Attach 4_Submittal Register.xlsx

XLSX spreadsheet 40 KB Posted

Attached to
Water Main Repair Wyman Ave
Solicitation number
N4008520B2559
Issued by

About this file

This document is a submittal register for the federal contract opportunity N4008520B2559 for Water Main Repair Wyman Ave. The submittal register outlines over 60 submittal items required from the contractor organized by specification section. Required submittals include preconstruction items such as schedules, plans for utility outages and connections, permits, and personnel lists. Construction phase submittals include shop drawings, product data, test reports, certificates, operation and maintenance manuals, and record drawings. Post-construction submittals include training documentation and closeout documents. The register includes columns specifying required content, responsible party, review timeline, and other details. The opportunity is issued by the Department of the Navy Naval Facilities Engineering Command for water main repair services.

View the file

Other files

File Type Posted
Attach 2_PNSYDIV1 Specs 152020.pdf PDF
Attach 5_Drawings.pdf PDF
Attach 3_Technical Specs.pdf PDF
Attach 7_PWD ME Water and Sewer Standards.pdf PDF
Attach 1_Bid Form.pdf PDF
Attach 6_MASTER eOMSI WORKBOOK REV 6.xlsx XLSX spreadsheet
N4008520B2559.pdf PDF
encl a SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
FY21_1617119_ST18-1265_MMCONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
01 11 00SD-01 Preconstruction Submittals
Utility Outage RequestsG
Utility Connection RequestsG
Borrow PermitsG
Excavation PermitsG
Welding PermitsG
01 14 00.00 22SD-01 Preconstruction Submittals
List of Contact Personnel1.4.1G
01 20 00.00 22SD-01 Preconstruction Submittals
Schedule of Prices1.3G
01 30 00.00 22SD-01 Preconstruction Submittals
NAVFAC Red Zone Checklist1.6G
NAVFAC PWD ME Follow-on1.6G
Services List
01 31 23.13 22SD-01 Preconstruction Submittals
List of Contractor's Personnel1.4.2G
01 32 01.00 10SD-01 Preconstruction Submittals
Project Scheduler Qualifications1.3G
Preliminary Project Schedule3.4.1G
Initial Project Schedule3.4.2G
Periodic Schedule Update3.6.2G
01 32 16.00 20SD-01 Preconstruction Submittals
Construction Schedule1.2G
SD-07 Certificates
Monthly Updates1.4
01 33 00SD-01 Preconstruction Submittals
01 33 00Submittal Register1.7G
01 33 10.05 20SD-01 Preconstruction Submittals
Consolidated RFP Documents2.1G
Submittal Register1.5.5G
SD-05 Design Data
Design Drawings1.7G
Specifications1.9G
Design Analysis1.8G
Design Submittals2.2G
SD-11 Closeout Submittals
Record Documents1.8G
DD Form 13541.8G
01 35 26.00 22SD-01 Preconstruction Submittals
Accident Prevention Plan (APP)1.7G
SD-06 Test Reports
Monthly Exposure Reports1.4
Notifications and Reports1.12
Accident Reports1.12.2G
LHE Inspection Reports1.12.3
SD-07 Certificates
Crane Operators/Riggers1.6.1.5
Standard Lift Plan1.7.2.2G
Critical Lift Plan1.7.2.3G
Naval Architecture Analysis1.7.2.3G
Activity Hazard Analysis (AHA)1.8
Confined Space Entry Permit1.9.1
01 35 26.00 22Hot Work Permit1.9.1
Certificate of Compliance1.12.4
Barge Mounted Mobile Cranes1.7.2.3
