ATT5-BusCost Proposal.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
INDUSTRY REVIEW - NEVI INFRASTRUCTURE
Solicitation number
5400027809
Issued by
South Carolina

About this file

This is a Cost Proposal spreadsheet template issued by the South Carolina Department of Transportation (SCDOT) for the National Electric Vehicle Infrastructure (NEVI) program. The spreadsheet is designed for proposers to submit detailed cost breakdowns for EV charging infrastructure across 21 different lots corresponding to Alternative Fuel Corridors (AFC) zones along I-85, I-26, I-77, I-20, and I-95 in South Carolina. Each lot represents specific highway exits where charging stations are to be installed, and proposers must submit separate cost proposals for each lot they bid on.

The cost proposal template requires detailed breakdowns of capital costs (including pre-construction, construction, EV charger acquisition, utility upgrades, and workforce development) and operations and maintenance (O&M) costs over five years. SCDOT will reimburse 80% of eligible costs, with proposers required to provide at least 20% cost share. The template includes specific restrictions on warranty and EVSE costs, which can only be submitted in either capital costs or O&M costs, but not both. For shared EVSE equipment between NEVI and non-NEVI ports, only costs proportional to the NEVI port power rating can be included.

View the file

Other files

File Type Posted
ATT4-PropProj Schedule.xlsx XLSX spreadsheet
ATT1 - Tech Requirements.pdf PDF
ATT3a-TechPropForm Part 1.pdf PDF
ATT10-Ex Letter of Credit.pdf PDF
ATT2 -TasksDeliverables.pdf PDF
ATT7 - Prequal Checklist.pdf PDF
ATT11-Certification.pdf PDF
ATT3b-TechPropForm Part 2.pdf PDF
ATT5-BusCost Proposal.xlsx XLSX spreadsheet
ATT6-Site Host License.pdf PDF
ATT8-FHWA Form 1273.pdf PDF
ATT9-Wage Rates.pdf PDF
Industry Review RFP.pdf PDF
ATT1 - Tech Requirements.pdf PDF
ATT7 - Prequal Checklist.pdf PDF
ATT11-Certification.pdf PDF
ATT3a-TechPropForm Part 1.pdf PDF
ATT10-Ex Letter of Credit.pdf PDF
ATT3b-TechPropForm Part 2.pdf PDF
ATT9-Wage Rates.pdf PDF
ATT5-BusCost Proposal.xlsx XLSX spreadsheet
Industry Review RFP.pdf PDF
ATT6-Site Host License.pdf PDF
ATT8-FHWA Form 1273.pdf PDF
ATT2 -TasksDeliverables.pdf PDF
ATT4-PropProj Schedule.xlsx XLSX spreadsheet
ATT7 - Prequal Checklist.pdf PDF
ATT8-FHWA Form 1273.pdf PDF
ATT10-Ex Letter of Credit.pdf PDF
ATT11-Certification.pdf PDF
ATT3b-TechPropForm Part 2.pdf PDF
ATT2 -TasksDeliverables.pdf PDF
ATT9-Wage Rates.pdf PDF
Industry Review RFP.pdf PDF
ATT1 - Tech Requirements.pdf PDF
ATT3a-TechPropForm Part 1.pdf PDF
ATT4-PropProj Schedule.xlsx XLSX spreadsheet
ATT6-Site Host License.pdf PDF
ATT7 - Prequal Checklist.pdf PDF
ATT8-FHWA Form 1273.pdf PDF
ATT1 - Tech Requirements.pdf PDF
Industry Review RFP.pdf PDF
ATT9-Wage Rates.pdf PDF
ATT4-PropProj Schedule.xlsx XLSX spreadsheet
ATT10-Ex Letter of Credit.pdf PDF
ATT5-BusCost Proposal.xlsx XLSX spreadsheet
ATT6-Site Host License.pdf PDF
ATT3a-TechPropForm Part 1.pdf PDF
ATT2 -TasksDeliverables.pdf PDF
ATT3b-TechPropForm Part 2.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Proposal

