DD Form 2794, Pg 1 (METADATA)
| ATTACHMENT 0003 COST AND SOFTWARE DATA REPORTING PLAN | OMB No. 0704-0188 |
| The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. |
PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
| 1a. PROGRAM NAME | |
| UH-60V Black Hawk Digital Cockpit | |
| 1b. PHASE/MILESTONE (check all that apply) | |
| Pre-A | |
| A | |
| B | |
| C-LRIP | |
| X | C-FRP |
| O&S | |
| 1c. PRIME MISSION PRODUCT | |
| H-60V Mechanical A-Kit Production | |
| 1d. ACQUISITION CATEGORY (ACAT) | |
| Pre-ACAT | |
| ACAT I (MDAP) | |
| ACAT IA (MAIS) | |
| X | ACAT II |
| ACAT III | |
| Other | |
| 2. COMMODITY TYPE | |
| Electronic System | |
| 3. PLAN ITERATION TYPE | |
| X | INITIAL |
| REVISION | |
| 4. CURRENT SUBMISSION DATE (YYYYMMDD) | |
| 20221006 | |
| 5. LAST APPROVED PLAN DATE (YYYYMMDD) |
| 6a. GOVERNMENT PLAN POINT OF CONTACT (POC) NAME (Last, First, M.) |
| McDonald, Shirley, J. |
| 6b. ADDRESS (Include ZIP Code) |
| John J. Sparkman Center Building 5308, |
Redstone Arsenal, AL 35898
| 6c. TELEPHONE NUMBER (Include Area Code) | |
| 256-842-6036 | |
| 6d. E-MAIL ADDRESS | |
| Shirley.J.McDonald13.ctr@mail.mil | |
| 7. PLAN TYPE | |
| GOVERNMENT | |
| X | CONTRACT (PRIME) |
| CONTRACT (SUB) | |
| 8. PLAN GOVERNMENT PREPARING ORGANIZATION | |
| UH Project Office | |
| 9a. CONTRACTOR NAME/ADDRESS | |
| i. REPORTING ORGANIZATION NAME | |
| TBD | |
| ii. DIVISION NAME | |
| TBD | |
| iii. LOCATION | |
| TBD | |
| iv. CONTRACTOR BUSINESS DATA REPORT (CBDR 1921-3) REQUIREMENT: | |
| X | CBDR REQUIRED FOR THIS ORGANIZATION |
| 9b. CONTRACT NUMBER (List all that apply, separated by commas) | |
| TBD - (A-16-E-C14) | |
| 9c. APPROPRIATION (check all that apply) | |
| RDT&E | |
| X | PROCUREMENT |
| O&M | |
| FMS | |
| WCF | |
| OTHER | |
| 10a. APPROVED PLAN NUMBER | |
| A-16-E-C14 | |
| 10b. APPROVED PLAN REVISION NUMBER | |
| 0 | |
| 10c. APPROVED PLAN REQUIREMENTS | |
| X | AT COMPLETION COSTS FOR STANDARD FUNCTIONAL CATEGORIES (FlexFile or Legacy) |
| X | AT COMPLETION COSTS FOR RECURRING/NONRECURRING (FlexFile only) |
| X | TECHNICAL DATA REQUIRED |
| 10d. COST REPORT TYPE | |
| X | FLEXFILE |
| LEGACY DD 1921 SERIES |
DRAFT DD FORM 2794 (PAGE 1), METADATA, JANUARY 2019 PREVIOUS EDITION IS OBSOLETE
DD Form 2794, Pg 2 (REPORTING)
| COST AND SOFTWARE DATA REPORTING PLAN | COST, SOFTWARE, & TECHNICAL DATA REPORTING/EARNED VALUE MANAGEMENT CO-PLAN | |||||
| 11. WORK BREAKDOWN STRUCTURE (WBS) | 12. COST | 13. TECHNICAL DATA | ||||
| a. WBS | ||||||
| CODE | b. WBS | |||||
| LEVEL | c. WBS ELEMENT NAME | a. ACTUALS TO | ||||
| DATE (ATD) | b. LEGACY | |||||
| 1921-1 | c. LEGACY | |||||
| 1921-2 | d. LEGACY | |||||
| 1921-5 | e. EAC/FAC | |||||
| (See item 10d) | a. QUANTITY | b. SRDR | ||||
| FORMATS | c. |
MAINT. &
REPAIR
PARTS
| i. QUANTITY | ||
| DATA | ii. GFE |
QUANTITY
| 1.0 | 1 | H-60V Mechanical A-Kit Production | X | ||
| 1.1 | 2 | Mechanical A-Kit | X | ||
| 1.1.1 | 3 | A-Kit Integration, Assembly, Test, and Checkout | X | ||
| 1.1.1.1 | 4 | Integration and Assembly | X | X | X |
| 1.1.1.2 | 4 | Test and Checkout | X | X | X |
| 1.1.1.3 | 4 | Rate Tooling | X | X | X |
| 1.1.2 | 3 | A-Kit Subsystem 1...n (Specify) | X | ||
| 1.1.2.1 | 4 | Subsystem Integration, Assembly, Test, and Checkout | X | X | X |
| 1.1.2.2 | 4 | Subsystem Hardware 1...n (Specify) | X | X | X |
| 1.1.2.3 | 4 | Subsystem Software Release 1...n (Specify) | X | X | |
| 1.1.3 | 3 | A-Kit Software | X | X | |
| 1.2 | 2 | Platform Integration, Assembly, Test, and Checkout | X | X | X |
| 1.3 | 2 | Systems Engineering | |||
| 1.3.1 | 3 | Software Systems Engineering | X | X | |
| 1.3.2 | 3 | Integrated Logistics Support (ILS) Systems Engineering | X | X | |
| 1.3.3 | 3 | Cybersecurity Systems Engineering | X | X | |
| 1.3.4 | 3 | Core Systems Engineering | X | X | |
| 1.3.5 | 3 | Other Systems Engineering 1...n (Specify) | X | X | |
| 1.4 | 2 | Program Management | |||
| 1.4.1 | 3 | Software Program Management | X | X | |
| 1.4.2 | 3 | Integrated Logistics Support (ILS) Program Management | X | X | |
| 1.4.3 | 3 | Cybersecurity Management | X | X | |
| 1.4.4 | 3 | Core Program Management | X | X | |
| 1.4.5 | 3 | Other Program Management 1...n (Specify) | X | X | |
| 1.5 | 2 | System Test and Evaluation | |||
| 1.5.1 | 3 | Developmental Test and Evaluation | |||
| 1.5.1.1 | 4 | Engineering Development Tests | X | X | |
| 1.5.1.2 | 4 | System Qualification Test | X | X | |
| 1.5.1.3 | 4 | Cybersecurity Test and Evaluation | |||
| 1.5.1.3.1 | 5 | Cybersecurity Development Test | X | X | |
| 1.5.1.3.2 | 5 | Cybersecurity Operational Test | X | X | |
| 1.5.1.3.3 | 5 | Cybersecurity Other (1...n) | X | X | |
| 1.5.1.4 | 4 | Service/Agency DT&E 1...n (Specify) (GOV ONLY) | X | X | |
| 1.5.1.5 | 4 | Other DT&E Tests 1...n (Specify) | X | X | |
| 1.5.2 | 3 | Operational Test and Evaluation | |||
| 1.5.2.1 | 4 | Cybersecurity Test and Evaluation | |||
| 1.5.2.1.1 | 5 | Cybersecurity Development Test | X | X | |
| 1.5.2.1.2 | 5 | Cybersecurity Operational Test | X | X | |
| 1.5.2.1.3 | 5 | Cybersecurity Other (1...n) | X | X | |
| 1.5.2.2 | 4 | Other OT&E Tests 1...n (Specify) | X | X | |
| 1.5.3 | 3 | Live Fire Test and Evaluation | X | X | |
| 1.5.4 | 3 | Mock-ups/System Integration Labs (SILs) | X | X | |
| 1.5.5 | 3 | Test and Evaluation Support | X | X | |
| 1.5.6 | 3 | Test Facilities | |||
| 1.5.6.1 | 4 | Commercial (GOV ONLY) | X | X | |
| 1.5.6.2 | 4 | Government (Pay-as-You-Go) (GOV ONLY) | X | X | |
| 1.6 | 2 | Training | |||
| 1.6.1 | 3 | Equipment | X | ||
| 1.6.1.1 | 4 | Operator Instructional Equipment | X | X | X |
| 1.6.1.2 | 4 | Maintainer Instructional Equipment | X | X | X |
| 1.6.2 | 3 | Services | |||
| 1.6.2.1 | 4 | Operator Instructional Services | |||
| 1.6.2.1.1 | 5 | Development of Training Materials | X | X | |
| 1.6.2.1.2 | 5 | Provide Training | X | X | |
