Q_A_0001.pdf

PDF 616 KB Posted

Attached to
7J--HAFC IDS MOTION SENSORS Federal contract opportunity
Solicitation number
140P2125Q0124
Issued by
Department of the Interior National Park Service National Office

About this file

This document is a Questions and Answers (Q&A) file for an Intrusion Detection System (IDS) Motion Sensors contract (Solicitation 140P2125Q0124) for the National Park Service. The document provides detailed facility information for three buildings: the Interpretive Design Center (IDC), Lewis Anthony Building (LA), and Bird Brady House (BB), which range from 55 to 130 years old and total approximately 43,402 square feet. The Q&A covers existing motion sensor inventory (52 total units across multiple floors and buildings), facility characteristics including wall compositions, power stability, and specific installation requirements.

Key technical details include confirmation that door contacts will be added to multiple exterior doors, power is stable with a standby generator, and interior walls have varied compositions of masonry, wood, and composite materials. The existing IDS Bosch 8512G-C system's installation date is noted as 2025, though many specifics about the current system remain unknown, including cable types, original installation date, and the installing company. The system is not monitored by DHS, and the contractor will be responsible for verifying equipment locations and determining specific conduit footage during installation.

View the file

Other files for this federal contract opportunity

Other files attached to 7J--HAFC IDS MOTION SENSORS, newest first.
File Type Posted
Sol_140P2125Q0124_Amd_0002.pdf PDF
Q_A_p2_0002.pdf PDF
Attach_6_-_BIRD_BRADY_FLOOR_PLAN_0001.pdf PDF
Sol_140P2125Q0124_Amd_0001.pdf PDF
Attach_5_-_LEWIS_ANTHONY_FLOOR_PLAN_0001.pdf PDF
Attach_4_-_IDC_FLOOR_PLAN_0001.pdf PDF
Attach_3_-_Vendor_cost_sheet.pdf PDF
Attach_2_-_Site_Visit_info_HFC_Motion_Sensors.pdf PDF
Attach_1_-_current_Equipment.xlsx XLSX spreadsheet
Sol_140P2125Q0124.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers IDC Motion Sensors

140P2125Q0124

Q1. 1. Does the HFC wish to add door contacts to any of the existing exterior doors listed below?

• IDC 1st Floor - Door 106 Back Entrance Door along the back glass wall

• IDC 1st Floor – Garage Roll-Up Door Loading Dock

• IDC 2nd Floor – Door 203 Stairwell Entrance Ground Level patio

• IDC 2nd Floor – Door 206 Side Entrance Room 2012

• Bird Brady Basement – Door 001 Back Entrance

• Bird Brady 1st Floor – Door 102 Back Entrance

• Bird Brady 3rd Floor – Door 301 Balcony Entrance?

A: Yes.

Q2. How old is the facility?

A: Interpretive Design Center Building (IDC) = 55 years old Lewis Anthony Building (LA) = 122 years old Bird Brady House (BB) = 130 years old

Q3. Is the use of this facility mainly office use?

A: Yes

Q4. How much square footage is in the facility?

A: IDC = 33,640 sq ft LA = 5,013 sq ft BB = 4,749 sq ft

Q5. How stable is the power?

A: Power is stable. The IDC has a standby generator.

Q6. Is there a dropped ceiling in all areas of installation?

A: No. The IDC and LA builds have mostly (80%) drop ceiling. The Bird Brady House does not have any drop ceilings.

Q7. What type of walls are in the perimeter areas?

A: IDC – Concrete and brick AL – Masonry/Stone BB – Masonry/Stone, stucco/wood

Q8. Do we need to drill between the walls, to run our cable infrastructure?

A: No. Wall/ ceiling penetrations shall be avoided whenever possible.

Q9. Do we need to use conduit? If yes, what do you estimate the total conduit footage will be?

A: Yes. Total footage to be determined by contractor.

Q10. Can you please provide an inventory of the existing system?

A: *Contractor to verify locations for all equipment.

Existing equipment Location Quantity Notes Wall Mounted IDC 1st Floor 8 IDC Ceiling mounted IDC 1st Floor 5 IDC Wall Mounted IDC 2nd Floor 14 IDC Wall Mounted IDC 3rd Floor 1 IDC Ceiling Mounted IDC 3RD Floor 4 IDC

Ceiling mounted Lewis Anthony 1st Floor 5 LA

Ceiling Mounted Lewis Anthony 2nd Floor 5 LA

Wall Mounted Bird Brady Basement 1 BB Wall Mounted Bird Brady 1st Floor 4 BB Wall Mounted Bird Brady 2nd Floor 4 BB Wall Mounted Bird Brady 3rd Floor 1 BB

Total units 52

Q11. Can you please provide a drawing/floor plan of the existing system?

A: Floor plan drawings have been added (attachments 4, 5 & 6)

Q12. What type of walls are inside the offices?

A: Interior wall composition varies, with masonry, wood, and composite.

Q13. Are the door frames metal and concrete filled?

A: Yes

Q14. Are there any areas of existing asbestos?

A: Unknown

Q15. Based on the SOW, when was the existing IDS Bosch 8512G-C and its keypads installed?

A: 2025

Q16. When were the existing sensors installed?

A: Unknown

A17. Do you know the type of cable used for the installation? Is the cable installed according to factory specifications?

A: Unknown

Q18. Are the existing sensors creating false alarms? If yes, can you tell us in which areas?

A: No

Q19. What is the name of the company that installed the sensors and the IDS system?

A: Unknown

Q20. Are the IDS system monitors by DHS FPS, or is it locally monitored?

A: DHS does not monitor this system