This document is a 100% Construction Document set for the Installation of an Electrical Generator at the Fisher House located at the Audie L. Murphy VA Hospital in San Antonio, Texas. The project involves installing a new 200kW diesel-powered emergency generator with a base-mounted fuel tank capable of providing 24 hours of fuel capacity. The generator will serve two existing 208V transfer switches, one for each Fisher House building, and will be housed in a CMU enclosure with a concrete pad, double gate with lock, and wall pack lighting.
The comprehensive design includes electrical site plans, one-line diagrams, structural details, and civil drawings. Key components include a new outdoor-rated panel (GDP), underground conduits for power and communication, a load bank, and an emergency power off switch. The generator system is designed as a separately derived system with proper grounding, and includes provisions for lightning protection. The project number is 671-22-139, with construction documents dated June 17, 2024, and involves consultants from Romanyk Consulting, IMEG Corp, and the U.S. Department of Veterans Affairs.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25725R0060 0004.pdf | ||
| 36C25725R0060 0003.pdf | ||
| Install Electrical Generator at the Fisher House_RFIs.pdf | ||
| 36C25725R0060 Conformed Through Amendment 0002.pdf | ||
| 36C25725R0060 0002.pdf | ||
| Sign-in Sheet_Site Visit_Install Electrical Generator at the Fisher House.pdf | ||
| 36C25725R0060 0001.pdf | ||
| Attach 3 APPENDIX B SPECIFICATIONS.pdf | ||
| Attach 4 PCRA Electrical Gen Fisher House Corrected.pdf | ||
| 36C25725R0060_1.pdf | ||
| Attach 1 SOW Fisher Generator Final.pdf | ||
| Attach 5 Price Breakout Worksheet.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERATOR PROJECT SUMMARY
PROJECT INFORMATION
GENERATOR INSTALLATION:
THE PROJECT INVOLVES SIZING, INSTALLATION LOCATION DETERMINATION AND DESIGN FOR THE INSTALLATION OF A NEW DIESEL POWERED EMERGENCY GENERATOR, GENERATOR ENCLOSURE, FUEL TANK, AN AUTOMATIC TRANSFER SWITCH, LOAD BANK, ANNUNCIATOR PANEL, AND ALL SYSTEMS REQUIRED FOR PROPER OPERATION. THIS INSTALLATION WILL PROVIDE
BACKUP POWER FOR STANDBY POWER SYSTEMS IN THE CASE OF AN UTILITY POWER OUTAGE.
GENERAL NOTES
PROJECT NAME: INSTALLATION OF ELECTRICAL GENERATOR FISHER HOUSE
PROJECT NUMBER: 671-22-139
PROJECT LOCATION: AUDIE L. MURPHY VA HOSPITAL 7400 MERTON MINTER BLVD., SAN ANTONIO, TX
SCOPE OF WORK SUMMARY:
PROJECT TEAMVICINITY MAP
INDEX OF DRAWINGS
AE101
DISCIPLINE: A - ARCHITECTURE
C - CIVIL
E - ELECTRICAL
G - GENERAL
M - MECHANICAL
P - PLUMBING
T - TELECOMMUNICATIONS
SHEET TYPE
DESIGNATOR
SHEET NUMBER
WITHIN SERIES
PROJECT DRAWING INDEX ON SHEET GI101
GENERATOR:
THE DESIGN SCOPE OF WORK IS FOR A NEW 200KW DIESEL FUEL GENERATOR INSTALLATION TO SERVE THE EXISTING FISHER HOUSES. THE GENERATOR WILL BE IN AN OUTDOOR ENCLOSURE ON A CONCRETE PAD WITH A BASE MOUNTED FUEL TANK.
THE BASE MOUNTED FUEL STORAGE TANK WILL BE PROVIDED FOR A MINIMUM 24 HOURS OF FUEL CAPACITY. THE GENERATOR WILL BE PREPARED TO SERVE (2) SEPARATE 208V TRANSFER SWITCHES, ONE FOR EACH BUILDING. TRANSFER SWITCHES ARE
EXISTING.
EXISTING UNDERGROUND CONDUITS WILL BE UTILIZED FOR NEW FEEDERS FROM THE GENERATOR PANEL GBP TO THE EXISTING ATS'S. NEW PULLBOXES WILL BE INSTALLED FOR GENERATOR POWER FEEDERS TO THE ATS'S AND TO THE FISHER HOUSES. NEW OUTDOOR RATED PANEL GDP WILL BE PROVIDED FOR POWER LIGHTING, RECEPTACLES, AND HEATER/CHARGER IN THE GENERATOR. PANEL GDP WILL BE FED FROM THE MAIN PANEL IN FISHERHOUSE 2.
CMU ENCLOSURE WILL BE PROVIDED FOR THE GENERATOR AND LOAD BANK. DOUBLE GATE WITH LOCK WILL BE PROVIDED
FOR THE ENCLOSURE. GENERATOR AND LOAD BANK WILL BE PROVIDED WITH CONCRETE PADS.
WALL PACK LIGHTING FIXTURES WILL BE INSTALLED ALONG CMU WALLS TO LIGHT GENERATOR AREA, CONTROLLED BY AN
ON/OFF LIGHT SWITCH.
GENERATOR
FISHER HOUSE I
VON SCHEELE DRIVE →
COMPASS BANK
LIST OF DRAWING SHEETS
GI100
AS100
AE100
S000 S001
C100 C101 C102 C103 C104
E-001
ES100
ES101
E-500
SHEET INDEX, GENERAL INFORMATION, & VICINITY MAP
ARCHITECTURAL SITE PLAN
ENLARGED PLAN, ELEVATIONS, SECTIONS & DETAILS
GENERAL NOTES
PLAN AND DETAILS
EXISTING CONDITIONS & DEMO PLAN
OVERALL SITE PLAN LAYOUT
SITE PLAN
TYPICAL SECTIONS PLAN
GRADING & EROSION CONTROL PLANS
ELECTRICAL LEGEND, NOTES, & ABBREVIATIONS
ELECTRICAL SITE PLAN
ELECTRICAL ENLARGED SITE PLAN
ELECTRICAL ONE-LINE DIAGRAMS
POWER OUTAGES AND TEMPORARY POWER NEEDS:
1. CONTRACTOR SHALL NOTIFY COR MINIMUM 14 DAYS PRIOR TO ANY POWER OUTAGES DURING CONSTRUCTION.
2. CONTRACTOR SHALL COORDINATE WITH COR FOR DATE AND TIME OF POWER INTERRUPTION TO THE FISHER HOUSE.
3. CONTRACTOR SHALL PREPARE AND INSTALL EQUIPMENT, CONDUITS, AND FEEDERS FIRST PRIOR TO ANY POWER INTERRUPTION. CUSTOMER AND CONNECT FEEDERS SHALL BE THE LAST STEP TO MINIMIZE DOWNTIME.
4. IF CONTRACTOR DETERMINES EXTENDED POWER OUTAGE IS NEEDED, PROVIDE TEMPORARY FEEDER OR GENERATOR AS
REQUIRED. A TEMPORARY GENERATOR EQUAL TO THE REQUIRED LOAD SHALL BE PROVIDED.
SHEET # SHEET TITLE1. THESE DRAWINGS SHALL BE USED ONLY FOR THIS SPECIFIC PROJECT/SITE LOCATION. THESE DRAWINGS ARE A COMPOSITE SET OF CONTRACT DOCUMENTS AND SHALL NOT BE SEPARATED FOR DISTRIBUTION. THE GC SHALL
REVIEW ALL DRAWINGS AND PROVIDE/DISTRIBUTE THE ENTIRE SET TO EACH SUBCONTRACTOR.
2. THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF THE DRAWINGS AND THE PROJECT MANUAL.
CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THESE DRAWINGS, THE PROJECT MANUAL, AND IMMEDIATELY NOTIFY THE DESIGN PROFESSIONAL OF ANY INCONSISTENCIES THAT ARE DISCOVERED.
3. DO NOT SCALE THE DRAWINGS. REQUEST ANY MISSING DIMENSIONS FROM THE A/E.
4. ALL WORK PERFORMED SHALL BE IN STRICT COMPLIANCE WITH GOVERNING FEDERAL, STATE AND LOCAL BUILDING
CODE REQUIREMENTS, SHALL BE EXECUTED IN ACCORDANCE WITH ACCEPTED INDUSTRY STANDARDS, AND SHALL CONFORM TO SPECIFIC REGULATIONS AS MANDATED BY THE OWNER, THE ARCHITECT, ENGINEER AND THE AUTHORITIES HAVING JURISDICTION. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ANY FEES ASSOCIATED WITH PROCURING SUCH PERMITS AND CERTIFICATES AND SHALL FURNISH COPIES OF PERMITS, INSPECTIONS, AND
CERTIFICATES TO THE OWNER.
5. THE GENERAL CONTRACTOR SHALL COORDINATE ALL WORK TO MINIMIZE DISRUPTION OF ANY EXISTING TENANTS OR BUILDING OPERATIONS. THE GENERAL CONTRACTOR SHALL TAKE ADEQUATE PRECAUTIONS TO PROTECT BUILDING OCCUPANTS, MATERIALS, AND EXISTING CONSTRUCTION THROUGHOUT ALL PHASES OF CONSTRUCTION.
DAMAGE TO EXISTING-TO-REMAIN CONSTRUCTION OR EQUIPMENT SHALL BE RESTORED TO ORIGINAL CONDITION AT
THE CONTRACTOR'S EXPENSE.
6. THE GENERAL CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE JOB SITE ON A DAILY BASIS.
7. ANY REQUESTS FOR SUBSTITUTIONS OF ANY SPECIFIED ITEM ARE TO BE SUBMITTED TO THE ARCHITECT IN WRITING
AND WILL BE CONSIDERED ONLY IF THE ALTERNATE PROPOSED IS PROVEN TO BE ADVANTAGEOUS TO THE OWNER
WITH RESPECT TO DELIVERY DATE, QUALITY, OR COST.
8. THE MEANS AND METHODS OF CONSTRUCTION, AND TEMPORARY STRUCTURES AND FACILITIES, ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE A/E DOES NOT ASSUME ANY RESPONSIBILITY FOR THE
CONTRACTOR'S MEANS AND METHODS OR FOR TEMPORARY STRUCTURES.