| 1.6.2.2 | 4 | Maintainer Instructional Services | |||
| 1.6.2.2.1 | 5 | Development of Training Materials | X | X | |
| 1.6.2.2.2 | 5 | Provide Training | X | X | |
| 1.6.3 | 3 | Facilities | X | X | |
| 1.6.4 | 3 | Training Software 1...n (Specify) | |||
| 1.7 | 2 | Data | |||
| 1.7.1 | 3 | Data Deliverables 1...n (Specify) | X | X | |
| 1.7.2 | 3 | Data Repository | X | X | |
| 1.7.3 | 3 | Data Rights 1...n (Specify) | X | X | |
| 1.8 | 2 | Peculiar Support Equipment | X | ||
| 1.8.1 | 3 | Test and Measurement Equipment | X | ||
| 1.8.1.1 | 4 | Test and Measurement Equipment (Airframe/Hull/Vehicle) | X | X | X |
| 1.8.1.2 | 4 | Test and Measurement Equipment (Propulsion) | X | X | X |
| 1.8.1.3 | 4 | Test and Measurement Equipment (Electronics/Avionics) | X | X | X |
| 1.8.1.4 | 4 | Test and Measurement Equipment (Other Major Subsystems 1...n (Specify)) | X | X | X |
| 1.8.2 | 3 | Support and Handling Equipment | X | ||
| 1.8.2.1 | 4 | Support and Handling Equipment (Airframe/Hull/Vehicle) | X | X | X |
| 1.8.2.2 | 4 | Support and Handling Equipment (Propulsion) | X | X | X |
| 1.8.2.3 | 4 | Support and Handling Equipment (Electronics/Avionics) | X | X | X |
| 1.8.2.4 | 4 | Support and Handling Equipment (Other Major Subsystems 1...n (Specify)) | X | X | X |
| 1.9 | 2 | Common Support Equipment | X | ||
| 1.9.1 | 3 | Test and Measurement Equipment | X | ||
| 1.9.1.1 | 4 | Test and Measurement Equipment (Airframe/Hull/Vehicle) | X | X | X |
| 1.9.1.2 | 4 | Test and Measurement Equipment (Propulsion) | X | X | X |
| 1.9.1.3 | 4 | Test and Measurement Equipment (Electronics/Avionics) | X | X | X |
| 1.9.1.4 | 4 | Test and Measurement Equipment (Other Major Subsystems 1...n (Specify)) | X | X | X |
| 1.9.2 | 3 | Support and Handling Equipment | X | ||
| 1.9.2.1 | 4 | Support and Handling Equipment (Airframe/Hull/Vehicle) | X | X | X |
| 1.9.2.2 | 4 | Support and Handling Equipment (Propulsion) | X | X | X |
| 1.9.2.3 | 4 | Support and Handling Equipment (Electronics/Avionics) | X | X | X |
| 1.9.2.4 | 4 | Support and Handling Equipment (Other Major Subsystems 1...n (Specify)) | X | X | X |
| 1.10 | 2 | Operational/Site Activation by Site 1...n (Specify) | |||
| 1.10.1 | 3 | System Assembly, Installation, and Checkout on Site | |||
| 1.10.1.1 | 4 | Deployment HW and SW | X | X | |
| 1.10.1.2 | 4 | Site Activation | X | X | |
| 1.10.2 | 3 | Contractor Technical Support | X | X | |
| 1.10.3 | 3 | Site Construction | X | X | |
| 1.10.4 | 3 | Site/Ship/Vehicle Conversion | X | X | |
| 1.10.5 | 3 | Interim Contractor Support (ICS) | X | X | |
| 1.11 | 2 | Contractor Logistics Support (CLS) | X | X | |
| 1.12 | 2 | Industrial Facilities | |||
| 1.12.1 | 3 | Construction/Conversion/Expansion | X | X | |
| 1.12.2 | 3 | Equipment Acquisition or Modernization | X | X | |
| 1.12.3 | 3 | Maintenance (Industrial Facilities) | X | X | |
| 1.13 | 2 | Initial Spares and Repair Parts | X | ||
| 1.13.1 | 3 | PMP Spare and Repair 1...n (Specify) | X | X | X |
| 1.13.2 | 3 | Support Equipment Spare and Repair Parts | X | X | X |
| 1.13.3 | 3 | Training Equipment Spare and Repair Parts | X | X | X |
| 1.13.4 | 3 | Packaging, Handling, Storage, and Transportation (PHS&T) | X | ||
| 1.13.4.1 | 4 | Containers | X | X | X |
| 1.13.4.2 | 4 | Transportation | X | X | X |
Subtotal Cost X X
| Reporting Contractor G&A | X | X |
| Reporting Contractor Undistributed Budget | X | X |
| Reporting Contractor Management Reserve | X | X |
| Reporting Contractor FCCM | X | X |
| Total Cost | X | X |
Reporting Contractor Profit/Loss or Fee X X
| Total Price | X | X | |
| DRAFT DD FORM 2794 (PAGE 2), REPORTING, JANUARY 2019 |
DD Form 2794, Pg 3 (EVENTS)
| COST AND SOFTWARE DATA REPORTING PLAN | |||||||
| 14. CSDR SUBMISSION EVENTS | |||||||
| a. | |||||||
| EVENT ID | b. | ||||||
| DATA REPORT(S) | c. | ||||||
| SUBMISSION EVENT NAME | d. | ||||||
| REPORT CYCLE | e. AS OF DATE | f. DUE DATE | |||||
| (YYYYMMDD) | (YYYYMMDD) | ||||||
| 1 | Cost and Hour Report (FlexFile), Quantity Data Report | Contract Award (plus 90 days) | Interim | 20240930 | 20241129 | ||
| 2 | Technical Data Report | Contract Award (plus 90 days) | Interim | 20240930 | 20241129 | ||
| 3 | Cost and Hour Report (FlexFile), Quantity Data Report | Annual Report 1 | Interim | 20250630 | 20250829 | ||
| 4 | Technical Data Report | Annual Report 1 | Interim | 20250630 | 20250829 | ||
| 5 | Cost and Hour Report (FlexFile), Quantity Data Report | Annual Report 2 | Interim | 20260630 | 20260829 | ||
| 6 | Technical Data Report | Annual Report 2 | Interim | 20260630 | 20260829 | ||
| 7 | Cost and Hour Report (FlexFile), Quantity Data Report | Annual Report 3 | Interim | 20270630 | 20270829 | ||
| 8 | Technical Data Report | Annual Report 3 | Interim | 20270630 | 20270829 | ||
| 9 | Cost and Hour Report (FlexFile), Quantity Data Report | Annual Report 4 | Interim | 20280630 | 20280829 | ||
| 10 | Technical Data Report | Annual Report 4 | Interim | 20280630 | 20280829 | ||
| 11 | Cost and Hour Report (FlexFile), Quantity Data Report | Contract Completion | Final | 20290630 | 20290829 | ||
| 12 | Technical Data Report | Contract Completion | Final | 20290630 | 20290829 | ||
| DRAFT DD FORM 2794 (PAGE 3), SUBMISSION EVENTS, JANUARY 2019 | PREVIOUS EDITION IS OBSOLETE |
DD Form 2794, Pg 4 (REMARKS)
| COST AND SOFTWARE DATA REPORTING PLAN |
| 15. REMARKS |
The contractor must report costs on all CLINs associated with the (Specify contract name) contract including Over and Above, Advance Procurement, Long Lead Materials, Multiyear Procurement, Inter-Division or Inter-Company Work Orders (IWOs), Foreign Military Sales (FMS), Warranty, etc. Costs should not be omitted based on contract CLIN structure or definition.
INITIAL REPORT
Other than the Resource Distribution Table, submission events associated with this CSDR Plan are classified as either "Initial", "Interim", or "Final" submissions as identified in block 14.d of this CSDR plan.
