Attachment 0002 Revised Price Model.xlsx

XLSX spreadsheet 92 KB Posted

Attached to
Project Manager Expeditionary Energy and Sustainment Systems (PM E2S2) Power Distribution Illumination Systems, Electrical (PDISE)
Solicitation number
W909MY-24-R-0008
Issued by

About this file

This document is a Draft Invitation for Bid (IFB) for the procurement of Power Distribution Illumination Systems, Electrical (PDISE) systems and accessories. The requirement consists of the purchase of the M40 A/P Distribution System, the M100 A/P and M200 A/P Electrical Feeder Systems, and the M46 Electrical Utility Assembly. This will result in a five-year, Firm Fixed-Price, Indefinite Delivery Indefinite Quantity, Small Business Set-Aside contract to maintain standardization with current fielding equipment and production using existing Government Technical Data Packages. The objective is to procure PDISE systems to meet U.S. Army acquisition objectives and other DoD customer requirements. This is for informational purposes only and does not constitute a solicitation or commitment by the Government.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLINs Post Report Hamlet, David A. WNY Tecolote: Version=1.3 Type=TimePhasedReport

Hamlet, David A. WNY Tecolote: culture=en-US Timestamp=5/10/2022 1:44:48 PM Heading=Time Phased Report for Point Estimate in 2022-05-05_ICIDS-POE.acex Inflation=ThenYear UseHeuristicRiskInflation=True Cases="2022-05-05_ICIDS-POE.acex,Point Estimate" HintPaths=2022-05-05_ICIDS-POE.acex=C:\Users\dhamlet\Documents\PM FPS\ RowFilter=All SelectedRows="ACE182,Y","ACE346,Y" SecondaryRows= FirstYear=2021 LastYear=2040 TotalLocation=Beginning ShowMonthlyValues=False FiscalStartMonth=10 FirstMonth=10/1/2020 12:00:00 AM LastMonth=9/30/2021 12:00:00 AM

MonthlyTotal=BeginningTime Phased Report for Point Estimate in 2022-05-05_ICIDS-POE.acex
Funding in TY $K, TY
Tuesday, 10 May 2022, 1:44 PM

Time Phased Results from Point Estimate

Hamlet, David A. WNY Tecolote: Version=1.3 Type=Table Style=PhasedCaseTable Name=1C45-5642-1B64-4EF7 Description=Time Phased Table Culture=en-US Timestamp=5/10/2022 1:44:48 PM Footprint=R12C4:R67C10

Locks=WBSTotalFY2023FY2024FY2025FY2026FY2027
ACE182** QUANTITY PROFILE
ACE346CLIN0.000.000.000.000.000.00
ACE276
ACE277
ACE278
ACE279
ACE280
ACE281
ACE282
ACE283
ACE284
ACE285
ACE286
ACE287
ACE288
ACE289
ACE290
ACE291
ACE292
ACE293
ACE294
ACE295
ACE296
ACE297
ACE298
ACE299
ACE300
ACE301
ACE302
ACE303
ACE304
ACE305
ACE306
ACE307
ACE308
ACE309
ACE310
ACE311
ACE312
ACE313
ACE314
ACE315
ACE316
ACE317
ACE318
ACE319
ACE320
ACE948
ACE889
ACE953
ACE954
ACE955
ACE958
ACE959

&F Page &P of &N Printed: &D &T

Rows Filter Case Years Show Prior/Complete

Instruction Sheet

PDISE Price Model Instruction Sheet
1.) Vendors are directed to enter firm fixed price data estimates in YELLOW cells for all CLINS for Base and each of the four Ordering Periods
2.) Vendors are directed to enter firm fixed price data estimated for all CLINS 0005 through 0028
3.) Total cost estimate will be calculated as the sum of the total cost for each Base Year and Option Year based off estimated quantity values per year.
4.) Pricing Model is locked, except cells requiring vendor input.
5.) CDRL are priced separately as indicated in the Base Year sheet

Summary Summary of PDISE Extended Price for Base Year Period through Option Year 4

