Attach A_Specialized Experience Supplemental Information.docx
DOCX document 65 KB Posted
- Solicitation number
- N6247826R5058
About this file
This is a supplemental information template for documenting specialized experience relevant to an Indefinite Delivery/Indefinite Quantity (IDIQ) contract for Architect-Engineer (A/E) services supporting utility projects under Naval Facilities Engineering Systems Command (NAVFAC), Hawaii. The template is designed to capture up to ten example projects that demonstrate the offeror's qualifications and experience in utility infrastructure design and engineering.
For each project entry, the template requires documentation of: project title and location (city and state), design completion year (excluding Preliminary Commissioning Activities), estimated construction completion year, offeror's project role (Prime A/E, Design-Build Designer of Record, or Sub Consultant), construction cost (excluding A/E design fees), A/E firm name or joint venture information, and project classification as either New Construction (NC) or Repair (R). Additionally, offerors must identify all applicable design/engineering services performed, including Design-Bid-Build, NAVFAC Design-Build RFP, Engineering Studies, Design-Build, Design of Record, DD1391 submissions, FACD (Facility Condition Assessment Data), and Design Charrettes. The template further requires checking all relevant engineering disciplines involved (Civil, Electrical, Telecom, Architect, Structural, Mechanical, Fire Protection, Geotechnical, and Fuels/POL) and identifying project types such as water distribution systems, wastewater collection and treatment systems, electrical distribution systems, power generation, telecommunications systems, pump stations, utility substations, storm drainage systems, utility switching stations, and waterfront electrical systems. This form serves as a critical evaluation tool for demonstrating the offeror's experience and technical capability in the specific utility infrastructure domains relevant to the Navy's requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6247826R5058_QA_MOD4.pdf | ||
| N6247826R5058SYNOPSIS_MOD 3.pdf | ||
| N6247826R5058_QA_MOD3.pdf | ||
| N6247826R5058_QA_MOD2.pdf | ||
| N6247826R5058SYNOPSIS_MOD 2.pdf | ||
| N6247826R5058SYNOPSIS_MOD1.pdf | ||
| N6247826R5058_QA_MOD1.pdf | ||
| N6247826R5058_SYNOPSIS_20260624.pdf | ||
| Attach E_Small Business Subcontracting Plan.docx | DOCX document | |
| Attach D_Historical Small Business Utilization.docx | DOCX document | |
| Attach C_Past Performance Questionnaire.docx | DOCX document | |
| Attach F_Small Business Participation Commitment.docx | DOCX document | |
| Attach B_Key Personnel Resume Supplemental Information.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT (A)
SPECIALIZED EXPERIENCE SUPPLEMENTAL INFORMATION
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 1 |
| PROJECT TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
(NOT INCLUDING PCAS)
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)
DESIGN-BID BUILD
NAVFAC D-B RFP
ENGINEERING STUDIES
DESIGN-BUILD DOR
DD1391
FACD/ DESIGN CHARRETTES
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ELECTRICAL
TELECOM
ARCHITECT
STRUCTURAL
MECHANICAL
FIRE PROTECTION
GEOTECH
FUELS/POL
RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):
WATER DISTRIBUTION SYSTEMS
WATEWATER COLLECTION SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
POWER GENERATION
TELECOMMUNICATIONS SYSTEM FOR FACILITIES
WATER PUMP STATIONS
WASTEWATER TREATMENT SYSTEMS
UTILITY SUBSTATIONS
SECONDARY DISTRIBUTION SYSTEMS
STORM DRAINAGE SYSTEMS
