DD Form 2794, Pg 1 (METADATA)

ATTACHMENT 0003 COST AND SOFTWARE DATA REPORTING PLANOMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

1a. PROGRAM NAME
UH-60V Black Hawk Digital Cockpit
1b. PHASE/MILESTONE (check all that apply)
Pre-A
A
B
C-LRIP
XC-FRP
O&S
1c. PRIME MISSION PRODUCT
H-60V Mechanical A-Kit Production
1d. ACQUISITION CATEGORY (ACAT)
Pre-ACAT
ACAT I (MDAP)
ACAT IA (MAIS)
XACAT II
ACAT III
Other
2. COMMODITY TYPE
Electronic System
3. PLAN ITERATION TYPE
XINITIAL
REVISION
4. CURRENT SUBMISSION DATE (YYYYMMDD)
20221006
5. LAST APPROVED PLAN DATE (YYYYMMDD)
6a. GOVERNMENT PLAN POINT OF CONTACT (POC) NAME (Last, First, M.)
McDonald, Shirley, J.
6b. ADDRESS (Include ZIP Code)
John J. Sparkman Center Building 5308,

Redstone Arsenal, AL 35898

6c. TELEPHONE NUMBER (Include Area Code)
256-842-6036
6d. E-MAIL ADDRESS
Shirley.J.McDonald13.ctr@mail.mil
7. PLAN TYPE
GOVERNMENT
XCONTRACT (PRIME)
CONTRACT (SUB)
8. PLAN GOVERNMENT PREPARING ORGANIZATION
UH Project Office
9a. CONTRACTOR NAME/ADDRESS
i. REPORTING ORGANIZATION NAME
TBD
ii. DIVISION NAME
TBD
iii. LOCATION
TBD
iv. CONTRACTOR BUSINESS DATA REPORT (CBDR 1921-3) REQUIREMENT:
XCBDR REQUIRED FOR THIS ORGANIZATION
9b. CONTRACT NUMBER (List all that apply, separated by commas)
TBD - (A-16-E-C14)
9c. APPROPRIATION (check all that apply)
RDT&E
XPROCUREMENT
O&M
FMS
WCF
OTHER
10a. APPROVED PLAN NUMBER
A-16-E-C14
10b. APPROVED PLAN REVISION NUMBER
0
10c. APPROVED PLAN REQUIREMENTS
XAT COMPLETION COSTS FOR STANDARD FUNCTIONAL CATEGORIES (FlexFile or Legacy)
XAT COMPLETION COSTS FOR RECURRING/NONRECURRING (FlexFile only)
XTECHNICAL DATA REQUIRED
10d. COST REPORT TYPE
XFLEXFILE
LEGACY DD 1921 SERIES

DRAFT DD FORM 2794 (PAGE 1), METADATA, JANUARY 2019 PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 2 (REPORTING)

COST AND SOFTWARE DATA REPORTING PLANCOST, SOFTWARE, & TECHNICAL DATA REPORTING/EARNED VALUE MANAGEMENT CO-PLAN
11. WORK BREAKDOWN STRUCTURE (WBS)12. COST13. TECHNICAL DATA
a. WBS
CODEb. WBS
LEVELc. WBS ELEMENT NAMEa. ACTUALS TO
DATE (ATD)b. LEGACY
1921-1c. LEGACY
1921-2d. LEGACY
1921-5e. EAC/FAC
(See item 10d)a. QUANTITYb. SRDR
FORMATSc.

