Attach 1_Instructions to Offerors_Evaluation Criteria_23-R-0005_22 DEC 2022.pdf
PDF 165 KB Posted
- Attached to
- Nurse Case Managers
- Solicitation number
- W81K00-23-R-0005
- Issued by
-
Department of the Army Medical Command
About this file
This solicitation requests proposals to provide twenty full-time nurse case managers to support Brooke Army Medical Center at Joint Base San Antonio. Offerors must submit proposals electronically by January 16, 2023. The government will award a firm-fixed-price contract for a one-year base period starting April 1, 2023, plus four one-year option periods. The requirement is set aside for 8(a) small businesses under NAICS code 621399 for health practitioners with a size standard of $9 million. Evaluation will consider past performance, compensation plans, and price. The compensation plan must demonstrate the ability to attract qualified nurses. The government seeks the best value and will consider all factors in the award decision.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
22 December 2022 W81K00-23-R-0005
ADDENDUM TO 52.212-1
Offerors shall submit proposals in electronic form via email no later than 2:00 P.M., Central Time (CT)((San Antonio, Texas)), 16 January 2023. The point of contact is Ms. Tammi Lambert, Contract Specialist, at tammi.r.lambert.civ@health.mil and Robin M. Castro, Contracting Officer, at robin.m.castro.civ@health.mil.
Offers shall be submitted via e-mail only. Proposals received after 2:00 P.M., CT on 16 January 2023 will be late and will not be considered for award. Failure to submit the required documentation as specified in the following paragraphs will make the Offeror non-compliant and ineligible for award. It is vital that Offerors follow instructions provided and adhere to page limits specified.
Questions shall be submitted via e-mail to Ms. Tammi Lambert (tammi.r.lambert.civ@health.mil) and Robin M. Castro (robin.m.castro.civ@health.mil) not later than 2:00 P.M., CT 28 December 2022. No questions will be entertained after this date. Do NOT submit multiple emails for questions.
Answers to vendor questions will be posted to SAM.gov.
Note: Only electronic (e-mail) proposals will be accepted. Offers submitted by any other method are unacceptable. Each volume shall be submitted as a separate file in .pdf format, with the files names clearly identifying the volume number and contractor’s name. Pricing shall be submitted on the Excel spreadsheet attached to the solicitation (Attachment 2), renamed with the same naming convention. A .pdf of pricing is not required. Pricing information shall be included in Volume IV – Pricing only and shall not be included or summarized in any other volume. The proposal shall not contain any extraneous information such as advertisements or marketing information.
Files larger than 20MB may need to be transmitted in separate emails. All emails, regardless of size, need to be received by the Government server, by the stated submission deadline. The Government will not be responsible for any failure of transmission or receipt of the proposal, or any failure of the Offeror to verify receipt of the emailed proposal. All proposals submitted after the deadline will be considered untimely and ineligible for award.
The proposal shall be clear, concise and include sufficient detail for effective evaluation and for substantiation of the validity of stated claims. Responses to this solicitation shall strictly adhere to the requirements set forth in the solicitation. Therefore, each initial proposal should contain the Offeror’s best terms for past performance, compensation, and price. Submissions that do not adhere to format and content requirements may be considered non-complaint. The Government reserves the right to eliminate any such proposals from consideration for award.
The proposal shall be prepared in four (4) separate volumes as follows.
Volume I – Administrative Volume II – Past Performance Volume III – Compensation Plan Volume IV – Pricing
VOLUME I – ADMINISTRATIVE
Volume I – Administrative shall include the following:
1. A summary or title page identifying the Offeror, the full address, phone, DUNS number, CAGE code, point(s) of contact (POC(s)) of the Offeror, and the solicitation number. Offeror shall include a statement that the Offeror agrees to hold the offered prices firm for 180 calendar days after the proposal closing date. (Page limit: 1 page)
2. For Offerors proposing as an 8(a) Joint Venture (JV), the JV must be separately identified with its own name, DUNS number, and CAGE number in the System for Award Management (SAM) and designate the entity type as a joint venture, with individual partners listed as the immediate owners.