License Certificates1.14
Radiography Operation Planning1.14.1G
Work Sheet
01 44 00.22SD-01 Preconstruction Submittals
Archaeologist Qualifications1.4G
SD-06 Test Reports
Archaeological Monitoring3.2
Reports
01 45 00.10 22SD-01 Preconstruction Submittals
QC Plan1.6G
01 50 00.00 22SD-01 Preconstruction Submittals
Construction site plan1.4G
Traffic control plan3.2.1G
SD-06 Test Reports
Backflow Preventer Tests2.2.5G
SD-07 Certificates
Backflow Tester1.5.1G
Backflow Preventers1.5G
01 57 19.00 22SD-01 Preconstruction Submittals
Preconstruction Survey1.5.1G
Solid Waste Management Plan3.4G
Regulatory Notifications1.5.2G
01 57 19.00 22Environmental Management Plan3.1G
(EMP)
Dirt and Dust Control Plan3.14.1G
Contractor Hazardous Material3.6G
Inventory Log
Storm Water3.2.1G
Management/Erosion and
Sedimentation Control Plan
SD-06 Test Reports
Laboratory Analysis3.13.4.2G
Disposal Requirements3.15.2G
Erosion and Sediment Control3.2.4G
Inspection Reports
Solid Waste Management Report3.4.1G
SD-11 Closeout Submittals
Storm Water Management and3.2.1G
Erosion Control Compliance
Notebook
Waste Determination3.5G
Documentation
Disposal Documentation for3.13.4.4G
Hazardous and Regulated Waste
Contractor 40 CFR Employee1.5.5G
Training Records
Solid Waste Management Report3.4.1G
01 57 19.00 22Contractor Hazardous Material3.6G
Inventory Log
Hazardous Waste/Debris3.13.4G
Management
Regulatory Notifications1.5.2G
01 74 19.00 22SD-01 Preconstruction Submittals
Waste Management Plan1.3G
SD-11 Closeout Submittals
Records1.4G
01 78 00.00 22SD-03 Product Data
As-Built Record of Equipment1.2.2G
and Materials
Warranty Management Plan1.6.1G
Warranty Tags1.6.4G
Final CleaningG
Spare Parts Data1.3G
SD-08 Manufacturer’s Instructions
Preventative Maintenance1.4G
Condition Monitoring (Predictive1.4G
Testing)
Inspection1.4G
Instructions1.6.1G
SD-10 Operation and Maintenance
Data
Operation and Maintenance1.8G
Manuals
01 78 00.00 22SD-11 Closeout Submittals
Record Drawings1.2.1G
Certification of EPA Designated1.5G
Items
Certification of EPA Designated1.5G
Items
Red Zone Documents1.2.6G
01 78 23SD-10 Operation and Maintenance
Data
O&M DatabaseG
Training Plan3.1.1G
Training Outline3.1.3G
Training Content3.1.2G
SD-11 Closeout Submittals
Training Video Recording3.1.4G
Validation of Training Completion3.1.6G
01 78 24.00 22SD-11 Closeout Submittals
eOMSI, Progress Submittal1.4.1G
eOMSI, Prefinal Submittal1.4.2G
eOMSI, Final Submittal1.4.3G
02 41 00SD-01 Preconstruction Submittals
Demolition Plan1.2.1G
Existing Conditions; G
SD-07 Certificates
Notification1.7G
03 01 30.71SD-03 Product Data
03 01 30.71Repair Mortar; G
Epoxy Resin; G
Protective Coating/Bonding
Agent; G
SD-06 Test Reports
Epoxy Resin; G
SD-08 Manufacturer’s Instructions
Epoxy Resin Adhesive; G
Polymer Modified Portland
Cement (PMC) Mortar; G
03 30 53SD-02 Shop Drawings
Installation Drawings1.4G
SD-03 Product Data
Air-Entraining Admixture; G
Accelerating Admixture; G
Water-Reducing or Retarding
Admixture; G
Curing Materials; G
Expansion Joint Filler Strips,
Premolded; G
Joint Sealants - Field Molded
Sealants; G
Waterstops; G
