Attach 7_VRF APPENDIX TABLE F-1.xlsx
XLSX spreadsheet 290 KB Posted
- Solicitation number
- FA301625R0051
About this file
The file is an Excel spreadsheet (Attach 7_VRF APPENDIX TABLE F-1.xlsx) containing historical HVAC service work order data for various buildings at Joint Base San Antonio (JBSA) sites, including Sam Houston, Lackland Air Force Base, Kelly Field Annex, Chapman Training Annex, Grayson Street Annex, and Randolph Air Force Base. The detailed log covers work orders from May 17, 2021 to June 10, 2021, documenting HVAC repair and maintenance activities across multiple facilities.
The associated federal contract opportunity is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside solicitation (FA301625R0051) for Variable Refrigerant Flow (VRF) System Support Services issued by the Department of the Air Force Air Education and Training Command. The procurement will be awarded using the Lowest Price Technically Acceptable (LPTA) evaluation method. Key dates include a Q&A deadline of June 25, 2025 at 3:00 PM CST and proposal submission deadline of July 2, 2025 at 1:00 PM CST. Only certified SDVOSB concerns are eligible to submit proposals, which must be verified through SBA's VetCert database or SAM registration.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HVAC Historical Data
| SR Building (Case Sensitive) | SR Submitted (MM/DD/YYYY) | Service Requested | WT Site Location | WT Facility (Case Sensitive) | WT-Status (Draft, Active, Completed, Closed) | WT Priority (Enter 1 - 4) | WT Name | WT Resp Org | Labor Start (MM/DD/YYYY) | Labor End (MM/DD/YYYY) | Total Logged Labor Hours | Column1 | WT Resolution Description |
| 16 | 05/17/2021 | HVAC Service | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - FSH - GENERAL/STAFF A/C INOP - REPAIR - FRANKO - 05/17/2021 - SR 2459237 | JB SAN ANTONIO - HVAC SHOP - FSH | 05/18/2021 | 06/07/2021 | 11 | hours | RESET AND ADDED MINIMAL AMOUNT OF REFRIGERANT AWAITING DAIKIN VRF REP JOB COMPLETE. JT |
| 133 | 05/17/2021 | HVAC Service | JBSA SAM HOUSTON | 133 | Closed | 1-Emergency | 1 - 133 - WT - HVAC SHOP - FSH - BLDG TOO HOT/THERMOSTAT SENSOR INOP - RPR - SGT MEDRANO - 5/17/21 - SR 2459387 | JB SAN ANTONIO - HVAC SHOP - FSH | 05/17/2021 | 05/17/2021 | 1.50 | hours | DIN 1 RUBEN RIOS DISPATCHED 5/17/21 @ 1417; C/O TO PM SHIFT 5/17/21 |
5/17/21 NOTE FROM BABIN LABOR SHEET: SHOP WILL BE SENDING TECH IN THE AM
| 2418 | 05/18/2021 | Other Climate Control Need | LACKLAND AIR FORCE BASE SITE 1 | 2418 | Closed | 3A - High Sustain | 3A - 2418 - WT - HVAC SHOP - LAK - AC INOP - RPR - RAINEY - 05/18/21 - SR 2460072 | JB SAN ANTONIO - HVAC SHOP - LAK | 10/18/2021 | 10/18/2021 | 4 | hours | Rap/Ortega - No comments entered, Complete. |
| 16 | 05/18/2021 | HVAC Service | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - FSH - BLDG 16, RM 206 HVAC - RPR - JESSE GARRETT - 5/18/21 - SR 2460189 | JB SAN ANTONIO - HVAC SHOP - FSH | 05/17/2021 | 05/17/2021 | 1 | hours | WT CREATED PER BABIN'S LABOR SHEET |
| 2028 | 05/19/2021 | HVAC Service | KELLY FIELD ANNEX SITE 1 | 2028 | Closed | 3A - High Sustain | 3A - 2028 - WT - HVAC SHOP - LAK - REPLACE BOILER PILOT LITE ASSEMBLY - REPAIR - JESSIE - 05/19/2021 - SR 2462978 | JB SAN ANTONIO - HVAC SHOP - LAK | 07/27/2021 | 07/27/2021 | 1 | hours | REPLACED PIOLT ASSY |
| 146 | 05/20/2021 | HVAC Service | JBSA SAM HOUSTON | 146 | Closed | 1-Emergency | 1 - 146 - WT - HVAC SHOP - FSH - ENTIRE BLDG TOO HOT - RPR - RUBEN - 05/20/21 - SR 2464132 | JB SAN ANTONIO - HVAC SHOP - FSH | 05/20/2021 | 05/20/2021 | 2.50 | hours | SENT TO DIN 0836 05/20 |
5/20/21: 3A CONVERT TO SHOP
| 145 | 05/20/2021 | HVAC Service | JBSA SAM HOUSTON | 145 | Closed | 3A - High Sustain | 3A - 145 - WT - HVAC SHOP - FSH - A/C INOP HALF OF BLDG - REPAIR - HUTCHINSON - 05/20/2021 - SR 2464144 | JB SAN ANTONIO - HVAC SHOP - FSH | 06/23/2021 | 08/24/2021 | 54 | hours | TROUBLESHOOT AND REPAIRED HVAC WQUIPMENT VERIFED OPERATION NO OTHER ISSUES RESIDE JOB COMPLETE. JT | |
| 146 | 05/20/2021 | HVAC Service | JBSA SAM HOUSTON | 146 | Closed | 3A - High Sustain | 3A - 146 - WT - HVAC SHOP - FSH - ENTIRE BLDG TOO HOT - RPR - RUBEN - 05/20/21 - SR 2465016 | JB SAN ANTONIO - HVAC SHOP - FSH | 05/25/2021 | 08/31/2021 | 30 | hours | TROUBLESHOOT AND REPAIRED HVAC EQUIPMENT VERIFIED OPERATION NO FURTHER ISSUES RESIDE JOB COMPLETE. JT | |
| 16 | 05/21/2021 | Room Too Warm | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - FSH - museum temps are too high - RPR - FRANKO - 05/21/21 - SR 2466153 | JB SAN ANTONIO - HVAC SHOP - FSH | 05/21/2021 | 09/03/2021 | 34.50 | hours | NOT ABLE TO ENTER THE AREA. AG. | |
| 16 | 05/22/2021 | HVAC Service | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - FSH - MUSEUM IS TOO HOT - REPAIR - DAVIS - 5/22/2021 - SR 2466748 | JB SAN ANTONIO - HVAC SHOP - FSH | 05/25/2021 | 05/25/2021 | 7 | hours | BROKEN FAN CYCLING SWITCH WIRE, LOOSE WIRE TO CC-COIL...DL | |
| 2028 | 05/24/2021 | HVAC Service | KELLY FIELD ANNEX SITE 1 | 2028 | Closed | 3A - High Sustain | 3A - 2028 - WT - HVAC SHOP - LAK - RM 158A8 Condensation pump on rear wall IS leaking - REPIAR- MR KOCH - 05/24/21 - SR 2467502 | JB SAN ANTONIO - HVAC SHOP - LAK | 05/25/2021 | 05/25/2021 | 0.50 | hours | PUMP S/U COMP | |
| 4012 | 05/26/2021 | Appliances | JBSA SAM HOUSTON | 4012 | Closed | 3A - High Sustain | 3A - 4012 - WT - HVAC SHOP - FSH - Fan Coil Unit 70 outside RM128 loud banging noise whenever unit is turned on - RPR - BLUE - 05/26/21 - SR 2472476 | JB SAN ANTONIO - HVAC SHOP - FSH | 10/04/2021 | 03/22/2023 | 14.50 | hours | 03/22/2023 UNIT WORKING. WALK THROUGH WITH F.M. - COMPLETE | |
| 100 | 05/26/2021 | Room Too Warm | CHAPMAN TRAINING ANNEX | 100 | Closed | 1-Emergency | 1 - 100 - WT - HVAC SHOP LAK - Entire BLDG. A/C is not working -repair - Rellion - 05/26/21 - SR 2472496 | JB SAN ANTONIO - HVAC SHOP - LAK | 05/27/2021 | 05/27/2021 | 4 | hours | All units were in STBY Mode - STBY Mode set points are 79 deg - Walked bldg to set off motion sensors to put bldg in Occupied Mode - Occupied set points are 76 deg - Units are operational at this time | |
| 3313 | 05/27/2021 | Room Too Warm | JBSA SAM HOUSTON | 3313 | Closed | 3A - High Sustain | 3A - 3313 - WT - HVAC SHOP - FSH - CLASSROOM 123-124 TOO WARM/HUMID - REPAIR - ROCHA - 06/02/21 - SR 2473238 | JB SAN ANTONIO - HVAC SHOP - FSH | 06/08/2021 | 06/14/2021 | 2.50 | hours | UNIT WAS WORKING PROPERLY, REQUIRE CONTROLS. AG. | |
| 16 | 05/27/2021 | Room Too Warm | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - FSH - GENERALS OFFICE 2ND FLR IS WARM - REPAIR - COLBY FRANKO - 05/27/21 - SR 2473300 | JB SAN ANTONIO - HVAC SHOP - FSH | 05/27/2021 | 03/04/2022 | 37 | hours | RESET UNIT AND AWAITED FURTHER INSTRUCTION ON ETA OF DAIKIN REP. JT |
03/04/22 PER JAVIER AND JORGE; REPAIRING VRF SYSTEM
ALL PARTS RECEIVED AND VRF IS REPAIRED
| 44 | 05/27/2021 | Room Too Warm | GRAYSON STREET ANNEX SITE 1 | 44 | Closed | 3A - High Sustain | 3A - 44 - WT - HVAC SHOP - FSH - HVAC UNIT IS INOP ROOM A100 - REPAIR - MR SMITH - 06/02/21 - SR 2473554 | JB SAN ANTONIO - HVAC SHOP - FSH | 06/25/2021 | 06/25/2021 | 2 | hours | VERIFIED AND EVERYTHING IS COOLING DID NOT NOTICE ANY ISSUES AT THIS TIME |
| 2028 | 05/27/2021 | HVAC Service | KELLY FIELD ANNEX SITE 1 | 2028 | Closed | 3A - High Sustain | 3A - 2028 - WT - HVAC SHOP - LAK - A/C UNIT IS LEAKING ROOM 158A8 - REPAIR - MR KOCH - 06/02/21 - SR 2473588 | JB SAN ANTONIO - HVAC SHOP - LAK | 06/11/2021 | 06/11/2021 | 6 | hours | REPAIRED LEAK |
