Attach 4_Submittal Register.xlsx
XLSX spreadsheet 40 KB Posted
- Attached to
- Water Main Repair Wyman Ave
- Solicitation number
- N4008520B2559
About this file
This document is a submittal register for the federal contract opportunity N4008520B2559 for Water Main Repair Wyman Ave. The submittal register outlines over 60 submittal items required from the contractor organized by specification section. Required submittals include preconstruction items such as schedules, plans for utility outages and connections, permits, and personnel lists. Construction phase submittals include shop drawings, product data, test reports, certificates, operation and maintenance manuals, and record drawings. Post-construction submittals include training documentation and closeout documents. The register includes columns specifying required content, responsible party, review timeline, and other details. The opportunity is issued by the Department of the Navy Naval Facilities Engineering Command for water main repair services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach 2_PNSYDIV1 Specs 152020.pdf | ||
| Attach 5_Drawings.pdf | ||
| Attach 3_Technical Specs.pdf | ||
| Attach 7_PWD ME Water and Sewer Standards.pdf | ||
| Attach 1_Bid Form.pdf | ||
| Attach 6_MASTER eOMSI WORKBOOK REV 6.xlsx | XLSX spreadsheet | |
| N4008520B2559.pdf | ||
| encl a SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| SUBMITTAL REGISTER | CONTRACT NO. | ||||
| TITLE AND LOCATION | |||||
| FY21_1617119_ST18-1265_MM | CONTRACTOR | ||||
| A C T I V I T Y | |||||
| N O | T R A N S M I T T A L | ||||
| N O | S P E C | ||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 01 11 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Utility Outage Requests | G | |||||||||||||||||
| Utility Connection Requests | G | |||||||||||||||||
| Borrow Permits | G | |||||||||||||||||
| Excavation Permits | G | |||||||||||||||||
| Welding Permits | G | |||||||||||||||||
| 01 14 00.00 22 | SD-01 Preconstruction Submittals | |||||||||||||||||
| List of Contact Personnel | 1.4.1 | G | ||||||||||||||||
| 01 20 00.00 22 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Schedule of Prices | 1.3 | G | ||||||||||||||||
| 01 30 00.00 22 | SD-01 Preconstruction Submittals | |||||||||||||||||
| NAVFAC Red Zone Checklist | 1.6 | G | ||||||||||||||||
| NAVFAC PWD ME Follow-on | 1.6 | G | ||||||||||||||||
| Services List | ||||||||||||||||||
| 01 31 23.13 22 | SD-01 Preconstruction Submittals | |||||||||||||||||
| List of Contractor's Personnel | 1.4.2 | G | ||||||||||||||||
| 01 32 01.00 10 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Project Scheduler Qualifications | 1.3 | G | ||||||||||||||||
| Preliminary Project Schedule | 3.4.1 | G | ||||||||||||||||
| Initial Project Schedule | 3.4.2 | G | ||||||||||||||||
| Periodic Schedule Update | 3.6.2 | G | ||||||||||||||||
| 01 32 16.00 20 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Construction Schedule | 1.2 | G | ||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Monthly Updates | 1.4 | |||||||||||||||||
| 01 33 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| 01 33 00 | Submittal Register | 1.7 | G | |||||||||||||||
| 01 33 10.05 20 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Consolidated RFP Documents | 2.1 | G | ||||||||||||||||
| Submittal Register | 1.5.5 | G | ||||||||||||||||
| SD-05 Design Data | ||||||||||||||||||
