Attach B 659-22-100.pdf
PDF 142 KB Posted
- Solicitation number
- 36C24624R0027
About this file
This document outlines the scope of design services for a 65% design submission for a campus energy management system project. The engineering and architecture firm is required to provide two copies of a narrative report updating the design from the 35% submission and addressing additional items in the design requirements. They must also submit three sets of drawings in AutoCAD 2013/2019 format at 1/8 inch scale, along with an itemized cost estimate by specification section and a master submittal list. One copy of all design files and specifications must be uploaded to the agency file transfer site. The related federal contract opportunity is a pre-solicitation to provide architecture and engineering services for the campus energy management system project for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. The solicitation number is 36C24624R0027 and requests SF330 applications for project number 659-22-100.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24624R0027.docx | DOCX document | |
| Attach C 659-22-100.pdf | ||
| Attach A 659-22-100.pdf | ||
| Attach E 659-22-100.pdf | ||
| Attach D 659-22-100.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Project No. 659-22-100 Project Title: Install Campus Energy Management System
A/E SCOPE OF SERVICES
Updated 01/06/2020
Attachment B
Design Development 65% Submission Requirements
Deliver the following (labeled with 65% submission) and include this attachment as a checklist with your submission: (In addition, all submissions to be uploaded to the AE FT site on the same day.)
2 copies of a narrative report forwarding the design developed 35% submission addressing items listed in the design requirements and any additional A/E recommendations. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager and any design calculations or analysis.
3 sets of all drawings updating all previous comments required by project produced on Auto CAD 2013/2019.
Provide 2 full size sets and 1 half size set of working drawings. Show equipment to be used in each room/area. All drawings shall be 1/8” scale.
2 copies of updated itemized cost estimate by spec section or trade (labor, material, and equipment).
2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.
1 copy of drawings in AutoCAD 2013/2019 and in PDF and specifications in Microsoft Word 2010 on AE FT Site
Provide 2 CDs of entire submittal package with delivery of hard copy design layouts and documents