| 4012 | 05/27/2021 | Appliances | JBSA SAM HOUSTON | 4012 | Closed | 3A - High Sustain | 3A - 4012 - WT - HVAC SHOP - FSH - FAN COIL UNIT IS INOP ROOM 129 - REPAIR - MR BLUE - 06/02/21 - SR 2473690 | JB SAN ANTONIO - HVAC SHOP - FSH | 07/15/2021 | 08/27/2021 | 45.20 | hours | 20JULY21 - ELEC - RESET BREAKER, CHECKED VOLTAGE, STOOD BY WHILE HVAC TURNED ON UNIT AND BREAKER DID NOT TRIP |
| 3313 | 05/28/2021 | HVAC Service | JBSA SAM HOUSTON | 3313 | Closed | 3A - High Sustain | 3A - 3313 - WT - HVAC SHOP - FSH - COMM RM TOO HOT - RPR - ROCHA - 05/28/21 - SR 2474502 | JB SAN ANTONIO - HVAC SHOP - FSH | 06/14/2021 | 06/21/2021 | 5 | hours | NOTIFIED JESSE IS BEING SENT TO PM SHIFT (NAOMI RIVERA) |
RESET PANNEL AND ALL TSTATS..DL
| 1001 | 06/01/2021 | Room Too Warm | JBSA SAM HOUSTON | 1001 | Closed | 3A - High Sustain | 3A- 1001 - WT - HVAC SHOP - FSH - 1ST FLOOR, A/C IS INOP - REPAIR - MR.GOMEZ'RIVERA - 06/01/21 - SR 2476144 | JB SAN ANTONIO - HVAC SHOP - FSH | 06/03/2021 | 06/03/2021 | 4 | hours | DIN1 (Robert Luce) Responded at 0910 on 06/03/21. L.G.; COMPLETED 2 HRS |
| 2418 | 06/02/2021 | HVAC Service | LACKLAND AIR FORCE BASE SITE 1 | 2418 | Closed | 3A - High Sustain | 3A - 2418 - WT - HVAC SHOP - LAK - HVAC FAMILY RM INOP @ 80 DEGREES - REPAIR - MR RAINEY - 06/02/21 - SR 2477497 | JB SAN ANTONIO - HVAC SHOP - LAK | 10/18/2021 | 10/18/2021 | 2 | hours | Rap/Ortega - No comments entered, Complete. |
| 100 | 06/02/2021 | Room Too Warm | CHAPMAN TRAINING ANNEX | 100 | Closed | 1-Emergency | 1 - 100 - WT - HVAC SHOP - LAK - HALF OF ALS BLDG NO A/C- REPAIR - RELLIN - 06/02/2021 - SR 2477877 | JB SAN ANTONIO - HVAC SHOP - LAK | 06/02/2021 | 06/02/2021 | 2 | hours | Emergency mitigated. Date of completion 6/2/21 |
| 16 | 06/07/2021 | Room Too Warm | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - FSH - HVAC system giving error code U0- low refrigerant - REPAIR - MR FRANKO - 06/07/21 - SR 2483347 | JB SAN ANTONIO - HVAC SHOP - FSH | 06/07/2021 | 06/07/2021 | 4 | hours | ADDED CORRECT REFRIGERANT CHARGE AND VERIFED OPERATION CLEARED ALARM NO FURTHER ISSUES PRESENT JOB COMPLETE. JT |
| 16 | 06/07/2021 | HVAC Service | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - FSH - 2ND FLOOR RM 240U LEAKING - REPAIR - FRANKO - 06/07/2021 - SR 2483691 | JB SAN ANTONIO - HVAC SHOP - FSH | 07/17/2021 | 07/17/2021 | 1 | hours | HVAC SHOP RESPONDED AND PROBLEM WAS ADRESSED. CD. |
| 199 | 06/07/2021 | HVAC Service | JBSA SAM HOUSTON | 199 | Closed | 3A - High Sustain | 3A - 199 - WT - HVAC SHOP - FSH - AC WENT OUT - RPR - WHITE - 06/07/21 - SR 2483729 | JB SAN ANTONIO - HVAC SHOP - FSH | 06/07/2021 | 08/18/2021 | 9.50 | hours | DIN 1 SERGIO SENT TASK OVER TO SHOP. 1 HOUR. |
TROUBLESHOOT AND REPAIRED HVAC EQUIPMENT VERIFED OPERATION NO FURTHER ISSUES RESIDE JOB COMPLETE.JT 901 06/07/2021 HVAC Service RANDOLPH AIR FORCE BASE SITE 1 901 Closed 3A - High Sustain 3A - 901 - WT - JB SAN ANTONIO - HVAC SHOP - RAN - REPLACE RECIRCULATING PUMP - ROBERT RODRIGUEZ - 6-7-2021 - SR 2484271 JB SAN ANTONIO - HVAC SHOP - RAN 06/16/2021 09/01/2021 60 hours INSTALL RECIRCULATION PUMP
REPLACE RECICULATING PUMP
MOTOR MAKING LOUD NOISE, FOUND PROPELLER WAS HITTING THE CASING DOE TO DENT ON COVER. ATTEMPTED TO STRAIGHTEN IT. WILL NEED TO MAKE ANOTHER ADJUSTMENT. FOUND OUT HAS FLOW ISSUE. WILL NEED TO CONTINUE TO TROUBLESHOOT.
WATER FLOW ISSUE
RECIRCULATING PUMP MAKING LOUD NOICE. MADE NECCESSARY ADJUSTMENT, NO MORE NOICE.
| 100 | 06/07/2021 | Room Too Warm | CHAPMAN TRAINING ANNEX | 100 | Closed | 3A - High Sustain | 3A - 100 - WT -HVAC SHOP LAK -North west half the building No A/C INOP -repair - Mr. Rellin -06/07/21 - SR 2484406 | JB SAN ANTONIO - HVAC SHOP - LAK | 06/09/2021 | 06/09/2021 | 0.50 | hours | RESET UNIT | |
| 16 | 06/08/2021 | HVAC Service | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - FSH - HVAC LEAKING WATER ONTO FLOOR 2ND FLOOR ROOM 240 - REPAIR - FRANKO - 6/8/2021 - SR 2485294 | JB SAN ANTONIO - HVAC SHOP - FSH | 06/08/2021 | 06/08/2021 | 6 | hours | TROUBLESHOOT AND FOUND DRAIN BLOCKED PRESSURIZED WITH DRY NITROGEN AND ENSURED PROPER DRAINAGE JOB COMPLETE.JT | |
| 16 | 06/08/2021 | HVAC Service | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - RPR - PUMP REBUILD - RPR - BROCK - 06/08/21 - SR 2486572 | JB SAN ANTONIO - HVAC SHOP - FSH | 09/09/2021 | 09/09/2021 | 5 | hours | REBUILT PUMP AND VERIFED OPERATION NO FURTHER ISSUES RESIDE JOB COMPLETE. JT | |
| 133 | 06/09/2021 | HVAC Service | JBSA SAM HOUSTON | 133 | Closed | 3A - High Sustain | 3A - 133 - WT - HVAC SHOP - FSH - ORDER COMPRESSORS - RPR - GARRETT - 06/09/21 - SR 2487442 | JB SAN ANTONIO - HVAC SHOP - FSH | 09/16/2021 | 09/16/2021 | 1 | hours | TROUBLESHOOT HVAC EQUIPMENT VERIFED OPERTAION NO FURTHER ISSUES RESIDE JOB COMPLETE. JT | |
| 4645 | 06/09/2021 | HVAC Service | JBSA SAM HOUSTON | 1001 | Closed | 3A - High Sustain | 3A - 1001 - WT - HVAC SHOP - FSH - SERVER RM TOO HOT - RPR - JOSE - 06/09/21 - SR 2487488 | JB SAN ANTONIO - HVAC SHOP - FSH | 06/09/2021 | 06/22/2022 | 24.50 | hours | MEET WITH HVAC AND PLAN ROUTE TO INSTALL DEDICATED RECEPTICLE. |
** 3A WT CREATED FOR ELECTRICAL SYSTEMS WT # 11530595 **
17/JUN/22 - INSTALLED DEDICATED RECEPTICLEFOR AIR CHILLER.
| 2418 | 06/09/2021 | HVAC Service | LACKLAND AIR FORCE BASE SITE 1 | 2418 | Closed | 3A - High Sustain | 3A - 2418 - WT - HVAC SHOP - LAK - MEN LOCKER RM AC INOP - REPAIR - RAINEY - 06/09/2021 - SR 2487548 | JB SAN ANTONIO - HVAC SHOP - LAK | 10/18/2021 | 10/18/2021 | 4 | hours | Rap/Ortega - No comments entered, Complete. |
| 4012 | 06/10/2021 | Appliances | JBSA SAM HOUSTON | 4012 | Closed | 3A - High Sustain | 3A - 4012 - WT - HVAC SHOP - FSH - RM.138, Refrigerant suction line leak, hallway outside - REPAIR - DEREK BLUE - 06/15/21 - SR 2489682 | JB SAN ANTONIO - HVAC SHOP - FSH | 08/26/2021 | 08/26/2021 | 0.50 | hours | ->.CALLED NO ANSWER ON MORE INFO ON REQUEST.<- |
TROUBLESHOOT AND REPAIRED HVAC EQUIPMENT VERIFED OPERATION NO FURTHER ISSUES RESIDE JOB COMPLETE. JT
| 16 | 06/10/2021 | HVAC Service | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - 10107206 - JB SAN ANTONIO - HVAC SHOP - FSH - REPLACE COMPRESSOR - REPAIR - JON FOLEY - 10 JUN 21 - 2489833 | JB SAN ANTONIO - HVAC SHOP - FSH | 06/10/2021 | 06/10/2021 | 4 | hours | CONTRACTED OUT DAIKIN REP FOR COMPRESSOR REPLACEMENT JOB COMPLETE. JT |
| 2264 | 06/17/2021 | HVAC Service | JBSA SAM HOUSTON | 2264 | Closed | 3A - High Sustain | 3A - 22647 - WT - HVAC SHOP - FSH - RESET AHU 1/2/5/7/9/11 - REPAIR - ANDERSON - 06/17/2021 - SR 24500022 | JB SAN ANTONIO - HVAC SHOP - FSH | 07/10/2021 | 07/10/2021 | 4 | hours | Pm conducted in building 2264 units located at ceiling and all basement Ahu. techs Herb Davis and harry Seely. |
| 2264 | 06/17/2021 | HVAC Service | JBSA SAM HOUSTON | 2264 | Closed | 3A - High Sustain | 3A - 2264 - WT - HVAC SHOP - FSH - MECH RM C224 HAS CHILLER LINE LEAK - REPAIR - ANDERSON - 06/17/2021 - SR 2500030 | JB SAN ANTONIO - HVAC SHOP - FSH | 08/31/2021 | 08/31/2021 | 0.50 | hours | ANDERSON REPORTED COMP. 06/23/21 1425 |
| 2028 | 06/17/2021 | Room Too Warm | KELLY FIELD ANNEX SITE 1 | 2028 | Closed | 3A - High Sustain | 3A - 2028 - WT - HVAC SHOP - LAK - RM 211 AC INOP - REPAIR - MR TORRES - 06/17/21 - SR 2500969 | JB SAN ANTONIO - HVAC SHOP - LAK | 08/20/2021 | 10/21/2021 | 6 | hours | Ortega/Hilario. Communications problem with in system . Unit not communicating. |
Rudy/Hilario - Replaced batteries, Complete.