WASTEWATER PUMP STATIONS
UTILITY SWITCHING STATIONS
WATERFRONT ELECTICAL SYSTEM
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 2 |
| PROJECT TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)
DESIGN-BID BUILD
NAVFAC D-B RFP
ENGINEERING STUDIES
DESIGN-BUILD DOR
DD1391
FACD/ DESIGN CHARRETTES
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ELECTRICAL
TELECOM
ARCHITECT
STRUCTURAL
MECHANICAL
FIRE PROTECTION
GEOTECH
FUELS/POL
RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):
WATER DISTRIBUTION SYSTEMS
WATEWATER COLLECTION SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
POWER GENERATION
TELECOMMUNICATIONS SYSTEM FOR FACILITIES
WATER PUMP STATIONS
WASTEWATER TREATMENT SYSTEMS
UTILITY SUBSTATIONS
SECONDARY DISTRIBUTION SYSTEMS
STORM DRAINAGE SYSTEMS
WASTEWATER PUMP STATIONS
UTILITY SWITCHING STATIONS
WATERFRONT ELECTICAL SYSTEM
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 3 |
| PROJECT TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)
DESIGN-BID BUILD
NAVFAC D-B RFP
ENGINEERING STUDIES
DESIGN-BUILD DOR
DD1391
FACD/ DESIGN CHARRETTES
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ELECTRICAL
TELECOM
ARCHITECT
STRUCTURAL
MECHANICAL
FIRE PROTECTION
GEOTECH
FUELS/POL
RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):
WATER DISTRIBUTION SYSTEMS
WATEWATER COLLECTION SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
POWER GENERATION
TELECOMMUNICATIONS SYSTEM FOR FACILITIES
WATER PUMP STATIONS
WASTEWATER TREATMENT SYSTEMS
UTILITY SUBSTATIONS
SECONDARY DISTRIBUTION SYSTEMS
STORM DRAINAGE SYSTEMS
WASTEWATER PUMP STATIONS
UTILITY SWITCHING STATIONS
WATERFRONT ELECTICAL SYSTEM
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 4 |
| PROJECT TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)
DESIGN-BID BUILD
NAVFAC D-B RFP
ENGINEERING STUDIES
DESIGN-BUILD DOR
DD1391
FACD/ DESIGN CHARRETTES
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ELECTRICAL
TELECOM
ARCHITECT
STRUCTURAL
MECHANICAL
FIRE PROTECTION
GEOTECH
FUELS/POL
RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):
WATER DISTRIBUTION SYSTEMS
WATEWATER COLLECTION SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
POWER GENERATION
TELECOMMUNICATIONS SYSTEM FOR FACILITIES
WATER PUMP STATIONS
WASTEWATER TREATMENT SYSTEMS
UTILITY SUBSTATIONS
SECONDARY DISTRIBUTION SYSTEMS
STORM DRAINAGE SYSTEMS
WASTEWATER PUMP STATIONS
UTILITY SWITCHING STATIONS
WATERFRONT ELECTICAL SYSTEM
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 5 |
| PROJECT TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)
DESIGN-BID BUILD
NAVFAC D-B RFP
ENGINEERING STUDIES
DESIGN-BUILD DOR
DD1391
FACD/ DESIGN CHARRETTES
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ELECTRICAL
TELECOM
ARCHITECT
STRUCTURAL
MECHANICAL
FIRE PROTECTION
GEOTECH
FUELS/POL
RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):
WATER DISTRIBUTION SYSTEMS
WATEWATER COLLECTION SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
POWER GENERATION
TELECOMMUNICATIONS SYSTEM FOR FACILITIES
WATER PUMP STATIONS
WASTEWATER TREATMENT SYSTEMS
UTILITY SUBSTATIONS
SECONDARY DISTRIBUTION SYSTEMS
STORM DRAINAGE SYSTEMS
WASTEWATER PUMP STATIONS
UTILITY SWITCHING STATIONS
WATERFRONT ELECTICAL SYSTEM
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 6 |
| PROJECT TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)
DESIGN-BID BUILD
NAVFAC D-B RFP
ENGINEERING STUDIES
DESIGN-BUILD DOR
DD1391
FACD/ DESIGN CHARRETTES
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ELECTRICAL
TELECOM
ARCHITECT
STRUCTURAL
MECHANICAL
FIRE PROTECTION
GEOTECH
FUELS/POL
RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):
WATER DISTRIBUTION SYSTEMS
WATEWATER COLLECTION SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
POWER GENERATION
TELECOMMUNICATIONS SYSTEM FOR FACILITIES
WATER PUMP STATIONS
WASTEWATER TREATMENT SYSTEMS
UTILITY SUBSTATIONS
SECONDARY DISTRIBUTION SYSTEMS
STORM DRAINAGE SYSTEMS
WASTEWATER PUMP STATIONS
UTILITY SWITCHING STATIONS
WATERFRONT ELECTICAL SYSTEM
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 7 |
| PROJECT TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)
DESIGN-BID BUILD
NAVFAC D-B RFP
ENGINEERING STUDIES
DESIGN-BUILD DOR
DD1391
FACD/ DESIGN CHARRETTES
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ELECTRICAL
TELECOM
ARCHITECT
STRUCTURAL
MECHANICAL
FIRE PROTECTION
GEOTECH
FUELS/POL
RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):
WATER DISTRIBUTION SYSTEMS
WATEWATER COLLECTION SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
POWER GENERATION
TELECOMMUNICATIONS SYSTEM FOR FACILITIES
WATER PUMP STATIONS
WASTEWATER TREATMENT SYSTEMS
UTILITY SUBSTATIONS
SECONDARY DISTRIBUTION SYSTEMS
STORM DRAINAGE SYSTEMS
WASTEWATER PUMP STATIONS
UTILITY SWITCHING STATIONS
WATERFRONT ELECTICAL SYSTEM
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 8 |
| PROJECT TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)
DESIGN-BID BUILD
NAVFAC D-B RFP
ENGINEERING STUDIES
DESIGN-BUILD DOR
DD1391
FACD/ DESIGN CHARRETTES
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ELECTRICAL
TELECOM
ARCHITECT
STRUCTURAL
MECHANICAL
FIRE PROTECTION
GEOTECH
FUELS/POL
RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):
WATER DISTRIBUTION SYSTEMS
WATEWATER COLLECTION SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
POWER GENERATION
TELECOMMUNICATIONS SYSTEM FOR FACILITIES
WATER PUMP STATIONS
WASTEWATER TREATMENT SYSTEMS
UTILITY SUBSTATIONS
SECONDARY DISTRIBUTION SYSTEMS
STORM DRAINAGE SYSTEMS
WASTEWATER PUMP STATIONS
UTILITY SWITCHING STATIONS
WATERFRONT ELECTICAL SYSTEM
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 9 |
| PROJECT TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)
DESIGN-BID BUILD
NAVFAC D-B RFP
ENGINEERING STUDIES
DESIGN-BUILD DOR
DD1391
FACD/ DESIGN CHARRETTES
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ELECTRICAL
TELECOM
ARCHITECT
STRUCTURAL
MECHANICAL
FIRE PROTECTION
GEOTECH
FUELS/POL
RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):
WATER DISTRIBUTION SYSTEMS
WATEWATER COLLECTION SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
POWER GENERATION
TELECOMMUNICATIONS SYSTEM FOR FACILITIES
WATER PUMP STATIONS
WASTEWATER TREATMENT SYSTEMS
UTILITY SUBSTATIONS
SECONDARY DISTRIBUTION SYSTEMS
STORM DRAINAGE SYSTEMS
WASTEWATER PUMP STATIONS
UTILITY SWITCHING STATIONS
WATERFRONT ELECTICAL SYSTEM
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 10 |
| PROJECT TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
SPECIFIED DESIGN/ENGINEERING SERVICE (CHECK ALL THAT APPLIES)
DESIGN-BID BUILD
NAVFAC D-B RFP
ENGINEERING STUDIES
DESIGN-BUILD DOR
DD1391
FACD/ DESIGN CHARRETTES
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ELECTRICAL
TELECOM
ARCHITECT
STRUCTURAL
MECHANICAL
FIRE PROTECTION
GEOTECH
FUELS/POL
RELEVANT PROJECTS TYPES (CHECK ALL THAT APPLIES):
WATER DISTRIBUTION SYSTEMS
WATEWATER COLLECTION SYSTEMS
ELECTRICAL PRIMARY DISTRIBUTION SYSTEMS
POWER GENERATION
TELECOMMUNICATIONS SYSTEM FOR FACILITIES
WATER PUMP STATIONS
WASTEWATER TREATMENT SYSTEMS
UTILITY SUBSTATIONS
SECONDARY DISTRIBUTION SYSTEMS
STORM DRAINAGE SYSTEMS
WASTEWATER PUMP STATIONS
UTILITY SWITCHING STATIONS
WATERFRONT ELECTICAL SYSTEM
File details come from the government source that posted it. Updated .