This is a Contract Data Requirements List (DD Form 1423-1) for the Replacement Cooling Systems project at Rock Island Arsenal, specifying documentation and manual deliverables the contractor must provide.
The contract requires the contractor to deliver comprehensive installation and preparation documentation including equipment characteristics, installation documentation lists, tool lists, footprint drawings, machine foundation drawings, installation drawings, electrical schematics, and water piping schematics. Equipment characteristics data must be submitted in Microsoft Excel format within 30 calendar days of contract award. Installation documentation, including all drawings and schematics with a plainly visible cover sheet, must be provided in electronic format (PDF, DXF, or Word) a minimum of 60 calendar days prior to equipment delivery, with a second copy in electronic or paper format at delivery. The machine foundation drawing requires three copies (two paper, one electronic) within 60 days of award. Installation drawings must include anchor bolt locations with dimensions from a common baseline, power source connection points, component weights, and utility capacity requirements. The contractor is responsible for providing all special and custom tools necessary for installation and maintenance. Additional deliverables include a maintenance manual with safety lockout procedures, preventive maintenance schedules (daily operator checklists, visual inspections, lubrication schedules), and an operator manual with safe operation procedures for all equipment modes. Environmental compliance documentation must include Safety Data Sheets for all liquids and hazardous materials and a comprehensive chemical list specifying type, grade, and quantity of all chemicals needed for equipment operation. All three copies of manuals must be delivered with the equipment (two paper, one electronic). All deliverables must be submitted to Rock Island Arsenal, ATTN: TARA-LGC, Drew Canada, 2744 Rodman Ave (B220-B-D28), Rock Island, IL 61299-6400.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 15 Pages
C O N T R A C T D A T A R E Q U I R E M E N T S L I S T (1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
D. SYSTEM/ITEM
26-3-01 Replacement Cooling Systems
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Equipment Characteristics
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD250 REQ
9. DIST
STATEMENT
REQUIRED
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in either electronic or paper format, no later than 30-calendar-days after award of the contract. The contractor shall provide this information in electronic format using Microsoft Excel format.
The specific data required is:
Identify required info from LMP
PROVIDE COPIES, AS REQUESTED TO THE FOLLOWING:
Rock Island Arsenal
ATTN: TARA-LGC
Drew Canada 2744 Rodman Ave (B220-B-D28) Rock Island, IL 61299-6400
15. TOTAL
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 2 of 15 Pages
G. PREPARED BY
Chandler J. Work
H. DATE
24-Feb-2026
I. APPROVED BY
J. DATE
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Installation Documentation List
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in electronic format, a minimum of 60-calendar-days prior to delivery of equipment.
The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
A plainly visible cover sheet shall be provided with the Installation and Preparation Documentation package listing drawings and schematics required for installation.
ATTN: TARA-LGC
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 3 of 15 Pages
Drew Canada
Chandler J. Work
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Tool List
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.
The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
An itemized list of all fixtures, tools, and equipment, whether special or not, required to install, align, and maintain the equipment in this purchase description. NOTE: The contractor is responsible for providing special/custom tools and equipment necessary for installation, moving, and/or set-up as part of the equipment.
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 4 of 15 Pages
Rock Island Arsenal
ATTN: TARA-LGC
Drew Canada
Rock Island IL 61299 6400
Chandler J. Work
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Footprint Drawing
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.
The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
A dimensioned drawing shall be provided to accurately depict the layout of system, showing contours. It shall be fully dimensioned and include net operating clearance for moving components which travel beyond the gross contour. The drawing shall distinguish between the base of the equipment at floor level and the gross contour where it may overhang the base. Location of access doors for servicing of the equipment shall also be designated.
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 5 of 15 Pages
ATTN: TARA-LGC
Drew Canada
Chandler J. Work
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Machine Foundation Drawing
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide (3) copies of this information no later than 60-calendar-days after award of contract. Of these, (2) will be paper, and
(1) shall be electronic. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
The equipment requires a separate foundation, a drawing must be provided for approval. This will show all information necessary for a contractor to perform the required concrete preparation work prior to final installation of the system.
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 6 of 15 Pages
ATTN: TARA-LGC
Drew Canada
Chandler J. Work
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Installation Drawing
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.
The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 7 of 15 Pages
This drawing may be combined with either the Foundation Drawing or the Footprint Drawing, providing clarity is maintained. This drawing will provide location dimensions for anchor bolts including both the anchor bolt size and height of anchor bolt concrete surfaces clearly shown.
Dimensions will be from a common baseline, not chain dimensions. This is to prevent tolerance stack-up errors. Locations of the first connection points for all required power sources shall be shown and dimensioned.