9. DEMOLITION OF EXISTING STRUCTURES IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE CONTRACTOR
SHALL EMPLOY ENGINEERING EXPERTISE AS NEEDED TO ASSIST IN DEMOLITION.
10. JOB SITE SAFETY AND SECURITY ARE THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE GENERAL CONTRACTOR SHALL CONSULT WITH CAMPUS AND LOCAL FIRE AUTHORITIES TO ASCERTAIN REQUIREMENTS FOR FIRE SUPPRESSION AND SAFETY DURING CONSTRUCTION. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE
FOR MEETING OSHA REGULATIONS DURING CONSTRUCTION.
11. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR STORAGE AND PROTECTION OF BUILDING MATERIALS, AND INSTALLED CONSTRUCTION, FROM INCLEMENT WEATHER, THEFT, AND OTHER HAZARDS. THE GC SHALL FOLLOW ALL MANUFACTURER'S RECOMMENDATIONS FOR STORAGE OF MATERIALS. PARTIALLY COMPLETED WALLS SHALL BE COVERED TO PROTECT FROM WATER INTRUSION. DAMAGE, INCLUDING BUT NOT LIMITED TO MOLD, RESULTING FROM WATER INTRUSION DURING CONSTRUCTION SHALL BE REPAIRED AT THE GENERAL
CONTRACTOR'S EXPENSE.
12. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY OF WORK, AS DETERMINED BY THE
GOVERNMENT, SHALL BE PROVIDED.
13. THE GC SHALL BE RESPONSIBLE FOR COORDINATING THE INSTALLATION OF NEW UTILITIES WITH EXISTING
ADJACENT UTILITIES.
14. ANY WORK NOT SHOWN ON THE DRAWINGS, BUT CONSIDERED NECESSARY FOR THE COMPLETION OF THE WORK IN
A PROPER MANNER SHALL BE PROVIDED BY THE GC WITHOUT ADDITIONAL CHARGE.
15. WHERE PRESENT WORK IS DAMAGED IN THE EXECUTION OF THE CONTRACT OR WHERE OPENINGS ARE LEFT DUE TO THE REMOVAL OF PIPES, CONDUITS, CABLE TRAYS, EQUIPMENT OR APPARATUS, REPAIR OR CLOSE UP CORRESPONDING MATERIAL FINISH OF THE ADJOINING WORK WHERE DAMAGE IS NOT REPAIRABLE. NEW ITEMS OR
EQUIPMENT SHALL BE PROVIDED.
16. CONTRACTOR TO COORDINATE WITH THE COR FOR QUESTIONS REGARDING SITE ACCESS OF WORKERS, MATERIAL
DISPOSAL AND HOURS OF OPERATION.
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING AND VERIFYING DIRECTLY WITH THE COR REGARDING ANY OWNER DESIRED CHANGES TO THE NUMBERING SYSTEM AND/OR NAMING CONVENTION, LABELING AND/OR IDENTIFICATION FOR (OR ON) THE ELECTRICAL PANELS, MECHANICAL EQUIPMENT, FIRE ALARM
SYSTEMS/PANELS, SIGNAGE, ETC.
FISHER HOUSE II
W
U R
ZB
A
C H
R O
A D
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/3 2"
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
G ra p h ic S ca le
/2
0"
Romanyk Consulting Focusing on what matters
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
8910 7 6 5 4 3 2 1
Project Number
Building Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered Drawing Number of
VA FORM 08 - 6231
FISHER HOUSE
SAN ANTONIO,
TX
U.S. Department of Veterans Affairs
R :\R om an yk C on su lti ng
\R C
C A
E C
P ro je ct s\
V A
\V
IS
N \V
\S
A T
X -6
C
7- In st E le cG en -F
H -R ed es ig n\
D es ig n\
M od el s\
S A
T X
F
IS
H E
R H
O U
S E
G E
N R
E D
E S
IG
N
V
.r vt 6/
/2
8:
:2
A M
COVER SHEET
GF DC
100% CONSTRUCTION
DOCUMENTS
671-22-139INSTALLATION OF ELECTRICAL
GENERATOR FISHER HOUSE
REDESIGN
JUNE 17, 2024
GI100
VA MEDICAL CENTER SAN ANTONIO, TEXAS
PROJECT ADDRESS: VA MEDICAL CENTER SAN ANTONIO, TEXAS
100% CONSTRUCTION DOCUMENTS
JUNE 17, 2024
VA PROJECT NUMBER: 671-22-139
INSTALLATION OF ELECTRICAL GENERATOR FISHER HOUSE
REDESIGN
CONTRACTING OFFICER REPRESENTATIVE(COR):
Department of Veteran Affairs Audie L. Murphy VA Hospital 7400 Merton Minter Blvd., San Antonio, TX 78229
Michael Agwu Michael.Agwu2@va.gov
210.993.2061
ELECTRICAL ENGINEER:
Romanyk Consulting Corp.
3308 Preston Road, Suite 350-164 Plano, Texas 75093
Jeffrey Koehler, PE, PMP, LEED AP Jeffrey.koehler@RomanykConsulting.com
855-424-3838 x315
262.930.0903 cell
OWNER:
Department of Veteran Affairs Audie L. Murphy VA Medical Center 7400 Merton Minter Blvd., San Antonio, TX 78229
Tailor Brown tailor.brown2@va.gov
CIVIL ENGINEER:
IMEG CORP.
1717 State Street Suite 201 Bettendorf, IA 52722
Jason Holdorf Jason.L.Holdorf@imegcorp.com
563.823.6035
PROJECT ARCHITECT:
Romanyk Consulting Corp.
3308 Preston Road, Suite 350-164 Plano, Texas 75093
Gary Friedman, AIA gary.friedman@RomanykConsulting.com
855.424.3838 x311
720.989.8588 cell
STRUCTURAL ENGINEER:
IMEG CORP.
15 Sunnen Drive Suite 104 St. Louis, MO 63143
Katie Goldberg SE, PE, LEED AP katie.m.goldberg@imegcorp.com
314.951.2538
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.comRevisions: Date:
GENERAL NOTES:
MILESTONE GUIDLINES:
CODE & LIFE SAFETY NOTES
AE100
AE100
AE100
AE100
AE100
FLAG POLE
APPROXIMATE LOCATION OF REMOTE
ANNUNCIATOR PANEL IN BUILDING.
COORDINATE EXACT LOCATION WITH COR.
REF: ELECTRICAL DWGS
PROPERTY LINE
SETBACK
BOUNDARY
EXISTING BILLBOARD
TO REMAIN
NEW SIDEWALK TO BE
INSTALLED (ROUGHLY 290 SF).
REF: CIVIL & STRUCTURAL DWGS
APPROXIMATE ELECTRICAL PULLBOX
LOCATION (FIELD VERIFY).
REF: ELECTRICAL DWGS
W U
R
ZB
A C
H R
O
AD
CONSTRUCTION SITE
AREA BOUNDARY
A
TS
PB
PB
EXISTING UNDERGROUND
CONDUIT.
REF: ELECTRICAL DWGS
A
TS
VON SCHEELE DRIVE
EXISTING METER RACK
BY FISHER HOUSE
TWO (2) EXISTING 400A ATS'S
FOR FISHER HOUSE CONNECT.
REF: ELECTRICAL DWGS
EXISTING UNDERGROUND
CONDUIT.
REF: ELECTRICAL DWGS
FISHER HOUSE II
FISHER HOUSE I
APPROXIMATE LOCATION OF MAIN PANEL.
COORDINATE EXACT LOCATION WITH COR.
GRADING AND GENERATOR
ENCLOSURE SLAB.
REF: CIVIL DWGS
TRUE NORTH
PLAN NORTHNORTH
1. IBC (2021) 9.1.3.1, EMERGENCY GENERATORS AND STANDY POWER SYSTESMS
SHALL BE INSTALLED, TESTED AND MAINTAINED IN ACCORDANCE WITH NFPA 110.
2. INC (2021) 9.1.3.2, NEW GENERATOR CONTROLLERS SHALL BE MONITORED BY
THE FIRE ALARM SYSTEM OR AT AN ATTENDED LOCATION.
3. REFER TO NFPA 110 (2022) 7.2.2, FOR OUTDOOR EPS INSTALLATION.
4. THE GENERAL CONTRACTOR'S SCHEDULE SHOULD INCLUDE BUT NOT LIMITED TO
THE FOLLOWING:
THE CONTRACTOR SHALL PROVIDE ALL REQUIRED CONSTRUCTION
SAFETY BARRIERS, SIGNAGE APPROVED BY THE COR BEFORE
CONSTRUCTION COMMENCES PER CODE IBC (2021) CHAPTER 22
SAFEGUARDS DURING CONSTRUCTION 3302.1 AND 1007.3.5.
5. MAINTAIN ACCESS TO ALL EXISTING BUILDINGS & UTILITIES. ANY UTILITY
SHUTDOWN TO BE COORDINATED WITH THE COR AND PROVIDE AN ADVANCED
NOTICE.
1. GC SCHEDULE, LAYDOWN AND WORK AREA COORDINATED WITH THE COR.
2. VENDOR SHOP DRAWINGS.
3. GC SITE MOBILIZATION.
4. DEMOLITION OF SIDEWALK, TREE REMOVAL, EARTHWORK, GRADING AND
TRENCHING REQUIRED ELECTRICAL WORK AND GENERATOR ENCLOSURE SLAB /
FOUNDATION.
5. POUR FOOTING AND GENERATOR SLAB / PAD. INSTALLATION OF UNDERGROUND
UTILITIES ON SITE AND ENCLOSURE.
6. CONSTRUCT CMU GENERATOR ENCLOSURE AND COORDINATE / ROUGH-IN AND
LIGHTS, PANEL BOX, ETC.
7. DELIVERY AND INSTALLATION OF EQUIPMENT, LIGHTNING PROTECTION /
GROUNDING, LIGHTS AND ELECTRICAL PANELS IN GENERATOR ENCLOSURE.
8. GENERATOR HOOK UP TO FISHER HOUSE ELECTRICAL ROOM WITH NEW PANEL
AND ANNUNCIATOR PANEL INSTALLED.