i. Submission events marked "Initial" shall report the Contractor's total anticipated contract cost and resulting price using the maximum allowable contractor quantities, hours, or options (as applicable). For sealed bid contracts (i.e., contracts awarded under FAR Part 14) the reported FAC/EAC shall equal the value of the Contractor's sealed bid (using the maximum allowable contractor quantities, hours, or options (as applicable)). For negotiated contracts (i.e., contracts award under FAR Part 15) the reported FAC/EAC shall be equal in overall value to the Contractor's best and final offer (and consistent in distribution with any supporting cost and pricing data (e.g., basis of estimates, engineering build-ups) (using the maximum allowable contractor quantities, hours, or options (as applicable)). For all other contracts, the reported FAC/EAC shall be equal in overall value to the Contractor's final proposal and consistent in distribution with any supporting data provided to substantiate the contract's value, reasonableness, and/or realism (e.g., basis of estimates, engineering build-ups) (using the maximum allowable contractor quantities, hours, or options (as applicable)). No ATD costs are anticipated to reported on an "Initial" submission except for any certified precontract costs incurred prior to or on the date of contract award.
ii. Interim" report submissions are any report that is not either an "Initial" or "Final" report. Reported ATD, EAC/FAC, and quantities on "Interim" submissions shall be prepared reflecting only the value of work, quantities, hours, or options (as applicable) awarded on the report's "As Of Date" (do not include costs for anticipated but not awarded scopes of work, quantities, hours, or options).
iii. Reported ATD, EAC/FAC, and quantities on "Final" submissions shall be prepared reflecting the value of work, quantities, hours, and options (as applicable) anticipated to be awarded on a contract and meet the conditions listed in block 15.c.i.4.
COVID-19 Remarks:
The Reporting Entity shall provide a description of the type and timing of all impacts to program schedule, incurred actual costs, forecasted at complete costs, in process quantities, and delivered quantities, which are directly attributable to the COVID-19 pandemic.
Per the DIDs, note any relevant information that could be used in the interpretation of the data. Provide general or, if available, quantifiable contract impacts within the Summary Remarks. Provide impacts to specific WBS Elements or Functional Elements within the Remarks by DD FORM 2794 WBS Element. Provide impacts to the business unit within the Remarks of each 1921-3 submission. Organize impacts under a heading in the remarks that refers to “COVID-19 impacts”, or similar language, that segments this information from the rest of the remarks.
If applicable, the Reporting Entity shall provide an explanation of any new charge codes, work packages, control accounts, pricing categories, or other methods explicitly utilized to capture impacts of COVID-19.
If there are no impacts to report, then report there are no impacts in the Summary Remarks of each FlexFile and the Remarks of each 1921-3 submission.
Additional Data Fields #1-#12 (FlexFile): If applicable, the Reporting Entity shall utilize a “Tag” or the “Additional Data Field” referenced in Section B of the FlexFile DID (DI-FNCL-82162) to identify COVID-19 related data.
FAC vs EAC
The checkmarks for EAC/FAC in column 12e at the WBS level shall be reported as "Forecast at Completion" (FAC). The Forecast At Completion (FAC) required here is not subject to the standards established in ANSI/EIA-748 guideline #27 (Estimate at Complete); therefore, the FAC does not need to be, but may be, derived from Industry Earned Value Management (EVM) processes.
NON-RECURRING/RECURRING DEFINITIONS
Recurring and Non-Recurring Costs required for all levels:
Recurring costs. Repetitive elements of development, investment or sustainment costs that may vary with the quantity being produced or maintained, irrespective of system life cycle phase and appropriation. Recurring cost categories include procurement, and production and maintenance activities; acceptance testing; maintenance and support equipment, training, and data; test articles built to an operational configuration; and certain elements of systems engineering and program management.
Examples of Prime Mission Product activities include repetitive costs incurred when building prototype, test systems, or production units to an operational configuration. Examples of Prime Mission Product Hardware activities include Fabrication and assembly of partial/full prototype, test, or production units whether for customer or contractor use; Raw material, purchased parts, equipment associated with the fabrication and assembly of partial/full prototype or test units whether for customer or contractor use; Touch labor, integration and assembly, installation and check out; Engineering support for production unit fabrication, assembly and check out.
Examples of Prime Mission Product Software activities include Procurement of stand-alone or bundled COTS software licenses used in an operational system and installation and checkout of developed software into production units. Examples of Systems Engineering activities include Sustaining engineering, logistics support, planning, organizing, monitoring and reporting activities, document maintenance. Examples of Program Management activities include programmatic, financial, contractual, schedule, planning, organizing, and monitoring (quality information assurance, configuration management) activities in support of production unit fabrication, assembly and check out; meetings & efforts in support of supplier, manufacturing & production activities.