Base Period (BP)Option Year 1Option Year 2Option Year 3Option Year 4Total
Total Cost Estimate$0.00$0.00$0.00$0.00$0.00$0.00
Notes below:
Based off total price per CLIN/ CDRLBase Period (BP)Optional Ordering Period Y1Optional Ordering Period Y2Optional Ordering Period Y3Optional Ordering Period Y4Average Cost per Unit
Based off average unit price derived from range pricing
M200 Electrical Feeder System, NSN: 6150-01-308-5672.$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
M100 Electrical Feeder System , NSN: 6150-01-308-5671.$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
M40 Electrical Distribution Center, NSN: 6150-01-307-9446.$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
M46 Electrical Utiity Assembly, NSN: 6150-01-208-9751.$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Feeder Center Assembly Electrical 200 AMP/PH, 13229E6300$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Feeder Center Assembly Electrical 100 AMP/PH, 13229E6325$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Distribution Center Assembly Electrical 40 AMP/PH, 13229E6345$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Container, Storage, Utility, 13229E6362$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cable Assembly, GRP PC, 200 AMP/Phase, 13226E7021$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cable Assembly, GRP PC, 100 AMP/Phase, 13226E7020$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cable Assembly, GRP PC, 40 AMP/Phase, 13226E7019$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cable Assembly, GRP PC, 60 AMP, 13226E7018$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cable Assembly, GRP S/F, 200 AMP/Phase, 25 Ft, 13226E7025$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cable Assembly, GRP S/F, 100 AMP/Phase, 50 Ft, 13226E7024$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cable Assembly, GRP S/F, 40 AMP /Phase, 100 Ft, 13226E7023-1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cable Assembly, GRP S/F, 40 AMP /Phase, 50 Ft, 13226E7023-2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Utility Assembly, Electrical, Receptacles and Lighting, 13226E7046$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cable Assembly, GRP S/F, 60 AMP, 100 Ft, 13226E7022-1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cable Assembly, GRP S/F, 60 AMP, 50 Ft, 13226E7022-2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cable Assembly, GRP E, 20 AMP, (3/#12) Cvr36, 50 Ft, 13226E7032-1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cable Assembly, GRP E, 20 v, (3/#12) Cvr36, 25 Ft, 13226E7032-2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cable Assembly, In-Line GFCI, 09-40103$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Branch Circuit Trunk Assembly 3 Taps, 120v, 20a, 13226E7037$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Recepticale Group,2 Duplex ,Box Enclosure, 13226E7040$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Light, Utility, 13230E7018$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Double Strap, Cable Carrier Assembly, 13227E5825$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Double Strap, Cable Carrier Assembly 13227E5821$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Strap, 13226E7044$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
First Article Requirements for M200 Electrical Feeder System$ - 0
First Article Requirements for M100 Electrical Feeder System$ - 0
First Article Requirements for M40 Electrical Distribution System$ - 0
First Article Requirements for M46 ElectricalUtility System$ - 0

Base Period Base Period (BP)

