This Quality Assurance Surveillance Plan (QASP) is for Building and Equipment Life Cycle Management for Preventive and Demand Maintenance through Facility Management Support at Aberdeen Proving Ground (APG North & South), Adelphi Laboratory Center (ALC), and Blossom Point Research Facility (BPRF). The document outlines a performance-based approach for monitoring contractor performance across three primary contract line items (CLINs): Asset Management, Work Order Management, and Inventory Management.
The QASP establishes a 90% acceptable quality level (AQL) for all tasks, with surveillance methods including file reviews, periodic inspections, random observations, and customer complaints. The Contracting Officer's Representative (COR) will conduct monthly performance assessments, using monitoring forms to document the contractor's performance. Non-conforming services may result in Non-Conforming Reports and potential negative Contractor Performance Assessment Reporting System (CPARS) reports. The plan emphasizes a results-focused methodology that provides the contractor flexibility to improve processes while maintaining critical performance outcomes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page i of 12
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
Building and Equipment Life Cycle Management for Preventive and Demand Maintenance Through Facility Management Support, GFEBS (General Fund Enterprise Business System)
Aberdeen Proving Ground (APG North & South) & Adelphi Laboratory Center (ALC) and Blossom Point Research Facility (BPRF)
Directorate of Public Works (DPW)
19 August 2025
TABLE OF CONTENTS
1 INTRODUCTION
1.1 Purpose
1.2 Performance Management Approach
1.3 Performance Management Strategy
2 ROLES AND RESPONSIBILITIES
2.1 The Contracting Officer
2.2 The Contracting Officer’s Representative
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY
LEVELS
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
4.2 Customer Feedback
4.3 Acceptable Quality Levels
5 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
5.2 Monitoring Forms
6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
6.1 Determining Performance
6.2 Reporting
6.3 Reviews and Resolution
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
ATTACHMENT 2: QUALITY ASSURANCE MONITORING FORM
ATTACHMENT 3: QUALITY ASSURANCE MONITORING FORM – CUSTOMER
COMPLAINT INVESTIGATION
QUALITY ASSURANCE SURVEILLANCE PLAN
(QASP)
1 INTRODUCTION
This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled “APG Building and Equipment Life Cycle Management for Preventive and Demand Maintenance through Facility Support & GFEBS (General Fund Enterprise Business System)”. This plan sets forth the procedures and guidelines the US Army Garrison, Aberdeen Proving Ground, Directorate of Public Works will use in ensuring the required performance standards or services levels are achieved by the contractor.
1.1 Purpose
1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.
1.1.2 This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.
1.2 Performance Management Approach
1.2.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by the US Army Garrison, Aberdeen Proving Ground, Directorate of Public Works to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.
1.2.2 Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health.
A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.
1.3 Performance Management Strategy
1.3.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.
1.3.2 The Contracting Officer’s Representative (COR) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
2 ROLES AND RESPONSIBILITIES
2.1 The Contracting Officer
The contracting officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the contracting officer's representative (COR) and the contractor. The CO will designate a COR as the government authority for performance management.
2.2 The Contracting Officer’s Representative
The contracting officer’s representative (COR) is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY
LEVELS
The required performance standards and/or quality levels are included in the PWS and in Attachment 1, “Performance Requirements Summary.”
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are Random monitoring, which shall be performed by the COR.
Periodic Inspection – COR typically performs the periodic inspection on a monthly basis.
Customer Feedback – COR will review completed work and contact users to determine if the quality and timeliness of finished work met customer expectations and contract requirements.
4.2 Customer Feedback
The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems, but the customer always has the option to communicate complaints to the COR as opposed to the contractor.
Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COR. The COR will accept those customer complaints and investigate using the Quality Assurance Monitoring Form – Customer Complaint Investigation, identified in Attachment 3.
Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.
4.3 Acceptable Quality Levels
The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed. Levels of performance are keyed to the relative importance of the task to the overall mission performance at the US Army Garrison, Aberdeen Proving Ground, Directorate of Public Works.
5 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1.
5.2 Monitoring Forms
The government’s QA surveillance, accomplished by the COR, will be reported using the monitoring forms in Attachments 2 and 3. The forms, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required results are being achieved.
5.2.1 The COR will retain a copy of all completed QA surveillance forms.
6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
6.1 Determining Performance
6.1.1 Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.
