This is a Definition of Contract Line Items specification document and Asbestos Survey Report for roof rehabilitation work at the Chickamauga and Chattanooga National Military Park maintenance complex located at 3370 Lafayette Road, Fort Oglethorpe, Georgia.

The contract includes ten line items organized as a base requirement plus four options. The base requirement (Line Items 1-2) covers replacement of roofing materials and removal/replacement of damaged roof decking on Units A, G, and B, with roofing replacement paid on a lump sum basis and roof decking work paid per square foot. Option A (Line Items 3-4) addresses Unit C roofing; Option B (Line Items 5-6) covers Units D and E; Option C (Line Items 7-8) covers Unit F; and Option D (Line Items 9-10) covers Unit H. Each roofing replacement line item includes demolition and disposal of hazardous and non-hazardous materials, including associated items such as downspouts, gutters, and deteriorated roof planking, followed by installation of new and salvaged roofing materials.

The accompanying Asbestos Survey Report, conducted August 8, 2023, identifies asbestos-containing materials (ACM) in the roofing materials requiring removal prior to renovation work. The survey found roof tiles containing 25% chrysotile asbestos across approximately 15,000 square feet in Buildings A, B, C, D, G, and H; roof tar containing 10% chrysotile asbestos in Building B Canopy (8 linear feet); roof mastic containing 3% chrysotile asbestos in Building D Canopy (15 linear feet); and presumed asbestos-containing penetration caulk/tar at approximately 18 penetration points across multiple buildings. All identified roofing materials are classified as Category I non-friable asbestos-containing materials, and removal must be performed by an accredited asbestos contractor in compliance with EPA, OSHA, Georgia EPD, and applicable state and local regulations.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHCH 257002 01 27 00 - 1

012721 DEFINITION OF CONTRACT LINE ITEMS

CHCH 257002

SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS

PART 1 - GENERAL

1.1 SUMMARY

A. Section explains in general, what is and is not included in a contract line item, and limits or cut-off points where one item ends and another begins.

B. If no contract line item exists for a portion of work, include costs in a related item.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 LIST OF CONTRACT LINE ITEMS

A. Contract Line Item Number [1] Replace Roofs Units A, G, and B

1. This item consists of replacing roofing materials on units A, G, and B. This includes all work necessary to complete the demolition and disposal of hazardous or non-hazardous roofing materials and associated items such as downspouts, gutters, deteriorated roof planking etc.. This item also includes all work necessary for installation of new and salvaged roofing materials once demolition has been completed.

2. Measurement for payment will be based on all work required to replace roofing materials on units A, G, and B.

3. Payment will be made at the contract lump sum (LS) price.

B. Contract Line Item Number [2] Remove and replace damaged roof decking Units A, G, and B.

1. This item consists of all work required to remove and replace damaged roof decking on units A, G, and B.

2. Measurement for payment will be per square feet of all work necessary for removal and replacement of damaged roof decking.

3. Payment will be made at the contract unit price per square feet (SF) price.

C. Option [A] Replace Roof Unit C

1. Contract Line Item Number [3]

a. This item consists of replacing roofing materials on unit C. This includes all work necessary to complete the demolition and disposal of hazardous or non-hazardous materials and associated items such as downspouts, gutters, deteriorated roof

CHCH 257002 01 27 00 - 2

planking etc... This item also includes all work necessary for installation of new and salvaged roofing materials once demolition has been completed.

b. Measurement for payment: based on all work required to replace roofing materials on unit C.

c. Payment will be made at the contract lump sum (LS) price.

2. Contract Line Item Number [4] Remove and replace damaged roof decking Unit C.

a. This item consists of all work required to remove and replace damaged roof decking on unit C.

b. Measurement for payment will be per square feet of all work necessary for removal and replacement of damaged roof decking.

c. Payment will be made at the contract unit price per square feet (SF) price.

