Attachment 0002 Construction Cost Breakdown.xls

XLS spreadsheet 58 KB Posted

Attached to
Building 623 Drop Ceiling Grid System Replacement - Devens, MA
Solicitation number
W15QKN-26-Q-A141
Issued by

About this file

This is a construction cost breakdown spreadsheet for the Building 623 Drop Ceiling Grid System Replacement project at the U.S. Army Garrison - Devens in Devens, Massachusetts. The project involves the complete removal and reinstallation of a drop-ceiling grid system and tiles in Building 623, the Hall of Flags Conference Center located at 42 Quebec Street. The contractor must provide all necessary plant, labor, equipment, tools, materials, supervision, incidentals, and services to execute the work as specified in the accompanying Performance Work Statement and solicitation documents.

The specific line-item costs and budget allocation details contained within this cost breakdown spreadsheet are not fully visible in the file summary provided, but this document serves as the pricing template for contractors to submit their cost proposals in response to Solicitation Number W15QKN-26-Q-A141. Contractors responding to this Army Contracting Command - New Jersey solicitation must complete and submit this cost breakdown as part of their proposal package to demonstrate their understanding of project scope and cost structure for the ceiling system replacement work.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet2

IDSortTypeDescription (to include labor,equipment, material type and grade)QuantityUnit MeasureLabor in ManhoursEquipmentMaterialTotal Cost
Crew (skill set)Labor HoursTotal HrsCity Cost IndexUnit Cost*Total Labor Cost*Unit CostTotal Equipment CostCity Cost IndexUnit CostTotal Material Cost
Totals
GENERAL CONTRACTOR
OVERHEAD$ - 0
$ - 0
PROFIT$ - 0
$ - 0
BOND$ - 0
G & A$ - 0
GRAND TOTAL$ - 0
Unit Cost*Cost for one labor hour of the specified crew
Total Labor Cost*"=Unit Cost x Total Hours"

File details come from the government source that posted it. Updated .