This document is a Request for Information (RFI) containing 19 questions and answers related to a Federal Aviation Administration (FAA) contract for painting an ASDE Tower in Houston, TX. The solicitation is a competitive, firm-fixed-price contract set aside for small businesses, seeking QP-2 certified paint contractors to prepare, remove, and repaint an existing tower and two shelters. Key details include a site visit scheduled for April 3, 2025, a requirement for QP-2 certified contractors, and potential lead-based paint abatement. The project involves full or spot lead abatement, with weekend work permitted and a 40x40 staging area available. Contractors must use Sherloxane 800 coating material, cannot use the on-site elevator, and must submit proposals by April 15, 2025, at 5:00 PM Central Time to Bryon R. Nolan via email.
The RFI clarifies critical project specifications, including no available tower drawings, more than 20% paint fade/missing paint, and more than 10% coating failure. The entire tower potentially contains lead-based paint and must be handled accordingly. The project includes two shelters - one at the top of the tower and another halfway up. The FAA will consider value engineering approaches like encapsulation or spot lead abatement methods. Contractors must provide their coating contractor's QP-2 certification with their offer, and no liquidated damages are associated with the project.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IAH ASDE TOWER PAINT RFI’s
SIR #6973GH-25-R-00115
1. Are you able to get us any drawings with dimensions of the tower?
Answer: No drawings are available of the tower.
2. Are you able to provide a list of contractors that will be bidding/attended the site visit?
Answer: A list of site visit attendees will not be provided.
3. Would it be safe to say that there is more than 20% corrosion to the existing coatings?
Answer: Site exhibits more than 20% paint fade / missing paint but does not have more than 20% corrosion on tower.
4. Are there any drawings available for dimensioning purposes?
Answer: See answer #1.
5. Will the elevator be in use while the work is being performed?
Answer: The local SSC would prefer that the elevator remain operational during the project.
However, the contractor will not be authorized to utilize the elevator.
6. Is there access to water on-site?
Answer: No.
7. Are weekends available for on-site work?
Answer: Yes, weekend work can be accommodated.
8. Lead abatement & recoating of the full structure is required, correct?
Answer: Correct. FAA will also accept value engineering utilizing encapsulation / overcoating using spot lead abatement methods in lieu of a full abatement.
9. Would it be safe to say that there is less than 10% coating failure?
Answer: No, there is more than 10% coating failure.
10. Will all answers to all questions be posted for everyone to see?
Answer: Yes.
11. Without the ability to get on the structure should we assume that less than 10% of the total surface area of the structure shows coating failure and will require surface prep and repair?
Answer: There is more than 10% failure to the painted surface.
12. Just to be clear, the requirement for QP-2 will be waived if a contractor can show successful past performance of lead removal or regardless, will the AMPP QP-2 Certification be required for this project.
Answer: No the QP-2 requirement will not be waived, the contractor or subcontractor must be QP-2 certified.
13. Are there any liquidated damages associated to the project?
Answer: No.
14. In regards to the worksite area we will need a 40x40 staging area that can be later used for our temporary facilities and waste yard. Preferably inside the gates. Can this be accomplished?
Answer: Yes, there is room at the facility.
15. There is an ECU I assume, on site. Is that going to be part of the project? meaning is this going to need to be contained, prepped and painted? Are there any others considered shelters other than on the tower?
Answer: There is a shelter directly underneath the rotodome at the top of the tower and another shelter about half-way up the tower. Both are included in the scope of work. No other shelters / structures separate from the tower are included in the scope of work.
16. What level of abatement is required? Full Abatement? Spot-Abatement?
Answer: Entire tower has the potential to contain lead based paint and should be handled accordingly.
17. Is full encapsulation of the tower a requirement during LBP abatement? Could spot-containment be utilized?
Answer: Entire tower has the potential to contain lead based paint and should be handled accordingly.
18. Is it acceptable for us to provide our Coating Contractors QP-2 Certification with our offer?
Answer: Yes.
19. Just so that you are aware the coating material specified on Page 3 of the Statement of Work (XLE-80) as Manuf. By S&W is discontinued and its replacement is Sher Loxane 800.
Answer: Sherloxane 800 is acceptable.