| 2418 | 06/21/2021 | HVAC Service | LACKLAND AIR FORCE BASE SITE 1 | 2418 | Closed | 3A - High Sustain | 3A - 2418 - WT - HVAC SHOP - LAK - HVAC in the Main Weight Room is out - REPAIR - MR RAINEY - 06/21/21 - SR 2502383 | JB SAN ANTONIO - HVAC SHOP - LAK | 07/20/2021 | 07/20/2021 | 3 | hours | Complete. |
| 2264 | 06/22/2021 | HVAC Service | JBSA SAM HOUSTON | 2264 | Closed | 3A - High Sustain | 3A - 2264 - WT - HVAC SHOP - FSH - 6 AHUs INOP - RPR - FOLEY - 6/22/21 - SR 2504613 | JB SAN ANTONIO - HVAC SHOP - FSH | 06/22/2021 | 09/10/2021 | 9 | hours | HVAC RESTORED |
| 4012 | 06/22/2021 | Appliances | JBSA SAM HOUSTON | 4012 | Closed | 1-Emergency | 1 - 4012 - WT - FSH - HVAC - FCU-57 LEAKING DOWN WALL IN HALLWAY - RPR - BLUE - 06/22/21 - SR 2504787 | JB SAN ANTONIO - HVAC SHOP - FSH | 08/31/2021 | 08/31/2021 | 0.50 | hours | 6/25/21 sent to pm shift. (EH) |
| 4012 | 06/22/2021 | Appliances | JBSA SAM HOUSTON | 4012 | Closed | 3A - High Sustain | 3A - 4012 - WT - HVAC SHOP - FSH - HVAC INOP - RPR - DEREK BLUE - 6/22/21 - SR 2504798 | JB SAN ANTONIO - HVAC SHOP - FSH | 06/23/2021 | 08/26/2021 | 8 | hours | 6/23/21 DIN 1 DID NOT GET TO TASK; SENT TO PM SHIFT. |
6/23/21 PM BABIN: CHECK TOMORROW. POC WAS GONE FOR THE DAY AND NO OTHER CONTACTS GIVEN. 0.5 HRS
6/24/21 DIN1 JOEY FLORES: NEEDS PARTS. C/O 0 HRS.
TROUBLESHOOT AND REPAIRED HVAC EQUIPMENT VERIFED OPERATION NO FURTHER ISSUES RESIDE JOB COMPLETE. JT
| 2028 | 06/22/2021 | Leaks | KELLY FIELD ANNEX SITE 1 | 2028 | Closed | 3A - High Sustain | 3A - 2028 - WT - HVAC SHOP - LAK - MAIN CONDENSATE PUMP LEAKING CAUISING SLIPPING HAZARD - REPAIR - KOCH - 06/22/2021 - SR 2505714 | JB SAN ANTONIO - HVAC SHOP - LAK | 06/23/2021 | 06/23/2021 | 12 | hours | Complete. |
| 199 | 06/24/2021 | HVAC Service | JBSA SAM HOUSTON | 199 | Closed | 1-Emergency | 1 - 199 - WT - HVAC - FSH - NO A/C IN BLDG - RPR - ANDREA WHITE - 06/24/21 - SR 2508751 | JB SAN ANTONIO - HVAC SHOP - FSH | 08/31/2021 | 08/31/2021 | 0.50 | hours | DIN JOEY FLORES NOTIFIED 0738 06/24; UNABLE TO GET TO. |
DIN J FLORES NOTIFIED 6/25/21 @ 0706; CONVERTED TO 3A - OVER THE 24-HRS
2028 06/24/2021 Other Interior Need KELLY FIELD ANNEX SITE 1 2028 Closed 3A - High Sustain 3A - 2028 - WT - HVAC SHOP - LAK - Change filters - REPAIR - J TORRES - 06/30/21 - SR 2510139 JB SAN ANTONIO - HVAC SHOP - LAK 02/18/2022 02/18/2022 0.10 hours Ish - 12/15/2021 - Summitted quote to order filters, Hold for Parts.
NO PARTS ON ORDER, WT IS OLD NEED TO CREATE ANOTHER WT 2/18/22
| 06/25/2021 | JBSA SAM HOUSTON | 199 | Closed | 3A - High Sustain | 3A - 199 - WT - HVAC - FSH - NO A/C IN BLDG - RPR - ANDREA WHITE - 06/24/21 - SR 2508751 | JB SAN ANTONIO - HVAC SHOP - FSH | 06/25/2021 | 06/25/2021 | 2 | hours | COMPLETED | ||
| 16 | 06/25/2021 | Room Too Warm | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - FSH - AC INOP DCOS AND SGS OFFICE 2ND FLOOR - REPAIR - FRANKO - 06/25/2021 - SR 2511086 | JB SAN ANTONIO - HVAC SHOP - FSH | 06/25/2021 | 06/25/2021 | 4 | hours | RESET DAIKIN VRF AND CLEANED CONDENSATE DRAIN TO ENSURE PROPER WATER FLOW JOB COMPLETE. JT |
| 3313 | 06/25/2021 | HVAC Service | JBSA SAM HOUSTON | 3313 | Closed | 3A - High Sustain | 3A - 3313 - WT - HVAC - FSH - REQUEST TECH TO DIAGNOSE HVAC IN OFFICE - RPR - VELASQUEZ - 06/25/21 - SR 2511433 | JB SAN ANTONIO - HVAC SHOP - FSH | 07/29/2021 | 07/29/2021 | 0.50 | hours | HVAC SHOP RESPONDED AND PROBLEM WAS ADRESSED. CD. |
| 100 | 06/28/2021 | Room Too Warm | CHAPMAN TRAINING ANNEX | 100 | Closed | 1-Emergency | 1 - 100 - WT - HVAC SHOP LAK - Chapman Medina Whole Entire Bldg. A/C INOP -repair - Justin -06/28/21 - SR 2512380 | JB SAN ANTONIO - HVAC SHOP - LAK | 06/28/2021 | 06/28/2021 | 2 | hours | complete |
| 2028 | 06/28/2021 | Room Too Cold | KELLY FIELD ANNEX SITE 1 | 2028 | Closed | 3A - High Sustain | 3A - HVAC SHOP - LAK - RM 124 TOO COLD - RPR - KOCH - 06/28/21 - SR 2512891 | JB SAN ANTONIO - HVAC SHOP - LAK | 02/23/2022 | 02/23/2022 | 0.10 | hours | NO BLDG NUMBER, NO ANSWER |
| 901 | 06/29/2021 | Room Too Warm | RANDOLPH AIR FORCE BASE SITE 1 | 901 | Closed | 1-Emergency | 1 - 901 - WT - HVAC SHOP - RAN - SIPR RM 312 HVAC UNIT INOP - REPAIR - RONN WALLACE - 06/29/21 - SR 2515286 | JB SAN ANTONIO - HVAC SHOP - RAN | 06/29/2021 | 06/29/2021 | 1 | hours | TROUBLESHOOTING VRV SYSTEM, OPENED NEW WORK TASK... |
| 16 | 06/29/2021 | HVAC Service | JBSA SAM HOUSTON | 16 | Closed | 1-Emergency | 1 - 16 - WT - HVAC SHOP - FSH - RM 206-1 TOO WARM - RPR - FRANCO - 06/29/21 - SR 2515384 | JB SAN ANTONIO - HVAC SHOP - FSH | 06/29/2021 | 06/29/2021 | 0.50 | hours | NOTIFIED JOEL SALAZAR 06/29/21 1249; |
6/29/21 BABIN PM COULD NOT GAIN ACCESS C/O .5 HRS
| 06/29/2021 | JBSA SAM HOUSTON | 4012 | Closed | 3A - High Sustain | 3A - 4012 - WT - FSH - HVAC - FCU-57 LEAKING DOWN WALL IN HALLWAY - RPR - BLUE - 06/22/21 - SR 2504787 | JB SAN ANTONIO - HVAC SHOP - FSH | 08/26/2021 | 08/26/2021 | 0.50 | hours | HVAC RESTORED | ||
| 901 | 06/29/2021 | HVAC Service | RANDOLPH AIR FORCE BASE SITE 1 | 901 | Closed | 3A - High Sustain | 3A - 901 - WT - HVAC SHOP - RAN - ROOM 312 SIPR ROOM HVAC UNIT INOP - REPAIR - RICHARDSON - 6/29/21- SR 2515615 | JB SAN ANTONIO - HVAC SHOP - RAN | 07/16/2021 | 07/22/2021 | 1.50 | hours | RM 312 SIPR NOT COOLING |
RIPR ROOM NOT COOLING DUPLICATE
901 06/30/2021 HVAC Service RANDOLPH AIR FORCE BASE SITE 1 901 Closed 3A - High Sustain 3A - 901 - WT - HVAC SHOP - RAN - SIPRE ROOM NOT COOLING - REPAIR - ROGERS - 06/30/21 - SR 2516837 JB SAN ANTONIO - HVAC SHOP - RAN 06/29/2021 09/29/2021 2 hours LOW ON REFRIGERANT
72 DEGREE COOLING OK
| 100 | 06/30/2021 | Room Too Warm | CHAPMAN TRAINING ANNEX | 100 | Closed | 3A - High Sustain | 1 - 100 - WT - HVAC SHOP LAK - entire bldg. no A/C INOP-repair -Justin Rellin - 06/30/21 - SR 2517722 | JB SAN ANTONIO - HVAC SHOP - LAK | 06/30/2021 | 06/30/2021 | 2 | hours | Ameresco sensor's are the reason why Bldg is Hot (NO MOVEMENT) | |
| 2028 | 07/01/2021 | Other Climate Control Need | KELLY FIELD ANNEX SITE 1 | 2028 | Closed | 3A - High Sustain | 3A - 2028 - WT -HVAC SHOP LAK - room 136C is leaking water into the room, the evaporator coil needs to cleaned -repair - Koch - 07/01/21 - SR 2519059 | JB SAN ANTONIO - HVAC SHOP - LAK | 08/20/2021 | 08/20/2021 | 3 | hours | Ortega/Hilario. Cleared drain line . Need 16x30x1 pleated air filter. | |