9. REGRADE SITE AREA REQUIRED BY PROJECT SCOPE, PROVIDE NEW SIDEWALK.
10. COMMISSIONING AND TESTING.
11. REMOVE CONSTRUCTION BARRIERS, FULL SITE USE.
CODES AND LIFE SAFETY STANDARDS:
2021 NFPA 101 NATIONAL FIRE PROTECTION ASSOCIATION LIFE SAFETY
CODE WITH THE EXCEPTION OF NFPA 5000 AND NFPA
900.
2021 IBC INTERNATIONAL BUILDING CODES.
2023 NEC NATIONAL ELECTRIC CODE.
2022 NFPA 110 STANDARD FOR EMERGENCY STANDBY POWER
SYSTEMS.
OSHA OCCUPATIONAL, SAFETY AND HEALTH
ADMINISTRATION STANDARDS.
11/1/2022 ABAAS ARCHITECTURE BARRIERS ACT ACCESSIBILITY
STANDARDS INCLUDING VA SUPPLEMENTAL BARRIER-
FREE DESIGN GUIDE (PG-18-13).
BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE, AMERICAN CONCRETE INSTITUTE AND
COMMENTARY (ACI-318).
APPLICABLE VA DESIGN STANDARDS AND CRITERIA:
PG-18-3 – DESIGN AND CONSTRUCTION PROCEDURES.
PG-18-15 A/E DESIGN SUBMISSIONS REQUIREMENTS.
OFFICE OF CONSTRUCTION AND FACILITIES MANAGEMENT, TECHNICAL
INFORMATION LIBRARY (TIL). THE DESIGN WILL COMPLY WITH THE MOST
CURRENT VERSION OF THE VA SUSTAINABLE DESIGN MANUAL AT TIME OF
AWARD FOUND ON THE VA TECHNICAL LIBRARY.
https://www.cfm.va.gov/til/sustain.asp
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/3 2"
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
G ra p h ic S ca le
/2
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
Sprinklered
E
D
C
B
A
F
FISHER HOUSE
SAN, ANTONIO
TX
R :\R om an yk C on su lti ng
\R C
C A
E C
P ro je ct s\
V A
\V
IS
N \V
\S
A T
X -6
C
7- In st E le cG en -F
H -R ed es ig n\
D es ig n\
M od el s\
S A
T X
F
IS
H E
R H
O U
S E
G E
N R
E D
E S
IG
N
V
.r vt 6/
/2
8:
:2
A M
ARCHITECTURAL SITE PLAN
GF DC
100% CONSTRUCTION
DOCUMENTS
671-22-139INSTALLATION OF ELECTRICAL
GENERATOR FISHER HOUSE
REDESIGN
VA MEDICAL CENTER SAN ANTONIO, TEXAS
JUNE 17, 2024
AS10015 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com
1" = 20'-0"
ARCHITECTURAL SITE PLAN
Revisions: Date:
GENERATOR ENCLOSURE NOTES:
AE100
Sim
CAST STONE CAP
DRIP THRU WALL FLASHING,
BOTH SIDES
8"X8"X16" CMU
REF: STRUCTURAL DWGS
SLOPED SLAB ON GRADE
REF: STRUCTURAL DWGS
T.O. FINISHED GRADE
REF: CIVIL DWGS
FREE DRAINING GRANULAR FILL
REF: STRUCTURAL DWGS
8' - 4"
CONT BOND BEAM
REF: STRUCTURAL DWGS
1/2" EXPANSION JOINT MATERIAL
REF: STRUCTURAL DWGS
EXTERIOR: FINISH CMU FACE
INTERIOR: CMU FACE
METAL DRIP EDGE
CELL FLASHING
EQUIPMENT PAD
REF: STRUCTURAL DWGS
0' - 4"
PRECAST CONCRETE CAP
DRIP
8"X8"X16" CMU
SLOPE SLOPE
DRIP THRU WALL FLASHING,
BOTH SIDES
STAINLESS STEEL DOWEL W/ SEALANT
AROUND PENETRATIONS THROUGH
WALL FLASHING
0' - 1"0' - 1 1/2"
0' - 1"
0' - 5" 0' - 5"
Level 1 0' - 0"
8' - 4"
28' - 8"
CAST STONE CAP
8"X8"X16"
FINISHED GRADE
4" CONCRETE CURB
Level 1 0' - 0"
CAST STONE CAP
8"X8"X16"
BOLLARD
FINISHED GRADE
8' - 4"
SWING GATE
16' - 8"
STEEL TUBE
10' - 0"
3' - 0"
EQ EQ
MAX0' - 6"
1' - 2"
0' - 8"
4" CONCRETE CURB
Level 1 0' - 0"
16' - 8"
8' - 4"
CAST STONE CAP
8"X8"X16"
FINISHED GRADE
4" CONCRETE CURB
Level 1 0' - 0"
8' - 4"
28' - 8"
CAST STONE CAP
8"X8"X16"
FINISHED GRADE
4" CONCRETE CURB
Level 1 0' - 0"
AE100
Sim28' - 8"
ELECTRICAL PANEL
REF: ELECTRICAL DWGS
8' - 4"
20' - 11"
LIGHTING
REF: ELECTRICAL DWGS
1' - 6"
9' - 0" 9' - 0" EQEQ
Level 1 0' - 0"
AE100
Sim
6' - 0"
16' - 8"
8' - 4"
LIGHTING
REF: ELECTRICAL DWGS
0' - 5"
8"X8"X16" CMU
PAINTED BREAK METAL CAP
2"X2"X1/8" STEEL TUBE FRAME,
FULLY WELDED, PAINTED
1' - 2"
SPRING BOLT
6"X2" STEEL TUBE WITH LOCK
1/4" STEEL PLATE WELDED
TO FRAME.
1 1/2" 18 GA. METAL DECK.
ATTACH TO FRAME W/ #10
SMS 8" O.C., MAX.
HINGE
2"X6"X3/16" STEEL TUBE W/
ENDS CAPPED, PTD. BOTTOM
TO HAVE DRAIN HOLES.
1/2" DIA. F1554-36 HEADED
ANCHOR AT TOP, BOTTOM,
AND MIDDLE OF WALL.
GROUT FILLED CELLS.
REF: STRUCTURAL DWGS
EXTERIOR: FINISH CMU FACEINTERIOR: CMU FACE
10' OPENING
0' - 2"
0' - 2"
CAST STONE CAP
8"X8"X16" CMU BEYOND
SLOPED SLAB ON GRADE
REF: STRUCTURAL DWGS
T.O. FINISHED GRADE
REF: CIVIL DWGS
FREE DRAINING GRANULAR FILL
REF: STRUCTURAL DWGS
EXTERIORINTERIOR
1/2" EXPANSION JOINT MATERIAL
REF: STRUCTURAL DWGS
0' - 6"
1/4" STEEL PLATE WELDED
TO FRAME
2"X2"X1/8" STEEL TUBE, PAINTED
1 1/2" GA. METAL DECK, ATTCH
TO FRAME W/ #10 SMS @ 8" O.C. MAX
PAINTED BREAK METAL CAP
EQUIPMENT PAD
REF: STRUCTURAL DWGS
8' - 4"
0' - 4"
0' - 6"
EQ
0' - 8"
EQ
4" CONCRETE CURB
MIN. DIA.
1' - 3"
MIN.3' - 0"
MIN.3' - 0"
MIN.0' - 6"
MIN. DIA.
0' - 6"
MIN. 6" DIA. STEEL PIPE
FILLED WITH CONCRETE
CONCRETE FOOTER *
FINISHED GRADE
5' - 6"
5' - 6"
16' - 8"
AE100
AE100
28' - 8"
4' - 4"
3' - 0"
3' - 1 1/2"
F R
O N
T /F
U E
L
IN
T A
K E
P A
IR
O
F
'-0 D
O O
R S
' O P
E N
IN
G
SLOPED CONCRETE SLAB (1/8"/1'-0")
REF: STRUCTURAL DWGS
LIGHTING
REF: ELECTRICAL DWGS
8"X8"X16" CMU
4" CONCRETE EQUIPMENT PAD
REF: STRUCTURAL & CIVIL DWGS
+L P
+H P
DIESEL GENERATOR
REF: ELECTRICAL DWGS
UNDERGROUND CONDUIT ROUTES
REF: ELECTRICAL DWGS
EXISTING BILLBOARD
SLOPE
BOLLARD
SLOPE
SLOPE
SLOPE
S
LO
P E
S
LO
P E
S
LO
P E
S
LO
P E
AE100
Sim
AE100
Sim
AE100
Sim
LOAD BANK
REF: ELECTRICAL DWGS
1' - 7"
1' - 7"
1' - 6"
4' - 2 1/4"
7' - 2"
12' - 3"
3' - 9 1/2"
4' - 8"
4' - 8"
1. BLOCK (CMU) BASIS OF DESIGN PRODUCT SELECTED BY THE COR THAT
MATCHES FISHER HOUSE BRICK (BEST BLOCK SOUTH TEXAS SPLIT FACE - (4)
ANTIQUE BRASS).
2. WYTHE CMU SYSTEMS (BASE AND OR PAN FLASHING WITH DRIP OR WEEP,
POLYESTER MESH DRAINAGE MAT AT CELLS, ETC.
3. INTEGRAL WATER REPELLENT ADMIXTURES IN BOTH THE GROUT AND MORTAR
TO COMPLY WITH NCMA TEK 19-17 AND ASTM C 1384.
4. SURFACE APPLIED CLEAR WATER REPELLENT PER CMU MANUFACTURE
REQUIREMENTS.
5. CMU COURSING PER STANDARD MODULAR UNITS AND CORNER/END CONDITIONS
PER MANUFACTURER STANDARD SIZE AND SHAPE GUIDELINES.
6. PROVIDE LOCK AT DOORS, COORDINATE WITH VA STANDARDS.
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/3 2"
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
G ra p h ic S ca le
/2
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
Sprinklered
E
D
C
B
A
F
FISHER HOUSE
SAN, ANTONIO
TX
R :\R om an yk C on su lti ng
\R C
C A
E C
P ro je ct s\
V A
\V
IS
N \V
\S
A T
X -6
C
7- In st E le cG en -F
H -R ed es ig n\
D es ig n\
M od el s\
S A
T X
F
IS
H E
R H
O U
S E
G E
N R
E D
E S
IG
N
V
.r vt 6/
/2
8:
:2
A M
ENLARGED PLAN, ELEVATIONS, SECTIONS, &
DETAILS.