MAINT. &

REPAIR

PARTS

i. QUANTITY
DATAii. GFE

QUANTITY

1.01H-60V Mechanical A-Kit ProductionX
1.12Mechanical A-KitX
1.1.13A-Kit Integration, Assembly, Test, and CheckoutX
1.1.1.14Integration and AssemblyXXX
1.1.1.24Test and CheckoutXXX
1.1.1.34Rate ToolingXXX
1.1.23A-Kit Subsystem 1...n (Specify)X
1.1.2.14Subsystem Integration, Assembly, Test, and CheckoutXXX
1.1.2.24Subsystem Hardware 1...n (Specify)XXX
1.1.2.34Subsystem Software Release 1...n (Specify)XX
1.1.33A-Kit SoftwareXX
1.22Platform Integration, Assembly, Test, and CheckoutXXX
1.32Systems Engineering
1.3.13Software Systems EngineeringXX
1.3.23Integrated Logistics Support (ILS) Systems EngineeringXX
1.3.33Cybersecurity Systems EngineeringXX
1.3.43Core Systems EngineeringXX
1.3.53Other Systems Engineering 1...n (Specify)XX
1.42Program Management
1.4.13Software Program ManagementXX
1.4.23Integrated Logistics Support (ILS) Program ManagementXX
1.4.33Cybersecurity ManagementXX
1.4.43Core Program ManagementXX
1.4.53Other Program Management 1...n (Specify)XX
1.52System Test and Evaluation
1.5.13Developmental Test and Evaluation
1.5.1.14Engineering Development TestsXX
1.5.1.24System Qualification TestXX
1.5.1.34Cybersecurity Test and Evaluation
1.5.1.3.15Cybersecurity Development TestXX
1.5.1.3.25Cybersecurity Operational TestXX
1.5.1.3.35Cybersecurity Other (1...n)XX
1.5.1.44Service/Agency DT&E 1...n (Specify) (GOV ONLY)XX
1.5.1.54Other DT&E Tests 1...n (Specify)XX
1.5.23Operational Test and Evaluation
1.5.2.14Cybersecurity Test and Evaluation
1.5.2.1.15Cybersecurity Development TestXX
1.5.2.1.25Cybersecurity Operational TestXX
1.5.2.1.35Cybersecurity Other (1...n)XX
1.5.2.24Other OT&E Tests 1...n (Specify)XX
1.5.33Live Fire Test and EvaluationXX
1.5.43Mock-ups/System Integration Labs (SILs)XX
1.5.53Test and Evaluation SupportXX
1.5.63Test Facilities
1.5.6.14Commercial (GOV ONLY)XX
1.5.6.24Government (Pay-as-You-Go) (GOV ONLY)XX
1.62Training
1.6.13EquipmentX
1.6.1.14Operator Instructional EquipmentXXX
1.6.1.24Maintainer Instructional EquipmentXXX
1.6.23Services
1.6.2.14Operator Instructional Services
1.6.2.1.15Development of Training MaterialsXX
1.6.2.1.25Provide TrainingXX
1.6.2.24Maintainer Instructional Services
1.6.2.2.15Development of Training MaterialsXX
1.6.2.2.25Provide TrainingXX
1.6.33FacilitiesXX
1.6.43Training Software 1...n (Specify)
1.72Data
1.7.13Data Deliverables 1...n (Specify)XX
1.7.23Data RepositoryXX
1.7.33Data Rights 1...n (Specify)XX
1.82Peculiar Support EquipmentX
1.8.13Test and Measurement EquipmentX
1.8.1.14Test and Measurement Equipment (Airframe/Hull/Vehicle)XXX
1.8.1.24Test and Measurement Equipment (Propulsion)XXX
1.8.1.34Test and Measurement Equipment (Electronics/Avionics)XXX
1.8.1.44Test and Measurement Equipment (Other Major Subsystems 1...n (Specify))XXX
1.8.23Support and Handling EquipmentX
1.8.2.14Support and Handling Equipment (Airframe/Hull/Vehicle)XXX
1.8.2.24Support and Handling Equipment (Propulsion)XXX
1.8.2.34Support and Handling Equipment (Electronics/Avionics)XXX
1.8.2.44Support and Handling Equipment (Other Major Subsystems 1...n (Specify))XXX
1.92Common Support EquipmentX
1.9.13Test and Measurement EquipmentX
1.9.1.14Test and Measurement Equipment (Airframe/Hull/Vehicle)XXX
1.9.1.24Test and Measurement Equipment (Propulsion)XXX
1.9.1.34Test and Measurement Equipment (Electronics/Avionics)XXX
1.9.1.44Test and Measurement Equipment (Other Major Subsystems 1...n (Specify))XXX
1.9.23Support and Handling EquipmentX
1.9.2.14Support and Handling Equipment (Airframe/Hull/Vehicle)XXX
1.9.2.24Support and Handling Equipment (Propulsion)XXX
1.9.2.34Support and Handling Equipment (Electronics/Avionics)XXX
1.9.2.44Support and Handling Equipment (Other Major Subsystems 1...n (Specify))XXX
1.102Operational/Site Activation by Site 1...n (Specify)
1.10.13System Assembly, Installation, and Checkout on Site
1.10.1.14Deployment HW and SWXX
1.10.1.24Site ActivationXX
1.10.23Contractor Technical SupportXX
1.10.33Site ConstructionXX
1.10.43Site/Ship/Vehicle ConversionXX
1.10.53Interim Contractor Support (ICS)XX
1.112Contractor Logistics Support (CLS)XX
1.122Industrial Facilities
1.12.13Construction/Conversion/ExpansionXX
1.12.23Equipment Acquisition or ModernizationXX
1.12.33Maintenance (Industrial Facilities)XX
1.132Initial Spares and Repair PartsX
1.13.13PMP Spare and Repair 1...n (Specify)XXX
1.13.23Support Equipment Spare and Repair PartsXXX
1.13.33Training Equipment Spare and Repair PartsXXX
1.13.43Packaging, Handling, Storage, and Transportation (PHS&T)X
1.13.4.14ContainersXXX
1.13.4.24TransportationXXX

Subtotal Cost X X

Reporting Contractor G&AXX
Reporting Contractor Undistributed BudgetXX
Reporting Contractor Management ReserveXX
Reporting Contractor FCCMXX
Total CostXX

Reporting Contractor Profit/Loss or Fee X X

Total PriceXX
DRAFT DD FORM 2794 (PAGE 2), REPORTING, JANUARY 2019

DD Form 2794, Pg 3 (EVENTS)

COST AND SOFTWARE DATA REPORTING PLAN
14. CSDR SUBMISSION EVENTS
a.
EVENT IDb.
DATA REPORT(S)c.
SUBMISSION EVENT NAMEd.
REPORT CYCLEe. AS OF DATEf. DUE DATE
(YYYYMMDD)(YYYYMMDD)
1Cost and Hour Report (FlexFile), Quantity Data ReportContract Award (plus 90 days)Interim2024093020241129
2Technical Data ReportContract Award (plus 90 days)Interim2024093020241129
3Cost and Hour Report (FlexFile), Quantity Data ReportAnnual Report 1Interim2025063020250829
4Technical Data ReportAnnual Report 1Interim2025063020250829
5Cost and Hour Report (FlexFile), Quantity Data ReportAnnual Report 2Interim2026063020260829
6Technical Data ReportAnnual Report 2Interim2026063020260829
7Cost and Hour Report (FlexFile), Quantity Data ReportAnnual Report 3Interim2027063020270829
8Technical Data ReportAnnual Report 3Interim2027063020270829
9Cost and Hour Report (FlexFile), Quantity Data ReportAnnual Report 4Interim2028063020280829
10Technical Data ReportAnnual Report 4Interim2028063020280829
11Cost and Hour Report (FlexFile), Quantity Data ReportContract CompletionFinal2029063020290829
12Technical Data ReportContract CompletionFinal2029063020290829
DRAFT DD FORM 2794 (PAGE 3), SUBMISSION EVENTS, JANUARY 2019PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 4 (REMARKS)

COST AND SOFTWARE DATA REPORTING PLAN
15. REMARKS

The contractor must report costs on all CLINs associated with the (Specify contract name) contract including Over and Above, Advance Procurement, Long Lead Materials, Multiyear Procurement, Inter-Division or Inter-Company Work Orders (IWOs), Foreign Military Sales (FMS), Warranty, etc. Costs should not be omitted based on contract CLIN structure or definition.