Only yellow highlighted boxes can be filled in
CLINCLIN TYPEDescriptionQuantity DescriptionUnit of Issue (U/I)QTY (Estimated)Unit PriceExtended PriceDescription
0001FFPBase period -M200 Electrical Feeder System, NSN: 6150-01-308-5672.Level of Effort (1 Unit)Unit of Issue (U/I)90$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0002FFPBase period - M100 Electrical Feeder System , NSN: 6150-01-308-5671.Level of Effort (1 Unit)Unit of Issue (U/I)115$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0003FFPBase period - M40 Electrical Distribution Center, NSN: 6150-01-307-9446.Level of Effort (1 Unit)Unit of Issue (U/I)265$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0004FFPBase period - M46 Electrical Utiity Assembly, NSN: 6150-01-208-9751.Level of Effort (1 Unit)Unit of Issue (U/I)276$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0005FFPBase period - Feeder Center Assembly Electrical 200 AMP/PH, 13229E6300Level of Effort (1 Unit)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0006FFPBase period - Feeder Center Assembly Electrical 100 AMP/PH, 13229E6325Level of Effort (1 Unit)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0007FFPBase period - Distribution Center Assembly Electrical 40 AMP/PH, 13229E6345Level of Effort (1 Unit)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0008FFPBase period - Container, Storage, Utility, 13229E6362Level of Effort (1 Unit)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0009FFPBase period - Cable Assembly, GRP PC, 200 AMP/Phase, 13226E7021Level of Effort (1 Unit)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0010FFPBase period - Cable Assembly, GRP PC, 100 AMP/Phase, 13226E7020Level of Effort (1 Unit)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0011FFPBase period - Cable Assembly, GRP PC, 40 AMP/Phase, 13226E7019Level of Effort (1 Unit)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0012FFPBase period - Cable Assembly, GRP PC, 60 AMP, 13226E7018Level of Effort (1 Unit)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0013FFPBase period - Cable Assembly, GRP S/F, 200 AMP/Phase, 25 Ft, 13226E7025Level of Effort (1 Unit)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0014FFPBase period - Cable Assembly, GRP S/F, 100 AMP/Phase, 50 Ft, 13226E7024Level of Effort (1 Unit)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0015FFPBase period - Cable Assembly, GRP S/F, 40 AMP /Phase, 100 Ft, 13226E7023-1Level of Effort (1 Unit)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0016FFPBase period - Cable Assembly, GRP S/F, 40 AMP /Phase, 50 Ft, 13226E7023-2Level of Effort (1 Unit)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0017FFPBase period - Utility Assembly, Electrical, Receptacles and Lighting, 13226E7046Level of Effort (1 Unit)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0018FFPBase period - Cable Assembly, GRP S/F, 60 AMP, 100 Ft, 13226E7022-1Level of Effort (1 Unit)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0019FFPBase period - Cable Assembly, GRP S/F, 60 AMP, 50 Ft, 13226E7022-2Level of Effort (1 Unit)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0020FFPBase period - Cable Assembly, GRP E, 20 AMP, (3/#12) Cvr36, 50 Ft, 13226E7032-1Level of Effort (1 Unit)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0021FFPBase period - Cable Assembly, GRP E, 20 v, (3/#12) Cvr36, 25 Ft, 13226E7032-2Level of Effort (1 Unit)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0022FFPBase period - Cable Assembly, In-Line GFCI, 09-40103Level of Effort (1 Unit)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0023FFPBase period - Branch Circuit Trunk Assembly 3 Taps, 120v, 20a, 13226E7037Level of Effort (1 Unit)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0024FFPBase period - Recepticale Group,2 Duplex ,Box Enclosure, 13226E7040Level of Effort (1 Unit)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0025FFPBase period - Light, Utility, 13230E7018Level of Effort (1 Unit)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0026FFPBase period - Double Strap, Cable Carrier Assembly, 13227E5825Level of Effort (1 Unit)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0027FFPBase period - Double Strap, Cable Carrier AssemblyLevel of Effort (1 Unit)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0028FFPBase period - Strap, 13226E7044Level of Effort (1 Unit)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