GF DC
100% CONSTRUCTION
DOCUMENTS
671-22-139INSTALLATION OF ELECTRICAL
GENERATOR FISHER HOUSE
REDESIGN
VA MEDICAL CENTER SAN ANTONIO, TEXAS
JUNE 17, 2024
AE10015 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com
1" = 1'-0"
MASONRY ENCLOSURE SECTION
3" = 1'-0"
MASONRY WALL CAP DETAIL
1/4" = 1'-0"
WEST ELEVATION
1/4" = 1'-0"
NORTH ELEVATION
1/4" = 1'-0"
SOUTH ELEVATION
1/4" = 1'-0"
EAST ELEVATION
1/4" = 1'-0"
SECTION 1
1/4" = 1'-0"
SECTION 2
1" = 1'-0"
ENCLOSURE JAMB DETAIL
1" = 1'-0"
SWING GATE SECTION
1" = 1'-0"
PERMANENT BOLLARD DETAIL
1/4" = 1'-0"
ENLARGED PLAN
STRUCTURAL ABBREVIATION KEY
ABBR: DESCRIPTION:
NUMBER OR POUNDS
AT
DEGREE
DIAMETER
EXISTING
ANCHOR BOLT
ARCHITECT, -URE, -URAL
BOTTOM OF
BEAM FLANGE WIDTH
BRACE FRAME
BEAM
BOUNDARY NAILING
BOTTOM
BETWEEN
COLD FORM STEEL FRAMING
CENTER OF GRAVITY OF THE TENDON
COMPLETE JOINT PENETRATION WELD
CLEAR
CENTERLINE
CONCRETE MASONRY UNIT
COLUMN
CONCRETE
CONNECTION
CONSTRUCTION
CONTINUOUS
COORDINATION
DIAMETER
DEAD LOAD
DETAIL
DRAWING
DOWEL
EACH
EACH FACE
EFFECTIVE
ELEVATION
ELECTRICAL
EMBEDMENT
EDGE NAILING
EDGE OF DECK
EDGE OF SLAB
EQUAL
EQUIPMENT
ETCETERA
EACH WAY
EXPANSION
EXTERIOR
CONCRETE COMPRESSIVE STRENGTH
FOUNDATION
FIELD NAILING
FOOT
FOOTING
YIELD STRESS
GAGE OR GAUGE
GALVANIZED
GLULAM BEAM
GIRDER TRUSS
HORIZONTAL
HEADED STUD ANCHOR
HIGH STRENGTH BOLT
JOINT
KILOPOUND (1,000 POUNDS)
KIPS PER SQUARE FOOT
KIPS PER SQUARE INCH
LENGTH
POUNDS
LIVE LOAD
LONG LEG HORIZONTAL
LONG LEG VERTICAL
LONGITUDINAL
LONG SIDE HORIZONTAL
LONG SIDE VERTICAL
LIGHTWEIGHT
MAXIMUM
MECHANICAL
MANUFACTURER
MINIMUM
NOT IN CONTRACT
NOT TO SCALE
ON CENTER
OPPOSITE HAND
OPENING
ORIENTED STRAND BOARD
POUNDS PER CUBIC FOOT
PENTHOUSE
PARTIAL JOINT PENETRATION WELD
PLATE
POUNDS PER LINEAR FOOT
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
POST-TENSION, -ED, -ING
RADIUS
REINFORCING, -MENT, -ED
REQUIRED
ROOF TOP UNIT
SLIP CRITICAL
SCHEDULE
SEISMIC FORCE-RESISTING SYSTEM
SIMILAR
SNOW LOAD
SHEET METAL SCREW
SPACE(S)
SPECIFICATION(S)
SQUARE
STIFFENER
STEEL
SYMMETRICAL
TOP AND BOTTOM
TOP OF
PRE-TENSIONED BOLT
TEMPERATURE
BEAM FLANGE THICKNESS
THICK
TRANSVERSE
TYPICAL
UNLESS OTHERWISE NOTED
VERTICAL
VERIFY IN FIELD
WITH
WORK POINT
WEIGHT
WELDED WIRE REINFORCING
(E) A.B.
ARCH
B.O.
bf
BF
BM
B.N.
BOTT
BTWN
CFSF
CGS
CJP
CLR
CL
CMU
COL
CONC
CONN
CONST
CONT
COORD
DIA
DL
DET
DWG
DWL
EA
EF
EFF
EL
ELEC
EMBED
E.N.
EOD
EOS
EQ
EQUIP
ETC
EW
EXP
EXT
f 'c
FDN
F.N.
FT
FTG
Fy
GA
GALV
GLB
GT
HORIZ
HSA
HSB
JT
K, KIP
KSF
KSI
L
LBS
LL
LLH
LLV
LONG.
LSH
LSV
LT WT
MAX
MECH
MANUF
MIN
NIC
NTS
OC
OH
OPNG
OSB
PCF
P.H.
PJP
PL
PLF
PSF
PSI
PT
R
REINF
REQD
RTU
SC
SCHED
SFRS
SIM
SL
S.M.S.
SP
SPECS
SQ
STIFF
STL
SYM
T&B T.O.
TC
TEMP
tf
THK
TRANS
TYP
UON
VERT
VIF
w/
WP
WT
WWR
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/3 2"
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
G ra p h ic S ca le
/2
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
Sprinklered
E
D
C
B
A
F
FISHER HOUSE
SAN ANTONIO,
TX
C :\R e vi t L o ca l F ile s\ S
.0
V
A S
A T
X G
E N
E R
A T
O R
P A
D C
W a lte r.
H
.L e w is
.r vt
/1
/2
:1
:5
P
M
GENERAL NOTES
KMG SNP
100% CONSTRUCTION
DOCUMENTS
671-22-139INSTALLATION OF ELECTRICAL
GENERATOR FISHER HOUSE
VA MEDICAL CENTER SAN ANTONIO, TEXAS
JUNE 17, 2024
SS-00015 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com
DESIGN CRITERIA
1. STRUCTURE HAS BEEN DESIGNED TO COMPLY WITH:
IBC 2021
ASCE 7-16
ACI 318-19
2. RISK CATEGORY
3. SEISMIC:
SEISMIC DESIGN CATEGORY A
IMPORTANCE FACTOR 1.50
SOIL CLASS C
Ss 0.102 g
S1 0.028 g
Sds 0.081 g
Sd1 0.032 g
SEISMIC FORCE RESISTING SYSTEM REINFORCED MASONRY WALLS
4. WIND:
BASIC WIND SPEED V ULT = 120 MPH
IMPORTANCE FACTOR 1.15
EXPOSURE CLASS C
GENERAL
1. STRUCTURAL SUBSTITUTIONS MAY BE ALLOWED WITH THE APPROVAL OF THE
STRUCTURAL ENGINEER. SUPPLIER SHALL PROVIDE SEALED DESIGN CALCULATIONS OR
SUITABLE PRODUCT LITERATURE FOR THE COMPONENTS.
2. ALL DIMENSIONS AND SITE CONDITIONS SHALL BE VERIFIED BY THE CONTRACTOR AT THE
JOBSITE PRIOR TO CONSTRUCTION, START OF SHOP DRAWINGS, START OF
CONSTRUCTION, AND/OR FABRICATION OF MATERIALS. IF DISCREPANCIES ARE
ENCOUNTERED, OR CONDITIONS DEVELOP THAT ARE NOT COVERED BY THE CONTRACT
DOCUMENTS, THE ARCHITECT SHALL BE NOTIFIED FOR CLARIFICATION.
3. CONTRACTOR SHALL PROVIDE AND BE RESPONSIBLE FOR THE PROTECTION AND REPAIR
OF ADJACENT EXISTING SURFACES AND AREAS WHICH MAY BE DAMAGED AS A RESULT OF
NEW WORK.
4. STRUCTURAL DRAWINGS INCLUDE DESIGN REQUIREMENTS AND DIMENSIONS FOR
STRUCTURAL INTEGRITY BUT DO NOT SHOW ALL DETAIL DIMENSIONS TO FIT INTRICATE
ARCHITECTURAL AND MECHANICAL DETAILS. CONTRACTOR SHALL SO CONSTRUCT THE
WORK SO IT WILL CONFORM TO THE CLEARANCES REQUIRED BY ARCHITECTURAL,
MECHANICAL AND ELECTRICAL DESIGN.
5. ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSIDERED TO BE
CONSTRUCTION STANDARDS. IF CLARIFICATION IS REQUIRED, THE CONTRACTOR SHALL
NOTIFY THE ARCHITECT PRIOR TO PROCEEDING WITH THE WORK.
6. DO NOT SCALE DRAWINGS. PRINTED DIMENSIONS HAVE PRECEDENCE OVER SCALED
DRAWINGS AND LARGE-SCALE OVER SMALL-SCALE DRAWINGS. CONTRACTOR TO
DETERMINE FINAL DIMENSION WITH ARCHITECT.
7. TYPICAL DETAILS SHALL APPLY TO SITUATIONS OCCURRING ON THE PROJECT THAT ARE
THE SAME OR SIMILAR TO THOSE SPECIFICALLY REFERENCED. WHERE NO DETAILS ARE
GIVEN, CONSTRUCTION SHALL BE AS SHOWN FOR SIMILAR WORK.
8. THE CONTRACT DOCUMENTS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT
INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL
MEASURES NECESSARY TO PROTECT THE STRUCTURE AND SAFETY OF WORKMEN
DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO,
BRACING AND SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT, ETC.
OBSERVATION VISITS TO THE SITE BY THE ARCHITECT OR STRUCTURAL ENGINEER SHALL
NOT INCLUDE INSPECTION OR APPROVAL OF THE ABOVE ITEMS AND DO NOT IN ANY WAY
RELIEVE THE CONTRACTOR OF THEIR RESPONSIBILITIES FOR THE ABOVE.
9. SEE ARCHITECTURAL, ELECTRICAL AND MECHANICAL DRAWINGS FOR DETAILS,
CONDITIONS, PITS, TRENCHES, PADS, DEPRESSIONS, ROOF/FLOOR OPENINGS, STAIRS,
SLEEVES, ITEMS TO BE EMBEDDED OR ATTACHED TO STRUCTURAL ELEMENTS, ETC., NOT
SHOWN ON THE STRUCTURAL DRAWINGS.