Examples of Systems Test and Evaluation activities include quality control, assurance, acceptance testing of production units including pilot support & system safety support; test equipment in support of operations; and Manufacturing System/Software Integration Laboratory (SIL) sustainment and lab support. Examples of Training activities include repetitive activities that vary with the quantity of training devices being produced. Examples of Spares and Repair Parts activities include spare parts and materials for production, production representative and/or LRIP units including both initial and replenishment spares.
Examples of Support Equipment activities include efforts that pertain to repetitive activities that vary with the quantity of support items being produced. Examples of Tooling activities include efforts that pertain to repetitive activities that vary with the quantity of items being produced and tooling maintenance/sustainment. Examples of Operational/Site Activation activities include efforts that pertain to a series of sites or organizations and those activities repeat for each site.
Nonrecurring costs. Non-repetitive elements of development, investment or sustainment costs that generally do not vary with the quantity being produced or maintained, irrespective of system life cycle phase and the appropriation. Nonrecurring cost categories include product design and development (PD&D) activities, including those for modifications; system test and evaluation (ST&E) including ST&E for modifications; tooling; pre-production or pre-maintenance activities; design and development of support equipment, training, and data; and certain elements of systems engineering and program management.
Examples of Prime Mission Product PD&D activities are: Requirements definition, engineering design, analysis & development; Redesign, rework & retest due to design flaws & first time corrective actions; test articles built for testing purposes only (i.e., units that are not production-representative) such as wind tunnel models, and bench and coupon test articles; structural development, static, fatigue, software, and ballistics testing; stress analysis; flight, ground, or sea testing of system properties; redesign as a result of testing; and retesting efforts; All configuration, quality, and data management efforts supporting release activity for first article configuration, delivery & certification; System safety plan, manuals, tech services, & maintenance manual development in support of first article delivery.
Examples of hardware design and development activities include material, purchased parts and labor associated with engineering models, operational models, bench, lab articles or partially built units (i.e. units that are not production representative), tooling, and ground support equipment for qualification, structural, static, fatigue or stress testing, and refurbishment of test units; and engineering support including manufacturing engineering, quality engineering, and tool engineering for development unit fabrication, assembly & tests.
Examples of software design and development activities include design and development of all software; delivered operational software and software developed to correct deficiencies and add capabilities; Initial integration of COTS and GOTS products into operational configuration; Support for HW-SW integration and test, system level testing; initial integration of COTS and GOTS products into operational configuration; and commercial software licenses for development facilities. System Engineering, Program Management, and Data activities occur throughout the system life cycle and are supportive in nature; as such, these costs take on the characteristics of the underlying activities being performed.
Examples of Systems Engineering activities include installation plans or quality inspection plans; requirements definition, allocation and flow-down; creation of specification and Interface Control Documents (ICDs); design and implementation of system security; top level design trade-offs; analyses, studies, and simulations for system performance and effectiveness, reliability, availability, maintainability or survivability; internal & external design review, IPT coordination & integration meetings; Certification & Control documentation; and supplier selection & coordination. Examples of Program Management activities include programmatic, financial, contractual, schedule, planning, organizing, and monitoring (quality information assurance, configuration management) activities in support of development, design & testing efforts.
Examples of Support Equipment activity include initial equipment design and test efforts, and test program sets development. Examples of Tooling activity include special test equipment, special tooling, procurement of initial & rate tooling, tool replacement (with the exact same tool) & tool modification (to accommodate product configuration changes). Examples of Operational/Site Activation activity include site planning efforts.
WBS INDEX AND DICTIONARY
The WBS Dictionary is a living document and must match the technical content, cost content, and work content of each end item (see Block 17) for all WBS elements for each Cost and Hour (FlexFile) submission. The dictionary shall contain a disclosure statement detailing any differences between the CSDR reporting methodology and the reporting entity's Cost Accounting Standards. The dictionary shall include a section detailing how parts are procured under this contract and any limitations of the parts procurement cost data or allocation of cost data for the WBS element.
The reporting entity must maintain and update the WBS Dictionary throughout the life of the contract, IAW DI-FNCL-82162, if changes to the WBS occur, the reporting entity shall annotate and track changes by adding the “As of Date” of the submitted FlexFile report and indicate the changes to the WBS Index and Dictionary Definitions.
For WBS elements identified in block 11 of the CSDR plan that is not within the contract's scope of work, the reporting entity shall report in the dictionary that “This CSDR WBS element is not associated with this contract’s scope of work”, and zero costs will be associated for ATD and FAC for these WBS elements.
COST ACCOUNTING STANDARDS (CAS) DISCLOSURE STATEMENT DIFFERENCES
Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable.
1921-3 CONTRACTOR BUSINESS DATA REPORT
a. The Contractor Business Data Report is prepared by and for the business entity (e.g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government.
b. Reports are submitted annually at the end of the contractor's fiscal year.
c. Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA. If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates should be provided for three future years.
d. The existing 1921-3 requires strictly formatted data and necessitates mappings to a government standard, the new DRAFT 1921-3 may be submitted in the contractor’s own format and according to the contractor’s own rate structure, so long as it meets the data requirements in the DRAFT 1921-3 Data Item Description DI-FNCL-81765.
END ITEMS/ORDER LOTS SCOPE IDIQ
Block 16 Orders/Lots is meant to capture the discrete Delivery Orders/Task Orders exercised on the contract. If a Delivery Order/Task Order is exercised on the contract and the CSDR plan has not been updated, it is the Reporting Entity's responsibility to still submit the dollars and hours in the FlexFile tagged to the appropriate Delivery Orders/Task Orders. The CSDR plan will be revised accordingly to include all exercised Delivery Orders/Task Orders.
COST AND HOUR REPORT UNIT/SUBLOT REPORTING
The Reporting Entity is required to provide unit or sublot (specify) reporting for any given Order/Lot and End Item as outlined in block 18 of the DD Form 2794. If Unit Reporting is selected in item 18c (Unit Reporting), it is expected that all touch labor costs and hours that are associated with the discrete units or sublots be tagged as Touch Manufacturing or Touch Maintenance as defined in Data Group E, Item 7.
QUANTITY REPORTING
a. If the quantity for a given element differs from the quantity reported for the full system, provide a comment in the WBS Element Remarks section.
b. The Reporting Entity shall provide meaningful quantity information lower than the summary level in the remarks for WBS elements Peculiar Support Equipment, Common Support Equipment, and Initial Spares and Repair Parts, if applicable.
FINAL COST REPORT
Final Cost Report to be submitted when final end item has been delivered and accepted by the government (e.g., as evidenced by a completed DD 250) and 95% or more of total costs for each Order/Lot (see Block 16) and each End Item (see Block 17) has been incurred.
