Attach 3 IAH-2 Surface Surveillance Systems (ASDE) Inspection Checklist 04.07.22.pdf
PDF 1 MB Posted
- Solicitation number
- 6973GH-25-R-00115
About this file
This document is a Surface Surveillance Systems Inspection Report for an ASDE-3 radar system located at Houston's IAH Remote Tower, conducted on 04/07/2022. The comprehensive inspection aimed to assess the potential life extension of the antenna and tower, identifying several critical maintenance recommendations including replacing the hatch support arm, repainting the tower, replacing the flex waveguide, repairing the belly pan, addressing hoist and elevator maintenance, and installing cable clamps. The inspection utilized a color-coded deficiency assessment system (green, yellow, red) to categorize issues across 12 different system components, with recommendations focusing on preserving the system's operational integrity and extending its service life.
The related federal contract opportunity (Solicitation Number 6973GH-25-R-00115) is a competitive solicitation by the Federal Aviation Administration for QP-2 Paint Contractors to prepare, remove, and repaint the existing ASDE Tower and Shelters at Houston, TX. The solicitation is 100% set-aside for Small Businesses, with a firm fixed-price contract anticipated. Key dates include a site visit on April 3, 2025, questions due by April 9, 2025, and proposal submissions due by April 15, 2025, at 5:00 PM Central Time. Proposals will be evaluated based on the lowest priced quote that is fully responsive and responsible.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Surface Surveillance Systems Inspection Report 1
Surface Surveillance Systems
Inspection Report (ASDE)
Site Name: IAH Remote
Survey Date: 04/07/2022
Radar Information
System ASDE-3
Site ID IAH Remote Tower
Tower Height 140ft
Shipping Address
Physical Site Address
Latitude 29.982396
Longitude -95.363775
Asset Serial Numbers:
Detection Equipment
Set N008
Pedestal Assembly M001
Antenna Assembly M001
Drive Motor
Slipring 216-R03
Rotary Joint 1846
Antenna
PERSONNEL INFORMATION
Lead Technician / Engineer
Randy Mitchell Phone # 405.514.5470 E-mail don.randy.mitchell@faa.gov
Assessment Technician
Ronnie Medlinger Phone # E-mail ronnie.ctr.medlinger@faa.gov
Site Escort Rodney Edgin Phone # 281.784.7623 E-mail rodney.a.edgin@faa.gov
SSC Manager Jennifer Lemmon Phone # 281.209.8604 E-mail jennifer.l.lemmon@faa.gov
Surface Surveillance Systems Assessment Report 2
Introduction
The PMO desires to extend the life of ASDE antennas up to 10 years until a new antenna is approved and installed, and extend the life of the ASDE towers up to 20 years to support the new antennas.
This ASDE inspection project is an input to the PMO to aid their decision-making regarding what tasks need to be performed at each site to meet these desires.
The inspection project includes a hands-on inspection of the physical condition and functionality or serviceability of site assets including the tower, antenna system, and shelter buildings to determine whether the standards and tolerances for operations are being maintained. When the existing condition, functionality or serviceability are determined to be out of required standards and tolerances a corrective action has been provided to facilitate repairs.
Recommendations
1. Order and replace hatch support arm for the top gate access to the maintenance platform.
2. Repaint tower.
3. Replace flex waveguide on bottom side of the rotary joint.
4. Repair or replace belly pan. If a replacement part is available, then it can be ordered and replaced. If no replacement parts are available, then the part can be cleaned, and the groove repaired using epoxy resin. Pan is also missing more than half its latches; the latches will have to be ordered and installed.
5. Contact hoist company for maintenance to the hoist. Replace if necessary.
6. Have elevator inspected by a certified company.
7. During installation of coaxial cables on tower the installation contractor did not use any cable clamps or cable supports. Recommend that clamps are purchased and installed using 20 each size 7/8’’ cable clamps and 20 each size ½’’ cable clamps plus hardware to attach clamps to tower structure.
Surface Surveillance Systems Assessment Report 3
Assessment Deficiency Report
• Green: Minor issues noted due to non-compliance with a current standard.
• Yellow: Moderate issues identified that should be corrected when possible, but is not an immediate concern.
• Red: Critical issues identified that may affect personnel safety, cause a system outage, or damage to equipment. These issues require immediate attention.
Critical Moderate Minor No Issues Not
Inspected
1. Tower
2. Concrete Foundation
3. Tower Painting and Galvanization
4. Shelters
5. Waveguide
6. Lightning Protection System
7. Main Bearing / Drive System
8. Rotary Joint
9. Antenna Junction Box Enclosures
10. Antenna / Rotodome / Radome
11. Hoist / Davit Crane
12. Elevator
A full summary and site specific notation can be referenced in the following sections of this report for more detail on each observation recorded.
Surface Surveillance Systems Assessment Report 4
SECTION 1
Tower
Yes No Comments
1.1 Are there any signs of distress or failure to the
air terminal?