10. ESTABLISH AND VERIFY ALL OPENINGS AND INSERTS FOR MECHANICAL, ELECTRICAL AND
PLUMBING WITH APPROPRIATE TRADE CONTRACTORS. OPENING SIZES AND LOCATIONS
SHOWN FOR DUCTS, PIPE, INSERTS AND OTHER PENETRATIONS WHEN SHOWN ARE FOR
GENERAL INFORMATION ONLY AND SHALL BE VERIFIED PRIOR TO FORMING.
11. NO HOLES, NOTCHES, BLOCK-OUTS, ETC. ARE ALLOWED IN STRUCTURAL ELEMENTS
UNLESS SPECIFICALLY DETAILED ON THE STRUCTURAL DRAWINGS OR APPROVED BY THE
STRUCTURAL ENGINEER.
12. PENETRATIONS SHALL BE CAST-IN-PLACE AND SHALL NOT BE PERMITTED EXCEPT AS
SHOWN IN THE STRUCTURAL DRAWINGS.
13. BEFORE SUBMITTING A PROPOSAL FOR THIS WORK, [ENGR NOTE: EACH PARTY SHALL
VISIT THE PREMISES AND BECOME FULLY ACQUAINTED WITH CONDITIONS IN FIELD,
TEMPORARY CONSTRUCTION REQUIRED, QUANTITIES AND TYPE OF EQUIPMENT, ETC. THE
PROPOSAL SHALL INCLUDE ALL SUMS REQUIRED TO DO THE WORK.
SUBMITTALS
1. SUBMITTALS ARE:
a. CONCRETE MIX DESIGNS
b. CONCRETE AND MASONRY REINFORCING
2. SUBMITTALS SHALL BE REVIEWED AND COORDINATED PRIOR TO SUBMITTING TO THE
ARCHITECT. EACH SHOP DRAWING SUBMITTED SHALL BE STAMPED INDICATING REVIEW
BY THE CONSTRUCTION MANAGER/GENERAL CONTRACTOR AND REVIEW BY THE
ARCHITECT SHALL NOT BEGIN UNTIL THIS IS COMPLETE. WORK SHALL NOT BEGIN
WITHOUT REVIEW BY THE ARCHITECT/STRUCTURAL ENGINEER.
3. SUBMITTALS SHALL BE REVIEWED BY THE ARCHITECT/STRUCTURAL ENGINEER FOR
GENERAL CONFORMANCE WITH DESIGN CONCEPT ONLY. NOTATIONS MADE BY THE
ARCHITECT/STRUCTURAL ENGINEER ON THE SHOP DRAWINGS DOES NOT RELIEVE THE
CONTRACTOR FROM COMPLYING WITH THE REQUIREMENTS OF THE DRAWINGS.
4. FOR ADDITIONAL INFORMATION ON REQUIRED SUBMITTALS, SEE INDIVIDUAL MATERIAL
SECTIONS.
EARTHWORK
1. FOUNDATION DESIGN IS BASED ON THE GEOTECHNICAL REPORT DATED JANUARY 20, 2012
BY RABAKISTNER FOR THE ADJACENT BUILDING. REPORT IS ON FILE WITH THE
ARCHITECT.
2. SOIL PROPERTIES PER THE GEOTECHNICAL REPORT:
ALLOWABLE NET SOIL BEARING PRESSURE:
FOOTINGS 2500 PSF
ANTICIPATE DEPTH TO ALLOWABLE SOIL BEARING 1.5 FT BELOW EXISTING GRADE
3. ALL EXCAVATIONS SHALL BE PROPERLY AND SAFELY BACKFILLED. DO NOT PLACE
BACKFILL BEHIND RETAINING/BASEMENT WALLS BEFORE CONCRETE HAS ATTAINED
SPECIFIED COMPRESSIVE STRENGTH. CONTRACTOR SHALL BRACE OR PROTECT ALL
WALLS BELOW GRADE FROM LATERAL LOADS UNTIL SUPPORTING FLOORS ARE
COMPLETELY IN PLACE AND HAVE ATTAINED 7-DAY STRENGTH MINIMUM. BACKFILLING IS
NOT PERMITTED FOR FOUNDATION WALLS UNTIL SUPPORTED SLAB TOP AND BOTTOM IS
IN PLACE OR THE WALL IS ADEQUATELY BRACED TO RESIST LATERAL LOADS.
CONTRACTOR SHALL PROVIDE FOR DESIGN, PERMITS, AND INSTALLATION OR SHORING
AND/OR SHEETING.
4. CONTRACTOR SHALL PROVIDE FOR DE-WATERING OF EXCAVATIONS FROM SURFACE
WATER, GROUND WATER OR SEEPAGE. FREE GROUND WATER WAS NOT ENCOUNTERED
IN THE BORINGS. DETAILS OF GROUND WATER INFORMATION CAN BE OBTAINED FROM
THE ABOVE-MENTIONED GEOTECHNICAL REPORT. IF GROUND WATER SHOULD OCCUR
DURING EXCAVATION, SPECIAL PROCEDURES SHALL BE IMPLEMENTED AS
RECOMMENDED BY THE GEOTECHNICAL ENGINEER.
5. CARE SHALL BE EXERCISED WHEN EXCAVATING OR GRADING ADJACENT TO EXISTING
STRUCTURES OR IMPROVEMENTS TO NOT DAMAGE OR UNDERMINE FOUNDATIONS,
WALLS, SLABS, UTILITIES, ETC.
6. CONTRACTOR SHALL INVESTIGATE SITE DURING CLEARING AND EARTHWORK
OPERATIONS FOR FILL MATERIAL OR BURIED STRUCTURES SUCH AS CESSPOOLS,
CISTERNS AND FOUNDATIONS. IF ANY SUCH MATERIAL OR STRUCTURES ARE FOUND,
ARCHITECT/ENGINEER SHALL BE NOTIFIED IMMEDIATELY. ALL ABANDONED FOUNDATIONS,
UTILITIES AND OTHER STRUCTURES THAT INTERFERE WITH NEW CONSTRUCTION SHALL
BE REMOVED.
7. ALL FOOTINGS AND SLABS ON GRADE SHALL BE PLACED ONTO FIRM UNDISTURBED SOIL
OR CONTROLLED COMPACTED FILL, REMOVING ANY EXISTING FILL, ORGANIC MATERIAL,
OR UNSUITABLE SOILS, AS RECOMMENDED BY THE GEOTECHNICAL REPORT. EXPOSED
NATURAL SOIL SHALL BE PROOF ROLLED BELOW SLABS ON GRADE.
8. FOUNDATION ELEVATIONS SHOWN DESIGNATE A MINIMUM DEPTH WHERE AN ADEQUATE
SOIL BEARING PRESSURE IS EXPECTED. FOOTINGS, PIERS AND/OR WALLS SHALL BE
LOWERED OR EXTENDED AS REQUIRED TO REACH SOIL MEETING THE DESIGN BEARING
PRESSURE.
9. THE MOISTURE CONTENT OF ONSITE CLAYEY SOILS AT THE TIME OF COMPACTION SHALL
BE BETWEEN 2-3% ABOVE OPTIMUM MOISTURE CONTENT.
11. SHALLOW FOUNDATION EXCAVATIONS SHOULD BE OBSERVED BY THE GEOTECHNICAL
ENGINEER PRIOR TO PLACEMENT OF REINFORCING STEEL AND CONCRETE. IF SOFT
POCKETS OF SOIL ARE ENCOUNTERED IN THE FOUNDATION EXCAVATIONS, THEY SHOULD
BE REMOVED AND REPLACED WITH COMPACTED NON-EXPANSIVE FILL MATERIAL OR LEAN
CONCRETE UP TO THE DESIGN FOUNDATION BEARING ELEVATION.
REINFORCING STEEL
1. ALL REINFORCING STEEL SHALL BE DETAILED AND PLACED IN CONFORMANCE WITH THE
AMERICAN CONCRETE INSTITUTE “ACI DETAILING MANUAL” (SP-066) EXCEPT AS
OTHERWISE SHOWN, NOTED OR SPECIFIED.
2. CONCRETE REINFORCING STEEL SHALL BE HIGH STRENGTH NEW BILLET STEEL
CONFORMING TO THE FOLLOWING STANDARDS:
DEFORMED BARS ASTM A615, GR 60 Fy = 60 KSI
WELDED WIRE REINFORCING ASTM A1064 Fy = 65 KSI
STEEL WIRE ASTM A1064 Fy = 60 KSI
DEFORMED BAR ANCHORS ASTM A1064 Fy = 70 KSI
3. MINIMUM CONCRETE COVER SHALL BE PROVIDED AS FOLLOWS TO THE OUTERMOST
REINFORCING BARS:
CAST AGAINST AND PERMANENTLY IN CONTACT WITH GROUND 3”
EXPOSED TO WEATHER OR IN CONTACT WITH GROUND
#6 BARS OR LARGER 2”
#5 BARS OR SMALLER 1 1/2”
4. SUPPORTS FOR REINFORCEMENT SHALL HAVE CLASS 2 PROTECTION AS DEFINED IN THE
CRSI MANUAL OF STANDARD PRACTICE, UNLESS OTHERWISE NOTED.
5. ALL WELDED WIRE REINFORCING (WWR) SHALL BE LAPPED 2 PANELS AT EDGES AND
ENDS.
6. CONTINUOUS HORIZONTAL REINFORCING SHALL BE LAPPED AT MIDSPAN FOR TOP BARS
AND DIRECTLY OVER SUPPORTS FOR BOTTOM BARS. AT DISCONTINUOUS ENDS, THE TOP
STEEL SHALL BE BENT DOWN 12 BAR DIAMETERS OR 12” MINIMUM, WHICHEVER IS
GREATER.
7. WHERE REINFORCEMENT LENGTH IS SPECIFIED, NO SPLICES ARE PERMITTED WITHIN THE
SPECIFIED LENGTH WITHOUT APPROVAL BY THE STRUCTURAL ENGINEER.
8. DOWELS BETWEEN FOOTINGS AND WALLS SHALL BE THE SAME GRADE, SIZE AND
SPACING OR NUMBER AS THE VERTICAL REINFORCING, RESPECTIVELY, UNLESS
OTHERWISE NOTED. PROVIDE FOUNDATION DOWELS TO MATCH SIZE AND SPACING OF
WALL OR COLUMN REINFORCEMENT. EXTEND DOWELS A LAP SPLICE LENGTH INTO WALL
OR COLUMN AND TERMINATE WITH STANDARD HOOK AT BOTTOM OF FOOTING, UNLESS
OTHERWISE NOTED.