CSDR READINESS REVIEW (CSDR-RR) also known as Post Award Conference (PAC)
The Reporting Entity shall attend and participate in a CSDR Readiness Review meeting (also known as the Post award CSDR conference) which will be held with the Cost Working Group Integrated Product Team (CWIPT) IAW DFARS 242.503-2(b) and DoDM 5000.04 (CSDR Manual). During this meeting, the CWIPT and contractor will review the Reporting Entity's process for data collection and reporting to ensure it satisfies the guidelines outlined in the DoDM 5000.04, CSDR Manual, the approved CSDR plan reporting requirement, and the Resource Distribution Table. The Reporting Entity shall demonstrate how costs will be based, to the maximum extent possible, upon actual cost transactions and not cost allocations; describe how recurring vs. nonrecurring costs will be segregated; demonstrate how the data from its accounting system will be mapped into the reporting categories in the approved CSDR plan. The Reporting Entity shall present the methodologies used for mapping internal cost accounts to the agreed upon WBS, specifically illustrating how individual WBS elements and standard functional categories in the FlexFile (functional data elements in the 1921 series) codes will be populated. The review shall include any reporting issue corrections and identify proposed changes to the approved CSDR Plan as necessary.
RESOURCE DISTRIBUTION TABLE (RDT)
The Reporting Entity is instructed to provide a Resource Distribution Table upon contract award, which identifies the value and work assigned to the Reporting Entity and its subcontractors. The Reporting Entity shall provide an updated RDT when additional quantities/scope are added to the contract to ensure that no major sub-contract(s) breach the direct CSDR reporting threshold specified in DODI 5000.73 and DoDM 5000.04-M-1.
PERIOD OF PERFORMANCE (POP)
If contract Period of Performance is extended, the contractor shall submit an additional cost report for each additional year of extension. The final report will be moved to the revised end of the Period of Performance.
DRAFT DD FORM 2794 (PAGE 4), REMARKS, JANUARY 2019 PREVIOUS EDITION IS OBSOLETE
DD Form 2794, Pg 5 (SCOPE DEF)
| COST AND SOFTWARE DATA REPORTING PLAN | ||
| INTRA-CONTRACT SCOPE REPORTING DEFINITION | ||
| 16. ORDERS/LOTS | ||
| a. ID | b. NAME | c. PHASE/MILESTONE |
| 1 | DO1 | C-FRP |
| 2 | DO2 | C-FRP |
| 3 | DO3…n | C-FRP |
| 17. END ITEMS | ||
| a. ID | b. NAME | |
| A | Mechanical A-Kit |
| 18. OPTIONAL REQUIREMENTS | ||||
| a. ORDER/LOT ID | b. END ITEM ID | c. UNIT REPORTING | ||
| (X if applicable) | d. SEQUENCING |
(X if applicable)
| 1 | A | X | X |
| 2 | A | X | X |
| 3 | A | X | X |
DRAFT DD FORM 2794 (PAGE 5), INTRA-CONTRACT SCOPE, JANUARY 2019
DD Form 2794, Pg 8 (TECH RQTS)
| COST AND SOFTWARE DATA REPORTING PLAN - TECHNICAL PARAMETER REQUIREMENTS | |||||||||
| TECHNICAL PARAMETER REQUIREMENTS | |||||||||
| 26. WBS | |||||||||
| ELEMENT CODE | 27. WBS ELEMENT NAME | 28. ITEM TYPE | 29. TECHNICAL PARAMETER | ||||||
| a. PARAMETER NAME | b. UNIT OF MEASURE | c. UNIT OF MEASURE QUALIFIER | d. REPEATABLE | e. REMARKS | |||||
| 1.1 | Mechanical A-Kit | C4ISys | Target Environment | List | |||||
| 1.1 | Mechanical A-Kit | C4ISys | Platform | List | |||||
| 1.1 | Mechanical A-Kit | C4ISys | Infrastructure Availability | List | |||||
| 1.1 | Mechanical A-Kit | C4ISys | Environmental Tolerance - Radiation Hardening | List | |||||
| 1.1.1 | A-Kit Integration, Assembly, Test, and Checkout | IAT&CO | Number of Electrical Connections | Quantity | Electrical Connections | ||||
| 1.1.1 | A-Kit Integration, Assembly, Test, and Checkout | IAT&CO | Number of Mechanical Connections | Quantity | Mechanical Connections | ||||
| 1.1.1 | A-Kit Integration, Assembly, Test, and Checkout | IAT&CO | Number of Interface Control Drawings (ICD) | Quantity | Drawings | ||||
| 1.1.2 | A-Kit Subsystem 1...n (Specify) | PhysicalOther | Material Mix 1…n | Percent of Total Weight | Material Name | Y | |||
| 1.1.2 | A-Kit Subsystem 1...n (Specify) | PhysicalElec | Volume | Cubic Inches | |||||
| 1.1.2 | A-Kit Subsystem 1...n (Specify) | PhysicalElec | Weight | Pounds | |||||
| 1.1.2 | A-Kit Subsystem 1...n (Specify) | PhysicalElec | Weight - Structural | Pounds | |||||
| 1.1.2 | A-Kit Subsystem 1...n (Specify) | PhysicalElec | Weight - Electronics | Pounds | |||||
| 1.1.2 | A-Kit Subsystem 1...n (Specify) | PhysicalElec | Power - Maximum Consumption Rate | Kilowatts | |||||
| 1.1.2.1 | Subsystem Integration, Assembly, Test, and Checkout | IAT&CO | Number of Electrical Connections | Quantity | Electrical Connections | ||||
| 1.1.2.1 | Subsystem Integration, Assembly, Test, and Checkout | IAT&CO | Number of Mechanical Connections | Quantity | Mechanical Connections | ||||
| 1.1.2.1 | Subsystem Integration, Assembly, Test, and Checkout | IAT&CO | Number of Interface Control Drawings (ICD) | Quantity | Drawings | ||||
| 1.1.2.2 | Subsystem Hardware 1...n (Specify) | PhysicalOther | Material Mix 1…n | Percent of Total Weight | Material Name | Y | |||
| 1.1.2.2 | Subsystem Hardware 1...n (Specify) | PhysicalElec | Volume | Cubic Inches | |||||
| 1.1.2.2 | Subsystem Hardware 1...n (Specify) | PhysicalElec | Weight | Pounds | |||||
| 1.1.2.2 | Subsystem Hardware 1...n (Specify) | PhysicalElec | Weight - Structural | Pounds | |||||
| 1.1.2.2 | Subsystem Hardware 1...n (Specify) | PhysicalElec | Weight - Electronics | Pounds | |||||
| 1.1.2.2 | Subsystem Hardware 1...n (Specify) | PhysicalElec | Power - Maximum Consumption Rate | Kilowatts | |||||
| 1.1.2.2 | Subsystem Hardware 1...n (Specify) | ElecBox | Circuit Cards - Number of | Quantity | Cards | ||||
| 1.1.2.2 | Subsystem Hardware 1...n (Specify) | TransReceivRF | Bandwidth | Megahertz | |||||
| 1.1.2.2 | Subsystem Hardware 1...n (Specify) | TransReceivRF | Transmitter Power Output - Peak | Watts | |||||
| 1.1.2.2 | Subsystem Hardware 1...n (Specify) | TransReceivRF | Transmitter Power Output - Average | Watts | |||||
| 1.2 | Platform Integration, Assembly, Test, and Checkout | IAT&CO | Number of Electrical Connections | Quantity | Electrical Connections | ||||
| 1.2 | Platform Integration, Assembly, Test, and Checkout | IAT&CO | Number of Mechanical Connections | Quantity | Mechanical Connections | ||||
| 1.2 | Platform Integration, Assembly, Test, and Checkout | IAT&CO | Number of Interface Control Drawings (ICD) | Quantity | Drawings | ||||
| 1.3 | Systems Engineering | SysEng | Number of Requirement Document - "Shalls" | Quantity | Shalls | YG | |||