| Design Drawings | 1.7 | G | ||||||||||||||||
| Specifications | 1.9 | G | ||||||||||||||||
| Design Analysis | 1.8 | G | ||||||||||||||||
| Design Submittals | 2.2 | G | ||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| Record Documents | 1.8 | G | ||||||||||||||||
| DD Form 1354 | 1.8 | G | ||||||||||||||||
| 01 35 26.00 22 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Accident Prevention Plan (APP) | 1.7 | G | ||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Monthly Exposure Reports | 1.4 | |||||||||||||||||
| Notifications and Reports | 1.12 | |||||||||||||||||
| Accident Reports | 1.12.2 | G | ||||||||||||||||
| LHE Inspection Reports | 1.12.3 | |||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Crane Operators/Riggers | 1.6.1.5 | |||||||||||||||||
| Standard Lift Plan | 1.7.2.2 | G | ||||||||||||||||
| Critical Lift Plan | 1.7.2.3 | G | ||||||||||||||||
| Naval Architecture Analysis | 1.7.2.3 | G | ||||||||||||||||
| Activity Hazard Analysis (AHA) | 1.8 | |||||||||||||||||
| Confined Space Entry Permit | 1.9.1 | |||||||||||||||||
| 01 35 26.00 22 | Hot Work Permit | 1.9.1 | ||||||||||||||||
| Certificate of Compliance | 1.12.4 | |||||||||||||||||
| Barge Mounted Mobile Cranes | 1.7.2.3 | |||||||||||||||||
| License Certificates | 1.14 | |||||||||||||||||
| Radiography Operation Planning | 1.14.1 | G | ||||||||||||||||
| Work Sheet | ||||||||||||||||||
| 01 44 00.22 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Archaeologist Qualifications | 1.4 | G | ||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Archaeological Monitoring | 3.2 | |||||||||||||||||
| Reports | ||||||||||||||||||
| 01 45 00.10 22 | SD-01 Preconstruction Submittals | |||||||||||||||||
| QC Plan | 1.6 | G | ||||||||||||||||
| 01 50 00.00 22 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Construction site plan | 1.4 | G | ||||||||||||||||
| Traffic control plan | 3.2.1 | G | ||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Backflow Preventer Tests | 2.2.5 | G | ||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Backflow Tester | 1.5.1 | G | ||||||||||||||||
| Backflow Preventers | 1.5 | G | ||||||||||||||||
| 01 57 19.00 22 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Preconstruction Survey | 1.5.1 | G | ||||||||||||||||
| Solid Waste Management Plan | 3.4 | G | ||||||||||||||||
| Regulatory Notifications | 1.5.2 | G |
| 01 57 19.00 22 | Environmental Management Plan | 3.1 | G |
| (EMP) | |||
| Dirt and Dust Control Plan | 3.14.1 | G | |
| Contractor Hazardous Material | 3.6 | G | |
| Inventory Log | |||
| Storm Water | 3.2.1 | G | |
| Management/Erosion and | |||
| Sedimentation Control Plan | |||
| SD-06 Test Reports | |||
| Laboratory Analysis | 3.13.4.2 | G | |
| Disposal Requirements | 3.15.2 | G | |
| Erosion and Sediment Control | 3.2.4 | G | |
| Inspection Reports | |||
| Solid Waste Management Report | 3.4.1 | G | |
| SD-11 Closeout Submittals | |||
| Storm Water Management and | 3.2.1 | G | |
| Erosion Control Compliance | |||
| Notebook | |||
| Waste Determination | 3.5 | G | |
| Documentation | |||
| Disposal Documentation for | 3.13.4.4 | G | |
| Hazardous and Regulated Waste | |||
| Contractor 40 CFR Employee | 1.5.5 | G | |
| Training Records | |||
| Solid Waste Management Report | 3.4.1 | G | |
| 01 57 19.00 22 | Contractor Hazardous Material | 3.6 | G |
| Inventory Log | |||