Batching and Mixing Equipment;
G
03 30 53Conveying and Placing Concrete;
G
Formwork; G
Ready-Mix Concrete; G
Curing Compound; G
SD-05 Design Data
Mix Design; G
Calculations; G
SD-06 Test Reports
Aggregates; G
Concrete Mixture Proportions2.1.3G
Compressive Strength Testing3.8.3G
Slump3.8.3G
Air Content; G
Water; G
SD-07 Certificates
Cementitious Materials, G
Aggregates, G
Delivery Tickets; G
SD-08 Manufacturer’s Instructions
Curing Compound, G
03 62 17SD-01 Preconstruction Submittals
Flowable Fill Mix Design2.2G
SD-06 Test Reports
Compressive Strength3.3G
03 62 17Placement And Inspection1.3.1G
Reports
SD-07 Certificates
Portland Cement2.1.1G
05 50 13SD-02 Shop Drawings
Miscellanous Structural SteelG
Manhole Covers and FramesG
Fabricated Pipe SupportsG
Anchor BoltsG
Embedded Angles and Plates,
installation drawings; G
22 05 83.63SD-03 Product Data
Installation EquipmentG
CIPP Lining TubeG
ResinG
Liner MaterialsG
Manufacturer's Warranty1.5.2G
SD-08 Manufacturer’s Instructions
CIPP Manufacturer's WrittenG
Installation Instructions
SD-11 Closeout Submittals
Report Summarizing The ExtentG
Of Pipe Lining Performed
Pre-Lining InspectionG
Cut-InG
Post-Lining InspectionG
22 05 83.63Record DrawingsG
31 23 00.00 22SD-01 Preconstruction Submittals
Shoring and Sheeting Plan3.1.1G
Dewatering Work Plan1.7.2G
Excavation and Trenching Plan1.7.1G
Vacuum Excavation Plan3.13.1G
Excess Soil Disposal & Soil1.7.4G
Sampling Plan
Archeologists Qualifications1.7.5G
SD-06 Test Reports
Pervious Granular Fill3.12.2.3G
Borrow Materials2.4G
Fill and backfill3.12.2.1G
Select material3.12.2.2G
Density tests3.12.2.4G
Moisture Content TestsG
SD-07 Certificates
Aggregates Sourcing Certification1.6G
Letter
32 12 17SD-05 Design Data
Job-mix formula1.3.2
Mix Design2.8G
SD-06 Test Reports
Specific gravity test of asphalt2.9.1G
Coarse aggregate tests2.9.1G
Weight of slag test2.9.1G
32 12 17Percent of crushed pieces in2.9.1G
gravel
Fine aggregate tests2.9.1G
Specific gravity of mineral filler2.9.1G
Bituminous mixture tests2.9.1G
Aggregates tests3.5.2.1G
Bituminous mix tests3.5.2.2G
Pavement courses3.5.2.3G
32 17 23.00 20SD-03 Product Data
Reflective media for roads and
streets; G
Paints for roads and streets; G
Equipment1.5G
SD-06 Test Reports
Reflective media for roads and
streets; G
Paints for roads and streets; G
SD-07 Certificates
Reflective media for roads and
streets; G
Paints for roads and streets; G
Construction equipment list; G
SD-08 Manufacturer’s Instructions
Paints for roads and streets; G
33 11 00SD-03 Product Data
Piping Materials2.2.1
33 11 00Water distribution main2.2
Water service line2.3
Hydrants2.2.2.2
Indicator posts2.2.2.3
Corporation stops2.3.2.1
Valve boxes;2.2.2.4
Valve boxes;2.3.2.8
SD-05 Design Data
Design calculations of water
piping
Temporary water distribution2.4
materials
SD-06 Test Reports
Disinfection2.3.2.10G
SD-07 Certificates
Water distribution main2.2
Water service line2.3
lining and coating1.5.2
Lining2.2.1.1
Lining2.2.1.1
Sprinkler Craftspersons /3.2.4.2
Journeyman
SD-08 Manufacturer’s Instructions
Delivery, storage, and handling;
G
Installation3.2.1