9. CUTTING OF REINFORCING WHICH CONFLICTS WITH EMBEDDED OBJECTS OR SLEEVES IS
NOT ACCEPTABLE.
10. REINFORCING BARS SHALL BE BENT COLD, AND NO METHOD OF FABRICATION SHALL BE
USED WHICH WOULD BE INJURIOUS TO THE MATERIAL. HEATING OF BARS FOR BENDING IS
NOT PERMITTED.
11. FIELD WELDING OR BENDING OF REINFORCING IS NOT PERMITTED EXCEPT AS INDICATED
ON THE DRAWINGS OR AS APPROVED BY THE STRUCTURAL ENGINEER.
12. USE TEMPLATES TO SET ALL EMBEDDED ANCHOR BOLTS, LEVELING PLATES, AND DOWEL
BARS AS REQUIRED OR INDICATED ON THE DRAWINGS.
13. SUBMIT SHOP DRAWINGS FOR FABRICATION AND PLACEMENT OF REINFORCING STEEL.
INCLUDE SCHEDULES AND DIAGRAMS OF BENT BARS AND SHOW ARRANGEMENT OF
REINFORCEMENT, INCLUDING CONCRETE COVER. STRUCTURAL ENGINEER’S REVIEW WILL
BE FOR COMPLIANCE WITH DESIGN REQUIREMENTS. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR VERIFYING DIMENSIONS AND QUANTITIES.
14. ALL CONCRETE NOT OTHERWISE SPECIFIED SHALL BE REINFORCED TO THE MINIMUM
REQUIREMENT OF ACI 318.
15. REINFORCE ALL ARCHITECTURAL CONCRETE TOPPING SLABS WITH 6x6-W1.4xW1.4 WWR
UNLESS OTHERWISE NOTED.
25. THE PROPOSED MATERIALS AND MIX DESIGN SHALL BE FULLY DOCUMENTED AND
REVIEWED BY THE TESTING AGENCY. RESPONSIBILITY FOR OBTAINING THE REQUIRED
DESIGN STRENGTH IS THE CONTRACTOR’S. SUBMIT TEST DATA ON EACH PROPOSED MIX
FOR REVIEW IN ACCORDANCE WITH THE APPLICABLE CODE. MIX DESIGNS SUBMITTED
WITHOUT THE REQUIRED TEST DATA WILL BE RETURNED WITHOUT REVIEW.
MASONRY
1. CMU CONSTRUCTION SHALL BE PERFORMED IN ACCORDANCE WITH ACI 530/530.1 TMS
402/602 “BUILDING CODE REQUIREMENTS AND SPECIFICATION FOR MASONRY
STRUCTURES”.
2. MINIMUM 28-DAY COMPRESSIVE STRENGTHS FOR CMU CONSTRUCTION SHALL BE:
DESIGN ASSEMBLY STRENGTH, f’m 2000 PSI
INDIVIDUAL CONCRETE MASONRY UNITS 2800 PSI
GROUT 2000 PSI
3. CMU MATERIALS SHALL CONFORM TO THE FOLLOWING STANDARDS:
CONCRETE MASONRY UNITS ASTM C90, NORMAL WEIGHT
MORTAR ASTM C270, TYPE N
GROUT ASTM C476
JOINT REINFORCING ASTM A82
4. WIRE REINFORCING PER ASTM A82 FOR SINGLE-WYTHE CMU WALLS, CMU CAVITY WALLS,
AND MULTI-WYTHE COMPOSITE CMU WALLS SHALL BE HOT-DIP GALVANIZED PER ASTM
A153, CORROSION RESISTANT HORIZONTAL JOINT REINFORCING WITH THE FOLLOWING
GAUGE AND VERTICAL SPACING:
RUNNING BOND 9 GA @ 16” OC (ALL WIDTHS)
OTHER THAN RUNNING BOND 9 GA @ 16” OC (6”-8” WIDTH) 9 GA @ 8” OC
(10”-16” WIDTH)
5. ALL LOAD BEARING CMU WALLS TO HAVE FULL MORTAR BED, HEAD, AND COLLAR JOINTS.
6. GROUT SOLID ALL JAMBS FULL HEIGHT IN LOAD BEARING CMU WALLS TO UNDERSIDE OF
LINTEL PLUS ONE CELL BEYOND BEARING LENGTH.
7. PROVIDE MINIMUM 1 INCH GROUT BETWEEN MAIN REINFORCING AND/OR BOLTS AND CMU
UNIT FACE. VERTICAL REINFORCEMENT SHALL BE CENTERED IN WALL, UNLESS
OTHERWISE NOTED. VERTICAL REINFORCING BARS SHALL SECURELY BE HELD IN
POSITION BY WIRE TIES OR OTHER APPROVED MEANS TO ENSURE DESIGN LOCATION AND
LAP. PLACE BARS AND LAP PRIOR TO GROUTING.
8. HORIZONTAL BOND BEAM AND VERTICAL REINFORCING SHALL BE CONTINUOUS UNLESS
OTHERWISE NOTED.
9. CELLS SHALL BE IN VERTICAL ALIGNMENT. DOWELS IN FOOTINGS SHALL BE SET TO ALIGN
WITH VERTICAL REINFORCING STEEL.
10. ALL CELLS CONTAINING REINFORCING SHALL BE FILLED SOLID WITH GROUT.
11. GROUT CELLS SOLID IN ALL WALLS, UNLESS OTHERWISE NOTED. GROUT IN 4’-0” MAXIMUM
LIFTS.
12. LIFTS OF GROUT SHALL BE KEYED 1 1/2 INCHES INTO THE PREVIOUS COURSE BELOW.
13. HORIZONTAL BAR REINFORCEMENT SHALL BE FULLY EMBEDDED IN GROUT IN AN
UNINTERRUPTED POUR.
14. EXCEPT FOR WALL PILASTERS, VERTICAL REINFORCEMENT SHALL BE FIELD CUT FOR 4’-0”
LIFTS AND LAP SPLICED PER LAP LENGTH SCHEDULE.
15. COORDINATE ANY UNIDENTIFIED PIPE OR DUCT PASSING THROUGH STRUCTURAL CMU
WALLS WITH TYPICAL DETAILS, UNLESS OTHERWISE NOTED.
16. SEE ARCHITECTURAL DRAWINGS FOR SURFACE AND HEIGHT OF UNITS, LAYING PATTERN,
AND JOINT TYPE. ALL BLOCK SHALL BE LAID IN RUNNING BOND, UNLESS OTHERWISE
NOTED.
10. ANY REQUIRED IMPORT FILL SOIL SHALL HAVE A LOW POTENTIAL FOR EXPANSION AND
SHALL BE APPROVED BY THE GEOTECHNICAL ENGINEER PRIOR TO IMPORTING.
IV
Revisions: Date:
16. BAR SPLICES SHALL BE PROVIDED WHERE INDICATED ON THE DRAWINGS. ALL SPLICES
SHALL BE CLASS 'B' AS DEFINED IN ACI 318. IF SPLICE LENGTH IS NOT GIVEN ON THE
DRAWINGS, PROVIDE LAP LENGTH (IN INCHES) AS FOLLOWS:
3000 PSI CONCRETE 4000 PSI CONCRETE
BAR SIZE OTHER TOP OTHER TOP
#3
#4
#5
#6
LAP LENGTHS ASSUME CLEAR SPACING BETWEEN BARS OF 2 BAR DIAMETERS, AND
A MINIMUM COVER OF 1 BAR DIAMETER. FOR DEVELOPMENT LENGTHS, DIVIDE BY
1.3. TOP BARS ARE DEFINED AS HORIZONTAL BARS WITH MORE THAN 1'-0" OF
FRESH CONCRETE BELOW.
CAST-IN-PLACE CONCRETE
1. ALL CONCRETE WORK SHALL CONFORM TO THE CORRESPONDING EDITION OF THE
AMERICAN CONCRETE INSTITUTE PUBLICATIONS: ACI 117, ACI 301, ACI 305.1, ACI 306.1, ACI
308.1, ACI 318 AND SP-066, UNLESS OTHERWISE NOTED.
2. CONCRETE MATERIALS SHALL CONFORM TO:
CEMENT ASTM C150, TYPE I OR II
FLY ASH ASTM C618, TYPE C OR F
FINE AND COARSE AGGREGATE ASTM C33
WATER POTABLE
AIR-ENTRAINING ADMIXTURE ASTM C260
WATER REDUCING ADMIXTURE ASTM C494
3. CONCRETE STRENGTHS SHALL CONFORM TO:
INTENDED USE STRENGTH (PSI) EXPOSURE
CLASS
FOOTINGS 3000 N/A
FOUNDATIONS 4000 N/A
SLAB ON GRADE 4000 N/A
UNLESS OTHERWISE NOTED 4000 N/A
NORMAL-WEIGHT 28-DAY STRENGTH UNLESS OTHERWISE NOTED.
4. THE MODULUS OF ELASTICITY OF ALL CONCRETE SHALL EXCEED 57,000 SQRT(f’c) FOR NORMAL-WEIGHT CONCRETE OR wc1.5 33 SQRT(f’c).
5. DRYPACK OR GROUT SHALL HAVE A MINIMUM 28-DAY STRENGTH OF 7000 PSI.
6. CROSS REFERENCE ARCHITECTURAL AND STRUCTURAL DRAWINGS TO ENSURE PROPER
DIMENSIONS AND PLACEMENT OF ALL ANCHOR BOLTS, INSERTS, NOTCHES, AND EDGES
OF WALLS/FOUNDATIONS PRIOR TO PLACING CONCRETE.
7. UNLESS OTHERWISE NOTED, ALL FOOTINGS SHALL BE CENTERED UNDER WALLS.
8. CONSTRUCTION JOINTS SHALL BE THOROUGHLY ROUGHENED TO 1/4” AMPLITUDE BY
SAND BLASTING OR MECHANICAL MEANS. CLEAN BEFORE POUR. LOCATION TO BE
APPROVED BY THE STRUCTURAL ENGINEER. SUBMIT LOCATION PLAN OF ALL PROPOSED
JOINTS NOT INDICATED ON DRAWINGS FOR APPROVAL PRIOR TO BEGINNING WORK.