| 16 | 07/06/2021 | HVAC Service | JBSA SAM HOUSTON | 16 | Closed | 1-Emergency | 1 - 16 - WT - HVAC SHOP - FSH - GENERALS OFFICE TOO HOT - REPAIR - SALGADO - 7/6/2021 - SR 2521314 | JB SAN ANTONIO - HVAC SHOP - FSH | 07/06/2021 | 07/06/2021 | 2 | hours | DIN 1 JOEL SALAZAR NOTIFIED 7/6/21 @ 0949 HRS; 3A CONVERT TO SHOP: DIN COULDN'T RESET VRF SYSTEM | |
| 2028 | 07/06/2021 | Room Too Warm | KELLY FIELD ANNEX SITE 1 | 2028 | Closed | 3A - High Sustain | 3A - 2028 - WT - HVAC SHOP - LAK - RM 126B/CCSD COMMANDERS OFFICE ARE TOO HOT - REPAIR - MR KOCH - 07/06/21 - SR - 2521737 | JB SAN ANTONIO - HVAC SHOP - LAK | 07/07/2021 | 07/07/2021 | 0.50 | hours | AC UNIT WAS OFF | |
| 2418 | 07/06/2021 | HVAC Service | LACKLAND AIR FORCE BASE SITE 1 | 2418 | Closed | 3A - High Sustain | 3A - 2418 - WT - HVAC SHOP - LAK - DOWNSTAIRS CARDIO RM NO AC - REPAIR - RAINEY - 07/06/2021 - SR 2522533 | JB SAN ANTONIO - HVAC SHOP - LAK | 07/20/2021 | 07/20/2021 | 3 | hours | Complete. | |
| 07/06/2021 | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - FSH - RM 206-1 TOO WARM - RPR - FRANCO - 06/29/21 - SR 2515384 | JB SAN ANTONIO - HVAC SHOP - FSH | 07/06/2021 | 07/06/2021 | 4 | hours | RESET OUTDOOR DAIKIN VRF ALARM VERIFED OPERATION UNIT IS FULLY OPERATION AND MAINTAINING SETPOINT. JT | |||
| 07/07/2021 | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - FSH - GENERALS OFFICE TOO HOT - REPAIR - SALGADO - 7/6/2021 - SR 2521314 | JB SAN ANTONIO - HVAC SHOP - FSH | 07/07/2021 | 09/30/2021 | 6.50 | hours | ADDED REFRIGERANT TO DAIKIN SYSTEM TO BRING PRESSURES UP TO MANUFACTURE DESIGN VERIFED OPERATION JOB COMPLETE. JT | |||
| 1001 | 07/07/2021 | Other Exterior Need | JBSA SAM HOUSTON | 1001 | Closed | 3A - High Sustain | 3A - 1001 - WT - HVAC SHOP - FSH - ROOF LEAKING INTO 4TH FLR CONF RM - RPR - WILLIAMS - 07/07/21 - SR 2524154 | JB SAN ANTONIO - HVAC SHOP - FSH | 07/19/2021 | 07/20/2021 | 6.50 | hours | 7/19/2021 ASSESS ROOF LEAK, LEAK IS FROM HVAC/ REFER TO HVAC |
TROUBLESHOOT AND REPAIRED HVAC EQUIPMENT VERIFIED OPERATION NO FURTHER ISSUES RESIDE JOB COMPLETE. JT
| 44 | 07/09/2021 | HVAC Service | GRAYSON STREET ANNEX SITE 1 | 44 | Closed | 1-Emergency | 1 - 44 - WT - HVAC SHOP - FSH - BAY 2 AC UNIT OUT - RPR - PENA - 07/09/21 - SR 2527936 | JB SAN ANTONIO - HVAC SHOP - FSH | 07/09/2021 | 07/09/2021 | 2 | hours | NOTIFIED JOEY FLORES 11;24 07/09/21 |
| 146 | 07/12/2021 | HVAC Service | JBSA SAM HOUSTON | 146 | Closed | 1-Emergency | 1 - 146 - WT - HVAC SHOP - FSH - BLDG TOO HOT - RPR - CRUZ - 07/12/21 - SR 2529754 | JB SAN ANTONIO - HVAC SHOP - FSH | 07/12/2021 | 07/12/2021 | 2 | hours | NOTIFIED SERGIO 0836 07/12; SENT TO PM SHIFT |
7/12/21 PM BABIN: OPEN 3A - NEEDS EMCS; UNITS OUTSIDE HAVE NO FAULTS. SETPOINT ISSUE.
| 16 | 07/12/2021 | HVAC Service | JBSA SAM HOUSTON | 16 | Closed | 1-Emergency | 1 - 16 - WT - HVAC SHOP - FSH - EAST SIDE OF BLDG TOO HOT - RPR - SALGADO - 07/12/21 - SR 2529817 | JB SAN ANTONIO - HVAC SHOP - FSH | 07/12/2021 | 07/12/2021 | 1 | hours | DIN 1 SERGIO NOTIFIED 0839 07/12; TASK IS UNDER 3A CONVERT WT# 10057406 (5/27/21) HFP |
| 07/12/2021 | GRAYSON STREET ANNEX SITE 1 | 44 | Closed | 3A - High Sustain | 3A - 44 - WT - HVAC SHOP - FSH - BAY 2 AC UNIT OUT - RPR - PENA - 07/09/21 - SR 2527936 | JB SAN ANTONIO - HVAC SHOP - FSH | 07/12/2021 | 07/12/2021 | 2 | hours | REPLACED BELT AND RESET PACKAGE UNIT ON ROOF. | ||
| 2418 | 07/12/2021 | HVAC Service | LACKLAND AIR FORCE BASE SITE 1 | 2418 | Closed | 3A - High Sustain | 3A - 2418 - WT - HVAC SHOP - LAK - FAMILY ROOM HAS A LARGE HVAC WATER LEAK - REPAIR - DESTINY - 07/12/21 - SR 2530223 | JB SAN ANTONIO - HVAC SHOP - LAK | 10/18/2021 | 10/18/2021 | 2 | hours | Rap/Ortega - No comments entered, Complete. |
| 16 | 07/12/2021 | HVAC Service | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - FSH - A/C IS OUT SECOND FLOOR - REPAIR - MARSHAL - 07/12/2021 - SR 2531510 | JB SAN ANTONIO - HVAC SHOP - FSH | 07/01/2021 | 10/04/2021 | 121 | hours | C/O TO SHOP (HFP) |
PARTS RECEIVED, UNIT REPAIRED PER DAIKIN REP
901 07/15/2021 HVAC Service RANDOLPH AIR FORCE BASE SITE 1 901 Closed 3A - High Sustain 3A - 901 - WT - HVAC SHOP - RAN - 3RD FLOOR A/C ON-OP - REPAIR - TODGE - 07/15/2021 - SR 2537796 JB SAN ANTONIO - HVAC SHOP - RAN 07/16/2021 07/22/2021 2 hours UNIT NOT COOLING
3RD FLOOR AC INOP/CHANGED UNIT
| 2418 | 07/19/2021 | Room Too Warm | LACKLAND AIR FORCE BASE SITE 1 | 2418 | Closed | 3A - High Sustain | 3A - 2418 - 10248232 - HVAC SHOP - LAK - BLDG TO HOT - REPAIR - POC DESTINY 671-2016 - 07/19/21 - SOR 2539823 | JB SAN ANTONIO - HVAC SHOP - LAK | 10/18/2021 | 10/18/2021 | 2 | hours | Rap/Ortega - No comments entered, Complete. |
| 100 | 07/20/2021 | Room Too Warm | CHAPMAN TRAINING ANNEX | 100 | Closed | 3A - High Sustain | 3A - 100 - WT -HVAC SHOP LAK - Chapman medina no A/C half of bldg -repair -Justin Rellin -07/20/21 - SR 2542527 | JB SAN ANTONIO - HVAC SHOP - LAK | 07/13/2021 | 07/13/2021 | 0.80 | hours | Per Juan Ortega mention everything clear & completed. |
| 1001 | 07/20/2021 | HVAC Service | JBSA SAM HOUSTON | 1001 | Closed | 3A - High Sustain | 3A - 1001 - WT - HVAC SHOP - FSH - LOUD NOISE IN MECH RM - RPR - WILLIAMS - 07/20/21 - SR 2543387 | JB SAN ANTONIO - HVAC SHOP - FSH | 09/18/2021 | 09/18/2021 | 3 | hours | REPLACED BELT TO AHU AND NOISE IS LONGER AN ISSUE. MTZ |
| 1001 | 07/21/2021 | HVAC Service | JBSA SAM HOUSTON | 1001 | Closed | 1-Emergency | 1 - 1001 - WT - HVAC SHOP - FSH - A/C IN COMMS RM C103 OUT - RPR - WILLIAMS - 07/21/21 - SR 2544495 | JB SAN ANTONIO - HVAC SHOP - FSH | 07/21/2021 | 07/21/2021 | 1 | hours | DIN 1 NOTIFIED 07/21/21 / 0912. JOEL SALAZAR; SENT TO PM SHIFT |
BABIN UNABLE TO ACCESS 21 JULY 2021 @ 1900 HRS - 3A CONVERT
2028 07/22/2021 Room Too Warm KELLY FIELD ANNEX SITE 1 2028 Closed 3A - High Sustain 3A - 2028 - WT - HVAC SHOP - LAK - RM 142D NOT COOLING PROPERTY - RPR - TORRES - 07/22/21 - SR 25465638 JB SAN ANTONIO - HVAC SHOP - LAK 08/16/2021 08/20/2021 13 hours Per Garth mention found leak in bard unit.
Joe. H/Joe. P/Perez. Room 142 D Low refrigerant . Find leak and repair . Recharge BARD UNIT.
Ortega/Hilario. No refrigerant in system . Leak checked system with nitrogen Replaced valve cores . Pulled vacuum and charged system with 6 pounds of R410A .
1001 07/23/2021 HVAC Service JBSA SAM HOUSTON 1001 Closed 3A - High Sustain 3A - 1001 - WT - HVAC SHOP - FSH - ALL THE COMM ROOMS HAVE NO A/C - REPAIR - MR.RIVERA - 07/23/21 - SR 2549061 JB SAN ANTONIO - HVAC SHOP - FSH 07/29/2021 09/18/2021 38 hours DIN1 (Jorge Delarosa) Responded at 1305 on 07/23/21. L.G.