3. A summary identifying any proposed teaming partners or subcontractors. At a minimum the summary shall include the role and percentage of work proposed to be performed by the teaming partner or subcontractor. (Page limit: 2 pages)
4. A completed copy of PAGE 1 ONLY of the SF 1449 and any amendments to the solicitation, if any are issued, with the signature of a corporate officer authorized to negotiate for the company.
Electronic signature is acceptable. Do not include the entire SF 1449.
5. Representations and Certifications. Offerors shall be registered in the SAM with the appropriate NAICS Code and shall not have any Active Exclusions listed within SAM. If the Offeror is currently registered in SAM with completed representations and certifications, an affirmation on the title page (or separate page) that these representations and certificates are current, complete, and accurate as of the date proposals are due shall suffice. Otherwise, the Offeror shall complete and include with its proposal one (1) copy of the following provisions located within the solicitation: FAR Provision 52.212-3, Offeror Representations and Certifications, Alternate I; FAR Provision 52.209-7, Information Regarding Responsibility Matters; plus any other provisions herein. A small business joint venture offeror must submit, with its offer, the representation required in paragraph (c) of FAR solicitation provision 52.212-3, Offeror Representations and Certifications-Commercial Products and Commercial Services, and paragraph (c) of FAR solicitation provision 52.219-1, Small Business Program Representations, in accordance with 52.204-8(d) and 52.212-3(b) for the following categories: (A) Small business; (B) Service-disabled veteran-owned small business; (C) Women-owned small business (WOSB) under the WOSB Program; (D) Economically disadvantaged women-owned small business under the WOSB Program; or
(E) Historically underutilized business zone small business. (Page limit: 1 page if registered in SAM; unlimited pages if including provisions.)
6. The Continuation of Essential Contractor Services Plan. This plan shall be prepared in accordance with DFARS 252.237-7024, Notice of Continuation of Essential Contractor Services, contained in this solicitation. There is no page limit for this plan; however, Offerors are encouraged to be as succinct as possible in describing how it will continue to perform the essential contractor services listed in the Performance Work Statement during periods of crisis.
The plan shall identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed, and shall address, at a minimum, (i) Challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves;
(ii) The time lapse associated with the initiation of the acquisition of essential personnel and resources and their actual availability on site; (iii) The components, processes, and requirements for the identification, training, and preparedness of personnel who are capable of relocating to alternate facilities or performing work from home; (iv) Any established alert and notification procedures for mobilizing identified “essential contractor service'' personnel; and (v) The approach for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis. Note: The inclusion of this plan falls under administrative proposal compliance and is not an individually rated factor. By the offeror’s submission, the Continuation of Essential Contractor Services Plan will be incorporated into the resultant contract award of the successful offeror and will be utilized in the event of a period of crisis.
VOLUME II – PAST PERFORMANCE
The Offeror shall submit with its proposal evidence of recent and relevant past performance under which YOUR company (the Offeror) provided the same or similar services with similar magnitude and scope in the public and/or private sector. Performance must have been by the Offeror (not by a subsidiary or sister company) either as the prime contractor or subcontractor. For a description of the characteristics or aspects the Government will consider in determining recency and relevancy, see the Evaluation Criteria for Factor 1 – Past Performance in the Addendum to 52.212-2.
Offerors shall complete and provide the Past Performance Information (PPI) Sheet
(Attachment 6) on three (3) task orders or stand-alone contracts/purchase orders the Offeror will complete or has completed within the past three (3) years from the closing date of this solicitation that the Offeror considers most relevant in demonstrating YOUR company’s (the Offeror’s) ability to perform the proposed effort. Offerors shall utilize the templates provided and ensure all information is complete and accurate.
If the Task Order or Contract being submitted is an ordering type contractual vehicle (for example, including but not limited to an Indefinite Delivery “D” type contract per FAR 16.5), only after issuance of a delivery/task order does performance occur. The Contract Number, Total Contract Dollar Value, Period of Performance, Type and Complexity of Services provided submitted shall be for the Task/Delivery Order the Offeror has performed under this ordering type contractual vehicle. Not the ordering vehicle itself or a combination of orders under the vehicle. Offeror’s PPI submissions that do not adhere to this information/format will not be evaluated and may effect the overall rating received.
Past Performance must be with the Department of Defense (DoD), other US Government departments or agencies, state and local governments and/or commercial/private sector clients. If the Offeror performed as a subcontractor on the reference project, the PPI shall explain what percentage and type of work that was performed by the Offeror as subcontractor.
