Attach A 659-22-100.pdf

PDF 141 KB Posted

Attached to
C223--A/E Campus Energy Management System Request for SF330s Project # 659-22-100
Solicitation number
36C24624R0027
Issued by

About this file

This document is a statement of work for a campus energy management system project for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. The project involves installing an energy management system at a VA campus. The statement of work provides requirements for architectural and engineering firms to submit 35% design development documents including scaled drawings showing equipment placement, a cost estimate by specification section, custom edited master specifications and submittal list, and project files in specified formats. Interested firms can find more details in solicitation number 36C24624R0027 on the federal contracting opportunity portal for request for SF330 qualifications related to project number 659-22-100.

View the file

Other files

File Type Posted
36C24624R0027.docx DOCX document
Attach C 659-22-100.pdf PDF
Attach B 659-22-100.pdf PDF
Attach E 659-22-100.pdf PDF
Attach D 659-22-100.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Project No. 659-22-100 Project Title: Install Campus Energy Management System

A/E SCOPE OF SERVICES

Updated 01/06/2020

Attachment A

Design Development 35% Submission Requirements

Deliver the following (labeled with 35% submission) and include this attachment as a checklist with your submission: (In addition, all submissions to be uploaded to the AE FT site on the same day.)

1 sets of all drawings updating all previous comments required by project produced on Auto CAD 2013/2019.

Provide 1 full size set of working drawings. Show equipment to be used in each room/area. All drawings shall be 1/8” scale.

1 copies of updated itemized cost estimate by spec section or trade (labor, material, and equipment).

1 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.

1 copy of drawings in AutoCAD 2019 and in PDF and specifications in Microsoft Word 2010 on AE FT Site

Provide 1 CDs of entire submittal package with delivery of hard copy design layouts and documents.

File details come from the government source that posted it. Updated .