| 1.3 | Systems Engineering | SysEng | Number of Platforms - Integrated | Quantity | Platforms | ||||
| 1.4 | Program Management | ProgMgmt | Frequency of Government Program Reviews | Quantity | Reviews per Year | ||||
| 1.4 | Program Management | ProgMgmt | Number of Contract Line Item Number (CLIN)s | Quantity | CLINs | ||||
| 1.4 | Program Management | ProgMgmt | Number of Subcontractors | Quantity | Subcontractors | ||||
| 1.4 | Program Management | ProgMgmt | Number of Customer Stakeholders | Quantity | Stakeholders | ||||
| 1.4 | Program Management | ProgMgmt | Number of CDRLs | Quantity | CDRLs | ||||
| 1.5.4 | Mock-ups/System Integration Labs (SILs) | SIL | Modeling Type | List | YG | ||||
| 1.5.4 | Mock-ups/System Integration Labs (SILs) | SIL | Mock-up / SIL - Size | Square Feet | by Facility / Suite | YG | |||
| 1.5.4 | Mock-ups/System Integration Labs (SILs) | SIL | Mock-up / SIL - Primary Purpose | List | YG | ||||
| 1.5.6 | Test Facilities | ConstrConv | Facility Name | Descriptor | |||||
| 1.5.6 | Test Facilities | ConstrConv | Facility Description | Descriptor | |||||
| 1.5.6 | Test Facilities | ConstrConv | New product alteration square footage | Feet | |||||
| 1.6.1.1 | Operator Instructional Equipment | TrainDevice | Training Device Name | Descriptor | Training Device Name | YG | |||
| 1.6.1.1 | Operator Instructional Equipment | TrainDevice | Training Device Quantity | Quantity | Devices | YG | |||
| 1.6.1.1 | Operator Instructional Equipment | TrainDevice | Training Device Description | Descriptor | YG | ||||
| 1.6.1.2 | Maintainer Instructional Equipment | TrainDevice | Training Device Name | Descriptor | Training Device Name | YG | |||
| 1.6.1.2 | Maintainer Instructional Equipment | TrainDevice | Training Device Quantity | Quantity | Devices | YG | |||
| 1.6.1.2 | Maintainer Instructional Equipment | TrainDevice | Training Device Description | Descriptor | YG | ||||
| 1.6.3 | Facilities | ConstrConv | Facility Name | Descriptor | |||||
| 1.6.3 | Facilities | ConstrConv | Facility Description | Descriptor | |||||
| 1.6.3 | Facilities | ConstrConv | New product alteration square footage | Feet | |||||
| 1.7.1 | Data Deliverables 1...n (Specify) | Data | Data Rights Category | List | |||||
| 1.7.2 | Data Repository | DataDepository | Storage Footprint | Square Feet | Data storage size | ||||
| 1.7.3 | Data Rights 1...n (Specify) | Data | Data Rights Category | List | |||||
| 1.8.1 | Test and Measurement Equipment | SupportEquipment | Quantity of Support Equipment | Quantity | Support Equipment | ||||
| 1.8.1 | Test and Measurement Equipment | SupportEquipment | Number of Locations | Quantity | Locations | ||||
| 1.8.1 | Test and Measurement Equipment | SupportEquipment | Support Equipment Locations | Descriptor | |||||
| 1.8.2 | Support and Handling Equipment | SupportEquipment | Quantity of Support Equipment | Quantity | Support Equipment | ||||
| 1.8.2 | Support and Handling Equipment | SupportEquipment | Number of Locations | Quantity | Locations | ||||
| 1.8.2 | Support and Handling Equipment | SupportEquipment | Support Equipment Locations | Descriptor | |||||
| 1.9.1 | Test and Measurement Equipment | SupportEquipment | Quantity of Support Equipment | Quantity | Support Equipment | ||||
| 1.9.1 | Test and Measurement Equipment | SupportEquipment | Number of Locations | Quantity | Locations | ||||
| 1.9.1 | Test and Measurement Equipment | SupportEquipment | Support Equipment Locations | Descriptor | |||||
| 1.9.2 | Support and Handling Equipment | SupportEquipment | Quantity of Support Equipment | Quantity | Support Equipment | ||||
| 1.9.2 | Support and Handling Equipment | SupportEquipment | Number of Locations | Quantity | Locations | ||||
| 1.9.2 | Support and Handling Equipment | SupportEquipment | Support Equipment Locations | Descriptor | |||||
| 1.10 | Operational/Site Activation by Site 1...n (Specify) | OpSiteActivation | Facility Description | Descriptor | |||||
| 1.10 | Operational/Site Activation by Site 1...n (Specify) | OpSiteActivation | Organic Site Activation | List | |||||
| 1.10 | Operational/Site Activation by Site 1...n (Specify) | OpSiteActivation | Amplifying Descriptive Text | Descriptor | |||||
| 1.10.3 | Site Construction | ConstrConv | Facility Name | Descriptor | |||||
| 1.10.3 | Site Construction | ConstrConv | Facility Description | Descriptor | |||||
| 1.10.3 | Site Construction | ConstrConv | New product alteration square footage | Feet | |||||
| 1.12.1 | Construction/Conversion/Expansion | ConstrConv | Facility Name | Descriptor | |||||
| 1.12.1 | Construction/Conversion/Expansion | ConstrConv | Facility Description | Descriptor | |||||
| 1.12.1 | Construction/Conversion/Expansion | ConstrConv | New product alteration square footage | Feet | |||||
| DD FORM 2794 (PAGE 8), TECHNICAL PARAMETER REQUIREMENTS, JANUARY 2019 |
Pg 8a (TECH RQTS Definitions)
| COST AND SOFTWARE DATA REPORTING PLAN - TECHNICAL PARAMETER REQUIREMENTS | |||||||||||||||||
| TECHNICAL PARAMETER REQUIREMENTS (Definitions) | |||||||||||||||||
| 26. WBS | |||||||||||||||||
| ELEMENT CODE | 27. WBS ELEMENT NAME | 29. TECHNICAL PARAMETER | TECHNICAL PARAMETER (Definintions and Choice List) | ||||||||||||||
| a. PARAMETER NAME | b. UNIT OF MEASURE | DEFINITION | List Item #1 | List Item #2 | List Item #3 | List Item #4 | List Item #5 | List Item #6 | List Item #7 | List Item #8 | List Item #9 | List Item #10 | List Item #n | ||||
| 1.1 | Mechanical A-Kit | Target Environment | List | Choice List: Ground, Maritime, Airborne or Space | Ground | Maritime | Airborne | Space | Other | ||||||||
| 1.1 | Mechanical A-Kit | Platform | List | Denotes the specific platform type where C4I Electronics system will be employed. | UAV | Small/Fighter/Helo | Large/Bomber | Large/Transport | Ground/fixed | Ground/ transportable | Man-Portable | Maritime- Ship Based | Maritime - Shore Based | Other | |||
| 1.1 | Mechanical A-Kit | Infrastructure Availability | List | Choice List: Rate 1 - 5; (1) None available, no shelter, connectivity or power; (5) Full connectivity, environmentally controlled | 1 | 2 | 3 | 4 | 5 | Other | |||||||
| 1.1 | Mechanical A-Kit | Environmental Tolerance - Radiation Hardening | List | Environmental tolerance refers to radar environmental constraints or requirements such as radiation hardening. Denotes if this environmental tolerance applies. | Yes | No | |||||||||||
| 1.1.1 | A-Kit Integration, Assembly, Test, and Checkout | Number of Electrical Connections | Quantity | The number of electrical and electronic connections at this level of assembly. | |||||||||||||
