About this file

This file is a Price Schedule Breakdown Worksheet for a Department of Veterans Affairs project to install an electrical generator at the Fisher House at Audie L. Murphy Hospital in San Antonio, Texas. The contract (Solicitation Number 36C25725R0060) is 100% set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) with a project value between $500,000 and $1,000,000. The project requires installing a new 200 KW electrical generator, including demolition, site preparation, excavation, grading, and associated components, with a performance period of 560 days after Notice to Proceed. The pricing document provides a detailed breakdown by construction divisions, with current line items showing $0.00, suggesting that specific pricing details will be filled in by the contractor. Key compliance requirements include having a current VETS 4212 report, SAM registration, and SBA SDVOSB verification at the time of proposal submission.

View the file

Other files for this federal contract opportunity

Other files attached to Install Electrical Generator Fisher House, newest first.
File Type Posted
36C25725R0060 0004.pdf PDF
36C25725R0060 0003.pdf PDF
Install Electrical Generator at the Fisher House_RFIs.pdf PDF
36C25725R0060 0002.pdf PDF
36C25725R0060 Conformed Through Amendment 0002.pdf PDF
36C25725R0060 0001.pdf PDF
Sign-in Sheet_Site Visit_Install Electrical Generator at the Fisher House.pdf PDF
Attach 2 APPENDIX A DRAWINGS.pdf PDF
Attach 1 SOW Fisher Generator Final.pdf PDF
Attach 3 APPENDIX B SPECIFICATIONS.pdf PDF
Attach 4 PCRA Electrical Gen Fisher House Corrected.pdf PDF
36C25725R0060_1.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

PRICE SCHEDULE BREAKDOWN INSTRUCTIONS
INSTRUCTIONS
1Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary
2The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record.
3The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables.
4Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable.
5All pricing is fixed price.

Proposal Price Schedule

PRICE SCHEDULE BREAKDOWN
671-22-139

Install Electrical Generator Fisher House *instruction provided in the instructions tab

CLIN 0001
RatesBase Item
General Requirements & Facility ConstructionPrice
Division Item 1 General RequirementsN/A$0.00
Division Item 2 Existing ConditionsN/A$0.00
Division Item 3 ConcreteN/A$0.00
Division Item 4 MasonryN/A$0.00
Division Item 5 MetalsN/A$0.00
Division Item 6 Woods, Plastic and CompositesN/A$0.00
Division Item 7 Thermal and Moisture ProtectionN/A$0.00
Division Item 8 OpeningsN/A$0.00
Division Item 9 FinishesN/A$0.00
Division Item 10 SpecialtiesN/A$0.00
Division Item 11 EquipmentN/A$0.00
Division Item 12 FurnishesN/A$0.00
Division Item 13 Special ConstructionN/A$0.00
Division Item 14 Conveying EquipmentN/A$0.00
Facility Services SubgroupN/A$0.00
Division Item 21 Fire SuppressionN/A$0.00
Division Item 22 PlumbingN/A$0.00
Division Item 23 Heating, Ventilating and A/CN/A$0.00
Division Item 25 Integrated AutomationN/A$0.00
Division Item 26 ElectricalN/A$0.00
Division Item 27 CommunicationsN/A$0.00
Division Item 28 Electronic Safety & SecurityN/A$0.00
Site & Infrastructure Subgroup
Division Item 31 EarthworkN/A$0.00
Division Item 32 Exterior ImprovmentsN/A$0.00
Division Item 33 UtilitiesN/A$0.00
Division Item 34 TransportationN/A$0.00
Division Item 35 Waterway & Marine ConstructionN/A$0.00
Process Equipment Subgroup$0.00
Division Item 40 Process InterconnectionsN/A$0.00
Division Item 41 Material Processing & Handling EquipmentN/A$0.00
Division Item 42 Process Heating, Cooling, & Drying EquipmentN/A$0.00
Division Item 43 Process Gas & Liquid HandlingN/A$0.00
Division Item 44 Pollution & Waste Control EquipmentN/A$0.00
Division Item 45 Industry Specific Mfg. EquipmentN/A$0.00
Division Item 46 Water & Wastewater EquipmentN/A$0.00
Division Item 48 Electrical Power GenerationN/A$0.00

TOTAL DIVISIONS $0.00

Insurance / Bonds$0.00
Taxes / Other Fees (provide itemized list)$0.00
O&M Manuals and Red Line Drawings$0.00
Overhead$0.00
SubContract Mark-Up$0.00
Profit$0.00
SubTotals$0.00

Other Items not Requested Above (provide itemized list) $0.00

CONTRACT TOTALS$0.00
TOAL$0.00