INITIAL REPORT

Other than the Resource Distribution Table, submission events associated with this CSDR Plan are classified as either "Initial", "Interim", or "Final" submissions as identified in block 14.d of this CSDR plan.

i. Submission events marked "Initial" shall report the Contractor's total anticipated contract cost and resulting price using the maximum allowable contractor quantities, hours, or options (as applicable). For sealed bid contracts (i.e., contracts awarded under FAR Part 14) the reported FAC/EAC shall equal the value of the Contractor's sealed bid (using the maximum allowable contractor quantities, hours, or options (as applicable)). For negotiated contracts (i.e., contracts award under FAR Part 15) the reported FAC/EAC shall be equal in overall value to the Contractor's best and final offer (and consistent in distribution with any supporting cost and pricing data (e.g., basis of estimates, engineering build-ups) (using the maximum allowable contractor quantities, hours, or options (as applicable)). For all other contracts, the reported FAC/EAC shall be equal in overall value to the Contractor's final proposal and consistent in distribution with any supporting data provided to substantiate the contract's value, reasonableness, and/or realism (e.g., basis of estimates, engineering build-ups) (using the maximum allowable contractor quantities, hours, or options (as applicable)). No ATD costs are anticipated to reported on an "Initial" submission except for any certified precontract costs incurred prior to or on the date of contract award.

ii. Interim" report submissions are any report that is not either an "Initial" or "Final" report. Reported ATD, EAC/FAC, and quantities on "Interim" submissions shall be prepared reflecting only the value of work, quantities, hours, or options (as applicable) awarded on the report's "As Of Date" (do not include costs for anticipated but not awarded scopes of work, quantities, hours, or options).

iii. Reported ATD, EAC/FAC, and quantities on "Final" submissions shall be prepared reflecting the value of work, quantities, hours, and options (as applicable) anticipated to be awarded on a contract and meet the conditions listed in block 15.c.i.4.

COVID-19 Remarks:

The Reporting Entity shall provide a description of the type and timing of all impacts to program schedule, incurred actual costs, forecasted at complete costs, in process quantities, and delivered quantities, which are directly attributable to the COVID-19 pandemic.

Per the DIDs, note any relevant information that could be used in the interpretation of the data. Provide general or, if available, quantifiable contract impacts within the Summary Remarks. Provide impacts to specific WBS Elements or Functional Elements within the Remarks by DD FORM 2794 WBS Element. Provide impacts to the business unit within the Remarks of each 1921-3 submission. Organize impacts under a heading in the remarks that refers to “COVID-19 impacts”, or similar language, that segments this information from the rest of the remarks.

If applicable, the Reporting Entity shall provide an explanation of any new charge codes, work packages, control accounts, pricing categories, or other methods explicitly utilized to capture impacts of COVID-19.

If there are no impacts to report, then report there are no impacts in the Summary Remarks of each FlexFile and the Remarks of each 1921-3 submission.

Additional Data Fields #1-#12 (FlexFile): If applicable, the Reporting Entity shall utilize a “Tag” or the “Additional Data Field” referenced in Section B of the FlexFile DID (DI-FNCL-82162) to identify COVID-19 related data.

FAC vs EAC

The checkmarks for EAC/FAC in column 12e at the WBS level shall be reported as "Forecast at Completion" (FAC). The Forecast At Completion (FAC) required here is not subject to the standards established in ANSI/EIA-748 guideline #27 (Estimate at Complete); therefore, the FAC does not need to be, but may be, derived from Industry Earned Value Management (EVM) processes.

NON-RECURRING/RECURRING DEFINITIONS

Recurring and Non-Recurring Costs required for all levels:

Recurring costs. Repetitive elements of development, investment or sustainment costs that may vary with the quantity being produced or maintained, irrespective of system life cycle phase and appropriation. Recurring cost categories include procurement, and production and maintenance activities; acceptance testing; maintenance and support equipment, training, and data; test articles built to an operational configuration; and certain elements of systems engineering and program management.

Examples of Prime Mission Product activities include repetitive costs incurred when building prototype, test systems, or production units to an operational configuration. Examples of Prime Mission Product Hardware activities include Fabrication and assembly of partial/full prototype, test, or production units whether for customer or contractor use; Raw material, purchased parts, equipment associated with the fabrication and assembly of partial/full prototype or test units whether for customer or contractor use; Touch labor, integration and assembly, installation and check out; Engineering support for production unit fabrication, assembly and check out.

Examples of Prime Mission Product Software activities include Procurement of stand-alone or bundled COTS software licenses used in an operational system and installation and checkout of developed software into production units. Examples of Systems Engineering activities include Sustaining engineering, logistics support, planning, organizing, monitoring and reporting activities, document maintenance. Examples of Program Management activities include programmatic, financial, contractual, schedule, planning, organizing, and monitoring (quality information assurance, configuration management) activities in support of production unit fabrication, assembly and check out; meetings & efforts in support of supplier, manufacturing & production activities.

Examples of Systems Test and Evaluation activities include quality control, assurance, acceptance testing of production units including pilot support & system safety support; test equipment in support of operations; and Manufacturing System/Software Integration Laboratory (SIL) sustainment and lab support. Examples of Training activities include repetitive activities that vary with the quantity of training devices being produced. Examples of Spares and Repair Parts activities include spare parts and materials for production, production representative and/or LRIP units including both initial and replenishment spares.

Examples of Support Equipment activities include efforts that pertain to repetitive activities that vary with the quantity of support items being produced. Examples of Tooling activities include efforts that pertain to repetitive activities that vary with the quantity of items being produced and tooling maintenance/sustainment. Examples of Operational/Site Activation activities include efforts that pertain to a series of sites or organizations and those activities repeat for each site.

Nonrecurring costs. Non-repetitive elements of development, investment or sustainment costs that generally do not vary with the quantity being produced or maintained, irrespective of system life cycle phase and the appropriation. Nonrecurring cost categories include product design and development (PD&D) activities, including those for modifications; system test and evaluation (ST&E) including ST&E for modifications; tooling; pre-production or pre-maintenance activities; design and development of support equipment, training, and data; and certain elements of systems engineering and program management.