Instructions:Fill in the yellow boxes with the required information.
DO NOT adjust any of the formulas or fill information in the white boxes. The white boxes will auto populate based upon inputs from yellow boxes.
If awarded, Awardees will be held to the Total Capital Costs, Total O&M Costs, and the Maximum Total Project Reimbursement (and percentages). Actual costs can shift within those categories.
* O&M Requested Reimbursement Percentage (%) must be the same for all 5 years
**The Maximum Total Project Reimbursement is subject to confirmation by the SCDOT that all proposed costs outlined in this proposal are eligible per 23 CFR 680.
*** Proposers can only submit warranty costs in Capital Costs OR O&M Costs, but NOT BOTH.
**** Proposers can only submit EVSE costs in Capital Costs OR O&M Costs, but NOT BOTH. If the EVSE is shared between NEVI and non-NEVI ports, proposers can only include costs proportional to the power rating of the equipment that can supply the NEVI port simultaneously.
NOTE: Please complete a separate ATTACHMENT 5 – Business/Cost Proposal for each Lot for which you are bidding. Each Business/Cost Proposal shall be clearly labeled indicating the respective Lot, and shall be a separate file or attachment.
Proposer Business Name
Federal UEI
Zone Number (Lot)
Location Address
Capital CostsYear 1 O&M CostsYear 2 O&M CostsYear 3 O&M CostsYear 4 O&M CostsYear 5 O&M CostsDescription (As Needed)
Capital Costs$ - 0
Pre-construction Costs$ - 0
Final Site Design/Engineering$ - 0
Environmental Review Documentation$ - 0
Local Permitting$ - 0
Other - (Describe in cell I19)$ - 0
Construction Costs (Done by Proposer)$ - 0
Concrete/Site Work$ - 0
Electrical work and equipment not provided by utility$ - 0
Striping$ - 0
Signage$ - 0
Communications Equipment$ - 0
Other - (Describe in cell I26)$ - 0
EV Charger Acquisition Costs$ - 0
EVSE****$ - 0
NACS Connectors/Adaptors$ - 0
Other - (Describe in cell I30)$ - 0
Utility Upgrades (Done by Utility)$ - 0
Minor Grid Upgrades$ - 0
Utility work and equipment to provide power to the site$ - 0
Other - (Describe in cell I34)$ - 0
Workforce Development Activities$ - 0
Recruitment$ - 0
Training$ - 0
Other - (Describe in cell I38)$ - 0
Miscellaneous Capital Costs$ - 0
Site Upgrades to meet RFP Requirements$ - 0
Commissioning Costs$ - 0
Reporting Costs$ - 0
Battery for EVSE peak power or resilience$ - 0
Site Upgrades to meet ADA Requirements$ - 0
Pre-purchased 5-Year Warranty***$ - 0
Other - (Describe in cell I46)$ - 0
O&M Costs$ - 0$ - 0$ - 0$ - 0$ - 0
Warranty Costs for each port***$ - 0$ - 0$ - 0$ - 0$ - 0
Site Maintenance (e.g. snow removal, etc.)$ - 0$ - 0$ - 0$ - 0$ - 0
Internet and Charger Network Fees$ - 0$ - 0$ - 0$ - 0$ - 0
Software Fees$ - 0$ - 0$ - 0$ - 0$ - 0
Other Fees (Payment processing, etc.)$ - 0$ - 0$ - 0$ - 0$ - 0
EVSE Maintenance and Repair Costs$ - 0$ - 0$ - 0$ - 0$ - 0
Data Sharing and Reporting Costs$ - 0$ - 0$ - 0$ - 0$ - 0
Cybersecurity and Data Management Costs$ - 0$ - 0$ - 0$ - 0$ - 0
EVSE Lease Fees ****$ - 0$ - 0$ - 0$ - 0$ - 0
Insurance$ - 0$ - 0$ - 0$ - 0$ - 0
Customer Service Line$ - 0$ - 0$ - 0$ - 0$ - 0
Workforce Development Activities (Recruitment)$ - 0$ - 0$ - 0$ - 0$ - 0
Workforce Development Activities (Training)$ - 0$ - 0$ - 0$ - 0$ - 0
Direct Administrative Costs$ - 0$ - 0$ - 0$ - 0$ - 0
Other - (Describe in cell I65)$ - 0$ - 0$ - 0$ - 0$ - 0
Requested Reimbursement Percentage (%)80%80%80%80%80%80%
Annual Reimbursement Amount ($)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Retainage Withheld ($)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Retainage Released ($)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Maximum Total Reimbursement Including Retainage ($)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Proposer Cost Share (%)100%100%100%100%100%100%
Total Capital Costs$ - 0
Total O&M Costs$ - 0
Total Project Costs$ - 0
Maximum Total Capital Reimbursement Amount ($)$ - 0
Maximum Total O&M Reimbursement Amount ($)$ - 0
Maximum Total Project Reimbursement**$ - 0NOTE: This number shall be entered into the respective Lot

The Contractor will be reimbursed according to the submitted Business/Cost Proposal. If actual expenses are less than the costs included in the Business/Cost Proposal, the Contractor will be reimbursed for no more than their Requested Reimbursement Percentage (%) of eligible costs for both capital and operations and maintenance (O&M) costs.

The total obligation of the State for all capital reimbursements to Contractor under this Agreement will not exceed $ - 0 or 80% percent of the total incurred eligible capital costs.

The total obligation of the State for all O&M reimbursements to Contractor under this Agreement will not exceed $ - 0 80% percent of the total incurred eligible O&M costs.