D. Option [B] Replace Roof Unit D and E

1. Contract Line Item Number [5]

a. This item consists of replacing roofing materials on units D and E. This includes all work necessary to complete the demolition and disposal of hazardous or non-hazardous materials and associated items such as downspouts, gutters, deteriorated roof planking etc.... This item also includes all work necessary for installation of new and salvaged roofing materials once demolition has been completed.

b. Measurement for payment: based on all work required to replace roofing materials on units D and E.

c. Payment will be made at the contract lump sum (LS) price.

2. Contract Line Item Number [6] Remove and replace damaged roof decking Units D and E.

a. This item consists of all work required to remove and replace damaged roof decking on units D and E.

b. Measurement for payment will be per square feet of all work necessary for removal and replacement of damaged roof decking.

c. Payment will be made at the contract unit price per square feet (SF) price.

E. Option [C] Replace Roof Unit F

1. Contract Line Item Number [7]

a. This item consists of replacing roofing materials on unit F. This includes all work necessary to complete the demolition and disposal of hazardous or non-hazardous materials and associated items such as downspouts, gutters, deteriorated roof planking etc.... This item also includes all work necessary for installation of new and salvaged roofing materials once demolition has been completed.

b. Measurement for payment: based on all work required to replace roofing materials on unit F.

c. Payment will be made at the contract lump sum (LS) price.

CHCH 257002 01 27 00 - 3

2. Contract Line Item Number [8] Remove and replace damaged roof decking Unit F.

a. This item consists of all work required to remove and replace damaged roof decking on unit F.

b. Measurement for payment will be per square feet of all work necessary for removal and replacement of damaged roof decking.

c. Payment will be made at the contract unit price per square feet (SF) price.

F. Option [D] Replace Roof Unit H

1. Contract Line Item Number [9]

a. This item consists of replacing roofing materials on unit H. This includes all work necessary to complete the demolition and disposal of hazardous or non-hazardous materials and associated items such as downspouts, gutters, deteriorated roof planking etc.... This item also includes all work necessary for installation of new and salvaged roofing materials once demolition has been completed.

b. Measurement for payment: based on all work required to replace roofing materials on unit H.

c. Payment will be made at the contract lump sum (LS) price.

2. Contract Line Item Number [10] Remove and replace damaged roof decking Unit H.

a. This item consists of all work required to remove and replace damaged roof decking on unit H.

b. Measurement for payment will be per square feet of all work necessary for removal and replacement of damaged roof decking.

c. Payment will be made at the contract unit price per square feet (SF) price.

END OF SECTION 01 27 00

Address: 9916 Walden Street Soddy Daisy, TN 37379 Office: 423-332-7077 Fax: 423-332-7078

August 23rd, 2023

Asbestos Survey Report 3370 Lafayette Road

Fort Oglethorpe, GA 30742

Prepared For: McMullan Group

Survey Conducted August 8th, 2023 by Bryan Wade / Affinity Group

Table of Contents For

Asbestos Survey/Inspection Report

1.0 Introduction & Purpose……………………………………………………… 3

2.0 Overview of Inspection Methods …………………………………………… 3

3.0 Site Description and Field Notes Summary………………………………… 4

4.0 Results………………………………………………………………………… 4

Appendices

Appendix I – Laboratory Analysis Reports and Chain-Of-Custody Forms

Appendix II – Site Map

Appendix III – Inspector License

1.0 Introduction & Purpose

Affinity Environmental Group conducted an asbestos survey at the commercial property located at 3370 Lafayette Road Fort Oglethorpe, GA 30742. The inspection survey was performed by Mr. Bryan Wade of Affinity Environmental Group on August 8th, 2023. Asbestos containing materials >1% were identified as roofing tiles, tar, and mastic.

The purpose of the inspection was to identify the presence of asbestos-containing materials (ACM) for proper removal prior to renovation of buildings in the complex. ACM is defined by State and Federal regulations as a building material containing greater than one percent (>1%) of one of the six asbestos minerals regulated by the Environmental Protection Agency (EPA) and the Occupational Safety & Health Administration (OSHA).