Examples of Prime Mission Product PD&D activities are: Requirements definition, engineering design, analysis & development; Redesign, rework & retest due to design flaws & first time corrective actions; test articles built for testing purposes only (i.e., units that are not production-representative) such as wind tunnel models, and bench and coupon test articles; structural development, static, fatigue, software, and ballistics testing; stress analysis; flight, ground, or sea testing of system properties; redesign as a result of testing; and retesting efforts; All configuration, quality, and data management efforts supporting release activity for first article configuration, delivery & certification; System safety plan, manuals, tech services, & maintenance manual development in support of first article delivery.

Examples of hardware design and development activities include material, purchased parts and labor associated with engineering models, operational models, bench, lab articles or partially built units (i.e. units that are not production representative), tooling, and ground support equipment for qualification, structural, static, fatigue or stress testing, and refurbishment of test units; and engineering support including manufacturing engineering, quality engineering, and tool engineering for development unit fabrication, assembly & tests.

Examples of software design and development activities include design and development of all software; delivered operational software and software developed to correct deficiencies and add capabilities; Initial integration of COTS and GOTS products into operational configuration; Support for HW-SW integration and test, system level testing; initial integration of COTS and GOTS products into operational configuration; and commercial software licenses for development facilities. System Engineering, Program Management, and Data activities occur throughout the system life cycle and are supportive in nature; as such, these costs take on the characteristics of the underlying activities being performed.

Examples of Systems Engineering activities include installation plans or quality inspection plans; requirements definition, allocation and flow-down; creation of specification and Interface Control Documents (ICDs); design and implementation of system security; top level design trade-offs; analyses, studies, and simulations for system performance and effectiveness, reliability, availability, maintainability or survivability; internal & external design review, IPT coordination & integration meetings; Certification & Control documentation; and supplier selection & coordination. Examples of Program Management activities include programmatic, financial, contractual, schedule, planning, organizing, and monitoring (quality information assurance, configuration management) activities in support of development, design & testing efforts.

Examples of Support Equipment activity include initial equipment design and test efforts, and test program sets development. Examples of Tooling activity include special test equipment, special tooling, procurement of initial & rate tooling, tool replacement (with the exact same tool) & tool modification (to accommodate product configuration changes). Examples of Operational/Site Activation activity include site planning efforts.

WBS INDEX AND DICTIONARY

The WBS Dictionary is a living document and must match the technical content, cost content, and work content of each end item (see Block 17) for all WBS elements for each Cost and Hour (FlexFile) submission. The dictionary shall contain a disclosure statement detailing any differences between the CSDR reporting methodology and the reporting entity's Cost Accounting Standards. The dictionary shall include a section detailing how parts are procured under this contract and any limitations of the parts procurement cost data or allocation of cost data for the WBS element.

The reporting entity must maintain and update the WBS Dictionary throughout the life of the contract, IAW DI-FNCL-82162, if changes to the WBS occur, the reporting entity shall annotate and track changes by adding the “As of Date” of the submitted FlexFile report and indicate the changes to the WBS Index and Dictionary Definitions.

For WBS elements identified in block 11 of the CSDR plan that is not within the contract's scope of work, the reporting entity shall report in the dictionary that “This CSDR WBS element is not associated with this contract’s scope of work”, and zero costs will be associated for ATD and FAC for these WBS elements.

COST ACCOUNTING STANDARDS (CAS) DISCLOSURE STATEMENT DIFFERENCES

Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable.

1921-3 CONTRACTOR BUSINESS DATA REPORT

a. The Contractor Business Data Report is prepared by and for the business entity (e.g., business unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government.

b. Reports are submitted annually at the end of the contractor's fiscal year.

c. Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA. If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates should be provided for three future years.

d. The existing 1921-3 requires strictly formatted data and necessitates mappings to a government standard, the new DRAFT 1921-3 may be submitted in the contractor’s own format and according to the contractor’s own rate structure, so long as it meets the data requirements in the DRAFT 1921-3 Data Item Description DI-FNCL-81765.

END ITEMS/ORDER LOTS SCOPE IDIQ

Block 16 Orders/Lots is meant to capture the discrete Delivery Orders/Task Orders exercised on the contract. If a Delivery Order/Task Order is exercised on the contract and the CSDR plan has not been updated, it is the Reporting Entity's responsibility to still submit the dollars and hours in the FlexFile tagged to the appropriate Delivery Orders/Task Orders. The CSDR plan will be revised accordingly to include all exercised Delivery Orders/Task Orders.

COST AND HOUR REPORT UNIT/SUBLOT REPORTING

The Reporting Entity is required to provide unit or sublot (specify) reporting for any given Order/Lot and End Item as outlined in block 18 of the DD Form 2794. If Unit Reporting is selected in item 18c (Unit Reporting), it is expected that all touch labor costs and hours that are associated with the discrete units or sublots be tagged as Touch Manufacturing or Touch Maintenance as defined in Data Group E, Item 7.

QUANTITY REPORTING

a. If the quantity for a given element differs from the quantity reported for the full system, provide a comment in the WBS Element Remarks section.

b. The Reporting Entity shall provide meaningful quantity information lower than the summary level in the remarks for WBS elements Peculiar Support Equipment, Common Support Equipment, and Initial Spares and Repair Parts, if applicable.

FINAL COST REPORT

Final Cost Report to be submitted when final end item has been delivered and accepted by the government (e.g., as evidenced by a completed DD 250) and 95% or more of total costs for each Order/Lot (see Block 16) and each End Item (see Block 17) has been incurred.