*LUIS MARKED THIS A 1 AND THEN SOMEHOW WAS DOWNGRADED TO 3A AND COMPLETED WITHOUT HOURS. I REOPENED TO ENSURE IT WAS DONE.
| 901 | 07/26/2021 | HVAC Service | RANDOLPH AIR FORCE BASE SITE 1 | 901 | Closed | 3A - High Sustain | 3A - 901 - WT - HVAC SHOP - RAN - HOT WATER LOOP LEAK - ROBERT R. - 07/26/21 - SR 2551462 | JB SAN ANTONIO - HVAC SHOP - RAN | 07/27/2021 | 07/28/2021 | 8 | hours | REPAIOR HOT WATER LOOP LEAK, GOTHERED NECESSARY PART AND TOOLS TO REPAIR LEAK. CHECKED FOR LEAK FOUND NONE. REPLACED 4 BLEEDERS DOE TO WATEER FREEZE DAMAGE. ASSESED AND TROUBLESOT ISSUE WITH AIR BLEEDERS WE WILL NEED TO REPLACE 4 DUE TO LEAK. |
| 3742 | 07/27/2021 | HVAC Service | LACKLAND AIR FORCE BASE SITE 1 | 3742 | Closed | 1-Emergency | 1 - 3742 - WT - HVAC SHOP - LAK - A/C INOP IN HALF OF THE BUILDING - REPAIR - SSGT PIERCE - 07/27/21 - SR - 2553416 | JB SAN ANTONIO - HVAC SHOP - LAK | 07/29/2021 | 07/29/2021 | 1 | hours | PER HVAC TECH AC IS WORKING IN THE BLDG BUT THERE ARE SEVERAL ROOMS THAT ARE WARM. COMPLETE THIS WT AND CREATE A 3A TO HAVE SOMEONE TROUBLESHOOT INDIVIDUAL ROOMS |
EDWIN MOSQUERA CSU
| 4012 | 07/27/2021 | HVAC Service | JBSA SAM HOUSTON | 4012 | Closed | 1-Emergency | 1 - WT - 4012 - HVAC SHOP - FSH - BLDG IS HOT/AIR COMPRESSOR FAULT ON PANEL - RPR - ROCHA - 07/27/21 - SR 2553689 | JB SAN ANTONIO - HVAC SHOP - FSH | 07/27/2021 | 07/27/2021 | 0.50 | hours | DIN 1 NOTIFIED. 07/27/21 / 1350. MYERS; 3A CONVERT |
| 100 | 07/28/2021 | Appliances | CHAPMAN TRAINING ANNEX | 100 | Closed | 3A - High Sustain | 3A - 100 - WT - HVAC SHOP LAK - HVAC- 1/2 of building HVAC inoperable and not working. -repair - Justin - 07/28/21 - SR 2555017 | JB SAN ANTONIO - HVAC SHOP - LAK | 02/25/2022 | 02/25/2022 | 8 | hours | 2/25 Roemer/Shaw - Bldg has no heat/ resynced outdoor unit w/indoor unit. running normally |
| 100 | 07/28/2021 | HVAC Service | CHAPMAN TRAINING ANNEX | 100 | Closed | 3A - High Sustain | 3A - 100 - WT - HVAC SHOP LAK - HVAC 1/2 building is out again -repair - Justin Rellin - 07/28/21 - SR 2555024 | JB SAN ANTONIO - HVAC SHOP - LAK | 07/29/2021 | 07/29/2021 | 0.50 | hours | ADJUSTED CONTROLLER |
| 16 | 07/28/2021 | Leaks | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - FSH - 2ND FLR RM 222/223 CEILING LEAK - RPR - MS. CUMMINS - 07/28/21 - SR 2555489 | JB SAN ANTONIO - HVAC SHOP - FSH | 08/04/2021 | 08/04/2021 | 1 | hours | POC CALLED 7/30/21 @ 1050 TO LET US KNOW PROBLEM IS WORSE TODAY. DIN 1 J DE LA ROSA NOTIFIED 7/30/21 @ 1107. UNABLE TO GET TO; SENT TO PM SHIFT |
8/4/21 MYERS - C/O TO SHOP
8-4-21 Per Joseph, Transfer to HVAC. unit is condensating/leaking.
TROUBLESHOOT, DIAGNOSED AND REPAIRED HVAC EQUIPMENT VERIFED OPERATION NO FURTHER ISSUES RESIDE JOB COMPLETE. JT
| 07/28/2021 | JBSA SAM HOUSTON | 4012 | Closed | 3A - High Sustain | 3A - WT - 4012 - HVAC SHOP - FSH - BLDG IS HOT/AIR COMPRESSOR FAULT ON PANEL - RPR - ROCHA - 07/27/21 - SR 2553689 | JB SAN ANTONIO - HVAC SHOP - FSH | 07/29/2021 | 07/29/2021 | 2 | hours | TROUBLESHOOT AND REPAIRED HVAC EQUIPMENT VERIFED OPERATION NO FURTHER ISSUES RESIDE JOB COMPLETE. JT | ||
| 100 | 07/29/2021 | Room Too Warm | CHAPMAN TRAINING ANNEX | 100 | Closed | 1-Emergency | 1 - 100 - WT - HVAC SHOP LAK - Half of 1st floor No A/C INOP - Repair - Rellin - 07/29/21 - SR 2556991 | JB SAN ANTONIO - HVAC SHOP - LAK | 07/29/2021 | 07/29/2021 | 2 | hours | Completed by Hilario & Juan the shop man . |
Ortega/Hilario. No one at building to open door.
| 2264 | 07/29/2021 | HVAC Service | JBSA SAM HOUSTON | 2264 | Closed | 3A - High Sustain | 3A - 2264 - WT - HVAC SHOP - FSH - 1-3 OFFICE AREAS AHU 3/HVAC MAKING LOUD NOISE/INOP - REPAIR - MR ANDERSON - 07/29/21 - SR 2557486 | JB SAN ANTONIO - HVAC SHOP - FSH | 09/10/2021 | 09/10/2021 | 2 | hours | HVAC RESTORED |
| 44 | 07/29/2021 | HVAC Service | GRAYSON STREET ANNEX SITE 1 | 44 | Closed | 1-Emergency | 1 - 44 - WT - HVAC SHOP - FSH - NO AC BAY 1 1ST FLR - RPR - MARK - 07/29/21 - SR 2557883 | JB SAN ANTONIO - HVAC SHOP - FSH | 07/29/2021 | 07/29/2021 | 2 | hours | 7/29/21 GIVEN TO PM SHIFT ; PADRON: UNITS RTU1B1 AND RTU1B2 NOT COOLING. CHECKED AND FOUND T-STATS ARE IN IDLE MODE - |
| 3742 | 07/29/2021 | HVAC Service | LACKLAND AIR FORCE BASE SITE 1 | 3742 | Closed | 3A - High Sustain | 3A - 3742 - WT - HVAC SHOP - LAK - AC IS WORKING BUT SOME ROOMS ARE WARM - REPAIR - FLORES - 07/29/21 - SR 2557920 | JB SAN ANTONIO - HVAC SHOP - LAK | 10/27/2021 | 10/27/2021 | 1 | hours | 10/27/2021 - Rap/Ortega - No comments entered, Complete. |
| 4012 | 07/30/2021 | HVAC Service | JBSA SAM HOUSTON | 4012 | Closed | 1-Emergency | 1 - 4012 - WT - HVAC SHOP - FSH - ZONE A, A/C IS INOP - REPAIR - SSGT.AROCHA - 07/30/21 - SR 2559352 | JB SAN ANTONIO - HVAC SHOP - FSH | 07/30/2021 | 08/01/2021 | 11.50 | hours | DIN1 (Jorge De La Rosa) Responded at 1412 on 07/30/21. L.G. |
SENT TO PM SHIFT
7/30/21 PADRON: WAS NOT ABLE TO GET ONLINE. MATT WILL ADJUST ON SAT 7/31.
