Attach_(A)_Specialized_Experience.docx
DOCX document 40 KB Posted
- Solicitation number
- N62478-24-R-5043
About this file
This document provides details for a pre-solicitation for an indefinite delivery/indefinite quantity contract for architect-engineer services for civil engineering projects at various locations under the Naval Facilities Engineering Command Hawaii. The solicitation number is N62478-24-R-5043 and responses are due by April 9, 2024 at 2:00 pm Hawaii Standard Time. The contract will be awarded by the Department of the Navy Naval Facilities Engineering Command and will provide architect-engineer services for civil engineering projects at various locations under its cognizance. Interested parties should download the attached synopsis and Attachments A through F for more information on specialized experience requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6247824R5043_SYNOPSIS_MOD2.pdf | ||
| N6247824R5034_QA_MOD2.pdf | ||
| N6247824R5043_QA_MOD1.pdf | ||
| N6247824R5043_SYNOPSIS_MOD1.pdf | ||
| Attach_(F)_Small Business Participation Commitment Document.docx | DOCX document | |
| Attach_(D)_Historical Small Business Utilization.docx | DOCX document | |
| Attach_(B)_Key_Personnel.docx | DOCX document | |
| Attach_(C)_Past Performance Questionnaire.docx | DOCX document | |
| N62478-23-R-5043 Civil IDIQ Synopsis.pdf | ||
| Attach_(E)_Small Business Subcontracting Plan.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT (A)
SPECIALIZED EXPERIENCE
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 1 |
| TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
(NOT INCLUDING PCAS)
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)
DD1391
FACD/ CHARRETTE
D-B RFP
DESIGN BID BUILD
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ARCHITECT
STRUCTURAL
ELECTRICAL
FIRE PROTECTION
MECHANICAL
GEOTECHNICAL
RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):
ROADWAY/PARKING PAVEMENTS
AIRFIELDS
WATER TREATMENT AND DISTRIBUTION SYSTEMS
SEWAGE COLLECTION AND TREATMENT SYSTEMS
DRAINAGE SYSTEMS, EROSION CONTROL, SLOPE STABILIZATION
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 2 |
| TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)
DD1391
FACD/ CHARRETTE
D-B RFP
DESIGN BID BUILD
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ARCHITECT
STRUCTURAL
ELECTRICAL
FIRE PROTECTION
MECHANICAL
GEOTECHNICAL
RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):
ROADWAY/PARKING PAVEMENTS
AIRFIELDS
WATER TREATMENT AND DISTRIBUTION SYSTEMS
SEWAGE COLLECTION AND TREATMENT SYSTEMS
DRAINAGE SYSTEMS, EROSION CONTROL, SLOPE STABILIZATION
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 3 |
| TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)
DD1391
FACD/ CHARRETTE
D-B RFP
DESIGN BID BUILD
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ARCHITECT
STRUCTURAL
ELECTRICAL
FIRE PROTECTION
MECHANICAL
GEOTECHNICAL
RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):
ROADWAY/PARKING PAVEMENTS
AIRFIELDS
WATER TREATMENT AND DISTRIBUTION SYSTEMS
SEWAGE COLLECTION AND TREATMENT SYSTEMS
DRAINAGE SYSTEMS, EROSION CONTROL, SLOPE STABILIZATION
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 4 |
| TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)
DD1391
FACD/ CHARRETTE
D-B RFP
DESIGN BID BUILD
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ARCHITECT
STRUCTURAL
ELECTRICAL
FIRE PROTECTION
MECHANICAL
GEOTECHNICAL
RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):
ROADWAY/PARKING PAVEMENTS
AIRFIELDS
WATER TREATMENT AND DISTRIBUTION SYSTEMS