9. PRIOR TO PLACING CONCRETE, THE CONTRACTOR SHALL ENSURE ALL REINFORCING AND
EMBEDMENTS, INCLUDING COLUMN ANCHOR BOLTS, ARE PROPERLY LOCATED AND
SECURELY TIED IN PLACE.
10. PROVIDE SLEEVES FOR PLUMBING AND ELECTRICAL PENETRATIONS THROUGH
CONCRETE BEFORE PLACING. SECURE SLEEVES TO PREVENT MOVEMENT DURING
PLACING OPERATIONS. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR LOCATIONS.
11. CONFIRM WITH ARCHITECT THAT MATERIALS TO BE EMBEDDED ARE SUITABLE FOR
EMBEDMENT IN CONCRETE.
12. CONDUIT, PIPES, AND SLEEVES EMBEDDED IN CONCRETE SHALL CONFORM TO
REQUIREMENTS OF ACI 318, SECTIONS 20.7 AND 26.8.
13. DO NOT PLACE VERTICAL CONDUIT IN CONCRETE COLUMNS WITHOUT APPROVAL OF THE
STRUCTURAL ENGINEER.
14. NO ALUMINUM SHALL BE ALLOWED IN THE CONCRETE WORK UNLESS COATED TO
PREVENT ALUMINUM-CONCRETE REACTION.
15. PROJECTING CORNERS OF HOUSEKEEPING PAD SHALL BE FORMED WITH A 3/4 INCH
CHAMFER, UNLESS OTHERWISE NOTED ON ARCHITECTURAL DRAWINGS.
16. CONCRETE SHALL NOT BE PERMITTED TO DROP MORE THAN 5 FEET.
17. IF CONCRETE IS PLACED BY PUMPING, SUPPORT SHALL BE PROVIDED FOR THE HOSE. THE
HOSE SHALL NOT BE ALLOWED TO RIDE ON THE REINFORCING AND OTHER EMBEDDED
ITEMS.
18. CONCRETE SLABS SHALL BE CURED BY KEEPING CONTINUOUSLY WET FOR 7 DAYS.
FORMS FOR CONCRETE WALLS SHALL BE LEFT IN PLACE FOR 7 DAYS OR MAY BE
STRIPPED AFTER 3 DAYS AND COATED WITH AN APPROVED CURING COMPOUND.
19. NO LOADS SHALL BE PLACED ON STRUCTURAL CONCRETE SLABS WITHIN 7 DAYS AFTER
CONCRETE IS PLACED. AFTER CONCRETE IS PLACED, IN NO CASE SHALL THE
SUPERIMPOSED CONSTRUCTION LOADS BE GREATER THAN SPECIFIED DESIGN LIVE
LOADS, UNLESS THE WORK IS SHORED.
20. CONTRACTOR SHALL SURVEY ALL CONCRETE WORK WITHIN 48 HOURS OF PLACING
CONCRETE TO ENSURE PLACEMENT IS IN ACCORDANCE WITH PROJECT REQUIREMENTS.
21. CORING OF CONCRETE IS NOT PERMITTED UNLESS APPROVED BY THE STRUCTURAL
ENGINEER.
22. NO CONCRETE SHALL BE PLACED ONTO OR AGAINST SUBGRADES CONTAINING FREE
WATER, FROST, ICE OR SNOW.
23. DURING WINTER CONSTRUCTION, ALL FOOTINGS SHALL BE PROTECTED FROM FROST
PENETRATION UNTIL THE BUILDING IS ENCLOSED AND TEMPORARY HEAT IS PROVIDED.
24. GENERAL CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR SIZE, LOCATION AND HEIGHT
OF MECHANICAL EQUIPMENT PADS ON CONCRETE AND SLAB-ON-GRADE.
17. BAR SPLICES SHALL BE PROVIDED WHERE INDICATED ON THE DRAWINGS. IF SPLICE
LENGTH IS NOT GIVEN ON THE DRAWINGS, PROVIDE LAP LENGTHS (IN INCHES) AS
FOLLOWS EXCEPT BARS LARGER THAN #9 SHALL BE MECHANICALLY SPLICED:
MINIMUM LAP SPLICE LENGTH
BAR SIZE
f'm = 2000 PSI
#3
#4
#5
#6
8" CMU
TMS 402/602-16/ACI 530
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/3 2"
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
G ra p h ic S ca le
/2
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
Sprinklered
E
D
C
B
A
F
FISHER HOUSE
SAN ANTONIO,
TX
C :\R e vi t L o ca l F ile s\ S
.0
V
A S
A T
X G
E N
E R
A T
O R
P A
D C
W a lte r.
H
.L e w is
.r vt
/1
/2
:1
:5
P
M
TESTING AND INSPECTION SCHEDULES
KMG SNP
100% CONSTRUCTION
DOCUMENTS
671-22-139INSTALLATION OF ELECTRICAL
GENERATOR FISHER HOUSE
VA MEDICAL CENTER SAN ANTONIO, TEXAS
JUNE 17, 2024
SS-00115 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com
Revisions: Date:
TESTING, INSPECTIONS, AND OBSERVATIONS
1. THE STRUCTURAL ENGINEER DOES NOT PROVIDE INSPECTIONS OF CONSTRUCTION. STRUCTURAL ENGINEER MAY MAKE PERIODIC OBSERVATIONS OF THE CONSTRUCTION. SUCH OBSERVATIONS SHALL NOT REPLACE REQUIRED INSPECTIONS BY THE GOVERNING AUTHORITIES OR SERVE AS “SPECIAL INSPECTIONS” AS MAY BE REQUIRED BY CHAPTER 17 OF THE INTERNATIONAL BUILDING CODE.
2. SEE ARCHITECTURAL, CIVIL, MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS OR SPECIFICATIONS FOR TESTING AND INSPECTION
REQUIREMENTS OF NON-STRUCTURAL COMPONENTS.
3. DUTIES OF THE INSPECTION AGENCY PER IBC CHAPTER 17:
a. SUBMIT A PROPOSED TESTING AND INSPECTION PROGRAM TO THE OWNER, THE ARCHITECT AND THE STRUCTURAL ENGINEER FOR REVIEW AND
APPROVAL AT LEAST TWO WEEKS PRIOR TO COMMENCEMENT OF WORK.
b. PERFORM ALL TESTING AND INSPECTION REQUIRED PER APPROVED TESTING AND INSPECTION PROGRAM.
c. FURNISH INSPECTION REPORT TO THE BUILDING OFFICIAL, THE OWNER, THE ARCHITECT, STRUCTURAL ENGINEER AND THE GENERAL CONTRACTOR. THE REPORTS SHALL BE COMPLETED AND FURNISHED WITHIN 48 HOURS OF INSPECTED WORK.
d. SUBMIT A FINAL SIGNED REPORT STATING WHETHER THE WORK REQUIRING SPECIAL INSPECTION WAS, TO THE BEST OF THE SPECIAL INSPECTION
AGENCY’S KNOWLEDGE, IN CONFORMANCE WITH THE APPROVED PLANS AND SPECIFICATIONS.
4. SPECIAL INSPECTIONS AND TESTS ARE REQUIRED FOR MATERIALS AND SYSTEMS REQUIRED TO BE INSTALLED IN ACCORDANCE WITH ADDITIONAL MANUFACTURER’S INSTRUCTIONS THAT PRESCRIBE REQUIREMENTS NOT CONTAINED IN CHAPTER 17 OF THE IBC OR IN STANDARDS REFERENCED BY
THE IBC. THESE ITEMS INCLUDE:
a. POST-INSTALLED ANCHORS - INSPECTION
5. THE FOLLOWING WORK SHALL BE INSPECTED BY THE SPECIAL INSPECTOR UNLESS SPECIFICALLY WAIVED BY THE BUILDING OFFICIAL.
VERIFICATION AND INSPECTION TASK CONTINUOUS PERIODIC MATERIAL STD
REFERENCE
IBC
REFERENCE
CONCRETE CONSTRUCTION
1. INSPECT REINFORCEMENT, INCLUDING PRESTRESSING TENDONS, AND VERIFY
PLACEMENT
X ACI 318: CH 20,
25.2, 25.3, 26.2.1-26.6.3
1908.4
2. MATERIAL IDENTIFICATION OF REINFORCING (TYPE/GRADE) X AISC 341: TABLE
J9.1
3. REINFORCING STEEL HAS NOT BEEN REBENT IN THE FIELD X AISC 341: TABLE
J9.1
4. REINFORCING STEEL HAS BEEN TIED AND SUPPORTED AS REQUIRED X AISC 341: TABLE
J9.1
5. REINFORCING STEEL CLEARANCES HAVE BEEN PROVIDED X AISC 341: TABLE
J9.1
6. INSPECT ANCHORS CAST IN CONCRETE X ACI 318: 17.8.2
7. INSPECT ANCHORS POST-INSTALLED IN HARDENED CONCRETE MEMBERS:
a. ADHESIVE ANCHORS INSTALLED IN HORIZONTALLY OR UPWARDLY INCLINED
ORIENTATIONS TO RESIST SUSTAINED TENSION LOADS
X ACI 318: 17.8.2.4
b. MECHANICAL ANCHORS AND ADHESIVE ANCHORS NOT DEFINED IN 9.a X ACI 318: 17.8.2
8. VERIFY USE OF REQUIRED DESIGN MIX X ACI 318: CH 19,
26.4.2, 26.4.4
1904.1, 1904.2, 1908.2, 1908.3
9. PRIOR TO CONCRETE PLACEMENT, FABRICATE SPECIMENS FOR STRENGTH TESTS,
PERFORM SLUMP AND AIR CONTENT TESTS, AND DETERMINE THE TEMPERATURE OF
THE CONCRETE
X ASTM C172, ASTM
C31, ACI 318: 26.5,
26.12
1907.10
10. INSPECT CONCRETE PLACEMENT FOR PROPER APPLICATION
TECHNIQUES
X ACI 318: 26.5 1908.6, 1908.7,
1908.8
11. VERIFY MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND TECHNIQUES X ACI 318:
26.5.3-26.5.5
1908.9
12. INSPECT FORMWORK FOR SHAPE, LOCATION, AND DIMENSIONS OF THE CONCRETE
MEMBER BEING FORMED
X ACI 318: 26.11.2(b)
VERIFICATION AND INSPECTION TASK CONTINUOUS PERIODIC TMS 402 TMS 602
MASONRY CONSTRUCTION - LEVEL 1
1. PRIOR TO CONSTRUCTION:
a. VERIFICATION OF COMPLIANCE OF SUBMITTALS X ART. 1.5
VERIFICATION AND INSPECTION TASK CONTINUOUS PERIODIC MATERIAL STD
REFERENCE
IBC
REFERENCE
SOILS
1. VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE ADEQUATE TO ACHIEVE
THE DESIGN BEARING CAPACITY
X
2. VERIFY EXCAVATIONS ARE EXTENDED TO PROPER DEPTH AND HAVE REACHED
PROPER MATERIAL
X
3. PERFORM CLASSIFICATIONS AND TESTING OF COMPACTED FILL MATERIAL X
4. VERIFY USE OF PROPER MATERIALS, DENSITIES, AND LIFT THICKNESSES DURING
PLACEMENT AND COMPACTION OF COMPACTED FILL
X
5. PRIOR TO PLACEMENT OF COMPACTED FILL, INSPECT SUBGRADE AND VERIFY THAT
SITE HAS BEEN PREPARED PROPERLY
X
A
B
NEW GENERATOR ON
4" MIN. HOUSEKEEPING
PAD. SLOPE BOTTOM
OF PAD WITH SLAB ON
GRADE. SURFACE
SHOULD BE LEVEL.
