Attach 1_Bid Form.pdf

PDF 11 KB Posted

Attached to
Water Main Repair Wyman Ave
Solicitation number
N4008520B2559
Issued by

About this file

This bid form requests pricing for a water main repair project at the Portsmouth Naval Shipyard in Kittery, Maine. The contractor is asked to provide unit costs for labor, materials, and equipment for line items including replacing a portion of an existing main with new 16-inch DI pipe, repairing a section of existing main with CIPPL, installing a 6-inch fire service PIV/building connection, conducting flow fill from Building 65 to a construction square, replacing a main and services on Dennett Street with CIPPL, and supplying two water valves. Pricing is requested for base bid quantities and optional items. The related federal contract opportunity is solicitation number N4008520B2559 from the Department of the Navy Naval Facilities Engineering Command for the Water Main Repair Wyman Ave project. Contractors are directed to attached requirements documents for additional details.

View the file

Other files

File Type Posted
Attach 2_PNSYDIV1 Specs 152020.pdf PDF
Attach 5_Drawings.pdf PDF
Attach 3_Technical Specs.pdf PDF
Attach 7_PWD ME Water and Sewer Standards.pdf PDF
Attach 4_Submittal Register.xlsx XLSX spreadsheet
Attach 6_MASTER eOMSI WORKBOOK REV 6.xlsx XLSX spreadsheet
N4008520B2559.pdf PDF
encl a SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID FORM

UEM ST REPAIR WATER MAIN WYMAN AVE

FY21 Water Main Repair

PROJECT LOCATION

Portsmouth Naval Shipyard Kittery, Maine

CONTRACTOR:

DATE:

MATERIAL LABOR EQUIPMENT LINE ITEM

ITEM DESCRIPTION NUMBER UNIT COST COST COST TOTAL

0001AA Water Piping 1 LS

0001AB CIPPL 1 LS

0001AC Flow Fill 1 LS

Sub-KTR Performance Value (1)

Prime KTR Div 01 & Project Management Costs (2)

CLIN 0001 FIRM FIXED PRICE PROPOSAL AMOUNT (3)

MATERIAL LABOR EQUIPMENT LINE ITEM

ITEM DESCRIPTION NUMBER UNIT COST COST COST TOTAL

0002AA Rock Ledge Removal 150 CY

Sub-KTR Performance Value (1)

Prime KTR Div 01 & Project Management Costs (2)

CLIN 0002 FIRM FIXED PRICE PROPOSAL AMOUNT (3)

NOTE:

Replace portion of existing main with new 16" DI Pipe, and repair section of existing water main with CIPPL

CLIN 0001 - BASE BID QUANTITY

CLIN 0002 - BASE BID QUANTITY

FY21 Water Main Repair

PROJECT LOCATION

Portsmouth Naval Shipyard Kittery, Maine

CONTRACTOR:

DATE:

NOTE:

Replace portion of existing main with new 16" DI Pipe, and repair section of existing water main with CIPPL

MATERIAL LABOR EQUIPMENT LINE ITEM

ITEM DESCRIPTION NUMBER UNIT COST COST COST TOTAL

0003AA 6" Fire Service PIV / Bldg Connection 1 LS

Sub-KTR Performance Value (1)

Prime KTR Div 01 & Project Management Costs (2)

CLIN 0003 FIRM FIXED PRICE PROPOSAL AMOUNT (3)

MATERIAL LABOR EQUIPMENT LINE ITEM

ITEM DESCRIPTION NUMBER UNIT COST COST COST TOTAL

0004AA Flow Fill from B65 to Const Sq. 1 LS

Sub-KTR Performance Value (1)

Prime KTR Div 01 & Project Management Costs (2)

CLIN 0004 FIRM FIXED PRICE PROPOSAL AMOUNT (3)

CLIN 0003 - OPTION 01 QUANTITY

CLIN 0004 - OPTION 02 QUANTITY

FY21 Water Main Repair

PROJECT LOCATION

Portsmouth Naval Shipyard Kittery, Maine

CONTRACTOR:

DATE:

NOTE:

Replace portion of existing main with new 16" DI Pipe, and repair section of existing water main with CIPPL

MATERIAL LABOR EQUIPMENT LINE ITEM

ITEM DESCRIPTION NUMBER UNIT COST COST COST TOTAL

0005AA Dennet Street CIPPL Main and Services 1 LS

Sub-KTR Performance Value (1)

Prime KTR Div 01 & Project Management Costs (2)

CLIN 0005 FIRM FIXED PRICE PROPOSAL AMOUNT (3)

MATERIAL LABOR EQUIPMENT LINE ITEM

ITEM DESCRIPTION NUMBER UNIT COST COST COST TOTAL

0006AA Two (2) Water Valves 2 EA

Sub-KTR Performance Value (1)

Prime KTR Div 01 & Project Management Costs (2)

CLIN 0006 FIRM FIXED PRICE PROPOSAL AMOUNT (3)

CLIN 0006 - OPTION 04 QUANTITY

CLIN 0005 - OPTION 03 QUANTITY

File details come from the government source that posted it. Updated .