Attach_3_-_Vendor_cost_sheet.pdf
PDF 185 KB Posted
- Attached to
- 7J--HAFC IDS MOTION SENSORS Federal contract opportunity
- Solicitation number
- 140P2125Q0124
About this file
This document is a Vendor Cost Sheet (Attachment 3) for a motion sensor replacement and installation project for the National Park Service. The cost sheet breaks down pricing into three main categories: Labor, Materials, and Services. Labor costs include removing 46 existing detectors, surface repair, and installing 26 ceiling-mount and 20 wall-mount detectors. Material costs cover 26 ceiling-mount motion sensors and 20 wall/ceiling motion sensors. Services include system software configuration and integration, training for HAFC IT, and QA documentation and building scan updates. The document provides a template for vendors to fill in specific pricing for each line item, with spaces to calculate subtotals for labor, materials, and services, and a final estimated total cost.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P2125Q0124_Amd_0002.pdf | ||
| Q_A_p2_0002.pdf | ||
| Attach_6_-_BIRD_BRADY_FLOOR_PLAN_0001.pdf | ||
| Q_A_0001.pdf | ||
| Sol_140P2125Q0124_Amd_0001.pdf | ||
| Attach_5_-_LEWIS_ANTHONY_FLOOR_PLAN_0001.pdf | ||
| Attach_4_-_IDC_FLOOR_PLAN_0001.pdf | ||
| Attach_2_-_Site_Visit_info_HFC_Motion_Sensors.pdf | ||
| Attach_1_-_current_Equipment.xlsx | XLSX spreadsheet | |
| Sol_140P2125Q0124.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 3
VENDOR COST SHEET
Labor
Remove existing detectors (46 units): $_____________
Surface repair after removal: $_____________
Install ____(currently 26) ceiling-mount detectors: $_____________
Install ____(currently 20) wall-mount detectors: $_____________ o Subtotal Labor: $_____________
Materials
26 ceiling-mount motion sensors: $_____________
20 wall/ceiling motion sensors: $_____________ o Subtotal Materials: $_____________
Services
System software configuration & integration: $_____________
Training HAFC IT: $_____________
QA documentation & building scan updates: $_____________ o Subtotal Services: $_____________
Final Estimated Total $_____________
File details come from the government source that posted it. Updated .