Contractor shall provide the Proposer Cost Share in the Business/Cost Proposal, which shall be no less than 20 percent of the total Project Costs. Contractor is responsible for all costs that exceed the Total Obligation.

Proposer (Legally Responsible Entity)
Authorized Signature (e.g. S-Signature/Name/)
Print Name/Title
Date

Bidding Schedule

Instructions: Complete the Unit Price and the Extended Price for the Lot that corresponds to this Business/Cost Proposal. DO NOT complete more than a single Lot in this tab.
NOTE: Each of the bid items below is a Lot, and each Lot corresponds directly to one of the AFC Zones as detailed in Section III, Table 1. The Unit Price should be the same as the Extended Price
Line NumberQuantityUnit of MeasureUnit PriceExtended Price
11each
Item Description: LOT 1 - AFC ZONE 1 (I-85)
Tendering Text: LOT 1 Charging Stations for AFC Zone 1 includes Exits 2, 4, 11, 14, and 19 on I-85. Please enter the number from cell C78 (Maximum Total Project Reimbursement) from the pricing/cost spreadsheet as the Unit Price.
Line NumberQuantityUnit of MeasureUnit PriceExtended Price
21each
Item Description: LOT 2 - AFC Zone 2 (I-85)
Tendering Text: LOT 2 Charging Stations for AFC Zone 2 includes Exits 36,48, and 51 on I-85. Please enter the number from cell C 78 (Maximum Total Project Reimbursement) from the pricing /cost spreadsheet as the Unit Price.
Line NumberQuantityUnit of MeasureUnit PriceExtended Price
31each
Item Description: LOT 3 - AFC Zone 3 (I-85)
Tendering Text: LOT 3 Charging Stations for AFC Zone 3 includes Exits 83, 87, 90, 92, 95, and 96 on I-85. Please enter the number from cell C 78 (Maximum Total Project Reimbursement) from the pricing/cost spreadsheet as the Unit Price.
Line NumberQuantityUnit of MeasureUnit PriceExtended Price
41each
Item Description: LOT 4 - AFC Zone 4 (I-26)
Tendering Text: LOT 4 Charging Stations for AFC Zone 4 includes Exits 10, 15, 16, 17, 19, 21, and 22 on I-26. Please enter the number from cell C 78 (Maximum Total Project Reimbursement) from the pricing/cost spreadsheet as the Unit Price.
Line NumberQuantityUnit of MeasureUnit PriceExtended Price
51each
Item Description: LOT 5 - AFC Zone 5 (I-26)
Tendering Text: LOT 5 Charging Stations for AFC Zone 5 includes Exits 52, 54, and 60 on I-26. Please enter the number from cell C 78 (Maximum Total Project Reimbursement) from the pricing /cost spreadsheet as the Unit Price.
Line NumberQuantityUnit of MeasureUnit PriceExtended Price
61each
Item Description: LOT 6 - AFC Zone 6 (I-26)
Tendering Text: LOT 6 Charging Stations for AFC Zone 6 includes Exits 97 and 101 on I-26. Please enter the number from cell C 78 (Maximum Total Project Reimbursement) from the pricing/cost spreadsheet as the Unit Price.
Line NumberQuantityUnit of MeasureUnit PriceExtended Price
71each
Item Description: LOT 7 - AFC Zone 7 (I-26)
Tendering Text: LOT 7 Charging Stations for AFC Zone 7 includes Exits 129, 136, 139, and 145 on I-26. Please enter the number from cell C 78 (Maximum Total Project Reimbursement) from the pricing/cost spreadsheet as the Unit Price.
Line NumberQuantityUnit of MeasureUnit PriceExtended Price
81each
Item Description: LOT 8 - AFC Zone 8 (I-26)
Tendering Text: LOT 8 Charging Stations for AFC Zone 8 includes Exits 159, 165, 169, 172, and 177 on I-26. Please enter the number from cell C 78 (Maximum Total Project Reimbursement) from the pricing/cost spreadsheet as the Unit Price.
Line NumberQuantityUnit of MeasureUnit PriceExtended Price
91each
Item Description: LOT 9 - AFC Zone 9 (I-26)
Tendering Text: LOT 9 Charging Stations for AFC Zone 9 includes Exits 197, 199, 203, 205, 209A, and 209B on I-26. Please enter the number from cell C 78 (Maximum Total Project Reimbursement) from the pricing/cost spreadsheet as the Unit Price.
Line NumberQuantityUnit of MeasureUnit PriceExtended Price
101each
Item Description: LOT 10 - AFC Zone 10 (I-77)
Tendering Text: LOT 10 Charging Stations for AFC Zone 10 includes Exits 73, 75, 77, 79, 82, 83, 85, 88, and 90 on I-77. Please enter the number from cell C 78 (Maximum Total Project Reimbursement) from the pricing/cost spreadsheet as the Unit Price.