Each Past Performance Information (PPI) Sheet is limited to 3 pages per project.
NOTE: Past performance reference projects performed by a proposed teaming partner or a proposed subcontractor will only be considered if: (1) the Offeror submits at least one recent and relevant past performance project that the Offeror has performed, as a prime; (2) the teaming partner or subcontractor is identified as a teaming partner or subcontractor in the administrative volume of the proposal, and (3) the role and percentage of work proposed to be performed by the teaming partner or subcontractor on the proposed requirement is detailed in the proposal. Items (2) and (3) shall be identified in the administrative volume.
Past Performance Questionnaires (PPQs) in accordance with the PPQ Form (Attachment 7).
The Offeror will send blank PPQs to Government agencies and/or private sector companies requesting past performance information on applicable projects. Narratives are required on questionnaires (PPQs) for ratings other than satisfactory. If the narratives do not support the rating or if there is no narrative for a rating higher than satisfactory, the questionnaire rating will be evaluated as satisfactory.
It is the responsibility of the Offeror to track and ensure the completion/submission of the PPQs by the proposal due date. The Government will not accept incomplete or late PPQs. The PPQs shall reference the exact same projects detailed in the PPIs. Past Performance references may be contacted.
Contractor Performance Assessment Reports (CPARs) will also be accepted. For PPIs that have CPARs Offerors can submit CPARs with PPIs in lieu of PPQs. Offerors shall ensure CPARs are finalized and reference the exact same projects detailed in the PPIs.
The Government reserves the right to use both the information provided in the Offeror’s Past Performance submittals and information obtained from other sources available to the Government.
VOLUME III – COMPENSATION PLAN
Compensation Plan: Offerors shall submit a complete Total Compensation Plan setting forth salaries and fringe benefits for the specialty identified in this solicitation. Offerors shall breakout the total compensation hourly rates (Base Rate + Fringe = Total Compensation Hourly Rate) for the base period and each option period. Attachment 3 is hereby provided as a sample to assist Offerors in how to breakout the Base Rate + Fringe to equal the Total Compensation Hourly Rate. Offerors are not required to use this sample; however, Offerors are cautioned to ensure that the information presented in Attachment 3 is included with their compensation plan to show the Total Compensation Hourly Rate (Base + Fringe).
Offerors shall include a narrative (limited to five (5) pages) and supporting information used in establishing the total compensation structure. The compensation levels proposed should reflect a clear understanding of work to be performed and should indicate the capability of the proposed compensation structure to obtain and keep suitably qualified personnel to meet mission objectives.
In the event of hiring independent contractors and or subcontractors, a separate Compensation Plan will NOT be required. Rather, independent /subcontractor data shall be rolled-up into the prime contractor’s Compensation Plan. Offerors shall provide an explanation of how the independent contractors and or subcontractors will be compensated, and that the proposal is compliant with subcontracting limitations.
VOLUME IV – PRICING
The Offeror shall submit proposed pricing for all contract line item numbers identified in the solicitation on the Excel spreadsheet provided as Attachment 2. The Pricing Worksheet shall be submitted in Microsoft Excel format with all formulas intact. Offerors shall ensure the formulas and totals accurately reflect the pricing data proposed. Provide total pricing for the base period and each option period, as well as a grand total of the entire proposal. Cost and Pricing Data is not required under competitive and commercial acquisitions; however, if only one proposal is received - Other than Certified Cost or Pricing data may be required.
(m) The Government will award a contract resulting from the solicitation to the responsible Offeror whose proposal conforms to the solicitation and is the most advantageous to the Government, price and other factors considered.
(End of Addendum to 52.212-1)
ADDENDUM TO 52.212-2
Paragraph (a) is hereby replaced with the following:
(a) Award will be made using the Best-Value Tradeoff source selection process. Past Performance is significantly more important than Compensation Plan, and both are more important than price when combined. However, price could become the determining factor, if the proposals are determined to be essentially equal. The Government intends to award one contract as a result of this solicitation. In using the best value approach, the Government seeks to award to the Offeror who gives the Agency the greatest confidence that it will best meet or exceed our requirements in a way that will be advantageous to the Government. This may result in an award to a higher rated, higher priced Offeror where the decision is consistent with the evaluation factors and the Source Selection Authority (SSA) reasonably determines that the past and present performance of the higher priced Offeror outweighs the price difference.