1.2 down conductor?
1.3 hardware?
1.4 mounting hardware?
1.5 obstruction tower lights?
1.6 exterior lighting fixtures?
1.7 Is there a need to replace the exterior lighting
fixtures with LED light bulbs?
1.8 conduits?
1.9 Is there a need to replace the conduits with PVC
coated rigid steel conduits?
1.10 grate hatch / lifting support piston arm?
Needs new piston arm
1.11 steel junction box?
1.12 Is there a need to replace the current junction
box with a stainless steel junction box?
1.13 safety interlocks?
Notes: The Top gate access to Maintenance platform needs the hatch support arm replaced. A replacement will need to be ordered and installed.
Surface Surveillance Systems Assessment Report 5
SECTION 2
Concrete Foundation
Yes No Comments
2.1 Have grout pads underneath base plates
deteriorated or otherwise require maintenance?
2.2 Does the foundation have excess spalling, cracking, or surface erosion?
2.3 Does the foundation appear to have been repaired
in the past?
2.4 Are there any other signs of distress or failure?
Explain.
Notes:
SECTION 3
Tower Painting and Galvanization
Yes No
3.1 Is the tower painted?
3.2 If painted, is the paint peeling?
3.3 If painted, based on visual observation, what is the approximate percentage of surface area on the tower that needs to be re-painted?
100%
3.4 Is the tower hot dipped galvanized?
3.5 Are there bird feces or other foreign substances present on the tower? If applicable, describe extent, severity, and whether work will be affected.
Notes: The paint is faded and thin in areas so that you can see the galvanized metal. Tower is painted in orange / white sections.
Surface Surveillance Systems Assessment Report 6
SECTION 4
Shelters
Yes No Comments
4.1 Base of Tower Equipment Shelter
a. Are there signs of distress or failure to the space heater?
b. Are there signs of distress or failure to the ventilation hood or screen?
c. Is there a need to replace the ventilation screen with a steel bug weave screen?
d. Are there signs of distress or failure to the door frames?
4.2 Second Level Equipment Shelter
4.3 Below Antenna Equipment Shelter
e. Are there signs of distress or failure to the safety interlocks?
4.4 Engine Generator Shelter
e. Are there any signs of corrosion on the fuel tanks?
f. Are there signs of distress or failure to the transformer or the protective bollards?
Surface Surveillance Systems Assessment Report 7
SECTION 5
Waveguide
Yes No Comments
5.1 mounting brackets/hardware?
5.2 Is there any damage to the waveguide?
Rubber piece under the rotary joint is weather cracking.
5.3 Are there any signs of corrosion? (fading, peeling, cracked) Flex rubber pieces are weather cracking.
5.4 Are there any issues with the operation of the
pressurize system?
5.5 Are there any issues with the joint weld condition?
(corroded/cracked)
5.6 Compressor cycle time (on – on)
Notes: The flex waveguide section that attaches to bottom of Rotary Joint should be replaced. This section of waveguide will have to be ordered and installed.
SECTION 6
Lightning Protection System
Yes No Comments
6.1 Does the system show signs of being in less than
generally good repair?
6.2 Are there loose connections that might result in
high-resistance joints?
6.3 Has any part of the system been weakened by
corrosion?
6.4 Have any of the conductors or grounding electrodes
been severed?
6.5 Are any conductors or system components
fastened insecurely to its mounting surfaces?
6.6 Are any conductors or system components subject
to accidental displacement?
6.7
Have any modifications been made or appurtenances added that require additional bonding to the system?
6.8 Is there any visual hardware damage?
Surface Surveillance Systems Assessment Report 8
SECTION 7
Main Bearing / Drive System
Yes No Comments
7.1 Drive – Start drive independently from a stall
a. Is there excessive noise or vibration?
b. Are there any signs of corrosion? (fading, peeling, cracked)
c. Are there any signs of distress or failure?
d. Are there any observed oil leaks (ASDE-X)
7.2 following: (ASDE-3)
a. Intermediate Shaft
b. Main Bearing
c. Tensioner
d. 50mm Belt
e. 85mm Belt
f. Slip Clutch
7.3 Notate date of last replacement for the following:
(ASDE-3)
a. Intermediate Shaft
b. Main Bearing
c. Tensioner
d. 50mm Belt
e. 85mm Belt
f. Slip Clutch
7.4 Workspace height below drives in ft. (ASDE-3) 3ft
7.5 Are there any issues with the accessibility of the
workspace? (ASDE-3)
Notes: The Belly Pan / Drive cover has broken latches and a groove from loose or broken drive belts. If available a new cover should be ordered, if not available then the groove can be fixed using epoxy and new latches can be ordered and installed.
Surface Surveillance Systems Assessment Report 9
SECTION 8
Rotary Joint
Yes No Comments
8.1 Install date of rotary joint
8.2 Performance data VSWR
8.3 Is there excessive noise?
8.4 Are there any signs of corrosion? (fading, peeling, cracked)
8.5 Are there signs of distress or failure to the rotary
joint?