| 4012 | 08/02/2021 | HVAC Service | JBSA SAM HOUSTON | 4012 | Closed | 1-Emergency | 1 - 4012 - WT - HVAC SHOP - FSH - NO AC ENTIRE BLDG - RPR - BLUE - 08/02/21 - SR 2560293 | JB SAN ANTONIO - HVAC SHOP - FSH | 08/02/2021 | 08/02/2021 | 6 | hours | NOTIFIED SHOP 0900 08/02; COMPLETE |
| 16 | 08/02/2021 | HVAC Service | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - FSH - HVAC not working properly - REPAIR - HOWARD - 08/02/21 - SR 2560440 | JB SAN ANTONIO - HVAC SHOP - FSH | 08/02/2021 | 08/02/2021 | 1 | hours | WORKING OFF WT 10026535 |
| 16 | 08/02/2021 | HVAC Service | JBSA SAM HOUSTON | 16 | Closed | 1-Emergency | 1 - 16 - WT - HVAC SHOP - FSH - NO A/C IN E-WING - RPR - HOWARD - 08/02/21 - SR 2560690 | JB SAN ANTONIO - HVAC SHOP - FSH | 0 | hours | SHOP SUP NOTIFIED. 08/02/21 / 1000. | ||
| 4012 | 08/02/2021 | Appliances | JBSA SAM HOUSTON | 4012 | Closed | 3A - High Sustain | 3A - 4012 - WT - HVAC SHOP - FSH - RM.145 AC INOP - REPAIR - DEREK BLUE - 08/04/21 - SR 2561505 | JB SAN ANTONIO - HVAC SHOP - FSH | 08/09/2021 | 09/23/2021 | 4 | hours | TROUBLESHOOT AND REPAIRED HVAC EQUIPMENT VERIFED OPERATION NO FURTHER ISSUES RESIDE JOB COMPLETE. JT |
| 2264 | 08/03/2021 | HVAC Service | JBSA SAM HOUSTON | 2264 | Closed | 3A - High Sustain | 3A - 2264 - WT - HVAC SHOP - FSH - AHU 3 AND 4 INOP - REPAIR - J ANDERSON - 08/09/21 - SR 2563180 | JB SAN ANTONIO - HVAC SHOP - FSH | 09/10/2021 | 09/10/2021 | 2 | hours | HVAC RESTORED |
| 2264 | 08/03/2021 | Other Climate Control Need | JBSA SAM HOUSTON | 2264 | Closed | 3A - High Sustain | 3A - 2264 - WT - HVAC SHOP - FSH - BOOSTER FAN REALY LOUD - REPAIR - J ANDERSON - 08/09/21 - SR 2563195 | JB SAN ANTONIO - HVAC SHOP - FSH | 10/06/2021 | 10/06/2021 | 5 | hours | LUCE REPORTED COMPLETE |
| 08/03/2021 | JBSA SAM HOUSTON | 1001 | Closed | 3A - High Sustain | 3A - 1001 - WT - HVAC SHOP - FSH - NO WATER THROUGHOUT BUILDING - RPR - GOMEZ - 08/02/21 - SR 2560146 | JB SAN ANTONIO - HVAC SHOP - FSH | 08/04/2021 | 08/04/2021 | 1 | hours | 8/4/21 BABIN: BOOSTER PUMPS BACK ONLINE AND WATER PRESSURE IS GOOD IN BLDG. COMPLETE | ||
| 08/03/2021 | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - FSH - NO A/C IN E-WING - RPR - HOWARD - 08/02/21 - SR 2560690 | JB SAN ANTONIO - HVAC SHOP - FSH | 08/02/2021 | 08/02/2021 | 1 | hours | WORKING OFF WT10026535 | ||
| 1001 | 08/04/2021 | HVAC Service | JBSA SAM HOUSTON | 1001 | Closed | 1-Emergency | 1 - 1001 - WT - HVAC SHOP - FSH - 4TH FLR AC OUT - RPR - WILLIAMS - 08/04/21 - SR 2564976 | JB SAN ANTONIO - HVAC SHOP - FSH | 08/04/2021 | 08/04/2021 | 1.50 | hours | DIN MYERS NOTIFIED 0921 08/04; COMPLETE |
| 1001 | 08/05/2021 | HVAC Service | JBSA SAM HOUSTON | 1001 | Closed | 3A - High Sustain | 3A - 1001 - WT - HVAC SHOP - FSH - TROUBLE SHOOT DX UNITS - RPR - TREJO - 08/05/21 - SR 2567866 | JB SAN ANTONIO - HVAC SHOP - FSH | 09/20/2021 | 11/27/2021 | 2 | hours | DX UNITS ARE OPERATIONAL, COMPLETE, JB |
| 145 | 08/06/2021 | HVAC Service | JBSA SAM HOUSTON | 145 | Closed | 1-Emergency | 1 - 145 - WT - HVAC SHOP - FSH - 1ST AND 2ND FLOOR ON THE EAST SIDE, A/C IS INOP - REPAIR - MR.SWENSON - 08/06/21 - SR 2568570 | JB SAN ANTONIO - HVAC SHOP - FSH | 09/13/2021 | 09/13/2021 | 0.50 | hours | DIN1 (Jorge De La Rosa) Responded at 0732 on 08/06/21. L.G. |
| 16 | 08/06/2021 | Other Climate Control Need | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - FSH - RM# 142, A/C LEAK DRIPPING - REPAIR - COLBY FRANCO - 08/06/21 - SR 2569374 | JB SAN ANTONIO - HVAC SHOP - FSH | 08/07/2021 | 08/07/2021 | 3 | hours | HVAC RESTORED |
| 16 | 08/06/2021 | HVAC Service | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - FSH - RM 221 & 222 REPL/REPR INSULATION - RPR - CHRISTIAN ALVAREZ - 08/06/21 - SR 2569406 | JB SAN ANTONIO - HVAC SHOP - FSH | 08/05/2021 | 08/09/2021 | 31 | hours | TROUBLESHOOT, DIAGNOSED AND REPAIRED HVAC EQUIPMENT VERIFED OPERATION NO FURTHER ISSUES RESIDE JOB COMPLETE. JT |
| 16 | 08/09/2021 | Other Climate Control Need | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - FSH - thermostat 2-20 INOP - REPAIR - FRANKO - 08/09/21 - SR 2570330 | JB SAN ANTONIO - HVAC SHOP - FSH | 08/09/2021 | 08/09/2021 | 1 | hours | HVAC RESTORED |
| 1001 | 08/09/2021 | HVAC Service | JBSA SAM HOUSTON | 1001 | Closed | 3A - High Sustain | 3A - 1001 - WT - HVAC SHOP - FSH - 4TH FLR HVAC LEAK - RPR - WILLIAMS - 08/09/21 - SR 2571395 | JB SAN ANTONIO - HVAC SHOP - FSH | 08/09/2021 | 08/13/2021 | 40 | hours | Follow up |
AUG 10 , 2021 MR ERIC DENNER ASSIST DRAINING AND RESETTING FIRE SYSTEM.
| 2028 | 08/12/2021 | HVAC Service | KELLY FIELD ANNEX SITE 1 | 2028 | Closed | 1-Emergency | 1 - 2028 - WT - HVAC SHOP - LAK - RM 162 we have an Air Conditioning system INOP - REPAIR - TORRES - 08/13/21 - SR 2577313 | JB SAN ANTONIO - HVAC SHOP - LAK | 08/16/2021 | 08/20/2021 | 4 | hours | Ortega/Hilario. Replaced 5MUF capacitor and changed air filter. 14x25x1 pleat. Per Garth mention condenser fan motor replaced. |
| 16 | 08/16/2021 | Room Too Warm | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - FSH - A/C ON 1ST FLR HAVING ISSUES AFFECTING RMS 117-121 - RPR - FRANKO - 08/16/21 - SR 2580713 | JB SAN ANTONIO - HVAC SHOP - FSH | 08/16/2021 | 08/16/2021 | 2 | hours | HVAC RESTORED |
| 16 | 08/23/2021 | HVAC Service | JBSA SAM HOUSTON | 16 | Closed | 1-Emergency | 1 - 16 - WT - HVAC SHOP - FSH - WEST WING AC OUT - RPR - VAENI - 08/23/21 - SR 2589275 | JB SAN ANTONIO - HVAC SHOP - FSH | 08/23/2021 | 08/23/2021 | 2 | hours | NOTIFIED DIN 1 TODD 08/23/21 0745; 3A CONVERT TO EMCS |
| 2264 | 08/23/2021 | Room Too Warm | JBSA SAM HOUSTON | 2264 | Closed | 3A - High Sustain | 3A - 2264 - WT - HVAC SHOP - FSH - RM 114A AC INOP - REPAIR - MR JACK - 08/25/21 - SR 2589734 | JB SAN ANTONIO - HVAC SHOP - FSH | 09/10/2021 | 09/10/2021 | 2 | hours | |
| 08/24/2021 | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - FSH - WEST WING AC OUT - RPR - VAENI - 08/23/21 - SR 2589275 | JB SAN ANTONIO - HVAC SHOP - FSH | 08/23/2021 | 08/23/2021 | 1 | hours | BABIN 8/23/21: UNITS ARE OPERATIONAL. 1 HR | ||
| 1001 | 08/25/2021 | Room Too Warm | JBSA SAM HOUSTON | 1001 | Closed | 3A - High Sustain | 3A - 1001 - WT - HVAC SHOP - FSH - 4TH FLR CONF RM AC INOP - RPR - GOMEZRIVERA - 08/25/21 - SR 2594618 | JB SAN ANTONIO - HVAC SHOP - FSH | 09/18/2021 | 09/18/2021 | 3 | hours | REPAIRED A/C TO CONFRENCE ROOM SUPPLY AIR NOW 57*. MTZ |
| 16 | 08/27/2021 | Other Climate Control Need | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - FSH - RM 220 HAS A LEAK DUE TO CONDENSATION BUILD UP IN INSULATION - RPR - FRANKO - 08/27/21 - SR 2597252 | JB SAN ANTONIO - HVAC SHOP - FSH | 08/30/2021 | 08/31/2021 | 12 | hours | Old Insulation removed and re-insulated duct work. |
| 16 | 08/29/2021 | HVAC Service | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - FSH - A/C IS OUT - REPAIR - KIMBERLY - 08/29/2021 - SR 2598052 | JB SAN ANTONIO - HVAC SHOP - FSH | 08/30/2021 | 09/24/2021 | 2.50 | hours | HVAC RESTORED |
| 16 | 08/30/2021 | HVAC Service | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - FSH - RM 145 HOT - RPR - KIMBERLY - 08/30/21 - SR 2598393 | JB SAN ANTONIO - HVAC SHOP - FSH | 08/30/2021 | 08/30/2021 | 2 | hours | SENT TO SHOP. 08/30/21 / 0708. |
TROUBLESHOOT AND RESOLVED HVAC ISSUE VERIFED OPERATON NO FURTHER ISSUES ARE PRESENT JOB COMPLETE. JT 16 08/30/2021 HVAC Service JBSA SAM HOUSTON 16 Closed 3A - High Sustain 3A - 16 - WT - HVAC SHOP - FSH - RM 146 HOT - RPR - KIMBERLY - 08/30/21 - SR 2598400 JB SAN ANTONIO - HVAC SHOP - FSH 08/30/2021 08/30/2021 2 hours SENT TO SHOP. 08/30/21 / 0708.
TROUBLESHOOT AND RESOLVED HVAC ISSUE VERIFED OPERATON NO FURTHER ISSUES ARE PRESENT JOB COMPLETE. JT 16 08/30/2021 HVAC Service JBSA SAM HOUSTON 16 Closed 3A - High Sustain 3A - 16 - WT - HVAC SHOP - FSH - RM 147 HOT - RPR - KIMBERLY - 08/30/21 - SR 2598414 JB SAN ANTONIO - HVAC SHOP - FSH 08/30/2021 08/30/2021 2 hours SENT TO SHOP. 08/30/21 / 0708.