0029FFPFirst Article Requirements for M200 Electrical Feeder SystemDevelopment First Article consists of two (2) units broken down into four categories: Fabrication, Test Plan, Test Report, and Test Execution
Unit of Issue (U/I)1$ - 0$ - 0
Fabrication of (2) NSN: 6150-01-308-5672.Each (1)$ - 0
NPSFirst Article Test PlanEach (1)
Test ExecutionEach (1)$ - 0
NPSTest ReportEach (1)
0030FFPFirst Article Requirements for M100 Electrical Feeder SystemDevelopment First Article consists of two (2) units broken down into four categories: Fabrication, Test Plan, Test Report, and Test Execution
Unit of Issue (U/I)1$ - 0$ - 0
Fabrication of 2 NSN: 6150-01-308-5671.Each (1)$ - 0
NPSFirst Article Test PlanEach (1)
Test ExecutionEach (1)$ - 0
NPSTest ReportEach (1)
0031FFPFirst Article Requirements for M40 Electrical Distribution SystemDevelopment First Article consists of two (2) units broken down into four categories: Fabrication, Test Plan, Test Report, and Test Execution
Unit of Issue (U/I)1$ - 0$ - 0
Fabrication of 2 NSN 6150-01-307-9446.Each (1)$ - 0
NPSFirst Article Test PlanEach (1)
Test ExecutionEach (1)$ - 0
NPSTest ReportEach (1)
0032FFPFirst Article Requirements for M46 ElectricalUtility SystemDevelopment First Article consists of two (2) units broken down into four categories: Fabrication, Test Plan, Test Report, and Test Execution
Unit of Issue (U/I)1$ - 0$ - 0
Fabrication of 2 NSN 6150-01-208-9751.Each (1)$ - 0
NPSFirst Article Test PlanEach (1)
Test ExecutionEach (1)$ - 0
NPSTest ReportEach (1)
9999FFPContract Data List Requirements (CDRLs)Unit of Issue (U/I)
CDRL #CDRL TYPECDRL DescriptionQuantity DescriptionUnit Price
A001NSPMeeting Minutes/ Post Award ConferenceShall be provided in accordance with SOW Paragraph 3.8.2 and Data Item DI-ADMN-81250
A002NSPMeeting Minutes/ Program Management Review (PMR)Shall be provided in accordance with SOW Paragraph 3.8.3 and Data Item DI-ADMN-81250
A003NSPConfiguration Baseline (CB) ChangesShall be provided in accordance with SOW Paragraph 3.9.4 and 3.9.4.1 and Data Items DI-SESS-80639,DI-SESS-80642,DI-SESS-80643, or DI-SESS-81000
A004NSPLogistics Management Information (LMI) Data Product(s)Design Change Notice (DCN)Shall be provided in accordance with SOW Paragraph 3.9.4.2 and Data Item SAE GEIA-STD-0007
A005NSPRequest for Variance (RFV)Shall be provided in accordance with SOW Paragraph 3.9.5 and Data Item DI-SESS-80640
A006NSPAssessment of Manufacturing Risk and ReadinessShall be provided in accordance with SOW Paragraph 3.11.9.1 and Data Item DI-SESS-81974
A007NPSCorrosion Prevention Control PlanShall be provided in accordance with SOW Paragraph 3.7 and Data Item DI-MFFP-81403
A008NSPTest/Inspection Reports First Article Preproduction Inspection (FAPI) Report(s)Shall be provided in accordance with SOW Paragraph 3.12.5.2 and Data Item DI-NDTI-80809
A009NSPScientific and Technical Reports Failed Item Analysis Reports (FIARs)Shall be provided in accordance with SOW Paragraph 3.12.5.4 and 3.12.5.5 and Data Item DI-MISC-80711
A010NSPTest PlanShall be provided in accordance with SOW Paragraph 3.12.5.1 and Data Item DI-NDTI-80566
A011NSPProduction Status ReportShall be provided in accordance with SOW Paragraph 3.8.5 Data Item DI-MGMT-81255
A012NPSProduction Surge PlanShall be provided in accordance with SOW Paragraph 3.8.6 Data Item DI-MGMT-80969
A013NSPWarranty Performance Report: Warranty Cost and Activity ReportsShall be provided in accordance with SOW Paragraph 3.13.3 Data Item DI-SESS-81639
A014NSPUnique Identification (IUID) Marking And Verification ReportShall be provided in accordance with SOW Paragraph 3.10.3 Data Item DI-MGMT-81858
A015NPSTechnical Report-Study/Services: Make or Buy Analysis ReportShall be provided in accordance with SOW Paragraph 3.6 Data Item DI-MGMT-82398
$ - 0