Approximate gross weight of each separate component shall be indicated.
This drawing shall show capacity requirements at each utility point of first connection.
PROVIDE COPIES, AS REQUESTED TO THE FOLLOWING:
Rock Island Arsenal
ATTN: TARA-LGC
Drew Canada
R k I l d IL 61299 6400
Chandler J. Work
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Electrical Schematic
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.
The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 8 of 15 Pages
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
The equipment includes this type of utility and a complete system schematic is required. The capacity required at the point of first connection must be clearly stated.
ATTN: TARA-LGC
Drew Canada
Chandler J Work
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Water Piping Schematic
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS SEE BLOCK 16
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 9 of 15 Pages
The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.
The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
The equipment includes this type of utility and a complete system schematic is required. The capacity required at the point of first connection must be clearly stated including flow rate, temperature requirements (if any), and any other specifications even if the vendor is providing equipment (e.g. filtration, pressure change, etc). Also, any requirement for discharge/drainage must be included along with the volume and quality of the discharge (will it have chemicals or is it completely isolated such as for some cooling coils).
ATTN: TARA-LGC
Drew Canada
Rock Island IL 61299 6400
Chandler J Work
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Equipment Identification
REQUIRED
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
8. APP CODE Final
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 10 of 15 Pages
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
This document shall consist of the make & model of the equipment with a complete list of standard features, optional features being installed in order to meet the specification, and a list of optional features available for field installation but not included. Each section shall be clearly identified.
Also included will be any technical data or brochures applicable to the equipment being provided.
ATTN: TARA-LGC
Drew Canada
Chandler J Work
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
2. TITLE OF DATA ITEM
Maintenance Manual
3. SUBTITLE
Safety Lockout Procedure
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 11 of 15 Pages
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide (3) copies of this manual/information with delivery of the equipment. Of these, (2) will be paper, and (1) shall be electronic. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
This shall be a written procedure describing safe machine shutdown and the sequence by which lockout devices, and if necessary, line blocks and other restraints are affixed and removed prior to maintenance and service.
This may include drawings or photographs for clarity.
ATTN: TARA-LGC
Drew Canada
Chandler J Work
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 12 of 15 Pages
2. TITLE OF DATA ITEM
Maintenance Manual
3. SUBTITLE
Preventive Maintenance Procedure
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide (3) copies of this manual/information with delivery of the equipment. Of these, (2) will be paper, and (1) shall be electronic. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
This section of the documentation shall include: Daily Operator Checklist, Visual Inspections, and a Lubrication Schedule. Procedures and schedules for inspections, adjustments, cleaning, and component replacements.
ATTN: TARA-LGC
Drew Canada
Chandler J Work
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 13 of 15 Pages
2. TITLE OF DATA ITEM
Operator Manual
3. SUBTITLE
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide (3) copies of this manual/information with delivery of the equipment. Of these, (2) will be paper, and (1) shall be electronic. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
This section of the documentation shall include: Procedures for safe operation of the equipment in all modes. It shall include information necessary for performing all the operations and utilizing all the functions listed in the purchase description.
ATTN: TARA-LGC
Drew Canada
Chandler J Work
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 14 of 15 Pages
2. TITLE OF DATA ITEM
Environmental Compliance Data
3. SUBTITLE
Safety Data Sheets (SDS)
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide (1) copy of this information in electronic format no later than 30-calendar-days prior to delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
SDS Sheets for all liquids (e.g. oils or coolants) and any hazardous materials shall be provided.
ATTN: TARA-LGC
Drew Canada
Chandler J Work
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 15 of 15 Pages
2. TITLE OF DATA ITEM
Environmental Compliance Data
3. SUBTITLE
Chemical List
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide (1) copy of this information in electronic format no later than 30-calendar-days prior to delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
A list of all chemicals necessary to operate the equipment shall be provided by the vendor. This is necessary in order to meet environmental compliance requirements. The list shall include the type, grade, and quantity of each liquid or gas regardless of who is to provide the actual material. (E.g. if hydraulic oil is necessary to operate the system, it shall be listed as 200-gal-u.s. of DTE-XX.)
ATTN: TARA-LGC
Drew Canada
Chandler J Work
H. DATE
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 001 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 001 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 001 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 001 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 001 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 001 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 001 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 001 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 001 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 002 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 002 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 003 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 004 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
| CONTRACT DATA REQUIREMENTS LIST |
| Form Approved |
| B. EXHIBIT |
| C. CATEGORY |
| E. CONTRACT/PR NO. |
| 004 |
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Draft |
| G. PREPARED BY |
File details come from the government source that posted it. Updated .