Attach 2 - SOI_Lake Fork _06.07.2024_REV1.xlsx
XLSX spreadsheet 69 KB Posted
- Attached to
- LAKE FORK ERFO ROAD REPAIR Federal contract opportunity
- Solicitation number
- 1122528
- Issued by
- Department of Agriculture Forest Service
About this file
This document is a Schedule of Items (SOI) for the LAKE FORK ERFO ROAD REPAIR project, which is a federal contract opportunity solicitation published by the U.S. Department of Agriculture Forest Service.
The SOI outlines the required repair work on Forest Road 50070 in Utah, including culvert replacement, gravel fill, drainage grading, rock riprap placement, and general roadway repair. The work is divided into a base item and four bid options, with estimated quantities and units of measure provided for items such as mobilization, traffic control, erosion/sediment control, select fill, roadway shaping, and various sizes of culvert installation. Offerors are required to provide unit prices for the listed items. The total project value is not provided.
The associated federal contract opportunity, Solicitation Number 1122528, provides additional details on the project scope and requirements. It specifies that the intent of the contract is to provide for the complete construction of the project as described in the contract documents.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1282B124R0024_A00003_LAKE FORK ERFO_S.pdf | ||
| 1282B124R0024_A0002_S.pdf | ||
| 1282B124R0024_A0001_S.pdf | ||
| Attachment 7 - Signs.pdf | ||
| Attach 4 - FSSS_All_Supplementals_2403 (1) 06.07.2024.pdf | ||
| Attach 6- Location Map.pdf | ||
| 1282B124R0024_LAKE FORK.pdf | ||
| Attach 3 - Lake Fork ERFO Drawing Signed 06.07.2024_ Rev 1.pdf | ||
| Attach 5 - Wage Determination_UT20240109_Lake Fork ERFO Rd Repair.pdf | ||
| Attach 1 - SOW_Lake Fork ERFO 06.07.2024_REV 1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOI -LAKE FORK ERFO
| USDA Forest Service | ||||||
| SCHEDULE OF ITEMS | ||||||
| Lake Fork ERFO Roadway Repair | ||||||
| USDA Forest Service- Utah County | ||||||
| Ferron-Price Ranger District | ||||||
| BASE ITEM # | DESCRIPTION (SITES 1-5) | *METHOD OF MEASURMENT | PAY UNIT | EST. QTY. | UNIT PRICE | TOTAL PRICE |
| 15101 | Mobilization | CQ | LS | 1 | $ - 0 | |
| 63501 | Traffic Control Signage | CQ | LS | 1 | $ - 0 | |
| 15701 | Erosion/Sediment Control /SWPPP | CQ | LS | 1 | $ - 0 | |
| 60101 | Select Fill (2" minus) (Commercial) | AQ | Ton | 104 | $ - 0 | |
| 20401 | Cut/Fill Roadway Template Shaping | CQ | CY | 1035 | $ - 0 | |
| 25101 | Rip Rap (Type 6)(Comercial) | AQ | Ton | 1508 | $ - 0 | |
| 25102 | Rip Rap (Type 6)(Onsite) | AQ | Ton | 72 | $ - 0 | |
| 20701 | Geo Textile | AQ | SQYD | 1783 | $ - 0 | |
| 60202 | 60" Culvert and Install | AQ | FT | 32 | ||
| Total Base | $ - 0 | |||||
| BID OPTION 1 | ||||||
| OPTION ITEM # | DESCRIPTION (SITES 6-13) | METHOD OF MEASURMENT | PAY UNIT | EST. QTY. | UNIT PRICE | TOTAL PRICE |
| 15101 | Mobilization | CQ | LS | 1 | $ - 0 | |
| 20401 | Cut/Fill Roadway Template Shaping | CQ | CY | 1100 | $ - 0 | |
| 25101 | Rip Rap (Type 6)(Comercial) | AQ | Ton | 1080 | $ - 0 | |
| 20701 | Geo Textile | AQ | SQYD | 1016 | $ - 0 | |
| Total Bid Option 1 | $ - 0 | |||||
| BID OPTION 2 | ||||||
| OPTION ITEM # | DESCRIPTION (SITES 14-23) | METHOD OF MEASURMENT | PAY UNIT | EST. QTY. | UNIT PRICE | TOTAL PRICE |
| 15101 | Mobilization | CQ | LS | 1 | $ - 0 | |
| 60101 | Select Fill (2" minus) (Commercial) | AQ | Ton | 468 | $ - 0 | |
| 20401 | Cut/Fill Roadway Template Shaping | CQ | CY | 1550 | $ - 0 | |
| 25101 | Rip Rap (Type 6)(Comercial) | AQ | Ton | 1494 | $ - 0 | |
| 25102 | Rip Rap (Type 6)(Onsite) | AQ | Ton | 126 | $ - 0 | |
| 20701 | Geo Textile | AQ | SQYD | 1862 | $ - 0 | |
| 60201 | 24" Culvert & Install | AQ | FT | 32 | ||
| Total Bid Option 2 | $ - 0 | |||||
| BID OPTION 3 | ||||||
| OPTION ITEM # | DESCRIPTION (SITES 23-30) | METHOD OF MEASURMENT | PAY UNIT | EST. QTY. | UNIT PRICE | TOTAL PRICE |
| 15101 | Mobilization | CQ | LS | 1 | $ - 0 | |
| 20401 | Cut/Fill Roadway Template Shaping | CQ | CY | 1420 | $ - 0 | |
| 25101 | Rip Rap (Type 6)(Comercial) | AQ | Ton | 1602 | $ - 0 | |
| 25102 | Rip Rap (Type 6)(Local) | DQ | CY | 554 | $ - 0 | |
| 20701 | Geo Textile | AQ | SQYD | 2244 | $ - 0 | |
| 60202 | 36" Culvert and Install | AQ | FT | 84 | ||
| Total Bid Option 3 | $ - 0 | |||||
| BID OPTION 4 (Site 9 MP 1.92) | ||||||
| OPTION ITEM # | DESCRIPTION (SITE 9) | METHOD OF MEASURMENT | PAY UNIT | EST. QTY. | UNIT PRICE | TOTAL PRICE |
| 15101 | Mobilization | CQ | LS | 1 | $ - 0 | |
| 20401 | Cut/Fill Roadway Template Shaping | CQ | CY | 370 | $ - 0 | |
| 25101 | Rip Rap (Type 6)(Comercial) | AQ | Ton | 342 | $ - 0 | |
| 20701 | Geo Textile | AQ | SQYD | 317.8 | $ - 0 | |
| Total Bid Option 4 | $ - 0 | |||||
| BID OPTION 5 (CATTLE GUARD MP 4.9 & Gate TBT) | ||||||
| OPTION ITEM # | DESCRIPTION (SITE 9) | METHOD OF MEASURMENT | PAY UNIT | EST. QTY. | UNIT PRICE | TOTAL PRICE |
| 15101 | Mobilization | CQ | LS | 1 | $ - 0 | |
| 61901 | 16 FT Cattle Guard and Install | DQ | LS | 1 | $ - 0 | |
| 61902 | 16 FT Gate and Install (Upper End TBT) | DQ | LS | 1 | $ - 0 | |
| Total Bid Option 4 | $ - 0 | |||||
| Project Total | $ - 0 |