6.2 Reporting
6.2.1 At the end of each month, the COR will prepare a written report summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
6.3 Reviews and Resolution
6.3.1 The COR may require the contractor’s project manager, or a designated alternate, to meet with the CO and other government IPT personnel as deemed necessary to discuss performance evaluation. The CO will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the COR as often as required or per the contractor’s request. The agenda of the reviews may include:
Monthly performance assessment data and trend analysis Issues and concerns of both parties Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis Recommendations for improved efficiency and/or effectiveness
6.3.2 The QAR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.
6.3.3 The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented.
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
Required Services (Tasks)
Performance Standards
Acceptable Quality Level
Methods of Surveillance Methods of Surveillance
CLIN 01, TE-2, Para. 2.2 Asset Management
Manage the process of data entry into
GFEBS/FMS
(TE-2)
90% of tasks performed meet requirements 90%
File reviews, periodic inspections, and random, observations, customer complaints, Monthly Status Report
Non-conforming services will result in Non-
Conforming Reports issued to Contractor and potential negative CPARS report.
Perform equipment Surveys
(TE-2)
90% of tasks performed meet requirements 90%
File reviews, periodic inspections, and random, observations, customer complaints, Monthly Status Report
Non-conforming services will result in Non-
Conforming Reports issued to Contractor and potential negative CPARS report.
Create and enter new records in
GFEBS/FMS from Surveys
(TE-2)
90% of tasks performed meet requirements 90%
File reviews, periodic inspections, and random, observations, customer complaints, Monthly Status Report
Non-conforming services will result in Non-
Conforming Reports issued to Contractor and potential negative CPARS report.
Coordinate with APG Stakeholders
(TE-2)
90% of tasks performed meet requirements 90%
File reviews, periodic inspections, and random, observations, customer complaints, Monthly Status Report
Non-conforming services will result in Non-
Conforming Reports issued to Contractor and potential negative CPARS report.
Update, configure and modify FMS through DWP Web Page
(TE-2)
90% of tasks performed meet requirements 90%
File reviews, periodic inspections, and random, observations, customer complaints, Monthly Status Report
Non-conforming services will result in Non-
Conforming Reports issued to Contractor and potential negative CPARS report.
Provide FMS analysis & reports
(TE-2)
90% of tasks performed meet requirements 90%
File reviews, periodic inspections, and random, observations, customer complaints, Monthly Status Report
Non-conforming services will result in Non-
Conforming Reports issued to Contractor and potential negative CPARS report.
Provide Technical Assistance
(TE-2)
90% of tasks performed meet requirements 90%
File reviews, periodic inspections, and random, observations, customer complaints, Monthly Status Report
Non-conforming services will result in Non-
Conforming Reports issued to Contractor and potential negative CPARS report.
Provide log of FMS issues
(TE-2)
90% of tasks performed meet requirements 90%
File reviews, periodic inspections, and random, observations, customer complaints, Monthly Status Report
Non-conforming services will result in Non-
Conforming Reports issued to Contractor and potential negative CPARS report.
CLIN 02, TE-2, Para. 2.3 Work Order Management
Manage PM and DM Work Orders in
GFEBS/FMS
(TE-2)
90% of tasks performed meet requirements 90%
File reviews, periodic inspections, and random, observations, customer complaints, Monthly Status Report
Non-conforming services will result in Non-
Conforming Reports issued to Contractor and potential negative CPARS report.
Update and Close PM and DM Work
Orders in
GFEBS/FMS
(TE-2)
90% of tasks performed meet requirements 90%
File reviews, periodic inspections, and random, observations, customer complaints, Monthly Status Report
Non-conforming services will result in Non-
Conforming Reports issued to Contractor and potential negative CPARS report.
Create DMO’s in
GFEBS
(TE-2)
90% of tasks performed meet requirements 90%
File reviews, periodic inspections, and random, observations, customer complaints, Monthly Status Report
Non-conforming services will result in Non-
Conforming Reports issued to Contractor and potential negative CPARS report.
Generate Monthly Reports from FMS
(TE-2)
90% of tasks performed meet requirements 90%
File reviews, periodic inspections, and random, observations, customer complaints, Monthly Status Report
Non-conforming services will result in Non-
Conforming Reports issued to Contractor and potential negative CPARS report.
Provide Technical Support
(TE-2)
90% of tasks performed meet requirements 90%
File reviews, periodic inspections, and random, observations, customer complaints, Monthly Status Report
Non-conforming services will result in Non-
Conforming Reports issued to Contractor and potential
CLIN 03, TE-2, Para. 2.4 Inventory Management
Manage Inventory in
GFEBS
(TE-2)
90% of tasks performed meet requirements 90%
File reviews, periodic inspections, and random, observations, customer complaints, Monthly Status Report
Non-conforming services will result in Non-
Conforming Reports issued to Contractor and potential negative CPARS report.