1 4-Yr Optional Ordering Period Ordering Period-Year 1

Only yellow highlighted boxes can be filled in
CLINCLIN TYPEDescriptionCLIN TypeUnit of Issue (U/I)QTY (Estimated)Unit PriceExtended Price
1001FFPOrdering period 1 -M200 Electrical Feeder System, NSN: 6150-01-308-5672.Firm Fixed-Price (FFP)Unit of Issue (U/I)105$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1002FFPOrdering period 1 - M100 Electrical Feeder System , NSN: 6150-01-308-5671.Firm Fixed-Price (FFP)Unit of Issue (U/I)131$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1003FFPOrdering period 1 - M40 Electrical Distribution Center, 6150-01-307-9446Firm Fixed-Price (FFP)Unit of Issue (U/I)253$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1004FFPOrdering period 1 - M46 Electrical Utiity Assembly, 6150-01-208-9751.Firm Fixed-Price (FFP)Unit of Issue (U/I)235$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1005FFPOrdering period 1 - Feeder Center Assembly Electrical 200 AMP/PH, 13229E6300Firm Fixed-Price (FFP)Unit of Issue (U/I)1$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1006FFPOrdering period 1 - Feeder Center Assembly Electrical 100 AMP/PH, 13229E6325Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1007FFPOrdering period 1 - Distribution Center Assembly Electrical 40 AMP/PH, 13229E6345Firm Fixed-Price (FFP)Unit of Issue (U/I)7$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1008FFPOrdering period 1 - Container, Storage, Utility, 13229E6362Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1009FFPOrdering period 1 - Cable Assembly, GRP PC, 200 AMP/Phase, 13226E7021Firm Fixed-Price (FFP)Unit of Issue (U/I)1$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1010FFPOrdering period 1 - Cable Assembly, GRP PC, 100 AMP/Phase, 13226E7020Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1011FFPOrdering period 1 - Cable Assembly, GRP PC, 40 AMP/Phase, 13226E7019Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1012FFPOrdering period 1 - Cable Assembly, GRP PC, 60 AMP, 13226E7018Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1013FFPOrdering period 1 - Cable Assembly, GRP S/F, 200 AMP/Phase, 25 Ft, 13226E7025Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1014FFPOrdering period 1 - Cable Assembly, GRP S/F, 100 AMP/Phase, 50 Ft, 13226E7024Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1015FFPOrdering period 1 - Cable Assembly, GRP S/F, 40 AMP /Phase, 100 Ft, 13226E7023-1Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1016FFPOrdering period 1 - Cable Assembly, GRP S/F, 40 AMP /Phase, 50 Ft, 13226E7023-2Firm Fixed-Price (FFP)Unit of Issue (U/I)90$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1017FFPOrdering period 1 - Utility Assembly, Electrical, Receptacles and Lighting, 13226E7046Firm Fixed-Price (FFP)Unit of Issue (U/I)1$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1018FFPOrdering period 1 - Cable Assembly, GRP S/F, 60 AMP, 100 Ft, 13226E7022-1Firm Fixed-Price (FFP)Unit of Issue (U/I)1$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1019FFPOrdering period 1 - Cable Assembly, GRP S/F, 60 AMP, 50 Ft, 13226E7022-2Firm Fixed-Price (FFP)Unit of Issue (U/I)1$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1020FFPOrdering period 1 - Cable Assembly, GRP E, 20 AMP, (3/#12) Cvr36, 50 Ft, 13226E7032-1Firm Fixed-Price (FFP)Unit of Issue (U/I)1$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1021FFPOrdering period 1 - Cable Assembly, GRP E, 20 v, (3/#12) Cvr36, 25 Ft, 13226E7032-2Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1022FFPOrdering period 1 - Cable Assembly, In-Line GFCI, 09-40103Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1023FFPOrdering period 1 - Branch Circuit Trunk Assembly 3 Taps, 120v, 20a, 13226E7037Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1024FFPOrdering period 1 - Recepticale Group,2 Duplex ,Box Enclosure, 13226E7040Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1025FFPOrdering period 1 - Light, Utility, 13230E7018Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1026FFPOrdering period 1 - Double Strap, Cable Carrier Assembly, 13227E5825Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1027FFPOrdering period 1 - Double Strap, Cable Carrier AssemblyFirm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1028FFPOrdering period 1 - Strap, 13226E7044Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0