| 1.1.1 | A-Kit Integration, Assembly, Test, and Checkout | Number of Mechanical Connections | Quantity | The number of mating surfaces, fasteners, or other non-electrical attach points at the level of assembly. | |||||||||||||
| 1.1.1 | A-Kit Integration, Assembly, Test, and Checkout | Number of Interface Control Drawings (ICD) | Quantity | ||||||||||||||
| 1.1.2 | A-Kit Subsystem 1...n (Specify) | Material Mix 1…n | Percent of Total Weight | List of primary materials comprising the item by percent of total weight. (Cite one or more materials as applicable) | |||||||||||||
| 1.1.2 | A-Kit Subsystem 1...n (Specify) | Volume | Cubic Inches | Physical volume of the item. | |||||||||||||
| 1.1.2 | A-Kit Subsystem 1...n (Specify) | Weight | Pounds | Physical weight of the item. | |||||||||||||
| 1.1.2 | A-Kit Subsystem 1...n (Specify) | Weight - Structural | Pounds | The item's mechanical/structural weight. | |||||||||||||
| 1.1.2 | A-Kit Subsystem 1...n (Specify) | Weight - Electronics | Pounds | The item's electronics weight. | |||||||||||||
| 1.1.2 | A-Kit Subsystem 1...n (Specify) | Power - Maximum Consumption Rate | Kilowatts | Maximum rate of power consumption by the item. | |||||||||||||
| 1.1.2.1 | Subsystem Integration, Assembly, Test, and Checkout | Number of Electrical Connections | Quantity | The number of electrical and electronic connections at this level of assembly. | |||||||||||||
| 1.1.2.1 | Subsystem Integration, Assembly, Test, and Checkout | Number of Mechanical Connections | Quantity | The number of mating surfaces, fasteners, or other non-electrical attach points at the level of assembly. | |||||||||||||
| 1.1.2.1 | Subsystem Integration, Assembly, Test, and Checkout | Number of Interface Control Drawings (ICD) | Quantity | ||||||||||||||
| 1.1.2.2 | Subsystem Hardware 1...n (Specify) | Material Mix 1…n | Percent of Total Weight | List of primary materials comprising the item by percent of total weight. (Cite one or more materials as applicable) | |||||||||||||
| 1.1.2.2 | Subsystem Hardware 1...n (Specify) | Volume | Cubic Inches | Physical volume of the item. | |||||||||||||
| 1.1.2.2 | Subsystem Hardware 1...n (Specify) | Weight | Pounds | Physical weight of the item. | |||||||||||||
| 1.1.2.2 | Subsystem Hardware 1...n (Specify) | Weight - Structural | Pounds | The item's mechanical/structural weight. | |||||||||||||
| 1.1.2.2 | Subsystem Hardware 1...n (Specify) | Weight - Electronics | Pounds | The item's electronics weight. | |||||||||||||
| 1.1.2.2 | Subsystem Hardware 1...n (Specify) | Power - Maximum Consumption Rate | Kilowatts | Maximum rate of power consumption by the item. | |||||||||||||
| 1.1.2.2 | Subsystem Hardware 1...n (Specify) | Circuit Cards - Number of | Quantity | Also referred to as Printed circuit boards. The IPC preferred term for assembled boards is circuit card assembly (CCA). Total Number of printed circuit boards (PCBs) in item. This includes all boards designed, modified, purchased or provided that make up the final end item. | |||||||||||||
| 1.1.2.2 | Subsystem Hardware 1...n (Specify) | Bandwidth | Megahertz | The width of the band of frequencies occupied by the central lobe of the spectrum of an alternating current signal. Bandwidth is the difference between the upper and lower cut-off frequencies of a receiver. |
| 1.1.2.2 | Subsystem Hardware 1...n (Specify) | Transmitter Power Output - Peak | Watts | The Peak Transmitter Power Output | ||||||||
| 1.1.2.2 | Subsystem Hardware 1...n (Specify) | Transmitter Power Output - Average | Watts | The Average Transmitter Power Output | ||||||||
| 1.2 | Platform Integration, Assembly, Test, and Checkout | Number of Electrical Connections | Quantity | The number of electrical and electronic connections at this level of assembly. | ||||||||
| 1.2 | Platform Integration, Assembly, Test, and Checkout | Number of Mechanical Connections | Quantity | The number of mating surfaces, fasteners, or other non-electrical attach points at the level of assembly. | ||||||||
| 1.2 | Platform Integration, Assembly, Test, and Checkout | Number of Interface Control Drawings (ICD) | Quantity | |||||||||
| 1.3 | Systems Engineering | Number of Requirement Document - "Shalls" | Quantity | The number of requirements cited in the system's requirements documents. | ||||||||
| 1.3 | Systems Engineering | Number of Platforms - Integrated | Quantity | The number of platforms (e.g. aircraft) on which the system will be qualified. | ||||||||
| 1.4 | Program Management | Frequency of Government Program Reviews | Quantity | The Frequency of Government Program Reviews in the contract. | ||||||||
| 1.4 | Program Management | Number of Contract Line Item Number (CLIN)s | Quantity | The number of Contract CLINs in the contract. | ||||||||
| 1.4 | Program Management | Number of Subcontractors | Quantity | The number of major subcontractors/suppliers in the program. | ||||||||
| 1.4 | Program Management | Number of Customer Stakeholders | Quantity | The number of customers and stakeholders that may require management accommodation. Stakeholders consist of any group or organization with a related or subsequent responsibility that is directly related to the outcome of an action or result. Generally speaking they can influence the outcome or are the recipient of the results. The range of personnel selected to participate as stakeholders is based on the outcome and processes involved. Typical stakeholders are: users or operators, acquisition commands, test communities, depots, manpower, personnel & training communities, maintainers, and suppliers | ||||||||
| 1.4 | Program Management | Number of CDRLs | Quantity | The number of Contract Data Requirements List items for which the CRS element staff is responsible. | ||||||||
| 1.5.4 | Mock-ups/System Integration Labs (SILs) | Modeling Type | List | Describes the types of modeling to be performed by the SIL. | 3-DOF | 6-DOF | Hardware in the loop | Other | ||||
| 1.5.4 | Mock-ups/System Integration Labs (SILs) | Mock-up / SIL - Size | Square Feet | Facility area measured in square feet. | ||||||||
| 1.5.4 | Mock-ups/System Integration Labs (SILs) | Mock-up / SIL - Primary Purpose | List | Describes the SIL's primary purpose. | V&V | Prototyping | System Qualification | Other | ||||
| 1.5.6 | Test Facilities | Facility Name | Descriptor | The facility name. | ||||||||
| 1.5.6 | Test Facilities | Facility Description | Descriptor | Describes each facility and quantify to the extent possible in terms of square feet, number of installations, power, etc. | ||||||||
