This Statement of Work (SOW) details security alarm monitoring services for the JPRA-Personnel Recovery Academy located in Spokane, Washington. The contractor will provide comprehensive 24/7 monitoring for ten building sites at two addresses (11604 West Newkirk Road and 800 West Survival Loop, Fairchild AFB), with specific requirements including zone reporting for intruder alarms, monitoring low battery and trouble signals, tracking opening/closing events, user identification, and generating monthly reports. Key monitoring tasks include calling designated personnel for alarm activations, verifying alarm arming/disarming schedules, conducting daily signal tests, and managing personnel access to alarm systems. The contractor must have at least two years of experience with similar security systems, use US citizen representatives who pass background checks, and be prepared to handle potential access to privacy information while adhering to applicable privacy regulations.

View the file

Other files

File Type Posted
Amendment 0002.pdf PDF
Attach 2- Amend 2- WD 2015-5537 (Revision 26).pdf PDF
Amendment 0001.pdf PDF
25QA918 Combo.pdf PDF
Attach. 2 WD 2015-5537.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Security Alarm Monitoring

Spokane, Washington

1. INTRODUCTION. This Statement of Work (SOW) defines the efforts required for the contractor to perform alarm monitoring in support of the JPRA-Personnel Recovery Academy alarm accounts. Contractor will monitor all facilities with security alarms and report (notification) all active alarms as applicable.

2. SPECIFIC TASKS AND REQUIREMENTS.

2.1. General Requirements. Contractor agrees that it will, by its authorized representatives, monitor all accounts and provide timely notification on all active alarms for each facility located at 11604 West Newkirk Road, Spokane, WA 99224 and 800 West Survival Loop, Fairchild AFB, WA 99011. There are a total of ten (10) building sites at two street addresses associated with JPRA-PRA security alarm monitoring service.

2.1.1. Notification of alarm conditions will adhere to contractual agreement agreed upon by contractor and owner/user. Procedural letter provided in an attachment by owner/user.

2.2. The contractor shall monitor all alarms through a central monitoring station.

2.2.1. The contractor shall provide alarm and monitoring service tasks identified below:

2.1.1. Zone reporting, for intruder alarm activation (by individual alarm activation). Contractor Alarm Monitoring station calls designated personnel with pertinent information.

2.1.2. Monitors for low battery and trouble signals.

2.1.3. Opening and closing signals (who, what, where, and when).

2.1.4. User identification of who is in after hours and for how long.

2.1.5. Notification if alarms are not armed/disarmed at scheduled times (0500 – Open, 2000-Close).

2.1.6. Notifications for closing no later than 2000.

2.1.7. Monthly report to JPRA POC on each account of opening and closing, alarm conditions and resolution.

2.1.8. Tests on alarm control panels, sending/receiving signals to and from each alarm panel (this is to ensure phone lines are working for transmission of alarm signals). If panels fail to report, alarm monitoring center contacts designated personnel to report communication failure.

2.1.9. Daily test of alarm signal from customer locale to monitoring station, ensuring alarm signal transmission.

2.1.10. Uploads and deletions of personnel from each alarm account. Software must be compatible with existing system. The existing system is comprised of many different models of panels and keypads.

2.2.2. Specific Requirements.

2.2.2.1. Contractor shall coordinate with the Contracting Officer all changes to alarm accounts, i.e., updates, deletions or any modifications to existing accounts.

2.2.2.2. Contractor shall request permission from JPRA Security Personnel to have remote connect capability to certain buildings. All other buildings will have only on-site repairs without remote access.

2.2.2.3. Contractor shall re-verify all requirements and measurements identified in this Statement of Work (SOW) by performing a post award site survey of the areas worked.

2.2.2.4. Expertise and Experience. The contractor at a minimum will have: 2 Years’ experience working with existing system or similar system.

3. DELIVERABLES.

3.1. Required Deliverables. All deliverables are subject to Government acceptance and shall meet professional standards and meet the requirements set forth in contractual documentation. All deliverables shall be produced using recommended software tools/versions as accepted by the Government and are compatible with current system. All materials, documents, notes, records, software tools acquired, and/or software produced by the contractor under this SOW shall become the property of the U.S. Government, which

FA462025QA918

Attachment 1 Statement of Work shall have unlimited rights to all materials and determine the scope of publication and distribution. The contractor shall be required to deliver electronic copies of all documents, notes, records and software to the Government upon termination of the contract services or expiration of the contract period. To the fullest extent possible, the contractor shall use processes taking full advantage of electronic storage, distribution and manipulation of information. The contractor shall be responsible for delivering all end items specified. Acceptance for all deliverables shall be based upon all previously mentioned standards and criteria and standards listed in this SOW.

3.2. Other Reporting Requirements. In addition to the deliverable requirements identified above, the contractor shall comply with the following:

3.2.1. The contractor shall bring problems or potential problems affecting performance to the attention of the Contracting Office and the JPRA POC as soon as possible. Any issues shall be communicated in writing to the Contracting Officer and JPRA POC.

3.2.2. The contractor shall provide in writing the results of all meetings with the client that affect and/or change conditions, or result in additional agreements or requirements to the Contracting officer and JPRA POC.

3.2.3. The contractor shall prepare additional written reports as required by the government POC.

4. PERFORMANCE. Alarms will be monitored continuously, 24/7.

5. SECURITY.

5.1. Authorized representatives must be US citizens and pass a security background check satisfactorily.

5.2. Work on this project may require that personnel have access to Privacy Information. Personnel shall adhere to the Privacy Act, Title 5 of the U.S. Code, Section 552a and applicable agency rules and regulations.

6. ADMINISTRATIVE CONSIDERATIONS.

6.1. Points of Contact:

JPRA

*POC will be provided upon contract award.

FA462025QA918

Attachment 1 Statement of Work

2. SPECIFIC TASKS AND REQUIREMENTS.
3. DELIVERABLES.
5. SECURITY.
6. ADMINISTRATIVE CONSIDERATIONS.