TROUBLESHOOT AND RESOLVED HVAC ISSUE VERIFED OPERATON NO FURTHER ISSUES ARE PRESENT JOB COMPLETE. JT
| 2028 | 08/30/2021 | HVAC Service | KELLY FIELD ANNEX SITE 1 | 2028 | Closed | 3A - High Sustain | 3A - 2028 - WT - HVAC SHOP - LAK - RM# 142-D, A/C CONDENSATE LEAK - REPAIR - WILLIAM KOCH - 08/30/21 - SR 2598479 | JB SAN ANTONIO - HVAC SHOP - LAK | 08/31/2021 | 08/31/2021 | 0.50 | hours | DRAIN S/U |
| 4012 | 08/30/2021 | HVAC Service | JBSA SAM HOUSTON | 4012 | Closed | 3A - High Sustain | 3A - 4012 - WT - HVAC SHOP - FSH - NO HOT WATER/ADJUST HEATING UNIT - RPR - TROY BROCK - 08/30/21 - SR 2598813 | JB SAN ANTONIO - HVAC SHOP - FSH | 08/27/2021 | 08/27/2021 | 2 | hours | Issue resolve |
| 2418 | 09/01/2021 | HVAC Service | LACKLAND AIR FORCE BASE SITE 1 | 2418 | Closed | 3A - High Sustain | 3A - 2418 - WT - HVAC SHOP - LAK - NO A/C IN MAIN WEIGHT ROOM/CARDIO ROOM - REPAIR - MR RAINEY - 09/01/21 - SR - 2602944 | JB SAN ANTONIO - HVAC SHOP - LAK | 10/18/2021 | 10/18/2021 | 2 | hours | Rap/Ortega - Bad CH-530 BUT in process of buying a new chiller, Complete. |
| 901 | 09/01/2021 | HVAC Service | RANDOLPH AIR FORCE BASE SITE 1 | 901 | Closed | 3A - High Sustain | 3A - 901 - WT - HVAC SHOP - RAN - HVAC Unit D-3, 2nd floor West wing producing cool air making a gurgling sound repair -Goet-9/3/21 -SR 2603140 | JB SAN ANTONIO - HVAC SHOP - RAN | 09/23/2021 | 09/23/2021 | 4 | hours | TROUBLESHOOTING THE PROBLEM. CHANGED BELT, GREASSED BLOWER, NO NOISE |
| 2028 | 09/01/2021 | Room Too Warm | KELLY FIELD ANNEX SITE 1 | 2028 | Closed | 3A - High Sustain | 3A - 2028 - WT - HVAC SHOP - LAK - RM 142D NOT COOLING PROPERTY REF# 10274235 - REPAIR - MR TORRES - 09/01/21 - SR - 2603379 | JB SAN ANTONIO - HVAC SHOP - LAK | 09/02/2021 | 09/02/2021 | 0.50 | hours | ADJUSTED TEMP |
| 2264 | 09/03/2021 | Other Climate Control Need | JBSA SAM HOUSTON | 2264 | Closed | 3A - High Sustain | 3A - 2264 - WT - HVAC SHOP - FSH - AHU3 AND AHU6 INOP - REPAIR - JACK ANDERSON - 09/03/21 - SR 2605486 | JB SAN ANTONIO - HVAC SHOP - FSH | 09/10/2021 | 11/27/2021 | 91.20 | hours | AHU 3 AND 6 ARE OPERATIONAL, COMPLETE JB |
| 4012 | 09/08/2021 | HVAC Service | JBSA SAM HOUSTON | 4012 | Closed | 1-Emergency | 1 - 4012 - WT - HVAC SHOP - FSH - COMPRESSOR UNIT 12 INOP - REPAIR - AROCHA - 09/08/21 - SR 2608600 | JB SAN ANTONIO - HVAC SHOP - FSH | 09/08/2021 | 09/08/2021 | 6 | hours | NOTIFIED CHAIREZ (DIN 1) 9/8/21 0823 -AYMAN; UNIT HAS A BAD COMPRESSOR BOARD. 3A CONVERT TO SHOP |
| 4012 | 09/09/2021 | HVAC Service | JBSA SAM HOUSTON | 4012 | Closed | 3A - High Sustain | 3A - 4012 - WT - HVAC SHOP - FSH - COMPRESSOR UNIT 12 INOP - REPAIR - AROCHA - 09/08/21 - SR 2608600 | JB SAN ANTONIO - HVAC SHOP - FSH | 09/14/2021 | 09/20/2021 | 10 | hours | issue fix |
| 2028 | 09/09/2021 | Room Too Warm | KELLY FIELD ANNEX SITE 1 | 2028 | Closed | 3A - High Sustain | 1 - 2028 - WT - HVAC SHOP LAK - Room 142D NO A/C INOP -REPAIR - JOEL TORRES- 09/9/21 - SR 2610712 | JB SAN ANTONIO - HVAC SHOP - LAK | 09/09/2021 | 09/09/2021 | 3 | hours | Getting a quote for evaporator coil |
| 1001 | 09/10/2021 | Room Too Warm | JBSA SAM HOUSTON | 1001 | Closed | 3A - High Sustain | 3A - 1001 - WT - HVAC SHOP - FSH - ENTIRE 3RD FLOOR, A/C IS INOP - REPAIR - MR.GOMEZRIVERA - .09/09/21 - SR 2611877 | JB SAN ANTONIO - HVAC SHOP - FSH | 09/18/2021 | 09/18/2021 | 1.50 | hours | REPAIRED SYSTEM TO THE THIRD FLOOR. MTZ |
| 1001 | 09/10/2021 | HVAC Service | JBSA SAM HOUSTON | 1001 | Closed | 3A - High Sustain | 3A - 1001 - WT - HVAC SHOP - FSH - 4th deck Air handler belt needs to be replaced along with filters - REPAIR - J.GOMEZRIVERA - 09/10/21 - SR 2611892 | JB SAN ANTONIO - HVAC SHOP - FSH | 09/18/2021 | 09/18/2021 | 3 | hours | Replaced belt and replaced filters. MTZ |
| 2028 | 09/10/2021 | Room Too Warm | KELLY FIELD ANNEX SITE 1 | 2028 | Closed | 3A - High Sustain | 3A - 2028 - WT - HVAC SHOP LAK - Room 142D NO A/C INOP -REPAIR - JOEL TORRES- 09/9/21 - SR 2610712 | JB SAN ANTONIO - HVAC SHOP - LAK | 11/30/2021 | 12/02/2021 | 52 | hours | Rudy/Hilario/Perez - 12/01/2021 - Troubleshooting - Rm 142D No AC, C/O. |
Hilario/Perez - 12/02/2021 - Troubleshooting - Rm 142D No AC, Complete.
| 3742 | 09/10/2021 | HVAC Service | LACKLAND AIR FORCE BASE SITE 1 | 3742 | Closed | 3A - High Sustain | 3A - 3742 - WT - Command Suite ROOMS 128/110/ ALL 2ND FLOOR NO A/C - REPAIR - MR ALVERES - 09/09/21 - SR 2613119 | JB SAN ANTONIO - HVAC SHOP - LAK | 10/27/2021 | 10/27/2021 | 1 | hours | 10/27/2021 - Rap/Ortega - No comments entered, Complete. |
| 3742 | 09/10/2021 | Room Too Warm | LACKLAND AIR FORCE BASE SITE 1 | 3742 | Closed | 3A - High Sustain | 3A - 3742 - WT - HVAC SHOP - LAK - RIGHT SIDE OF BLDG HAS NO A/C - REPAIR - MR PIRACE - 09/09/21 - SR 2613137 | JB SAN ANTONIO - HVAC SHOP - LAK | 10/27/2021 | 10/27/2021 | 1 | hours | 10/27/2021 - Rap/Ortega - No comments entered, Complete. |
| 149 | 09/13/2021 | Other House Keeping Need | JBSA SAM HOUSTON | 149 | Closed | 3A - High Sustain | 3A - 149 - WT - HVAC SHOP - FSH - MOLD CONCERN/INSPECTION REQUEST - REPAIR - ARMAND FERMIN - 09/13/21 - SR 2614083 | JB SAN ANTONIO - HVAC SHOP - FSH | 09/15/2021 | 09/15/2021 | 0.50 | hours | NEED TO CONTACT ABATEMENT TEAM FOR MOLD DIAGNOSIS |
| 4012 | 09/13/2021 | HVAC Service | JBSA SAM HOUSTON | 4012 | Closed | 1-Emergency | 1 - 4012 - WT - HVAC SHOP - FSH - COMPRESSOR UNIT 13, 14 INOP ERROR CODE: LOW VOLTAGE, INVERTER OVERRIDE - REPAIR - ARROCHA - 09/13/21 - SR 2614277 | JB SAN ANTONIO - HVAC SHOP - FSH | 09/13/2021 | 09/13/2021 | 1.50 | hours | NOTIFIED TILLMAN (DIN 1) 09/13/21 AT 1110 - AYMAN |
JOB HAS BEEN COMPLETED
| 2028 | 09/21/2021 | HVAC Service | KELLY FIELD ANNEX SITE 1 | 2028 | Closed | 3A - High Sustain | 3A - 2028 - WT - HVAC SHOP - LAK - RM.162, A/C UNIT OUT,TOO HOT,NO WINDOWS - REPAIR - Joel Torres - 09/23/21 - SR 2624515 | JB SAN ANTONIO - HVAC SHOP - LAK | 09/23/2021 | 09/23/2021 | 0.50 | hours | RESET UNIT |
| 2264 | 09/23/2021 | Pest Control | JBSA SAM HOUSTON | 2264 | Closed | 3A - High Sustain | 3A - 2264 - WT - HVAC SHOP - FSH - TROUBLE SHOOT MIMI SPLITS - RPR - TREJO - 09/23/21 - SR 2628941 | JB SAN ANTONIO - HVAC SHOP - FSH | 09/19/2022 | 09/19/2022 | 0.50 | hours | TROUBLESHOOT AND REPAIRED HVAC EQUIPMENT ENSURED NO FURTHER ISSUES RESIDE JOB COMPLETE. JT |
| 901 | 09/28/2021 | HVAC Service | RANDOLPH AIR FORCE BASE SITE 1 | 901 | Closed | 3B - Medium Sustain | 3B - 901 - WT - HVAC SHOP - RAN - AC SYSTEM HAS INTERMITTENT GURGLING - REPAIR - TODGE SMITH - 09/28/21 - SR 2633921 | JB SAN ANTONIO - HVAC SHOP - RAN | 12/06/2021 | 12/06/2021 | 0.50 | hours | AC INTRMITTENT. REPAIRED |
| 2028 | 09/29/2021 | Room Too Warm | KELLY FIELD ANNEX SITE 1 | 2028 | Closed | 3A - High Sustain | 3A - 2028 - SR - HVAC SHOP - LAK - Room 211 the HVAC is not working - REPAIR - ARCHER - 09/29/21 - SR 2635264 | JB SAN ANTONIO - HVAC SHOP - LAK | 10/21/2021 | 10/21/2021 | 8 | hours | 10-21-2021 - Rudy/Hilario - Need board, MAT, C/O. |
Complete No material required 16 10/06/2021 HVAC Service JBSA SAM HOUSTON 16 Closed 1-Emergency 1 - 16 - WT - HVAC SHOP - FSH - A/C OUT IN RM # 147 SCIF - RPR - FRANCO - 10/06/21 - SR 2646436 JB SAN ANTONIO - HVAC SHOP - FSH 10/06/2021 10/06/2021 4.50 hours DIN1 GOMEZ NOTIFIED 10/06/21 / 1345; RM 147 had to be trouble shot tcw
3A CONVERT TO SHOP TO TROUBLESHOOT
| 16 | 10/07/2021 | HVAC Service | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - FSH - A/C OUT IN RM # 147 SCIF - RPR - FRANCO - 10/06/21 - SR 2646436 | JB SAN ANTONIO - HVAC SHOP - FSH | 10/07/2021 | 03/22/2022 | 129.50 | hours | WARRANTY REPAIRS WERE PERFORMED BY DAIKIN REP JOB COMPLETE |
| 16 | 10/12/2021 | HVAC Service | JBSA SAM HOUSTON | 16 | Closed | 3A - High Sustain | 3A - 16 - WT - HVAC SHOP - FSH - NEW BOILER - RPR - MARTINEZ - 10/12/21 - SR 2650367 | JB SAN ANTONIO - HVAC SHOP - FSH | 10/25/2021 | 12/02/2021 | 34 | hours | EXISTING BOILER WAS REPAIRED. A NEW BOILER IS NOT CRITICAL AT THIS TIME. |
| 100 | 10/13/2021 | Room Too Warm | CHAPMAN TRAINING ANNEX | 100 | Closed | 1-Emergency | 1 - 100 - WT HVAC SHOP LAK - Chapman Medina 1st floor Half area no A/C INOP-repair - Rellin -10/7/21 - SR 2652371 | JB SAN ANTONIO - HVAC SHOP - LAK | 10/13/2021 | 10/13/2021 | 2 | hours | Per Eric & Roemer completed |
| 100 | 10/14/2021 | Room Too Warm | CHAPMAN TRAINING ANNEX | 100 | Closed | 3A - High Sustain | 3A - 100 - WT - HVAC SHOP LAK - 1st floor half bldg. no A/c INOP need amersco to fix ac issue-repair- Mr. Rellin -10/14/21 - SR 2652371 | JB SAN ANTONIO - HVAC SHOP - LAK | 01/13/2023 | 01/13/2023 | 0.20 | hours | SETPOINT ADJUSTED |
| 2028 | 10/15/2021 | Room Too Warm | KELLY FIELD ANNEX SITE 1 | 2028 | Closed | 3A - High Sustain | 3A- 2028 - WT - HVAC SHOP LAK - ROOM 157 NO A/C ADMIN OFFICE NO A/C INOP -REPAIR - MIchael - 10/15/21 - SR 2656331 | JB SAN ANTONIO - HVAC SHOP - LAK | 08/05/2022 | 08/10/2022 | 76 | hours | Rap- switched power from portable to house chiller - everything running normal, follow up 08/10/2022 - C/O 08/09/2022. |
Raymond/Shaw - Removed portable hook ups, C/O, 08/05/2022.