To arrive at a best value decision, the SSA will integrate the source selection team’s evaluations of the factors described in this provision. While the Government will strive for maximum objectivity, the tradeoff process, by its nature, is subjective; therefore, professional judgment is implicit throughout the selection process. Award will be made to the responsible Offeror whose proposal conforms to all required terms and conditions, includes all required representations and certifications, meets all requirements set forth in the solicitation, and also provides the best value to the Government based on the results of the evaluation as described below.
Award may be made without discussions with Offerors (except communications conducted for the purpose of minor clarification). Therefore, each initial offer should contain the Offeror's best terms from a past performance and price standpoint. However, the Government reserves the right to conduct discussions if it is later determined by the Contracting Officer to be necessary. When discussions/negotiations occur, each participating Offeror shall be given an opportunity to revise their proposal to reflect any changes that may have resulted from the discussions/negotiations.
The following factors shall be used to evaluate offers:
(1) FACTOR 1 - PAST PERFORMANCE
(2) FACTOR 2 - COMPENSATION PLAN
(3) FACTOR 3 - PRICE
EVALUATION CRITERIA
The Government evaluation process is as follows:
Step 1 – The Government will conduct a compliance review to determine if each Offeror met the submission requirements as outlined in 52.212-1 and Addendum to 52.212-1. If a proposal is found to be non-compliant no further consideration will be afforded to that proposal.
Step 2 – Once the Government has determined which proposals are compliant, only those proposals will continue with the evaluation process as outline below.
Step 3 – Evaluation Process for Factors 1, 2 and 3
FACTOR 1 – PAST PERFORMANCE
The overall PCA rating is based on an integrated assessment of the Offerors recent, relevant, and quality past performance (PPI Sheets, PPQs, CPARs, and information obtained from other sources available to the Government). The resulting PCA rating is determined at the factor level and represents an overall evaluation of contractor performance. Offerors without a record of recent, relevant and quality past performance or for whom information on past performance is so sparse that no meaningful confidence assessment rating can be reasonably assigned will not be evaluated favorably or unfavorably on past performance and, as a result, will receive a "Neutral Confidence" rating for the Past Performance factor.
More recent performance will have a greater impact on the performance confidence rating than less recent effort. A strong record of relevant past performance may be considered more advantageous to the Government than a "Neutral Confidence" rating. Likewise, a more relevant past performance record may receive a higher confidence rating and be considered more favorably than a less relevant record of favorable performance. In evaluating past performance, the Government reserves the right to give greater consideration to information on those contract citations deemed most relevant to the effort described in this solicitation. A rating of at least Satisfactory Confidence or Neutral Confidence must be obtained in order to be eligible for award. More relevant past performance record may receive a higher confidence rating and be considered more favorably than a less relevant record of favorable performance. A “Substantial Confidence” rating of past performance will be considered more advantageous to the Government than a "Satisfactory Confidence" rating.
For Offerors who relied on a subcontractor/teaming partner’s past performance information, the Government ensure those Offerors meet the subcontractor/teaming partner requirements outlined in the solicitation. The Government will follow 13 CFR 125.8(e) when evaluating any Joint Venture’s submittal under this factor. Consideration will be given to work done individually for each partner as well as work done as the Joint Venture (as applicable).
Definitions
The following definitions will be utilized for the Performance Confidence Assessment determination:
(a) Recency Assessment An assessment of the past performance information contained in the Offeror’s submittals will be made to determine if it is recent. To be recent, the effort must be ongoing or must have been performed within the past three (3) years from the closing date of this solicitation. Past performance information that fails this condition will not be evaluated.
(b) Relevancy Assessment An assessment of the recent past performance information will be made to determine its relevancy. This information will be evaluated to determine how closely the services performed under those contracts relate to the scope, magnitude of effort and complexities this solicitation requires.
(c) Performance Quality Assessment After the determination of recency and relevancy, the Government will assess the performance quality (how well the contractor performed on the contracts). The Government will review all past performance information collected and determine the quality of the Offeror’s performance, general trends, and usefulness of the information and incorporate these into the Performance Confidence Assessment. A separate quality assessment rating will not be assigned; rather, the Past Performance Confidence Assessment rating is based on the Offeror’s overall record of recency, relevancy, and quality of performance.