CSDR READINESS REVIEW (CSDR-RR) also known as Post Award Conference (PAC)

The Reporting Entity shall attend and participate in a CSDR Readiness Review meeting (also known as the Post award CSDR conference) which will be held with the Cost Working Group Integrated Product Team (CWIPT) IAW DFARS 242.503-2(b) and DoDM 5000.04 (CSDR Manual). During this meeting, the CWIPT and contractor will review the Reporting Entity's process for data collection and reporting to ensure it satisfies the guidelines outlined in the DoDM 5000.04, CSDR Manual, the approved CSDR plan reporting requirement, and the Resource Distribution Table. The Reporting Entity shall demonstrate how costs will be based, to the maximum extent possible, upon actual cost transactions and not cost allocations; describe how recurring vs. nonrecurring costs will be segregated; demonstrate how the data from its accounting system will be mapped into the reporting categories in the approved CSDR plan. The Reporting Entity shall present the methodologies used for mapping internal cost accounts to the agreed upon WBS, specifically illustrating how individual WBS elements and standard functional categories in the FlexFile (functional data elements in the 1921 series) codes will be populated. The review shall include any reporting issue corrections and identify proposed changes to the approved CSDR Plan as necessary.

RESOURCE DISTRIBUTION TABLE (RDT)

The Reporting Entity is instructed to provide a Resource Distribution Table upon contract award, which identifies the value and work assigned to the Reporting Entity and its subcontractors. The Reporting Entity shall provide an updated RDT when additional quantities/scope are added to the contract to ensure that no major sub-contract(s) breach the direct CSDR reporting threshold specified in DODI 5000.73 and DoDM 5000.04-M-1.

PERIOD OF PERFORMANCE (POP)

If contract Period of Performance is extended, the contractor shall submit an additional cost report for each additional year of extension. The final report will be moved to the revised end of the Period of Performance.

DRAFT DD FORM 2794 (PAGE 4), REMARKS, JANUARY 2019 PREVIOUS EDITION IS OBSOLETE

DD Form 2794, Pg 5 (SCOPE DEF)

COST AND SOFTWARE DATA REPORTING PLAN
INTRA-CONTRACT SCOPE REPORTING DEFINITION
16. ORDERS/LOTS
a. IDb. NAMEc. PHASE/MILESTONE
1DO1C-FRP
2DO2C-FRP
3DO3…nC-FRP
17. END ITEMS
a. IDb. NAME
AMechanical A-Kit
18. OPTIONAL REQUIREMENTS
a. ORDER/LOT IDb. END ITEM IDc. UNIT REPORTING
(X if applicable)d. SEQUENCING

(X if applicable)

1AXX
2AXX
3AXX

DRAFT DD FORM 2794 (PAGE 5), INTRA-CONTRACT SCOPE, JANUARY 2019

DD Form 2794, Pg 8 (TECH RQTS)

COST AND SOFTWARE DATA REPORTING PLAN - TECHNICAL PARAMETER REQUIREMENTS
TECHNICAL PARAMETER REQUIREMENTS
26. WBS
ELEMENT CODE27. WBS ELEMENT NAME28. ITEM TYPE29. TECHNICAL PARAMETER
a. PARAMETER NAMEb. UNIT OF MEASUREc. UNIT OF MEASURE QUALIFIERd. REPEATABLEe. REMARKS
1.1Mechanical A-KitC4ISysTarget EnvironmentList
1.1Mechanical A-KitC4ISysPlatformList
1.1Mechanical A-KitC4ISysInfrastructure AvailabilityList
1.1Mechanical A-KitC4ISysEnvironmental Tolerance - Radiation HardeningList
1.1.1A-Kit Integration, Assembly, Test, and CheckoutIAT&CONumber of Electrical ConnectionsQuantityElectrical Connections
1.1.1A-Kit Integration, Assembly, Test, and CheckoutIAT&CONumber of Mechanical ConnectionsQuantityMechanical Connections
1.1.1A-Kit Integration, Assembly, Test, and CheckoutIAT&CONumber of Interface Control Drawings (ICD)QuantityDrawings
1.1.2A-Kit Subsystem 1...n (Specify)PhysicalOtherMaterial Mix 1…nPercent of Total WeightMaterial NameY
1.1.2A-Kit Subsystem 1...n (Specify)PhysicalElecVolumeCubic Inches
1.1.2A-Kit Subsystem 1...n (Specify)PhysicalElecWeightPounds
1.1.2A-Kit Subsystem 1...n (Specify)PhysicalElecWeight - StructuralPounds
1.1.2A-Kit Subsystem 1...n (Specify)PhysicalElecWeight - ElectronicsPounds
1.1.2A-Kit Subsystem 1...n (Specify)PhysicalElecPower - Maximum Consumption RateKilowatts
1.1.2.1Subsystem Integration, Assembly, Test, and CheckoutIAT&CONumber of Electrical ConnectionsQuantityElectrical Connections
1.1.2.1Subsystem Integration, Assembly, Test, and CheckoutIAT&CONumber of Mechanical ConnectionsQuantityMechanical Connections
1.1.2.1Subsystem Integration, Assembly, Test, and CheckoutIAT&CONumber of Interface Control Drawings (ICD)QuantityDrawings
1.1.2.2Subsystem Hardware 1...n (Specify)PhysicalOtherMaterial Mix 1…nPercent of Total WeightMaterial NameY
1.1.2.2Subsystem Hardware 1...n (Specify)PhysicalElecVolumeCubic Inches
1.1.2.2Subsystem Hardware 1...n (Specify)PhysicalElecWeightPounds
1.1.2.2Subsystem Hardware 1...n (Specify)PhysicalElecWeight - StructuralPounds
1.1.2.2Subsystem Hardware 1...n (Specify)PhysicalElecWeight - ElectronicsPounds
1.1.2.2Subsystem Hardware 1...n (Specify)PhysicalElecPower - Maximum Consumption RateKilowatts
1.1.2.2Subsystem Hardware 1...n (Specify)ElecBoxCircuit Cards - Number ofQuantityCards
1.1.2.2Subsystem Hardware 1...n (Specify)TransReceivRFBandwidthMegahertz
1.1.2.2Subsystem Hardware 1...n (Specify)TransReceivRFTransmitter Power Output - PeakWatts
1.1.2.2Subsystem Hardware 1...n (Specify)TransReceivRFTransmitter Power Output - AverageWatts
1.2Platform Integration, Assembly, Test, and CheckoutIAT&CONumber of Electrical ConnectionsQuantityElectrical Connections
1.2Platform Integration, Assembly, Test, and CheckoutIAT&CONumber of Mechanical ConnectionsQuantityMechanical Connections
1.2Platform Integration, Assembly, Test, and CheckoutIAT&CONumber of Interface Control Drawings (ICD)QuantityDrawings
1.3Systems EngineeringSysEngNumber of Requirement Document - "Shalls"QuantityShallsYG
1.3Systems EngineeringSysEngNumber of Platforms - IntegratedQuantityPlatforms
1.4Program ManagementProgMgmtFrequency of Government Program ReviewsQuantityReviews per Year
1.4Program ManagementProgMgmtNumber of Contract Line Item Number (CLIN)sQuantityCLINs
1.4Program ManagementProgMgmtNumber of SubcontractorsQuantitySubcontractors
1.4Program ManagementProgMgmtNumber of Customer StakeholdersQuantityStakeholders
1.4Program ManagementProgMgmtNumber of CDRLsQuantityCDRLs
1.5.4Mock-ups/System Integration Labs (SILs)SILModeling TypeListYG
1.5.4Mock-ups/System Integration Labs (SILs)SILMock-up / SIL - SizeSquare Feetby Facility / SuiteYG
1.5.4Mock-ups/System Integration Labs (SILs)SILMock-up / SIL - Primary PurposeListYG
1.5.6Test FacilitiesConstrConvFacility NameDescriptor
1.5.6Test FacilitiesConstrConvFacility DescriptionDescriptor
1.5.6Test FacilitiesConstrConvNew product alteration square footageFeet
1.6.1.1Operator Instructional EquipmentTrainDeviceTraining Device NameDescriptorTraining Device NameYG
1.6.1.1Operator Instructional EquipmentTrainDeviceTraining Device QuantityQuantityDevicesYG
1.6.1.1Operator Instructional EquipmentTrainDeviceTraining Device DescriptionDescriptorYG
1.6.1.2Maintainer Instructional EquipmentTrainDeviceTraining Device NameDescriptorTraining Device NameYG
1.6.1.2Maintainer Instructional EquipmentTrainDeviceTraining Device QuantityQuantityDevicesYG
1.6.1.2Maintainer Instructional EquipmentTrainDeviceTraining Device DescriptionDescriptorYG
1.6.3FacilitiesConstrConvFacility NameDescriptor
1.6.3FacilitiesConstrConvFacility DescriptionDescriptor
1.6.3FacilitiesConstrConvNew product alteration square footageFeet
1.7.1Data Deliverables 1...n (Specify)DataData Rights CategoryList
1.7.2Data RepositoryDataDepositoryStorage FootprintSquare FeetData storage size
1.7.3Data Rights 1...n (Specify)DataData Rights CategoryList
1.8.1Test and Measurement EquipmentSupportEquipmentQuantity of Support EquipmentQuantitySupport Equipment
1.8.1Test and Measurement EquipmentSupportEquipmentNumber of LocationsQuantityLocations
1.8.1Test and Measurement EquipmentSupportEquipmentSupport Equipment LocationsDescriptor
1.8.2Support and Handling EquipmentSupportEquipmentQuantity of Support EquipmentQuantitySupport Equipment
1.8.2Support and Handling EquipmentSupportEquipmentNumber of LocationsQuantityLocations
1.8.2Support and Handling EquipmentSupportEquipmentSupport Equipment LocationsDescriptor
1.9.1Test and Measurement EquipmentSupportEquipmentQuantity of Support EquipmentQuantitySupport Equipment
1.9.1Test and Measurement EquipmentSupportEquipmentNumber of LocationsQuantityLocations
1.9.1Test and Measurement EquipmentSupportEquipmentSupport Equipment LocationsDescriptor
1.9.2Support and Handling EquipmentSupportEquipmentQuantity of Support EquipmentQuantitySupport Equipment
1.9.2Support and Handling EquipmentSupportEquipmentNumber of LocationsQuantityLocations
1.9.2Support and Handling EquipmentSupportEquipmentSupport Equipment LocationsDescriptor
1.10Operational/Site Activation by Site 1...n (Specify)OpSiteActivationFacility DescriptionDescriptor
1.10Operational/Site Activation by Site 1...n (Specify)OpSiteActivationOrganic Site ActivationList
1.10Operational/Site Activation by Site 1...n (Specify)OpSiteActivationAmplifying Descriptive TextDescriptor
1.10.3Site ConstructionConstrConvFacility NameDescriptor
1.10.3Site ConstructionConstrConvFacility DescriptionDescriptor
1.10.3Site ConstructionConstrConvNew product alteration square footageFeet
1.12.1Construction/Conversion/ExpansionConstrConvFacility NameDescriptor
1.12.1Construction/Conversion/ExpansionConstrConvFacility DescriptionDescriptor
1.12.1Construction/Conversion/ExpansionConstrConvNew product alteration square footageFeet
DD FORM 2794 (PAGE 8), TECHNICAL PARAMETER REQUIREMENTS, JANUARY 2019

Pg 8a (TECH RQTS Definitions)

COST AND SOFTWARE DATA REPORTING PLAN - TECHNICAL PARAMETER REQUIREMENTS
TECHNICAL PARAMETER REQUIREMENTS (Definitions)
26. WBS
ELEMENT CODE27. WBS ELEMENT NAME29. TECHNICAL PARAMETERTECHNICAL PARAMETER (Definintions and Choice List)
a. PARAMETER NAMEb. UNIT OF MEASUREDEFINITIONList Item #1List Item #2List Item #3List Item #4List Item #5List Item #6List Item #7List Item #8List Item #9List Item #10List Item #n
1.1Mechanical A-KitTarget EnvironmentListChoice List: Ground, Maritime, Airborne or SpaceGroundMaritimeAirborneSpaceOther
1.1Mechanical A-KitPlatformListDenotes the specific platform type where C4I Electronics system will be employed.UAVSmall/Fighter/HeloLarge/BomberLarge/TransportGround/fixedGround/ transportableMan-PortableMaritime- Ship BasedMaritime - Shore BasedOther
1.1Mechanical A-KitInfrastructure AvailabilityListChoice List: Rate 1 - 5; (1) None available, no shelter, connectivity or power; (5) Full connectivity, environmentally controlled12345Other
1.1Mechanical A-KitEnvironmental Tolerance - Radiation HardeningListEnvironmental tolerance refers to radar environmental constraints or requirements such as radiation hardening. Denotes if this environmental tolerance applies.YesNo
1.1.1A-Kit Integration, Assembly, Test, and CheckoutNumber of Electrical ConnectionsQuantityThe number of electrical and electronic connections at this level of assembly.
1.1.1A-Kit Integration, Assembly, Test, and CheckoutNumber of Mechanical ConnectionsQuantityThe number of mating surfaces, fasteners, or other non-electrical attach points at the level of assembly.
1.1.1A-Kit Integration, Assembly, Test, and CheckoutNumber of Interface Control Drawings (ICD)Quantity
1.1.2A-Kit Subsystem 1...n (Specify)Material Mix 1…nPercent of Total WeightList of primary materials comprising the item by percent of total weight. (Cite one or more materials as applicable)
1.1.2A-Kit Subsystem 1...n (Specify)VolumeCubic InchesPhysical volume of the item.
1.1.2A-Kit Subsystem 1...n (Specify)WeightPoundsPhysical weight of the item.
1.1.2A-Kit Subsystem 1...n (Specify)Weight - StructuralPoundsThe item's mechanical/structural weight.
1.1.2A-Kit Subsystem 1...n (Specify)Weight - ElectronicsPoundsThe item's electronics weight.
1.1.2A-Kit Subsystem 1...n (Specify)Power - Maximum Consumption RateKilowattsMaximum rate of power consumption by the item.
1.1.2.1Subsystem Integration, Assembly, Test, and CheckoutNumber of Electrical ConnectionsQuantityThe number of electrical and electronic connections at this level of assembly.
1.1.2.1Subsystem Integration, Assembly, Test, and CheckoutNumber of Mechanical ConnectionsQuantityThe number of mating surfaces, fasteners, or other non-electrical attach points at the level of assembly.
1.1.2.1Subsystem Integration, Assembly, Test, and CheckoutNumber of Interface Control Drawings (ICD)Quantity
1.1.2.2Subsystem Hardware 1...n (Specify)Material Mix 1…nPercent of Total WeightList of primary materials comprising the item by percent of total weight. (Cite one or more materials as applicable)
1.1.2.2Subsystem Hardware 1...n (Specify)VolumeCubic InchesPhysical volume of the item.
1.1.2.2Subsystem Hardware 1...n (Specify)WeightPoundsPhysical weight of the item.
1.1.2.2Subsystem Hardware 1...n (Specify)Weight - StructuralPoundsThe item's mechanical/structural weight.
1.1.2.2Subsystem Hardware 1...n (Specify)Weight - ElectronicsPoundsThe item's electronics weight.
1.1.2.2Subsystem Hardware 1...n (Specify)Power - Maximum Consumption RateKilowattsMaximum rate of power consumption by the item.
1.1.2.2Subsystem Hardware 1...n (Specify)Circuit Cards - Number ofQuantityAlso referred to as Printed circuit boards. The IPC preferred term for assembled boards is circuit card assembly (CCA). Total Number of printed circuit boards (PCBs) in item. This includes all boards designed, modified, purchased or provided that make up the final end item.
1.1.2.2Subsystem Hardware 1...n (Specify)BandwidthMegahertzThe width of the band of frequencies occupied by the central lobe of the spectrum of an alternating current signal. Bandwidth is the difference between the upper and lower cut-off frequencies of a receiver.
1.1.2.2Subsystem Hardware 1...n (Specify)Transmitter Power Output - PeakWattsThe Peak Transmitter Power Output
1.1.2.2Subsystem Hardware 1...n (Specify)Transmitter Power Output - AverageWattsThe Average Transmitter Power Output
1.2Platform Integration, Assembly, Test, and CheckoutNumber of Electrical ConnectionsQuantityThe number of electrical and electronic connections at this level of assembly.
1.2Platform Integration, Assembly, Test, and CheckoutNumber of Mechanical ConnectionsQuantityThe number of mating surfaces, fasteners, or other non-electrical attach points at the level of assembly.
1.2Platform Integration, Assembly, Test, and CheckoutNumber of Interface Control Drawings (ICD)Quantity
1.3Systems EngineeringNumber of Requirement Document - "Shalls"QuantityThe number of requirements cited in the system's requirements documents.
1.3Systems EngineeringNumber of Platforms - IntegratedQuantityThe number of platforms (e.g. aircraft) on which the system will be qualified.
1.4Program ManagementFrequency of Government Program ReviewsQuantityThe Frequency of Government Program Reviews in the contract.
1.4Program ManagementNumber of Contract Line Item Number (CLIN)sQuantityThe number of Contract CLINs in the contract.
1.4Program ManagementNumber of SubcontractorsQuantityThe number of major subcontractors/suppliers in the program.
1.4Program ManagementNumber of Customer StakeholdersQuantityThe number of customers and stakeholders that may require management accommodation. Stakeholders consist of any group or organization with a related or subsequent responsibility that is directly related to the outcome of an action or result. Generally speaking they can influence the outcome or are the recipient of the results. The range of personnel selected to participate as stakeholders is based on the outcome and processes involved. Typical stakeholders are: users or operators, acquisition commands, test communities, depots, manpower, personnel & training communities, maintainers, and suppliers
1.4Program ManagementNumber of CDRLsQuantityThe number of Contract Data Requirements List items for which the CRS element staff is responsible.
1.5.4Mock-ups/System Integration Labs (SILs)Modeling TypeListDescribes the types of modeling to be performed by the SIL.3-DOF6-DOFHardware in the loopOther
1.5.4Mock-ups/System Integration Labs (SILs)Mock-up / SIL - SizeSquare FeetFacility area measured in square feet.
1.5.4Mock-ups/System Integration Labs (SILs)Mock-up / SIL - Primary PurposeListDescribes the SIL's primary purpose.V&VPrototypingSystem QualificationOther
1.5.6Test FacilitiesFacility NameDescriptorThe facility name.
1.5.6Test FacilitiesFacility DescriptionDescriptorDescribes each facility and quantify to the extent possible in terms of square feet, number of installations, power, etc.
1.5.6Test FacilitiesNew product alteration square footageFeetNew product alteration square footage
1.6.1.1Operator Instructional EquipmentTraining Device NameDescriptorTraining equipment name.
1.6.1.1Operator Instructional EquipmentTraining Device QuantityQuantityTraining equipment quantity. Note: Describe Annual Quantity by Location in Time Phased Quantity Table
1.6.1.1Operator Instructional EquipmentTraining Device DescriptionDescriptorDescription of training devices
1.6.1.2Maintainer Instructional EquipmentTraining Device NameDescriptorTraining equipment name.
1.6.1.2Maintainer Instructional EquipmentTraining Device QuantityQuantityTraining equipment quantity. Note: Describe Annual Quantity by Location in Time Phased Quantity Table
1.6.1.2Maintainer Instructional EquipmentTraining Device DescriptionDescriptorDescription of training devices
1.6.3FacilitiesFacility NameDescriptorThe facility name.
1.6.3FacilitiesFacility DescriptionDescriptorDescribes each facility and quantify to the extent possible in terms of square feet, number of installations, power, etc.
1.6.3FacilitiesNew product alteration square footageFeetNew product alteration square footage
1.7.1Data Deliverables 1...n (Specify)Data Rights CategoryListCategory of Data Rights PurchasedUnlimited RightsGovernment Purpose RightsLimited RightsRestricted RightsNegotiated License RightsSBIR Data RightsCommercial Technical Data License RightsCommercial Computer Software Licenses
1.7.2Data RepositoryStorage FootprintSquare FeetThe area required for data storage.
1.7.3Data Rights 1...n (Specify)Data Rights CategoryListCategory of Data Rights PurchasedUnlimited RightsGovernment Purpose RightsLimited RightsRestricted RightsNegotiated License RightsSBIR Data RightsCommercial Technical Data License RightsCommercial Computer Software Licenses
1.8.1Test and Measurement EquipmentQuantity of Support EquipmentQuantityTotal number of support equipment used on the program
1.8.1Test and Measurement EquipmentNumber of LocationsQuantityNumber of locations support equipment is utilized
1.8.1Test and Measurement EquipmentSupport Equipment LocationsDescriptorList of all locations support equipment is utilized.
1.8.2Support and Handling EquipmentQuantity of Support EquipmentQuantityTotal number of support equipment used on the program
1.8.2Support and Handling EquipmentNumber of LocationsQuantityNumber of locations support equipment is utilized
1.8.2Support and Handling EquipmentSupport Equipment LocationsDescriptorList of all locations support equipment is utilized.
1.9.1Test and Measurement EquipmentQuantity of Support EquipmentQuantityTotal number of support equipment used on the program
1.9.1Test and Measurement EquipmentNumber of LocationsQuantityNumber of locations support equipment is utilized
1.9.1Test and Measurement EquipmentSupport Equipment LocationsDescriptorList of all locations support equipment is utilized.
1.9.2Support and Handling EquipmentQuantity of Support EquipmentQuantityTotal number of support equipment used on the program
1.9.2Support and Handling EquipmentNumber of LocationsQuantityNumber of locations support equipment is utilized
1.9.2Support and Handling EquipmentSupport Equipment LocationsDescriptorList of all locations support equipment is utilized.
1.10Operational/Site Activation by Site 1...n (Specify)Facility DescriptionDescriptorDescribes each facility and quantifies to the extent possible in terms of square feet, number of installations, power, etc.
1.1Operational/Site Activation by Site 1...n (Specify)Organic Site ActivationListDenotes if the site activation is a Government activityYesNo
1.1Operational/Site Activation by Site 1...n (Specify)Amplifying Descriptive TextDescriptorAdditional text as needed regarding the description of the amplification.
1.10.3Site ConstructionFacility NameDescriptorThe facility name.
1.10.3Site ConstructionFacility DescriptionDescriptorDescribes each facility and quantify to the extent possible in terms of square feet, number of installations, power, etc.
1.10.3Site ConstructionNew product alteration square footageFeetNew product alteration square footage
1.12.1Construction/Conversion/ExpansionFacility NameDescriptorThe facility name.
1.12.1Construction/Conversion/ExpansionFacility DescriptionDescriptorDescribes each facility and quantify to the extent possible in terms of square feet, number of installations, power, etc.
1.12.1Construction/Conversion/ExpansionNew product alteration square footageFeetNew product alteration square footage
DD FORM 2794 (PAGE 8a), TECHNICAL PARAMETER REQUIREMENTS, JANUARY 2019

DD Form 2794, Pg 7 (SRDR MX)

COST AND SOFTWARE DATA REPORTING PLAN - SRDR MAINTENANCE
23. RELEASES
a. IDb. NAMEc. DATE
1
2
2...n
24. PRODUCT SIZE REPORTING ELEMENTS
a. CODEb. NAMEc. RELEASE ID
1.2.9Air Vehicle Software Release 1..n (Specify)2
1.3.6Payload Software Release 1...n (Specify)2
1.4.7Ground Segment Software Release 1...n (Specify)2...n
1.5Aircraft System Software Release 1...n (Specify)1
1.6.1Software Systems Engineering2
1.7.1Software Program Management2...n
1.9.4Training Software 1...n (Specify)1
25. PRODUCT SIZE SUBMISSIONSc. RELEASE ID:122...n
a. NUMBERb. NAMEIncluded?Included?Included?
2Contract Award (plus 12 months - Total Contract Estimate) [See SRDR Implementation Guide]XXX
5Annual FYxx Report 1...n [See SRDR Implementation Guide]XXX
8Contract Completion (Total Contract Actuals) [See SRDR Implementation Guide]XXX
DRAFT DD FORM 2794 (PAGE 7), SRDR MAINTENANCE, JANUARY 2019