8.6 Are there signs of distress or failure to the cabling
and waveguide on the top side of the rotary joint?
8.7
Are there signs of distress or failure to the cabling and waveguide on the bottom side of the rotary joint?
SECTION 9
Antenna Junction Box Enclosures
Yes No Comments
9.1 Junction box orientation
9.2 Are there any issues with the condition of the
box?
9.3 Are there any issues with the operation of the
safety switch?
9.4 Are there signs of distress or failure to the wiring, relays, or contactors inside the box?
9.5 Are there signs of distress or failure to the conduit
& cabling from the junction box to the drives?
9.6 Are there any signs of corrosion? (fading, peeling, cracked)
9.7 Are there signs of distress or failure to the
mounting hardware?
9.8 Are there any signs of water intrusion?
9.9 Are there any signs that the penetrations of the
box are not weathertight?
Surface Surveillance Systems Assessment Report 10
SECTION 10
Antenna / Rotodome / Radome
Yes No Comments
10.1 Antenna Type (ASDE-3, ASDE-X Terma, or ASDE-X
Easat)
ASDE-3
10.2 Antenna Structure (riser, special mounting, etc.)
10.3 Antenna
a. Notate date of last repair
b. Are there any signs of corrosion (fading, peeling, cracked)
c. Are there any signs of distress or failure to the wiring?
d. Are there any signs of distress or failure to the electrical connections?
10.4 Rotodome (if applicable)
a. Are there any issues with the paint or laminate condition?
Painted 4/7/22
b. Are there any signs of corrosion on the threshold door?
c. Are there any signs of distress or failure to the wiring?
d. Are there any signs of distress or failure to the waveguide?
e. Are there any signs of distress or failure to the fans/heaters?
f. Are there any signs of distress or failure to the flashing at the rotodome base?
10.5 Radome (if applicable)
a. Are there any observed cracks in the caulking?
b. Does the paint appear to be faded?
c. Do any panels appear to be damaged?
Surface Surveillance Systems Assessment Report 11
SECTION 11
Hoist / Davit Crane
Yes No Comments
11.1 Is there a hoist or a Davit crane present? (If so, specify type) Chain Hoist
11.2 If present, are there any signs of distress or failure
to the following:
a. Chain Rusted
b. Hook Rusted
c. Cable
11.3 If present, are there any safety concerns? Hoist is heavily corroded
11.4 Are there any signs of corrosion to the
chain/hook/cable? (fading, peeling, cracked) Rusted
11.5 Are there any signs of corrosion to the pendant?
(fading, peeling, cracked)
Notes: A Hoist Company should be contacted to perform inspection and maintenance on the Hoist or replace if required.
SECTION 12
Elevator
Yes No Comments
12.1 Is the elevator operational?
Needs to be inspected by an elevator company.
12.2 following:
a. Rail
b. Mounting Hardware
c. Motor
d. Safety Interlocks
12.3 Is the emergency egress ladder present?
Notes: The Elevator is operational, but the site has tagged it out for use by the Site Technicians until it can be inspected by Elevator Company. Will need to contact a vendor and have it inspected.
Surface Surveillance Systems Assessment Report 12
SECTION 13
PHOTO CHECKLIST
Capture each photo in accordance with the sequence and description provided Comments
Site 1 Full tower and compound (site)
2 Looking at site from the North/A Face
3 Looking at site from the East/ B Face
4 Looking at site from the South/ C Face
5 Looking at site from the West/ D Face
Structure 6 Leg A from outside looking up (indicate with magic marker each leg)
7 Leg B from outside looking up (indicate with magic marker each leg)
8 Leg C from outside looking up (indicate with magic marker each leg)
9 Leg D from outside looking up (indicate with magic marker each leg)
10 Tower foundation @ the base of leg A
11 Tower foundation @ the base of leg B
12 Tower foundation @ the base of leg C
13 Tower foundation @ the base of leg D
14 Base of tower shelter
15 Second Level Shelter
16 Below antenna shelter
17 Equipment shelter
18 Drive assembly
19 Rotary Joint
20 Antenna Junction Box
21 Antenna Front
22 Hoist
23 Elevator
Deficiencies List pictures of deficiency observed
Hole work into belly pan
Belly pan missing clips
Surface Surveillance Systems Assessment Report 13
SECTION 14
REFERENCE IMAGES
Insert pictures from site in order of picture checklist
Full tower and compound (site)
Surface Surveillance Systems Assessment Report 14
Looking at site from the North / A Face
Looking at site from the West / D Face
Drive Assembly
Hoist
Surface Surveillance Systems Assessment Report 15
Elevator
Top of lower shelter
Hole worn into belly pan
Belly pan missing clips
Surface Surveillance Systems Assessment Report 16
Surface Surveillance Systems Assessment Report 17
File details come from the government source that posted it. Updated .