$ - 0

Ordering Period-Year 2

Only yellow highlighted boxes can be filled in
CLINCLIN TYPEDescriptionCLIN TypeUnit of Issue (U/I)QTY (Estimated)Unit PriceExtended Price
1029FFPOrdering period 2 -M200 Electrical Feeder System, NSN: 6150-01-308-5672.Firm Fixed-Price (FFP)Unit of Issue (U/I)101$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1030FFPOrdering period 2 - M100 Electrical Feeder System , NSN: 6150-01-308-5671.Firm Fixed-Price (FFP)Unit of Issue (U/I)130$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1031FFPOrdering period 2 - M40 Electrical Distribution Center, 6150-01-307-9446Firm Fixed-Price (FFP)Unit of Issue (U/I)238$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1032FFPOrdering period 2 - M46 Electrical Utiity Assembly, 6150-01-208-9751.Firm Fixed-Price (FFP)Unit of Issue (U/I)257$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1033FFPOrdering period 2 - Feeder Center Assembly Electrical 200 AMP/PH, 13229E6300Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1034FFPOrdering period 2 - Feeder Center Assembly Electrical 100 AMP/PH, 13229E6325Firm Fixed-Price (FFP)Unit of Issue (U/I)1$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1035FFPOrdering period 2 - Distribution Center Assembly Electrical 40 AMP/PH, 13229E6345Firm Fixed-Price (FFP)Unit of Issue (U/I)7$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1036FFPOrdering period 2 - Container, Storage, Utility, 13229E6362Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1037FFPOrdering period 2 - Cable Assembly, GRP PC, 200 AMP/Phase, 13226E7021Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1038FFPOrdering period 2 - Cable Assembly, GRP PC, 100 AMP/Phase, 13226E7020Firm Fixed-Price (FFP)Unit of Issue (U/I)75$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1039FFPOrdering period 2 - Cable Assembly, GRP PC, 40 AMP/Phase, 13226E7019Firm Fixed-Price (FFP)Unit of Issue (U/I)1$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1040FFPOrdering period 2 - Cable Assembly, GRP PC, 60 AMP, 13226E7018Firm Fixed-Price (FFP)Unit of Issue (U/I)1$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1041FFPOrdering period 2 - Cable Assembly, GRP S/F, 200 AMP/Phase, 25 Ft, 13226E7025Firm Fixed-Price (FFP)Unit of Issue (U/I)1$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1042FFPOrdering period 2 - Cable Assembly, GRP S/F, 100 AMP/Phase, 50 Ft, 13226E7024Firm Fixed-Price (FFP)Unit of Issue (U/I)1$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1043FFPOrdering period 2 - Cable Assembly, GRP S/F, 40 AMP /Phase, 100 Ft, 13226E7023-1Firm Fixed-Price (FFP)Unit of Issue (U/I)1$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1044FFPOrdering period 2 - Cable Assembly, GRP S/F, 40 AMP /Phase, 50 Ft, 13226E7023-2Firm Fixed-Price (FFP)Unit of Issue (U/I)90$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1045FFPOrdering period 2 - Utility Assembly, Electrical, Receptacles and Lighting, 13226E7046Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1046FFPOrdering period 2 - Cable Assembly, GRP S/F, 60 AMP, 100 Ft, 13226E7022-1Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1047FFPOrdering period 2 - Cable Assembly, GRP S/F, 60 AMP, 50 Ft, 13226E7022-2Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1048FFPOrdering period 2 - Cable Assembly, GRP E, 20 AMP, (3/#12) Cvr36, 50 Ft, 13226E7032-1Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1049FFPOrdering period 2 - Cable Assembly, GRP E, 20 v, (3/#12) Cvr36, 25 Ft, 13226E7032-2Firm Fixed-Price (FFP)Unit of Issue (U/I)1$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1050FFPOrdering period 2 - Cable Assembly, In-Line GFCI, 09-40103Firm Fixed-Price (FFP)Unit of Issue (U/I)1$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1051FFPOrdering period 2 - Branch Circuit Trunk Assembly 3 Taps, 120v, 20a, 13226E7037Firm Fixed-Price (FFP)Unit of Issue (U/I)1$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1052FFPOrdering period 2 - Recepticale Group,2 Duplex ,Box Enclosure, 13226E7040Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1053FFPOrdering period 2 - Light, Utility, 13230E7018Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1054FFPOrdering period 2 - Double Strap, Cable Carrier Assembly, 13227E5825Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1055FFPOrdering period 2 - Double Strap, Cable Carrier AssemblyFirm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1056FFPOrdering period 2 - Strap, 13226E7044Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0