Demolition and Renovation in public and commercial buildings are regulated by OSHA, EPA, State and local/county enforcement agencies. The EPA requires asbestos inspections by accredited individuals prior to renovation/demolition projects. The National Emissions Standards for Hazardous Air Pollutants (NESHAP) 40 CFR Part 61 Subpart M requires asbestos assessments, followed by proper removal and disposal of ACM that will be affected by renovation or demolition. The identification of ACMs will aid in the prevention of occupational exposures and/or environmental emissions of airborne asbestos. OSHA 1926.1101 requires the identification of ACM, and regulates materials consisting of any amount of asbestos.

2.0 Overview of Inspection Methods

A preliminary walkthrough was performed to familiarize and identify potential ACM. Homogeneous areas (HA), which are materials determined to be similar in appearance, color and texture, and thought to be installed at the same time, were determined and assigned. Affinity Group assessed the areas planned for renovation for suspect ACMs, including thermal system insulation (TSI), surfacing materials (SM), and miscellaneous materials. Bulk Samples of determined HAs were collected, visually inspected for homogenous composition, and assigned sample identification numbers at sample locations. Measurements were collected to aid in quantifying materials (estimated quantities). After collection of all determined and identified HA materials, all samples were verified and recorded onto a lab chain-of-custody form. Asbestos analysis of bulk materials was performed by EPA 600/R-93/116 Method using Polarized Light Microscopy (PLM) in accordance with 40 CFR Part 763.87.

3.0 Site Description and Field Notes Summary

The facility on site being inspected is maintenance complex for the Chickamauga and Chattanooga National Military Park. The complex houses multiple buildings that are planned to have renovations preformed on the roofing.

Two of the buildings on site were not included in this inspection: Building E (Wash Bay) and Building E (Open Storage). Building E is an open metal roofed structure that does not match the other building in the complex and will not be receiving roofing renovations. Building F has already undergone renovations of the roofing materials and will also not be included.

Caulk/Tar at roof penetration sites were not tested during the process of this inspection due to safety concerns. These materials will be classified as presumed asbestos containing materials (PACM).

A site description supplied by staff familiar with the facilities was referenced for the purpose of building naming conventions.

4.0 Results

ACM >1% was found in materials as follows:

* See Appendix I for Laboratory Report ** See Appendix II for Site Map

Material Locations** Approximate Quantity % Asbestos*

Roof Tile (Top) Building A, B, C, D, G, H ~ 15000 ft² 25% Chrysotile

Roof Tile (Bottom) Building A, B, C, D, G, H ~ 15000 ft² 25% Chrysotile

Roof Tar Building B Canopy ~ 8 linear ft 10% Chrysotile

Roof Mastic Building D Canopy ~ 15 linear ft 3% Chrysotile

Penetration Caulk/Tar Building A, B, C, D, G, H ~ 18 Penetrations Presumed

Roofing Materials are considered by NESHAP regulations to be Category I: Non-Friable Asbestos Containing Materials (ACM).

All asbestos removal activities must be permitted through Georgia EPD. Removal must be performed by an asbestos contractor with accredited supervision and workers. The asbestos Contractor must comply with all federal, state, local and OSHA asbestos regulations. All ACM must be properly transported with manifest(s) to an asbestos accepting landfill.

Affinity Group appreciates the opportunity to provide our services to you. Please contact us if you have any questions or concerns regarding information in this report or any of our services.

Sincerely, Bryan Wade / Affinity Group TN Asbestos Inspector Accreditation A-I-118740-134505 exp. Jan-31-2024

Appendix I

Laboratory Analysis Report / Chain of Custody Forms

OrderID: 072307297

Appendix II

Site Map

Appendix III

Inspector License

File details come from the government source that posted it. Updated .