| 1.5.6 | Test Facilities | New product alteration square footage | Feet | New product alteration square footage | ||||||||
| 1.6.1.1 | Operator Instructional Equipment | Training Device Name | Descriptor | Training equipment name. | ||||||||
| 1.6.1.1 | Operator Instructional Equipment | Training Device Quantity | Quantity | Training equipment quantity. Note: Describe Annual Quantity by Location in Time Phased Quantity Table | ||||||||
| 1.6.1.1 | Operator Instructional Equipment | Training Device Description | Descriptor | Description of training devices | ||||||||
| 1.6.1.2 | Maintainer Instructional Equipment | Training Device Name | Descriptor | Training equipment name. | ||||||||
| 1.6.1.2 | Maintainer Instructional Equipment | Training Device Quantity | Quantity | Training equipment quantity. Note: Describe Annual Quantity by Location in Time Phased Quantity Table | ||||||||
| 1.6.1.2 | Maintainer Instructional Equipment | Training Device Description | Descriptor | Description of training devices | ||||||||
| 1.6.3 | Facilities | Facility Name | Descriptor | The facility name. | ||||||||
| 1.6.3 | Facilities | Facility Description | Descriptor | Describes each facility and quantify to the extent possible in terms of square feet, number of installations, power, etc. | ||||||||
| 1.6.3 | Facilities | New product alteration square footage | Feet | New product alteration square footage | ||||||||
| 1.7.1 | Data Deliverables 1...n (Specify) | Data Rights Category | List | Category of Data Rights Purchased | Unlimited Rights | Government Purpose Rights | Limited Rights | Restricted Rights | Negotiated License Rights | SBIR Data Rights | Commercial Technical Data License Rights | Commercial Computer Software Licenses |
| 1.7.2 | Data Repository | Storage Footprint | Square Feet | The area required for data storage. | ||||||||
| 1.7.3 | Data Rights 1...n (Specify) | Data Rights Category | List | Category of Data Rights Purchased | Unlimited Rights | Government Purpose Rights | Limited Rights | Restricted Rights | Negotiated License Rights | SBIR Data Rights | Commercial Technical Data License Rights | Commercial Computer Software Licenses |
| 1.8.1 | Test and Measurement Equipment | Quantity of Support Equipment | Quantity | Total number of support equipment used on the program | ||||||||
| 1.8.1 | Test and Measurement Equipment | Number of Locations | Quantity | Number of locations support equipment is utilized | ||||||||
| 1.8.1 | Test and Measurement Equipment | Support Equipment Locations | Descriptor | List of all locations support equipment is utilized. | ||||||||
| 1.8.2 | Support and Handling Equipment | Quantity of Support Equipment | Quantity | Total number of support equipment used on the program | ||||||||
| 1.8.2 | Support and Handling Equipment | Number of Locations | Quantity | Number of locations support equipment is utilized | ||||||||
| 1.8.2 | Support and Handling Equipment | Support Equipment Locations | Descriptor | List of all locations support equipment is utilized. | ||||||||
| 1.9.1 | Test and Measurement Equipment | Quantity of Support Equipment | Quantity | Total number of support equipment used on the program | ||||||||
| 1.9.1 | Test and Measurement Equipment | Number of Locations | Quantity | Number of locations support equipment is utilized | ||||||||
| 1.9.1 | Test and Measurement Equipment | Support Equipment Locations | Descriptor | List of all locations support equipment is utilized. | ||||||||
| 1.9.2 | Support and Handling Equipment | Quantity of Support Equipment | Quantity | Total number of support equipment used on the program | ||||||||
| 1.9.2 | Support and Handling Equipment | Number of Locations | Quantity | Number of locations support equipment is utilized | ||||||||
| 1.9.2 | Support and Handling Equipment | Support Equipment Locations | Descriptor | List of all locations support equipment is utilized. | ||||||||
| 1.10 | Operational/Site Activation by Site 1...n (Specify) | Facility Description | Descriptor | Describes each facility and quantifies to the extent possible in terms of square feet, number of installations, power, etc. | ||||||||
| 1.1 | Operational/Site Activation by Site 1...n (Specify) | Organic Site Activation | List | Denotes if the site activation is a Government activity | Yes | No | ||||||
| 1.1 | Operational/Site Activation by Site 1...n (Specify) | Amplifying Descriptive Text | Descriptor | Additional text as needed regarding the description of the amplification. | ||||||||
| 1.10.3 | Site Construction | Facility Name | Descriptor | The facility name. | ||||||||
| 1.10.3 | Site Construction | Facility Description | Descriptor | Describes each facility and quantify to the extent possible in terms of square feet, number of installations, power, etc. | ||||||||
| 1.10.3 | Site Construction | New product alteration square footage | Feet | New product alteration square footage | ||||||||
| 1.12.1 | Construction/Conversion/Expansion | Facility Name | Descriptor | The facility name. | ||||||||
| 1.12.1 | Construction/Conversion/Expansion | Facility Description | Descriptor | Describes each facility and quantify to the extent possible in terms of square feet, number of installations, power, etc. | ||||||||
| 1.12.1 | Construction/Conversion/Expansion | New product alteration square footage | Feet | New product alteration square footage | ||||||||
| DD FORM 2794 (PAGE 8a), TECHNICAL PARAMETER REQUIREMENTS, JANUARY 2019 |
DD Form 2794, Pg 7 (SRDR MX)
| COST AND SOFTWARE DATA REPORTING PLAN - SRDR MAINTENANCE | |||||
| 23. RELEASES | |||||
| a. ID | b. NAME | c. DATE | |||
| 1 | |||||
| 2 | |||||
| 2...n | |||||
| 24. PRODUCT SIZE REPORTING ELEMENTS | |||||
| a. CODE | b. NAME | c. RELEASE ID | |||
| 1.2.9 | Air Vehicle Software Release 1..n (Specify) | 2 | |||
| 1.3.6 | Payload Software Release 1...n (Specify) | 2 | |||
| 1.4.7 | Ground Segment Software Release 1...n (Specify) | 2...n | |||
| 1.5 | Aircraft System Software Release 1...n (Specify) | 1 | |||
| 1.6.1 | Software Systems Engineering | 2 | |||
| 1.7.1 | Software Program Management | 2...n | |||
| 1.9.4 | Training Software 1...n (Specify) | 1 | |||
| 25. PRODUCT SIZE SUBMISSIONS | c. RELEASE ID: | 1 | 2 | 2...n | |
| a. NUMBER | b. NAME | Included? | Included? | Included? | |
| 2 | Contract Award (plus 12 months - Total Contract Estimate) [See SRDR Implementation Guide] | X | X | X | |
| 5 | Annual FYxx Report 1...n [See SRDR Implementation Guide] | X | X | X | |
| 8 | Contract Completion (Total Contract Actuals) [See SRDR Implementation Guide] | X | X | X | |