/4
/8
28'-8"
SS-100
PROVIDE FULLY
GROUTED CELL AT DOOR
JAMB WITH (1) #5, VERT
SS-100
SS-100
_____1
3'-11"
(VERIFY WITH EQUIPMENT)
20'-9 1/4" 2'-8 1/8"
CONDUIT THROUGH OR UNDER THE WALL. SEE
DETAIL 5/S-100. REFER TO ARCH AND ELECTRICAL
DRAWINGS FOR APPROXIMATE LOCATION. GC TO
COORDINATE WITH ELECTRICAL CONTRACTOR.
(V E
R
IF
Y W
IT
H
E
Q U
IP
M
E N
T
FREE-DRAINING GRANULAR FILL
SLAB ON GRADE - SEE PLAN
REINFORCING - SEE PLAN
NOTES:
1. REFERENCE SPECIFICATIONS FOR MATERIAL AND COMPACTION
REQUIREMENTS.
2. COMPACT ALL FILL MATERIAL TO 95% OF THE MAXIMUM DRY
DENSITY PER ASTM D1557.
3. EXCAVATION NOTED ABOVE IS AN ESTIMATION BASED ON
APPROXIMATE INFORMATION GIVEN IN THE AVAILABLE
GEOTECHNICAL REPORT. EXCAVATION SHALL EXTEND BELOW
EXPANSIVE CLAYEY SOILS AND OUT THREE FEET PAST THE
EXTERIOR FACE OF THE CONTINUOUS FOOTING. OVER-
EXCAVATED SOIL SHALL BE REPLACED WITH NEW SELECT FILL
AND COMPACTED PER THE SPECIFICATIONS. COORDINATE FINAL
EXCAVATION AND FILL REQUIREMENTS WITH ON-SITE SOIL
TESTING AGENCY.
/3 t)
OVER-EXCAVATED SOIL OF
APPROXIMATE 3 TO 5 FEET
S E
E P
L A
N T
H
IC
K N
E S
S t)
LEVEL TOP
#3x12"
@ 24" OC
NOTE:
1. SEE MECHANICAL AND ELECTRICAL DWGS FOR THE FOLLOWING:
A. LOCATION AND DIMENSIONS OF PADS.
B. LOCATION AND SIZE OF ANCHOR BOLTS.
C. DETAILS OF SUPPORTS, ISOLATORS AND OTHERS.
CONC PAD
1/2" TOOLED RADIUS 12"
SLAB ON GRADE
SEE PLAN, ARCH, MECH, OR ELEC
FOR SIZE AND LOCATION OF PAD
S E
E P
L A
N T
H
IC
K N
E S
S
M
A X
M
IN
REINF 6x6 - W2.1xW2.1 WWR
#5 @ 12" OC T&B
EL (+938'-3")
T.O. WALL
EL (SEE CIVIL)
T.O. SLAB
3'-6"
M
IN
8" CMU WALL REINFORCE
WITH VERTICAL #5 BARS @
32" OC IN GROUTED CELLS
1/2" EXPANSION
JOINT MATERIAL
SLAB ON GRADE
SEE TYPICAL DETAILS
CONT BOND BEAM
WITH (2) #5
3" CLR
(3) #5 LONGITUDINAL
BARS T&B
OVER-EXCAVATED SOIL OF
APPROXIMATELY 3 TO 5 FEET
NOTE:
1. EXCAVATION NOTED ABOVE IS AN ESTIMATION BASED ON
APPROXIMATE INFORMATION GIVEN IN THE AVAILABLE
GEOTECHNICAL REPORT. EXCAVATION SHALL EXTEND BELOW
EXPANSIVE CLAYEY SOILS AND OUT THREE FEET PAST THE
EXTERIOR FACE OF THE CONTINUOUS FOOTING. OVER-EXCAVATED
SOIL SHALL BE REPLACED WITH NEW SELECT FILL AND COMPACTED
PER THE SPECIFICATIONS. COORDINATE FINAL EXCAVATION AND FILL
REQUIREMENTS WITH ON-SITE SOIL TESTING AGENCY.
2. CONTRACTOR TO TAKE CARE NOT TO UNDERMINE ADJACENT SIGN
STRUCTURE FOUNDATION. DEPTH OF EXISTING FOOTING NOT
KNOWN. CONTRACTOR TO POTHOLE TO INVESTIGATE PRIOR TO
GENERATOR ENCLOSURE EXCAVATION.
(3) #5
DOWELS TO MATCH
WALL BAR SPACING
M
IN
IM
U
M L
A P
O F
8"
#5 @ 12" OC
NOTES:
1. SEE 3/S-100 FOR TYPICAL SLAB ON GRADE
DETAILS.
2. TOP OF FOUNDATION WALL EL (-0'-8") BELOW
TOP OF SLAB ON GRADE, UON.
3. CONTRACTOR TO TAKE CARE NOT TO
UNDERMINE ADJACENT SIGN STRUCTURE
FOUNDATION. DEPTH OF EXISTING FOOTING
NOT KNOWN. CONTRACTOR TO POTHOLE TO
INVESTIGATE PRIOR TO GENERATOR
ENCLOSURE EXCAVATION.
KEYNOTES:
1. MINIMUM 8" CONCRETE SLAB ON GRADE
REINFORCED WITH 6x6 -W4xW4 WWR. REFER
TO CIVIL DRAWINGS FOR SLAB ELEVATION AND
SURROUNDING GRADE INFORMATION. SLOPE
SLAB PER THE ARCHITECTURAL DRAWINGS.
FOOTING (LEVEL,
SLOPED OR STEPPED)
PIPE
PIPE
FINISH GRADE
COMPACTED BACKFILL
TAMPED SAND
PIPE
NO EXCAVATION
BELOW THIS LINE
ALL SLEEVES TO BE
1" CLEAR ALL
AROUND PIPE
WALL
NOTES:
1. PIPE DIAMETER SHALL NOT EXCEED 8".
2. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ALL
LOCATIONS, ELEVATIONS, ETC. OF SITE UTILITIES.
3. DETAIL REQUIRED AT ALL UTILITIES HAVING A PLAN
WIDTH UP TO 1'-0". FOR WIDTHS GREATER THAN 1'-0",
SEE PLAN FOR REQUIRED DETAIL.
4. PIPE IS NOT ALLOWED UNDER SPREAD FOOTINGS.
PLACE CONTROLLED LOW STRENGTH
CONCRETE FILL AROUND SLEEVE PRIOR
TO THE FOUNDATION POUR OR POUR
WITH THE FOOTING USING THE FOOTING
MIX. MAKE SAME WIDTH AS FOOTING AND
FULL WIDTH OF PIPE TRENCH (2'-0" MIN)
M
IN
1'-0" MIN
1'-6" MIN
4" MIN
H E
R E
N O
P
IP
E S
4" MIN
A
SECTION A
CORNER BARS TO
MATCH LONGITUDINAL
FOOTING REINFORCING
LONGITUDINAL FOOTING
REINFORCING - SEE PLAN
2'-6"
OPEN END BLOCK
BREAK SHELL FOR
FLOW OF GROUT, TYP
INTERSECTION
BARS SHALL MATCH
HORIZ WALL OR
BOND BEAM REINF
(1) #5 VERT BAR
(1) #5 VERT BAR
S E
E S
C H
E D
T
Y P
L A
P S
P L
IC
E
NOTES:
1. TYPICAL VERTICAL REINFORCING AND GROUT NOT SHOWN FOR CLARITY.
2. DETAIL ASSUMES CORNER IS CONSTRUCTED IN RUNNING BOND WITH UNITS
INTERLOCKED.
BEND CORNER
BARS AROUND
VERT REINF
DETAIL IS REQ'D
WHER INDICATED
HEAD JOINT IS CONT
FULL HEIGHT. WHERE
ALTERNATE JOINT
LOCATION OCCUR,
SEE TYPICAL CORNER
REINF DETAIL
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/1 6"
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/3 2"
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
G ra p h ic S ca le
/2
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
Sprinklered
E
D
C
B
A
F
FISHER HOUSE
SAN ANTONIO,
TX
C :\R e vi t L o ca l F ile s\ S
.0
V
A S
A T
X G
E N
E R
A T
O R
P A
D C
W a lte r.
H
.L e w is
.r vt
/1
/2
:1
:5
P
M
PLAN AND DETAILS
KMG SNP
100% CONSTRUCTION
DOCUMENTS
671-22-139INSTALLATION OF ELECTRICAL
GENERATOR FISHER HOUSE
VA MEDICAL CENTER SAN ANTONIO, TEXAS
JUNE 17, 2024
SS-100
N O R
HT
1/4" = 1'-0"1
FOUNDATION PLAN
3/4" = 1'-0"3
TYPICAL SLAB SECTION
3/4" = 1'-0"4
TYPICAL CONCRETE
EQUIPMENT PAD DETAIL
3/4" = 1'-0"2
PERIMETER WALL
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com
3/4" = 1'-0"5
TYPICAL PIPE TRENCH DETAIL