Relevancy Ratings: The Government will use the following relevancy definitions/ratings when assessing relevant past performance:
Relevancy Rating
Adjectival Rating Description
Very Relevant
Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires. (i.e., services included providing the same or larger sized full-service team, providing the same services, in the same environment as the solicited requirement.)
Relevant
Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires. (i.e., services included providing a slightly smaller sized full-service team, providing similar services in a similar environment as the solicited requirement.)
Somewhat Relevant
Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires. (i.e., services included providing a smaller full-service team, providing somewhat similar services in a similar environment as the solicited requirement.)
Not Relevant
Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires. (i.e., services included providing a considerably smaller sized team that did not encompass full-service, or where the scope, magnitude and complexities are dissimilar to the solicited requirement.)
Confidence Ratings: The Government will use the following definitions/ratings when making an overall Performance Confidence Assessment (PCA).
Performance Confidence Assessments Rating Methods
Rating Description
Substantial Confidence Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.
Satisfactory Confidence
Government has a reasonable expectation that the Offeror will successfully perform the required effort.
Neutral Confidence
No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
Limited Confidence
Government has a low expectation that the Offeror will successfully
No Confidence
Government has no expectation that the Offeror will successfully
FACTOR 2 – COMPENSATION PLAN
The proposed compensation plan for each specialty identified in this solicitation will be considered in terms of its impact upon recruiting and retention and its consistency with a total plan for compensation that is sufficient to attract and retain quality Health Care Providers (HCPs) at a fair and reasonable rate at which we could reasonably expect a vendor to be able to recruit and retain qualified individuals for this requirement. The Government will utilize a variety of sources to evaluate each Offeror’s Compensation Plan to determine an Acceptable or Unacceptable rating. In order to adequately manage the risk of non-performance and high turnover the Government will evaluate Compensation Plan (base salary plus fringe) rates for the base year and option years to ensure the Compensation Plan is sufficient to recruit and retain qualified candidates to support this requirement. A Compensation Plan for each of the specialties will be required and will be rated individually as either “acceptable” or “unacceptable” and then an overall rating will be assigned for this factor.
Any offer that receives a rating of less than “acceptable” on any of the specialties compensation plan will be ineligible for award and will be rated “unacceptable” for the overall rating for this factor. The proposal will be removed from consideration and no further evaluation will be conducted. Any compensation plan that is incomplete, does not show the breakdown of fringe benefits, explanation if hiring independent contractors/subcontractors, or are not submitted with amounts as hourly (not annual) rates will be rated “unacceptable”.
ACCEPTABLE
Based on Medical Readiness Contracting Office – West’s market research, the proposed compensation is sufficient to attract and retain quality HCPs.
UNACCEPTABLE
Based on Medical Readiness Contracting Office - West’s market research, the proposed compensation to the HCP is not sufficient to attract and retain quality HCPs.
FACTOR 3 – PRICE:
Price Analysis will be conducted. Proposals will be evaluated for price reasonableness. The proposed price will be evaluated on the bottom-line price for the entire effort, inclusive of all options. A price is reasonable if, in its nature and amount, it does not exceed that which would be incurred by a prudent person in the conduct of competitive business. The Government may use various price analysis techniques and procedures to ensure a fair and reasonable price. Some of those techniques are, but not limited to, comparison of proposed prices received in response to the solicitation and/or comparison of proposed prices with the Independent Government Estimate. Price must be determined fair and reasonable.
(c) Options. The Government will evaluate proposals for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that a proposal is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(d) Given that FAR 52.217-8 provides that the Government may exercise the Option to Extend Services at the rates specified in the contract (i.e., the rates in effect when the Extension of Services option is exercised), for purposes of evaluating the Option to Extend Services, the Contracting Officer will consider the prices submitted for each option year, since those are the binding prices should the Option to Extend be exercised.
(e) The award decision will be based on the best value offered to the Government and not solely on price and price related factors. In making the award decision, the Contracting Officer will consider the evaluated rating of all factors.
END OF ADDENDUM TO 52.212-2
File details come from the government source that posted it. Updated .