$ - 0

Ordering Period-Year 3

Only yellow highlighted boxes can be filled in
CLINCLIN TYPEDescriptionCLIN TypeUnit of Issue (U/I)QTY (Estimated)Unit PriceExtended Price
1057FFPOrdering period 3 -M200 Electrical Feeder System, NSN: 6150-01-308-5672.Firm Fixed-Price (FFP)Unit of Issue (U/I)97$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1058FFPOrdering period 3 - M100 Electrical Feeder System , NSN: 6150-01-308-5671.Firm Fixed-Price (FFP)Unit of Issue (U/I)125$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1059FFPOrdering period 3 - M40 Electrical Distribution Center, 6150-01-307-9446Firm Fixed-Price (FFP)Unit of Issue (U/I)246$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1060FFPOrdering period 3 - M46 Electrical Utiity Assembly, 6150-01-208-9751.Firm Fixed-Price (FFP)Unit of Issue (U/I)234$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1061FFPOrdering period 3 - Feeder Center Assembly Electrical 200 AMP/PH, 13229E6300Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1062FFPOrdering period 3 - Feeder Center Assembly Electrical 100 AMP/PH, 13229E6325Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1063FFPOrdering period 3 - Distribution Center Assembly Electrical 40 AMP/PH, 13229E6345Firm Fixed-Price (FFP)Unit of Issue (U/I)7$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1064FFPOrdering period 3 - Container, Storage, Utility, 13229E6362Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1065FFPOrdering period 3 - Cable Assembly, GRP PC, 200 AMP/Phase, 13226E7021Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1066FFPOrdering period 3 - Cable Assembly, GRP PC, 100 AMP/Phase, 13226E7020Firm Fixed-Price (FFP)Unit of Issue (U/I)90$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1067FFPOrdering period 3 - Cable Assembly, GRP PC, 40 AMP/Phase, 13226E7019Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1068FFPOrdering period 3 - Cable Assembly, GRP PC, 60 AMP, 13226E7018Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1069FFPOrdering period 3 - Cable Assembly, GRP S/F, 200 AMP/Phase, 25 Ft, 13226E7025Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1070FFPOrdering period 3 - Cable Assembly, GRP S/F, 100 AMP/Phase, 50 Ft, 13226E7024Firm Fixed-Price (FFP)Unit of Issue (U/I)1$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1071FFPOrdering period 3 - Cable Assembly, GRP S/F, 40 AMP /Phase, 100 Ft, 13226E7023-1Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1072FFPOrdering period 3 - Cable Assembly, GRP S/F, 40 AMP /Phase, 50 Ft, 13226E7023-2Firm Fixed-Price (FFP)Unit of Issue (U/I)90$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1073FFPOrdering period 3 - Utility Assembly, Electrical, Receptacles and Lighting, 13226E7046Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1074FFPOrdering period 3 - Cable Assembly, GRP S/F, 60 AMP, 100 Ft, 13226E7022-1Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1075FFPOrdering period 3 - Cable Assembly, GRP S/F, 60 AMP, 50 Ft, 13226E7022-2Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1076FFPOrdering period 3 - Cable Assembly, GRP E, 20 AMP, (3/#12) Cvr36, 50 Ft, 13226E7032-1Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1077FFPOrdering period 3 - Cable Assembly, GRP E, 20 v, (3/#12) Cvr36, 25 Ft, 13226E7032-2Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1078FFPOrdering period 3 - Cable Assembly, In-Line GFCI, 09-40103Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1079FFPOrdering period 3 - Branch Circuit Trunk Assembly 3 Taps, 120v, 20a, 13226E7037Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1080FFPOrdering period 3 - Recepticale Group,2 Duplex ,Box Enclosure, 13226E7040Firm Fixed-Price (FFP)Unit of Issue (U/I)1$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1081FFPOrdering period 3 - Light, Utility, 13230E7018Firm Fixed-Price (FFP)Unit of Issue (U/I)1$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1082FFPOrdering period 3 - Double Strap, Cable Carrier Assembly, 13227E5825Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1083FFPOrdering period 3 - Double Strap, Cable Carrier AssemblyFirm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1084FFPOrdering period 3 - Strap, 13226E7044Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0

$ - 0

Ordering Period-Year 4

Only yellow highlighted boxes can be filled in
CLINCLIN TYPEDescriptionCLIN TypeUnit of Issue (U/I)QTY (Estimated)Unit PriceExtended Price
1085FFPOrdering period 4 -M200 Electrical Feeder System, NSN: 6150-01-308-5672.Firm Fixed-Price (FFP)Unit of Issue (U/I)98$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1086FFPOrdering period 4 - M100 Electrical Feeder System , NSN: 6150-01-308-5671.Firm Fixed-Price (FFP)Unit of Issue (U/I)126$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1087FFPOrdering period 4 - M40 Electrical Distribution Center, 6150-01-307-9446Firm Fixed-Price (FFP)Unit of Issue (U/I)229$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1088FFPOrdering period 4 - M46 Electrical Utiity Assembly, 6150-01-208-9751.Firm Fixed-Price (FFP)Unit of Issue (U/I)250$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1089FFPOrdering period 4 - Feeder Center Assembly Electrical 200 AMP/PH, 13229E6300Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1090FFPOrdering period 4 - Feeder Center Assembly Electrical 100 AMP/PH, 13229E6325Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1091FFPOrdering period 4 - Distribution Center Assembly Electrical 40 AMP/PH, 13229E6345Firm Fixed-Price (FFP)Unit of Issue (U/I)9$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1092FFPOrdering period 4 - Container, Storage, Utility, 13229E6362Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1093FFPOrdering period 4 - Cable Assembly, GRP PC, 200 AMP/Phase, 13226E7021Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1094FFPOrdering period 4 - Cable Assembly, GRP PC, 100 AMP/Phase, 13226E7020Firm Fixed-Price (FFP)Unit of Issue (U/I)68$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1095FFPOrdering period 4 - Cable Assembly, GRP PC, 40 AMP/Phase, 13226E7019Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1096FFPOrdering period 4 - Cable Assembly, GRP PC, 60 AMP, 13226E7018Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1097FFPOrdering period 4 - Cable Assembly, GRP S/F, 200 AMP/Phase, 25 Ft, 13226E7025Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1098FFPOrdering period 4 - Cable Assembly, GRP S/F, 100 AMP/Phase, 50 Ft, 13226E7024Firm Fixed-Price (FFP)Unit of Issue (U/I)1$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1099FFPOrdering period 4 - Cable Assembly, GRP S/F, 40 AMP /Phase, 100 Ft, 13226E7023-1Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1100FFPOrdering period 4 - Cable Assembly, GRP S/F, 40 AMP /Phase, 50 Ft, 13226E7023-2Firm Fixed-Price (FFP)Unit of Issue (U/I)20$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1101FFPOrdering period 4 - Utility Assembly, Electrical, Receptacles and Lighting, 13226E7046Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1102FFPOrdering period 4 - Cable Assembly, GRP S/F, 60 AMP, 100 Ft, 13226E7022-1Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1103FFPOrdering period 4 - Cable Assembly, GRP S/F, 60 AMP, 50 Ft, 13226E7022-2Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1104FFPOrdering period 4 - Cable Assembly, GRP E, 20 AMP, (3/#12) Cvr36, 50 Ft, 13226E7032-1Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1105FFPOrdering period 4 - Cable Assembly, GRP E, 20 v, (3/#12) Cvr36, 25 Ft, 13226E7032-2Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1106FFPOrdering period 4 - Cable Assembly, In-Line GFCI, 09-40103Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1107FFPOrdering period 4 - Branch Circuit Trunk Assembly 3 Taps, 120v, 20a, 13226E7037Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1108FFPOrdering period 4 - Recepticale Group,2 Duplex ,Box Enclosure, 13226E7040Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1109FFPOrdering period 4 - Light, Utility, 13230E7018Firm Fixed-Price (FFP)Unit of Issue (U/I)0$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1110FFPOrdering period 4 - Double Strap, Cable Carrier Assembly, 13227E5825Firm Fixed-Price (FFP)Unit of Issue (U/I)1$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1111FFPOrdering period 4 - Double Strap, Cable Carrier AssemblyFirm Fixed-Price (FFP)Unit of Issue (U/I)1$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0
1112FFPOrdering period 4 - Strap, 13226E7044Firm Fixed-Price (FFP)Unit of Issue (U/I)1$ - 0$ - 0
Qty 1-50Each (1)$ - 0
Qty 51-100Each (1)$ - 0
Qty 101-200Each (1)$ - 0

