Attachment 0003 - Contractor Cost Breakdown Form.xlsx
XLSX spreadsheet 32 KB Posted
- Attached to
- Full Window Replacement, Building 674, U. S. Army Garrison Devens Reserve Forces Training Area (RFTA)
- Solicitation number
- W15QKN26RA056
About this file
This is a Contractor Cost Breakdown Form template designed for the Full Window Replacement project at Building 674, U.S. Army Garrison Devens Reserve Forces Training Area (RFTA). The form is an Excel-based pricing template that requires contractors to itemize and calculate all project costs across labor, equipment, and materials. The template is structured to capture detailed cost information including labor categories with hourly rates, equipment costs with unit measures, and material costs with quantities and unit pricing. All cost line items flow into subtotals that account for overhead and G&A expenses, profit markup, and bonding costs, culminating in a grand total project price.
The form includes sections for labor calculation (quantity of crew members multiplied by labor hours at specified unit cost rates), equipment breakdown (quantity and unit measure with associated costs), and material costs (quantity multiplied by unit cost). Additionally, the template contains a subcontractor information section requiring identification of any subcontractors, their percentage of work, and specialty area. The document is currently a blank template with zero dollar values displayed, indicating it requires contractor completion as part of their proposal submission for this firm-fixed-price construction contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ID | Sort | Type | Description (to include, but not limited to: task, labor, equipment, material type, grade, brand, etc.) | SOW Paragraph Number Reference | LABOR IN MANHOURS | EQUIPMENT | MATERIAL | TOTAL COST |
| QTY |
Mears, Amber L CIV USARMY ACC (USA):
QUANTITY Unit Measure Labor Catergoy (Crew skill set) Labor Hours Total Hrs Mears, Amber L CIV USARMY ACC (USA):
Quantity x Labor Hours = Total Hours Unit Cost Mears, Amber L CIV USARMY ACC (USA):
Cost for one labor hour of the specified crew Total Labor Cost Mears, Amber L CIV USARMY ACC (USA):
Total Hours x Unit Cost = Total Labor Cost QTY Unit Measure Unit Cost Total Equipment Cost QTY Unit Measure Mears, Amber L CIV USARMY ACC (USA):
i.e. Each, Linear Feet (LF), Lot, etc. Unit Cost Total Material Cost Mears, Amber L CIV USARMY ACC (USA):
Quantity x Unit Cost = Total Material Cost
Mears, Amber L CIV USARMY ACC (USA):
QUANTITY
Mears, Amber L CIV USARMY ACC (USA):
Quantity x Labor Hours = Total Hours
Mears, Amber L CIV USARMY ACC (USA):
Cost for one labor hour of the specified crew Mears, Amber L CIV USARMY ACC (USA):
| Total Hours x Unit Cost = Total Labor Cost | $ - 0 | |
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 | ||
| $ - 0 |
Totals $0.00 $0.00 $0.00 $ - 0
| OVERHEAD/G&A | $ - 0 |
| SUBTOTAL 1 | |
| PROFIT | $ - 0 |
| SUBTOTAL 2 | |
| BONDS | $ - 0 |
| GRAND TOTAL | $ - 0 |
| SUBCONTRACTOR INFORMATION (If Applicable) | ||
| Subcontractor Company Name | % of Work Performing | Specialty (i.e. Electical, HVAC) |
File details come from the government source that posted it. Updated .