| Hazardous Waste/Debris | 3.13.4 | G | |
| Management | |||
| Regulatory Notifications | 1.5.2 | G | |
| 01 74 19.00 22 | SD-01 Preconstruction Submittals | ||
| Waste Management Plan | 1.3 | G | |
| SD-11 Closeout Submittals | |||
| Records | 1.4 | G | |
| 01 78 00.00 22 | SD-03 Product Data | ||
| As-Built Record of Equipment | 1.2.2 | G | |
| and Materials | |||
| Warranty Management Plan | 1.6.1 | G | |
| Warranty Tags | 1.6.4 | G | |
| Final Cleaning | G | ||
| Spare Parts Data | 1.3 | G | |
| SD-08 Manufacturer’s Instructions | |||
| Preventative Maintenance | 1.4 | G | |
| Condition Monitoring (Predictive | 1.4 | G | |
| Testing) | |||
| Inspection | 1.4 | G | |
| Instructions | 1.6.1 | G | |
| SD-10 Operation and Maintenance | |||
| Data | |||
| Operation and Maintenance | 1.8 | G | |
| Manuals | |||
| 01 78 00.00 22 | SD-11 Closeout Submittals | ||
| Record Drawings | 1.2.1 | G | |
| Certification of EPA Designated | 1.5 | G | |
| Items | |||
| Certification of EPA Designated | 1.5 | G | |
| Items | |||
| Red Zone Documents | 1.2.6 | G | |
| 01 78 23 | SD-10 Operation and Maintenance | ||
| Data | |||
| O&M Database | G | ||
| Training Plan | 3.1.1 | G | |
| Training Outline | 3.1.3 | G | |
| Training Content | 3.1.2 | G | |
| SD-11 Closeout Submittals | |||
| Training Video Recording | 3.1.4 | G | |
| Validation of Training Completion | 3.1.6 | G | |
| 01 78 24.00 22 | SD-11 Closeout Submittals | ||
| eOMSI, Progress Submittal | 1.4.1 | G | |
| eOMSI, Prefinal Submittal | 1.4.2 | G | |
| eOMSI, Final Submittal | 1.4.3 | G | |
| 02 41 00 | SD-01 Preconstruction Submittals | ||
| Demolition Plan | 1.2.1 | G | |
| Existing Conditions; G | |||
| SD-07 Certificates | |||
| Notification | 1.7 | G | |
| 03 01 30.71 | SD-03 Product Data | ||
| 03 01 30.71 | Repair Mortar; G | ||
| Epoxy Resin; G | |||
| Protective Coating/Bonding | |||
| Agent; G | |||
| SD-06 Test Reports | |||
| Epoxy Resin; G | |||
| SD-08 Manufacturer’s Instructions | |||
| Epoxy Resin Adhesive; G | |||
| Polymer Modified Portland | |||
| Cement (PMC) Mortar; G | |||
| 03 30 53 | SD-02 Shop Drawings | ||
| Installation Drawings | 1.4 | G | |
| SD-03 Product Data | |||
| Air-Entraining Admixture; G | |||
| Accelerating Admixture; G | |||
| Water-Reducing or Retarding | |||
| Admixture; G | |||
| Curing Materials; G | |||
| Expansion Joint Filler Strips, | |||
| Premolded; G | |||
| Joint Sealants - Field Molded | |||
| Sealants; G | |||
| Waterstops; G | |||
| Batching and Mixing Equipment; | |||
| G | |||
| 03 30 53 | Conveying and Placing Concrete; | ||
| G | |||
| Formwork; G | |||
| Ready-Mix Concrete; G | |||
| Curing Compound; G | |||
| SD-05 Design Data | |||
| Mix Design; G | |||
| Calculations; G | |||
| SD-06 Test Reports | |||
| Aggregates; G | |||
| Concrete Mixture Proportions | 2.1.3 | G | |
| Compressive Strength Testing | 3.8.3 | G | |
| Slump | 3.8.3 | G | |
| Air Content; G | |||
| Water; G | |||
| SD-07 Certificates | |||
| Cementitious Materials, G | |||
| Aggregates, G | |||
| Delivery Tickets; G | |||
| SD-08 Manufacturer’s Instructions | |||
| Curing Compound, G | |||
| 03 62 17 | SD-01 Preconstruction Submittals | ||
| Flowable Fill Mix Design | 2.2 | G | |
| SD-06 Test Reports | |||
| Compressive Strength | 3.3 | G | |
| 03 62 17 | Placement And Inspection | 1.3.1 | G |
| Reports | |||
| SD-07 Certificates | |||
| Portland Cement | 2.1.1 | G | |
| 05 50 13 | SD-02 Shop Drawings | ||