$ - 0

CDRLs

CDRLAssociated CLIN(s)
A0010003
A0020003
A0030003
A0040003
A0050003
A0060003
A0070003
A0080003
A0090003
A0100003
A0110003
A0120003
A0130003
A0140003
A0150003
A0160003
A0170003
A0180003
A0190003
A0200003
A0210003
A0220003
A0230003
A0240003
A0250003
A0260003
A0270003
A0280003
A0290003
A0300003
A0310003
A0320003
A0330003
A0340003
A0350003
A0360003
A0370003
A0380003
A0390003
A0400003
A0410003
A0420003
A0430003
A0440003
A0450003

POE

RowWBS/CES DescriptionAppropTotalFY 2021FY 2022FY 2023FY 2024FY 2025FY 2026FY 2027FY 2028
1*ICIDS Estimate
2ICIDS Program Office Estimate (POE)
3Recurring Production
4XS Zone
5S Zone
6M Zone
7L Zone
8XL Zone
9A Sensor
10SCIF
11ECP
12XS PMC
13S PMC
14M PMC
15L PMC
16XL PMC
17OPWS
18RSM
19PMC UPS
20WS UPS
21S WS UPS
22XS SSD
23S SSD
24M SSD
25L SSD
26XL SSD
27FO IF
28XS SPV
29S SPV
30M SPV
31L SPV
32XL SPV
33SCIF SPV
34PMC UPS SPV
35RSM SPV
36ECP SPV
37OP Training
38SA Training
39M Training
40SCIF Training
41ESTL Establish
42ESTL Support
43IA
44TDP
45ILSP
46CLS
47Travel
48Contingency
49Interface Device for Additional Sensors
50Central Monitoring Station & Study
51Base System Performance Verification (SPV) test report
52Training
53Base Site Survey/Design
54SEPM
55SETA
56Matrix Support
57PRD
58OGA
59ACC
60RSA
61PM TS SETA
62
63*INPUT VARIABLES
64** SCALARS & FACTORS
65ICIDS-IV to -V scalar
66CLS Factor
67Installation Price Factor
68Labor Fringe Factor
69Labor Overhead Factor
70G&A Factor
71Labor Fee
72FCCM-Labor
73FCCM-G&A
74
75Install HW & Misc Material Factor
76
77** QUANTITY PROFILE
78CLIN
79XS Zone
80S Zone
81M Zone
82L Zone
83XL Zone
84A Sensor
85SCIF
86ECP
87XS PMC
88S PMC
89M PMC
90L PMC
91XL PMC
92OPWS
93RSM
94PMC UPS
95WS UPS
96S WS UPS
97XS SSD
98S SSD
99M SSD
100L SSD
101XL SSD
102FO IF
103XS SPV
104S SPV
105M SPV
106L SPV
107XL SPV
108SCIF SPV
109PMC UPS SPV
110RSM SPV
111ECP SPV
112OP Training
113SA Training
114M Training
115SCIF Training
116ESTL Establish
117ESTL Support
118IA
119TDP
120ILSP
121CLS
122Travel
123Contingency
124Interface Device for Additional Sensors
125Central Monitoring
126Base System Performance Verification (SPV) test report
127Training
128Base Site Survey/Design
129
130** LABOR RATE
131ICIDS-V IGCE Labor Rate
132Burdened Labor Rate (Replace with rigor build-up)
133Fee Rate
134Subtotal (through Fringe & Overhead)
135Cost including FCCM
136
137** LABOR HOUR
138Labor Hour Requirements by Site Size (ICIDS-V)
139XS SITE (Hrs)
140S SITE (Hrs)
141M SITE (Hrs)
142L SITE (Hrs)
143XL SITE (Hrs)
144
145*** ICIDS-V BOM
146**** Sensor Devices BOM
147Sensor Devices Price
148XS ZONE
149S ZONE
150M ZONE
151L ZONE
152XL ZONE
153A sensor
154ECE
155FO INTER
156
157Sensor Device
158FO
159FOI
160RADC INTERIOR
1614 POINT RIOX MODULE
162RADC INTERIOR EXTERIOR
163ACESS /SECURE KEYPAD
164RKP40 READER WITH KEYPAD
165EXIT PUSHBUTTON
166BMS, WITHOUT REMOTE TEST
167BMS, DPDT (DUAL)
168PIMS (OMNI)
169DURESS SWITCH
170DURESS SWITCH
171BLUE EMERGENCY PUSH BUTTON SWITCH
172STARWATCH LOCAL CONTROLLER, 1 DOOR
1732-INCH EXIT PUSHBUTTON
174MAGNETIC LOCK
175FO TRANSCEIVER, RS-485 2-WIRE, SM, STAND ALONE
176FO XCVR, RS-485 2-WIRE, SM, DROP & REPEAT, STD ALN
177Number of Rows Sensor Matrix
178Sensor Device Unit Costs
179FO
180FOI
181RADC INTERIOR
1824 POINT RIOX MODULE
183SUB-RADC INTERIOR
184RADC INTERIOR EXTERIOR
185ACESS /SECURE KEYPAD
186RKP40 READER WITH KEYPAD
187EXIT PUSHBUTTON
188BMS, WITHOUT REMOTE TEST
189BMS, DPDT (DUAL)
190PIMS (OMNI)
191DURESS SWITCH
192DURESS SWITCH
193BLUE EMERGENCY PUSH BUTTON SWITCH
194STARWATCH LOCAL CONTROLLER, 1 DOOR
1952-INCH EXIT PUSHBUTTON
196MAGNETIC LOCK
197FO TRANSCEIVER, RS-485 2-WIRE, SM, STAND ALONE
198FO XCVR, RS-485 2-WIRE, SM, DROP & REPEAT, STD ALN
199
200**** PMC BOM
201PMC CLIN $
202SCIF
203XS PMC
204S PMC
205M PMC
206L PMC
207XL PMC
208OPWS
209RSM
210PMC UPS
211SCIF/OPWS/RSM UPS
212SMALL UPS
213ESTL
214
215PMC ICIDS-V
216STARWATCH PMC BASE CABINET
217STARWATCH ETHERNET HUB
218RS-232 SIGNAL AMPLIFIER - DAQ (INCL IN 0001AA)
219PMC POWER SUPPLY
220STARWATCH PMC BIN
221STARWATCH AUDIO PMUX KIT
222PMC KVM MONITOR ,KEYBOARD , 8-PORT SWITCH
223HP LASERJET PRO 400
224UPS BYPASS SWITCH
225PMC CONSOLE
226MICROLINE 320 TURBO DOT MATRIX PRINTER
227UPS, 3.1 KVA W/BATTERY BOX
228UPS, 1.15 KVA W/ BATTERY BOX
229UPS STATUS MONITORING BOARD
230SMS DEVICE SERVER
231SMS FILE SERVER
232SMS OPWS WORKSTATION
233ROCKETPORT EXPRESS OCTA DB9 8-PORT SERIAL ADAPTER
234SERIAL ENCRYPTING TRANCEIVER (DES)
235STARWATCH SOFTWARE LICENSE
236PMC EXPANSION CABINET
237BYPASS SWITCH FOR 3.1 KVA UPS
238HARDISK MANAGER 14, BUSINESS, SINGLE LICENSE, INCLUDES 1 YEAR OF UPGRADE ASSURANCE AND TECHNICAL SUPPORT, PARAGON RETENTION WIZARD
239WINDOWS OS SERVER 2008 R2
240WINDOWS 7 PRO
241Windows SQL Server 2008
242Windows SQL CALS - Single License
243USB Port Expander (8 port)
244Gold X USB - Serial
245ACP SMART-UPS 2200VA LCD RM 2U 120V US
246STANDALONE MODEM, DC
247OFFICEJET 6100
248MEDIA CONVERTER, ETHERNET, MM, STAND ALONE
249MEDIA CONVERTER, ETHERNET, MM, STAND ALONE
250POWER DISTRIBUTION MODULE, 8 OUTPUT
251BATTERY, SLA, 12VDC, 12AH
252SMS RSM WORKSTATION
2533-PORT (MS-3) MODEM SPLITTER
254RS232/422 POINT-TO-POINT DATA TRANCEIVER, SM, 1F, SURFACE MOUNT

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .