Attachment 00001 - SOW.pdf
PDF 102 KB Posted
- Attached to
- Fusion Splicers and Cleavers
- Solicitation number
- W15QKN26QA1740001
About this file
This is a Statement of Work for a firm-fixed-price purchase of classroom and laboratory equipment for the 80th Training Command at Tobyhanna Army Depot. The requirement is for 24 fiber fusion splicers meeting Fujikura 100S specifications (without Bluetooth or equivalent) and 26 integrated cleavers without independent Bluetooth capability. The fusion splicers must include specific technical features including active core alignment, automated fiber-length adjustments, GPS tracking with geographic locking, and a comprehensive accessory package consisting of AC adapter, battery, AC cord, spare electrodes, sheath clamps, fiber holder set plates, alcohol dispenser, carrying strap, reference guide, tripod screw, work tray J-plate, singer fiber stripper, transit case, and two-year warranty. The splicers must meet defined performance standards including splice loss specifications per ITU-T standards and splice time requirements across multiple modes.
Delivery is required within 30 days of contract award to Tobyhanna Army Depot, 11 Hap Arnold Blvd., HTRTS, Building 58, Tobyhanna, PA 18466, with Inspection and Acceptance and Freight on Board terms at Destination. No substitutions are permitted without written approval from the Technical Subject Matter Expert, Major Jeffrey Blackman (804-873-8741 or Jeffrey.v.blackman.mil@army.mil). The awardee must utilize the Wide Area Workflow system for invoicing. For delivery-related questions, vendors should contact the Point of Contact, Mr. Kenneth I Aten at (570) 615-6144 or Kenneth.i.aten.civ@army.mil.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
High Tech Tobyhanna Classroom/Lab Updates and Setup Purchase
14 April 2026
1.0 Scope: The 80th Training Command requires fiber fusion splicers at Tobyhanna
Army Depot to support the 25H Course load, as well as update schoolhouse analog and digital display systems for uniform learning.
1.1 Contract Type: This effort shall be proposed on a firm-fixed-price basis.
1.2 Delivery: Delivery shall be made within 30 days of award. Delivery shall be made to the following location:
Tobyhanna Army Depot 11 Hap Arnold Blvd.
HTRTS, BLDG 58
Tobyhanna, PA 18466
1.5 Government Furnished Equipment/Materials/Facilities: N/A
1.6 Inspection/Acceptance /FOB Terms: Inspection and Acceptance shall be at Destination. Freight On Board shall be at Destination.
1.7 Security: If necessary, the Government will provide access to the appropriate Government buildings during the delivery of contracted items. The contractor is to contact the point of contact below (POC) to arrange access:
POC: Mr. Kenneth I Aten Phone: (570)615-6144 Email: Kenneth.i.aten.civ@army.mil
2.0 Applicable Documents: N/A
3.0 Requirements: This requirement is for the purchase of Classroom equipment needed to build a Fiber Optic/Maintenance Lab for the 25H course at Tobyhanna, PA.
3.1 Specifications: The Vendor shall provide the following equipment listed in that table below.
Require 24 fusion splicers with features and specifications of the Fujikura 100S without Bluetooth or equivalent model. Fusion splicer requires the following specifications: Active core alignment, single fiber (single-mode and multimode) with cladding 80 to 150 μm;
Sheath clamp coating Max 3,000 μm and cleave length 5 to 16 mm, splice loss standard:
ITU-T G.651: Avg. 0.01 dB, ITU-T G.652: Avg. 0.02 dB, ITU-T G.655: Avg. 0.04 dB, Splice Time for SM FAST mode: Avg. 7 to 9 sec.; SM AUTO mode: Avg. 11 to 13 sec.;
AUTO mode: Avg. 14 to 16 sec., Electrode Life of approx.. 6,000 splices. Fusion splicer requires the following features: Dual Fiber Preparation, Automated fiber-length adjustments, fiber guide, custom fiber, GPS tracking with geographic locking, splice coach; Purchased system must include AC adapter, battery, AC cord, space electrodes, sheath clamps, fiber holder set plates, alcohol dispenser, carrying strap, reference guide, tripod screw, work try J-plate, singer fiber stripper, transit case and two-year warranty.
Require 26 cleavers that integrate with purchased fusion splicers. Cleavers cannot have independent Bluetooth.
3.2 Hours of Operation: N/A
3.3 Recognized Holidays: No services required. Supply item only.
4.0 Deliverables: Above-mentioned items are listed.
5.0 Travel/Special Requirements: N/A
6.0 General Requirements: Delivery shall be 30 days after contract award.
7.0 Technical Requirements: Detailed in paragraph 3.1
8.0 Setup: N/A.
8.1 Maintenance – N/A
8.2 Labor, Parts, and Supplies: N/A
8.3 Replacements: N/A
9.0 Contact Information: N/A.
10.0 Locations: Please see paragraph 1.2 for the location of delivery.
11.0 Awardee shall utilize the Wide Area Workflow system for invoicing.
12.0 Additional Notes: Contracted items will be delivered in identified quantities to identified locations, should the vendor have any questions concerning delivery of contracted items, vendor should contact the delivery POC identified in paragraph 1. 7..
No substitutions are allowed without written approval of the Technical SME. Major Jeffrey Blackman. He can be reached at 804-873-8741 or Jeffrey.v.blackman.mil@army.mil .
File details come from the government source that posted it. Updated .