| Miscellanous Structural Steel | G | ||
| Manhole Covers and Frames | G | ||
| Fabricated Pipe Supports | G | ||
| Anchor Bolts | G | ||
| Embedded Angles and Plates, | |||
| installation drawings; G | |||
| 22 05 83.63 | SD-03 Product Data | ||
| Installation Equipment | G | ||
| CIPP Lining Tube | G | ||
| Resin | G | ||
| Liner Materials | G | ||
| Manufacturer's Warranty | 1.5.2 | G | |
| SD-08 Manufacturer’s Instructions | |||
| CIPP Manufacturer's Written | G | ||
| Installation Instructions | |||
| SD-11 Closeout Submittals | |||
| Report Summarizing The Extent | G | ||
| Of Pipe Lining Performed | |||
| Pre-Lining Inspection | G | ||
| Cut-In | G | ||
| Post-Lining Inspection | G | ||
| 22 05 83.63 | Record Drawings | G | |
| 31 23 00.00 22 | SD-01 Preconstruction Submittals | ||
| Shoring and Sheeting Plan | 3.1.1 | G | |
| Dewatering Work Plan | 1.7.2 | G | |
| Excavation and Trenching Plan | 1.7.1 | G | |
| Vacuum Excavation Plan | 3.13.1 | G | |
| Excess Soil Disposal & Soil | 1.7.4 | G | |
| Sampling Plan | |||
| Archeologists Qualifications | 1.7.5 | G | |
| SD-06 Test Reports | |||
| Pervious Granular Fill | 3.12.2.3 | G | |
| Borrow Materials | 2.4 | G | |
| Fill and backfill | 3.12.2.1 | G | |
| Select material | 3.12.2.2 | G | |
| Density tests | 3.12.2.4 | G | |
| Moisture Content Tests | G | ||
| SD-07 Certificates | |||
| Aggregates Sourcing Certification | 1.6 | G | |
| Letter | |||
| 32 12 17 | SD-05 Design Data | ||
| Job-mix formula | 1.3.2 | ||
| Mix Design | 2.8 | G | |
| SD-06 Test Reports | |||
| Specific gravity test of asphalt | 2.9.1 | G | |
| Coarse aggregate tests | 2.9.1 | G | |
| Weight of slag test | 2.9.1 | G | |
| 32 12 17 | Percent of crushed pieces in | 2.9.1 | G |
| gravel | |||
| Fine aggregate tests | 2.9.1 | G | |
| Specific gravity of mineral filler | 2.9.1 | G | |
| Bituminous mixture tests | 2.9.1 | G | |
| Aggregates tests | 3.5.2.1 | G | |
| Bituminous mix tests | 3.5.2.2 | G | |
| Pavement courses | 3.5.2.3 | G | |
| 32 17 23.00 20 | SD-03 Product Data | ||
| Reflective media for roads and | |||
| streets; G | |||
| Paints for roads and streets; G | |||
| Equipment | 1.5 | G | |
| SD-06 Test Reports | |||
| Reflective media for roads and | |||
| streets; G | |||
| Paints for roads and streets; G | |||
| SD-07 Certificates | |||
| Reflective media for roads and | |||
| streets; G | |||
| Paints for roads and streets; G | |||
| Construction equipment list; G | |||
| SD-08 Manufacturer’s Instructions | |||
| Paints for roads and streets; G | |||
| 33 11 00 | SD-03 Product Data | ||
| Piping Materials | 2.2.1 | ||
| 33 11 00 | Water distribution main | 2.2 | |
| Water service line | 2.3 | ||
| Hydrants | 2.2.2.2 | ||
| Indicator posts | 2.2.2.3 | ||
| Corporation stops | 2.3.2.1 | ||
| Valve boxes; | 2.2.2.4 | ||
| Valve boxes; | 2.3.2.8 | ||
| SD-05 Design Data | |||
| Design calculations of water | |||
| piping | |||
| Temporary water distribution | 2.4 | ||
| materials | |||
| SD-06 Test Reports | |||
| Disinfection | 2.3.2.10 | G | |
| SD-07 Certificates | |||
| Water distribution main | 2.2 | ||
| Water service line | 2.3 | ||
| lining and coating | 1.5.2 | ||
| Lining | 2.2.1.1 | ||
| Lining | 2.2.1.1 | ||
| Sprinkler Craftspersons / | 3.2.4.2 | ||
| Journeyman | |||
| SD-08 Manufacturer’s Instructions | |||
| Delivery, storage, and handling; | |||
| G | |||
| Installation | 3.2.1 |