SEWAGE COLLECTION AND TREATMENT SYSTEMS
DRAINAGE SYSTEMS, EROSION CONTROL, SLOPE STABILIZATION
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 5 |
| TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)
DD1391
FACD/ CHARRETTE
D-B RFP
DESIGN BID BUILD
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ARCHITECT
STRUCTURAL
ELECTRICAL
FIRE PROTECTION
MECHANICAL
GEOTECHNICAL
RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):
ROADWAY/PARKING PAVEMENTS
AIRFIELDS
WATER TREATMENT AND DISTRIBUTION SYSTEMS
SEWAGE COLLECTION AND TREATMENT SYSTEMS
DRAINAGE SYSTEMS, EROSION CONTROL, SLOPE STABILIZATION
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 6 |
| TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)
DD1391
FACD/ CHARRETTE
D-B RFP
DESIGN BID BUILD
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ARCHITECT
STRUCTURAL
ELECTRICAL
FIRE PROTECTION
MECHANICAL
GEOTECHNICAL
RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):
ROADWAY/PARKING PAVEMENTS
AIRFIELDS
WATER TREATMENT AND DISTRIBUTION SYSTEMS
SEWAGE COLLECTION AND TREATMENT SYSTEMS
DRAINAGE SYSTEMS, EROSION CONTROL, SLOPE STABILIZATION
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 7 |
| TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)
DD1391
FACD/ CHARRETTE
D-B RFP
DESIGN BID BUILD
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ARCHITECT
STRUCTURAL
ELECTRICAL
FIRE PROTECTION
MECHANICAL
GEOTECHNICAL
RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):
ROADWAY/PARKING PAVEMENTS
AIRFIELDS
WATER TREATMENT AND DISTRIBUTION SYSTEMS
SEWAGE COLLECTION AND TREATMENT SYSTEMS
DRAINAGE SYSTEMS, EROSION CONTROL, SLOPE STABILIZATION
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 8 |
| TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)
DD1391
FACD/ CHARRETTE
D-B RFP
DESIGN BID BUILD
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ARCHITECT
STRUCTURAL
ELECTRICAL
FIRE PROTECTION
MECHANICAL
GEOTECHNICAL
RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):
ROADWAY/PARKING PAVEMENTS
AIRFIELDS
WATER TREATMENT AND DISTRIBUTION SYSTEMS
SEWAGE COLLECTION AND TREATMENT SYSTEMS
DRAINAGE SYSTEMS, EROSION CONTROL, SLOPE STABILIZATION
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 9 |
| TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)
DD1391
FACD/ CHARRETTE
D-B RFP
DESIGN BID BUILD
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ARCHITECT
STRUCTURAL
ELECTRICAL
FIRE PROTECTION
MECHANICAL
GEOTECHNICAL
RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):
ROADWAY/PARKING PAVEMENTS
AIRFIELDS
WATER TREATMENT AND DISTRIBUTION SYSTEMS
SEWAGE COLLECTION AND TREATMENT SYSTEMS
DRAINAGE SYSTEMS, EROSION CONTROL, SLOPE STABILIZATION
| (a) SPECIALIZED EXPERIENCE |
| EXAMPLE PROJECT KEY NUMBER: |
| 10 |
| TITLE AND LOCATION (CITY & STATE) |
| DESIGN COMPLETED (YR) |
EST. CONSTRUCTION COMPLETED (YR)
| PROJECT ROLE: PRIME A/E, DB DESIGNER OF RECORD, OR SUB CONSULTANT |
| CONSTRUCTION COST (NOT AE DESIGN FEE): |
AE FIRM NAME OR JV:
NEW CONSTRUCTION (NC) OR REPAIR (R):
PROFESSIONAL SERVICE (CHECK ALL THAT APPLIES)
DD1391
FACD/ CHARRETTE
D-B RFP
DESIGN BID BUILD
ENGINEERING STUDIES
DESIGN-BUILD DOR
DISCIPLINES INVOLVED IN PROJECT (CHECK ALL THAT APPLIES):
CIVIL
ARCHITECT
STRUCTURAL
ELECTRICAL
FIRE PROTECTION
MECHANICAL
GEOTECHNICAL
RELEVANT DESIGN PROJECT TYPES (CHECK ALL THAT APPLIES):
ROADWAY/PARKING PAVEMENTS
AIRFIELDS
WATER TREATMENT AND DISTRIBUTION SYSTEMS
SEWAGE COLLECTION AND TREATMENT SYSTEMS
DRAINAGE SYSTEMS, EROSION CONTROL, SLOPE STABILIZATION
File details come from the government source that posted it. Updated .