Mike/Roland/Ish - Installed portable chiller plus troubleshooting In house pumps, C/O, 08/05/2022.
Rap/Ish - Troubleshooting chiller, Complete, 08/10/2022.
| 2028 | 10/19/2021 | Room Too Warm | KELLY FIELD ANNEX SITE 1 | 2028 | Closed | 1-Emergency | 1 - 2028 - WT - HVAC SHOP - LAK - 8 OFFICES ARE WITHOUT AC 158A ROOM 1 - 8 - REPAIR - RAMIREZ - 10/19/21 - SR 2660385 | JB SAN ANTONIO - HVAC SHOP - LAK | 10/19/2021 | 10/19/2021 | 4 | hours | Per Eric & Roemer completed | |
| 2028 | 10/20/2021 | Room Too Warm | KELLY FIELD ANNEX SITE 1 | 2028 | Closed | 1-Emergency | 1 - 2028 - WT - HVAC SHOP - LAK - NO AC IN THE BUILDING - REPAIR - RAMIREZ - 10/20/21 - SR 2661275 | JB SAN ANTONIO - HVAC SHOP - LAK | 10/20/2021 | 10/20/2021 | 4 | hours | Eric & Roemer completed clogged drains on vents. | |
| 2418 | 10/20/2021 | Room Too Cold | LACKLAND AIR FORCE BASE SITE 1 | 2418 | Closed | 1-Emergency | 1 - 2418 - WT - HVAC SHOP - LAK - TEMP IS TOO COLD 61 DEGREES - REPAIR - RONNIE - 10/20/21 - SR 2662306 | JB SAN ANTONIO - HVAC SHOP - LAK | 10/20/2021 | 10/20/2021 | 2 | hours | Per Eric & Roemer completed to cold T-STAT reading off by 70% degree repeat for new T-STAT Johnson Controls + Controls shop closed out emer. create a (3A). | |
| 2418 | 10/20/2021 | Room Too Cold | LACKLAND AIR FORCE BASE SITE 1 | 2418 | Closed | 3A - High Sustain | 3A - 2418 - WT - HVAC SHOP - LAK - TEMP IS TOO COLD 61 DEGREES - REPAIR - RONNIE - 10/20/21 - SR 2662306 | JB SAN ANTONIO - HVAC SHOP - LAK | 05/31/2022 | 05/31/2022 | 2 | hours | No Comments Entered. 05/31/2022. | |
| 4012 | 10/22/2021 | HVAC Service | JBSA SAM HOUSTON | 4012 | Closed | 3A - High Sustain | 3A - 4012 - WT - HVAC SHOP - ACU-006 REPLACE CONDENSOR MOTOR CONTROL - RPR - MYERS - 10/22/21 - SR 2664541 | JB SAN ANTONIO - HVAC SHOP - FSH | 09/20/2022 | 09/20/2022 | 4 | hours | ACU-006 IS RUNNING, COMPLETE, HS | |
| 100 | 10/22/2021 | HVAC Service | CHAPMAN TRAINING ANNEX | 100 | Closed | 1-Emergency | 1 - 100 - WT - HVAC SHOP - LAK - A/C is not working in auditorium there will be a commander's call - Repair - TSgt Rellin - 10/22/21 - SR | 2664680 | JB SAN ANTONIO - HVAC SHOP - LAK | 10/22/2021 | 10/22/2021 | 1 | hours | REPLACED T-STAT |
| 4012 | 10/26/2021 | Leaks | JBSA SAM HOUSTON | 4012 | Closed | 1-Emergency | 1 - 4012 - WT - HVAC SHOP - FSH - A/C LEAKING DOWN WALL IN EAST HALLWAY - RPR - BLUE - 10/26/21 - SR 2668279 | JB SAN ANTONIO - HVAC SHOP - FSH | 10/26/2021 | 10/26/2021 | 1 | hours | DIN 1 NOTIFIED GOMEZ 10/26/21 / 1047.; sent to PM shift |
Babin completed
| 4012 | 10/27/2021 | HVAC Service | JBSA SAM HOUSTON | 4012 | Closed | 3A - High Sustain | 3A - 4012 - WT - HVAC SHOP - FSH - HVAC PUDDLE - RPR - SGT BLUE - 10/27/21 - SR 2670050 | JB SAN ANTONIO - HVAC SHOP - FSH | 10/28/2021 | 02/18/2022 | 16.50 | hours | PER GONZALEZ NO WATER LEAK. REPLACED PUMP |
| 2028 | 10/29/2021 | HVAC Service | KELLY FIELD ANNEX SITE 1 | 2028 | Closed | 3A - High Sustain | 3A - 2028 - WT - HVAC SHOP - LAK - MECH RM#1 HEATING BOILER NEEDS PARTS - REPAIR - MR FLORES - 10/29/21 - SR 2673151 | JB SAN ANTONIO - HVAC SHOP - LAK | 05/24/2022 | 06/01/2022 | 3 | hours | INSPECTED BOILER TO DETERMINE WHAT IT NEEDS. |
FOLLOW UP, REPAIRED -R.M.
1001 11/01/2021 HVAC Service JBSA SAM HOUSTON 1001 Closed 1-Emergency 1- 1001 -WT - HVAC SHOP - FSH - 4TH FLOOR NO AC - RPR - WILLIAMS - 11/01/2021 - SR 2675054 JB SAN ANTONIO - HVAC SHOP - FSH 11/01/2021 11/01/2021 2 hours NOTIFED DN I GUTIERREZ BY CELL PHONE 1332N LEFT MESSEGE ON VOICE MAIL
1342 HAND DELIVER TO DN TCW 11/01/2021; COMPLETE
| 4012 | 11/03/2021 | HVAC Service | JBSA SAM HOUSTON | 4012 | Closed | 3A - High Sustain | 3A - 4012 - WT - HVAC SHOP - FSH - CONDENSING UNIT #17 ON ROOFTOP IS INOP - RPR - GONZALES - 11/03/2021 - SR 2678097 | JB SAN ANTONIO - HVAC SHOP - FSH | 12/02/2021 | 12/02/2021 | 1 | hours | Repaired Unit #17, Complete JB |
| 16 | 11/03/2021 | HVAC Service | JBSA SAM HOUSTON | 16 | Closed | 3B - Medium Sustain | 3B - 16 - WT - HVAC SHOP - FSH - REMOVE AND REPLACE BAD FRESH AIR COMPRESSOR - RPR - MARTINEZ - 11/03/21 - SR 2678267 | JB SAN ANTONIO - HVAC SHOP - FSH | 12/02/2021 | 03/01/2022 | 49 | hours | PER MECHANIC, ALL IS REPLACED ON SMALLER AAON UNIT, WORKING 100% |
| 2028 | 11/05/2021 | HVAC Service | KELLY FIELD ANNEX SITE 1 | 2028 | Closed | 3A - High Sustain | 3A - 2028 - WT - HVAC SHOP - LAK - CONDENSATE PUMP IS INOP - REPAIR - MR RAMIREZ - 11/05/21 - SR 2681751 | JB SAN ANTONIO - HVAC SHOP - LAK | 11/22/2021 | 11/22/2021 | 12 | hours | Pulled condensate pump - Cleaned out pump , drain line, & pan - Issue resolved Rudy/Hilario 11/22/2021 |
| 2418 | 11/08/2021 | Room Too Cold | LACKLAND AIR FORCE BASE SITE 1 | 2418 | Closed | 3A - High Sustain | 3A - 2418 - WT - HVAC SHOP - LAK - he AC in our weight room is really cold - REPAIR - REINEY - 11/08/21 - SR 2684531 | JB SAN ANTONIO - HVAC SHOP - LAK | 11/22/2021 | 11/22/2021 | 16 | hours | Found boiler off in alarm - Pulled apart burner & pilot assembly to clean - Heating restored |
| 16 | 11/12/2021 | HVAC Service | JBSA SAM HOUSTON | 16 | Closed | 1-Emergency | 1 - 16 - WT - HVAC SHOP - FSH - E-WING A/C OUT IN MUSEUM - RPR - SMITH - 11/12/21 - SR 2687621 | JB SAN ANTONIO - HVAC SHOP - FSH | 11/12/2021 | 11/12/2021 | 2 | hours | DIN 1 NOTIFIED SALAZAR 11/12/21 0905. Complete. |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .