529-8331 MIL B 001 P5-1-4342-80, dated 18 JUN 2019, REV
EH9L0556EH 4240-01-529-8340 MIL B 001 P5-1-4342-50, dated 03 APR 2019, REV
EH9L0549EH 4240-01-529-8345 MIL B 001 P5-1-4342-60, dated 10 SEP 2019, REV
EH9L0550EH 4240-01-529-8353 MIL B 001 P72006-8, dated 26 AUG 2019, REV B
EH9L0540EH 4240-01-529-8357 MIL B 001 P72008-1, dated 14 JUN 2019, REV B
EH9L0562EH 4240-01-529-8358 MIL B 001 P72008-4, dated 06 SEP 2019, REV B
EH9L0557EH 4240-01-529-8360 MIL B 001 P72008-2, dated 14 JUN 2019, REV B
EH9L0558EH 4240-01-529-8362 MIL B 001 P72008-5, dated 14 JUN 2019, REV B
EH9L0559EH 4240-01-529-8365 MIL B 001 P72006-6, dated 26 AUG 2019, REV B
EH9L0560EH 4240-01-529-8366 MIL B 001 P72008-3, dated 06 SEP 2019, REV B
EH9L0564EH 4240-01-529-9194 MIL B 001 P72003-3, dated 05 JUN 2019, REV B
EH9L0565EH 4240-01-529-9209 MIL B 001 P72004-2, dated 15 JUL 2019, REV B
EH0TD011EH 4240-01-646-2614 MIL B 001 P5-1-4243-20, dated 16 JAN 2020, REV
EH0TD010EH 4240-01-646-2625 MIL B 001 P5-1-4243-80, dated 16 JAN 2020, REV
EH0TD013EH 4240-01-646-2637 MIL B 001 P5-1-4243-50, dated 16 JAN 2020, REV
EH0TD012EH 4240-01-646-2646 MIL B 001 P5-1-4243-30, dated 16 JAN 2020, REV
EH0TD014EH 4240-01-646-2683 MIL B 001 P5-1-4243-70, dated 16 JAN 2020, REV
EH0TD009EH 4240-01-646-2699 MIL B 001 P5-1-4243-60, dated 16 JAN 2020, REV
EH0TD008EH 4240-01-646-2709 MIL B 001 P5-1-4243-40, dated 16 JAN 2020, REV
EH0L0081EH 4240-01-660-3862 MIL B 001 P72001-32-1, dated 16 JAN 2020, REV
EH0L0079EH 4240-01-660-3863 MIL B 001 P72001-30-1, dated 16 JAN 2020, REV
EH0L0077EH 4240-01-660-4224 MIL B 001 P72001-28-1, dated 16 JAN 2020, REV
EH0L0078EH 4240-01-660-4232 MIL B 001 P72001-29-1, dated 16 JAN 2020, REV
EH0L0080EH 4240-01-660-5075 MIL B 001 P72001-31-1, dated 16 JAN 2020, REV
EH0L0083EH 4240-01-660-5077 MIL B 001 P72001-34-1, dated 16 JAN 2020, REV
EH0L0076EH 4240-01-660-5084 MIL B 001 P72001-27-1, dated 16 JAN 2020, REV
EH0L0074EH 5120-01-615-6257 MIL B 001 P72004-6, dated 14 JAN 2020, REV B
EH9L0563EH 5331-01-529-8369 MIL B 001 P72004-5-7, dated 15 JULY 2019, REV C
EH0TD007EH 4240-01-646-2717 MIL B 001 P5-1-4243-10, dated 16 JAN 20, REV
EH0L0082EH 4240-01-660-3895 MIL B 001 P72001-33-1, dated 16 JAN 2020, REV
EH0TD006EH 4820-01-530-1000 MIL B 001 P5-1-4211, DATED-09 JAN 20, REV B
(c) THE REQUIRED SPECIAL PACKAGING INSTRUCTION (SPI) IS AVAILABLE ON THE WEB AT THE FOLLOWING URL: N/A (Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobe’s website (http://get.adobe.com/reader/) for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging Instructions in Adobe .PDF images using Internet Explorer, try the following: Go to "Tools," then "Internet Options." Click on the "Advanced" tab. Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")
(b) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
(c) Marking:
(1) In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.
(2) Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html (best viewed with Internet Explorer 11 or higher) for the current DoD Suppliers’ Passive RFID Information Guide. When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at http://dodprocurementtoolbox.com/page/unique-id/tools ) for development of the UII and MIL-STD-129 for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.
(d) Heat Treatment and Marking of Wood Packaging Materials (WPM):
(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), “Regulation of Wood Packaging Material in International Trade,” current edition, (hereinafter “ISPM 15”), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organization’s compliance program.
(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.
(3) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The ALS approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp. Foreign manufacturers shall comply with ISPM -15 and shall have the marking of WPM verified in accordance with their National Plant Protection Organization’s compliance program.
(e) Hazardous Materials (As applicable):
(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
(2) Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).
(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
(f) This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.
(g) SUPPLEMENTAL INSTRUCTIONS:
REFERENCE CONTRACT W56HZV-20-D-XXXX AND CLIN NUMBER ON EACH BOX AND PLACE A RED "X" AND THE WORDS "SHORT" BOX ON THE FRONT OF ANY BOX THAT HAS A SHORT QUANTITY, THEN PLACE THAT BOX/BOXES WITH THE MARKINGS SHOWING ON THE TOP FRONT OF THE PALLET LOAD.
File details come from the government source that posted it. Updated .