Setup Physical Inventory
(TE-2)
90% of tasks performed meet requirements 90%
File reviews, periodic inspections, and random, observations, customer complaints, Monthly Status Report
Non-conforming services will result in Non-
Conforming Reports issued to Contractor and potential negative CPARS report.
Complete Inventory Request
(TE-2)
90% of tasks performed meet requirements 90%
File reviews, periodic inspections, and random, observations, customer complaints, Monthly Status Report
Non-conforming services will result in Non-
Conforming Reports issued to Contractor and potential negative CPARS report.
Inventory Audit &
QAQC
(TE-2)
90% of tasks performed meet requirements 90%
File reviews, periodic inspections, and random, observations, customer complaints, Monthly Status Report
Non-conforming services will result in Non-
Conforming Reports issued to Contractor and potential negative CPARS report.
Manage Warranty Information in
GFEBS/FMS
(TE-2)
90% of tasks performed meet requirements 90%
File reviews, periodic inspections, and random, observations, customer complaints, Monthly Status Report
Non-conforming services will result in Non-
Conforming Reports issued to Contractor and potential
ATTACHMENT 2: QUALITY ASSURANCE
MONITORING FORM
SERVICE or STANDARD:
SURVEY PERIOD:
SURVEILLANCE METHOD (Check):
Random Sampling 100% Inspection Periodic Inspection Customer Complaint
LEVEL OF SURVEILLANCE (Check):
Monthly Quarterly As needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: ______ %
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______%
Service Provider’s Performance (Check): Meets Standards Does Not Meet Standards
Narrative of Performance During Survey Period:
PREPARED BY: ___________________________________ DATE:
ATTACHMENT 3: QUALITY ASSURANCE MONITORING FORM – CUSTOMER
COMPLAINT INVESTIGATION
SERVICE PROVIDED:
DATE/TIME COMPLAINT RECEIVED: _____________ ________ AM / PM
SOURCE OF COMPLAINT: _______________________________ (NAME)
_______________________________ (ORGANIZATION)
_______________________________ (PHONE NUMBER)
_______________________________ (EMAIL ADDRESS)
NATURE OF COMPLAINT:
RESULTS OF COMPLAINT INVESTIGATION:
DATE/TIME SERVICE PROVIDER INFORMED OF COMPLAINT:
CORRECTIVE ACTION TAKEN BY SERVICE PROVIDER:
RECEIVED AND VALIDATED BY: _____ __
PREPARED BY: ___________________________________ DATE:
| 1 INTRODUCTION |
| 1.1 Purpose |
| 1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting th... |
| 1.1.2 This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality a... |
| 1.2 Performance Management Approach |
| 1.2.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by... |
| 1.2.2 Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach mi... |
| 1.3 Performance Management Strategy |
| 1.3.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under ... |
| 2 ROLES AND RESPONSIBILITIES |
| 2.1 The Contracting Officer |
| 2.2 The Contracting Officer’s Representative |
| 3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS |
| 4 METHODOLOGIES TO MONITOR PERFORMANCE |
| 4.1 Surveillance Techniques |
| 4.2 Customer Feedback |
| 4.3 Acceptable Quality Levels |
| 5 QUALITY ASSURANCE DOCUMENTATION |
| 5.1 The Performance Management Feedback Loop |
| 5.2 Monitoring Forms |
| 5.2.1 The COR will retain a copy of all completed QA surveillance forms. |
| 6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT |
| 6.1 Determining Performance |
| 6.1.1 Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to sh... |
| 6.2 Reporting |
| 6.2.1 At the end of each month, the COR will prepare a written report summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted monthly report... |
| 6.3 Reviews and Resolution |
| 6.3.1 The COR may require the contractor’s project manager, or a designated alternate, to meet with the CO and other government IPT personnel as deemed necessary to discuss performance evaluation. The CO will define a frequency of in-depth reviews wi... |
| 6.3.2 The QAR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance. |
| 6.3.3 The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. |
| ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY |
| ATTACHMENT 2: QUALITY ASSURANCE MONITORING FORM |
| ATTACHMENT 3: QUALITY ASSURANCE MONITORING FORM – CUSTOMER COMPLAINT INVESTIGATION |
File details come from the government source that posted it. Updated .