Line NumberQuantityUnit of MeasureUnit PriceExtended Price
111each
Item Description: LOT 11 - AFC Zone 11 (I-77)
Tendering Text: LOT 11 Charging Stations for AFC Zone 11 includes Exits 41, 46, 48, 55, 62, and 65 on I-77. Please enter the number from cell C 78 (Maximum Total Project Reimbursement) from the pricing/cost spreadsheet as the Unit Price.
Line NumberQuantityUnit of MeasureUnit PriceExtended Price
121each
Item Description: LOT 12 -AFC Zone 12 (I-20/I-77)
Tendering Text: LOT 12 Charging Stations for AFC Zone 12 includes Exits 74 and 17 on I-20/I-77. Applicants for this lot must be within 1-mile of BOTH exit 74 on I-20 and exit 17 on I-77 to be eligible. Please enter the number from cell C 78 (Maximum Total Project Reimbursement) from the pricing/cost spreadsheet as th e Unit Price.
Line NumberQuantityUnit of MeasureUnit PriceExtended Price
131each
Item Description: LOT 13 - AFC Zone 13 (I-20)
Tendering Text: LOT 13 Charging Stations for AFC Zone 13 includes Exits 11, 18, and 22 on I-20. Please enter the number from cell C 78 (Maximum Total Project Reimbursement) from the pricing/cost spreadsheet as the Unit Price.
Line NumberQuantityUnit of MeasureUnit PriceExtended Price
141each
Item Description: LOT 14 - AFC Zone 14 (I-20)
Tendering Text: LOT 14 Charging Stations for AFC Zone 14 includes Exits 51, 55, and 58 on I-20. Please enter the number from cell C 78 (Maximum Total Project Reimbursement) from the pricing/cost spreadsheet as the Unit Price.
Line NumberQuantityUnit of MeasureUnit PriceExtended Price
151each
Item Description: LOT 15 - AFC Zone 15 (I-20)
Tendering Text: LOT 15 Charging Stations for AFC Zone 15 includes Exits 116, 120, and 123 on I-20. Please enter the number from cell C 78 (Maximum Total Project Reimbursement) from the p ricing/cost spreadsheet as the Unit Price.
Line NumberQuantityUnit of MeasureUnit PriceExtended Price
161each
Item Description: LOT 16 - AFC Zone 16 (1-95)
Tendering Text: LOT 16 Charging Stations for AFC Zone 16 includes Exits 5, 8, 18, 21, and 22 on I-95. Please enter the number from cell C 78 (Maximum Total Project Reimbursement) from the pricing/cost spreadsheet as the Unit Price.
Line NumberQuantityUnit of MeasureUnit PriceExtended Price
171each
Item Description: LOT 17 - AFC Zone 17 (I-95)
Tendering Text: LOT 17 Charging Stations for AFC Zone 17 includes Exits 38, 42, 53 on I-95. Please enter the number from cell C 78 (Maximum Total Project Reimbursement) from the pricing/ cost spreadsheet as the Unit Price.
Line NumberQuantityUnit of MeasureUnit PriceExtended Price
181each
Item Description: LOT 18 - AFC Zone 18 (I-95)
Tendering Text: LOT 18 Charging Stations for AFC Zone 18 includes Exits 77 and 82 on I-95. Please enter the number from cell C 78 (Maximum Total Project Reimbursement) from the pricing/cost spreadsheet as the Unit Price.
Line NumberQuantityUnit of MeasureUnit PriceExtended Price
191each
Item Description: LOT 19 - AFC Zone 19 (I-95)
Tendering Text: LOT 19 Charging Stations for AFC Zone 19 includes Exits 115 and 119 on I-95. Please enter the number from cell C 78 (Maximum Total Project Reimbursement) from the pricing /cost spreadsheet as the Unit Price.
Line NumberQuantityUnit of MeasureUnit PriceExtended Price
201each
Item Description: LOT 20 - AFC Zone 20 (I-95)
Tendering Text: LOT 20 Charging Stations for AFC Zone 20 includes Exits 150, 153, 157, 160, and 164 on I-95. Please enter the number from cell C 78 (Maximum Total Project Reimbursement) from the pricing/cost spreadsheet as the Unit Price.
Line NumberQuantityUnit of MeasureUnit PriceExtended Price
211each
Item Description: LOT 21 - AFC Zone 21 (I-95)
Tendering Text: LOT 21 Charging Stations for AFC Zone 21 includes Exits 1, 181, 190, and 193 on I-95. Please enter the number from cell C 78 (Maximum Total Project Reimbursement) from the pricing/cost spreadsheet as the Unit Price.

File details come from the government source that posted it. Updated .