This is a Price List for a Blanket Purchase Agreement (BPA) for vault toilet pumping services at Bonneville Lock & Dam, issued by the Department of the Army Corps of Engineers, Portland District under solicitation number W9127N26QA029.
The contractor must provide pricing for vault pumping services at seven locations around the Bonneville Lock & Dam facility in Oregon and Washington. The locations and vault capacities are: Bradford Island (OR) at 2,000 gallons, North Shore Shad Deadline (WA) at 1,000 gallons, North Shore Sturgeon Deadline (WA) at 1,000 gallons, Fort Cascades Trail Head (WA) at 1,000 gallons, Hamilton Island (WA) at 1,000 gallons, Hamilton Island Boat Ramp (WA) at 2,000 gallons, and Sediment Retention Structure (WA) at 1,000 gallons. Offerors must provide pricing for all seven line items to be considered for BPA establishment. The contractor is responsible for furnishing all supervision, labor, materials, equipment, and other resources necessary to perform the work. Following each waste removal, the contractor must refill each vault with a minimum of 250 gallons and a maximum of 400 gallons of fresh water, with the contractor responsible for sourcing water from an off-site location as no water sources are available at the vault sites. All work must be performed in accordance with the Performance Work Statement and contract terms and conditions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE LIST
BLANKET PURCHASE AGREEMENT (BPA) VAULT PUMPING
BONNEVILLE LOCK & DAM
CONTRACTOR SHALL FURNISH ALL SUPERVISION, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT (PWS), TERMS AND CONDITIONS SET FORTH IN THE CONTRACT, TO INCLUDE ALL ATTACHMENTS THERETO.
| 0001 |
| Bradford Island (OR) |
| 2,000 Gal |
| $________ |
| 0002 |
| North Shore Shad Deadline (WA) |
| 1,000 Gal |
| $________ |
| 0003 |
| North Shore Sturgeon Deadline (WA) |
| 1,000 Gal |
| $________ |
| 0004 |
| Fort Cascades Trail Head (WA) |
| 1,000 Gal |
| $________ |
| 0005 |
| Hamilton Island (WA) |
| 1,000 Gal |
| $________ |
| 0006 |
| Hamilton Island Boat Ramp (WA) |
| 2,000 Gal |
| $________ |
| 0007 |
| Sediment Retention Structure (WA) |
| 1,000 Gal |
| $________ |
NOTES:
Offerors shall provide a price on all items in order to be considered for evaluation and establishment of a BPA.
Contractor shall ensure that a minimum of 250 gallons and no more than 400 gallons of fresh water is placed into vault after removal of waste. No water sources are available at the locations, contractor will need to source a offsite water source.