Att2_Bracket_CDRL_Package_Final_5Dec23b.pdf

PDF 728 KB Posted

Attached to
F-16 Bracket Parts/Kit Assemblies Multiple Award IDIQ Acquisition Federal contract opportunity
Solicitation number
FA8232-24-R-3001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document contains a Contract Data Requirements List (CDRL) for an Indefinite Delivery Indefinite Quantity (IDIQ) multiple award contract opportunity for F-16 Bracket Parts and Kit Assemblies. The CDRL outlines five required deliverables for quality assurance and status reporting, to be provided by contractors on a regular basis throughout contract performance. Deliverables include Quality Assurance Reports, Status Reports, Test/Inspection Reports, and Government Property Inventory Reports. Contractors must submit deliverables electronically to the Air Force Life Cycle Management Center at specified intervals or as required, and are subject to a five-day review period. The opportunity is issued by the Department of the Air Force Materiel Command for an IDIQ program to provide F-16 parts and assemblies in support of the F-16 fleet.

View the file

Other files for this federal contract opportunity

Other files attached to F-16 Bracket Parts/Kit Assemblies Multiple Award IDIQ Acquisition, newest first.
File Type Posted
QA 1 (FA823224R3001)_Questions_1_thru_13_13Feb24_Rev1.pdf PDF
FA823224R3001_0002_13Feb24.pdf PDF
QA 2 (FA823224R3001)_Q14_29Jan24.pdf PDF
QA 1 (FA823224R3001)_Questions_1_thru_13_18Jan24.pdf PDF
Bracket Section L_18Jan24_HTRO.pdf PDF
Bracket_Sample_Task_IDO_18Jan24.docx DOCX document
FA823224R3001_0001.pdf PDF
Att1_SOW_Bracket IDIQ_Final_13Dec23.pdf PDF
Section J - Attachment 1 (Self-Scoring Worksheet).docx DOCX document
Bracket Section M_13Dec23_HTRO.pdf PDF
Att3_Packaging_Instructions.pdf PDF
FA823224R3001 (Final)_15Dec23.pdf PDF
Bracket_Sample_Task_IDO_15Dec23.docx DOCX document
Bracket Section L_13Dec23_HTRO.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12/4/2023 6:52:26 PM CST CDRL Table of Contents C23-02-15

RFP

CONTRACT #:

CONTRACTOR:

SET NAME: C23-02-15 SYSTEM ITEM: F-16 BRACKET PARTS AND KIT

ASSEMBLIES IDIQ

PROGRAM: F16

DATA ITEM REQUIRING OFFICE AUTHORITY/TITLE/SUBTITLE SOW PARAGRAPH

A001 AFMCLC/WAMB DI-SESS-80789A para 6.3

Quality Assurance Provisions (QAP)

(Quality Assurance Report)

A002 AFMCLC/WAMB DI-MGMT-80368A/T para 9.2, 16.1

Status Report

A003 AFMCLC/WAMB DI-NDTI-80809B/T para 12.2, 14.3

Test/Inspection Report

A004 AFMCLC/WAM DI-MGMT-80441D para 21

Government Property (GP) Inventory Report

B001 AFMCLC/WAMB DI-SESS-80789A para 6.3

Quality Assurance Provisions (QAP)

(Quality Assurance Report)

B002 AFMCLC/WAMB DI-MGMT-80368A/T para 9.2, 16.1

Status Report

B003 AFMCLC/WAMB DI-NDTI-80809B/T para 12.2, 14.3

Test/Inspection Report

B004 AFMCLC/WAM DI-MGMT-80441D para 21

Government Property (GP) Inventory Report

C23-02-15

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

F-16 BRACKET PARTS AND KIT ASSEMBLIES

IDIQ F-16

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Quality Assurance Provisions (QAP)

3. SUBTITLE

(Quality Assurance Report)

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80789A

5. CONTRACT REFERENCE

para 6.3

6. REQUIRING OFFICE

AFMCLC/WAMB

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

BLK16

13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

NOTE: Changes to office symbol and/or e-mail addresses when necessary shall be made by letter through the CO/ACO without further revision to this CDRL.

ALL DELIVERIES SHALL BE SUBITTED IN ENGLISH.

1. Block 4: Contractor's electronic format is acceptable.

2. Block 9: DISTRIBUTION STATEMENT D: Authorized to Department of Defense and U.S. DoD contractors for Administrative or Operational Use Only. Date of Determinations is March 2023. Other requests for this document shall be referred to AFLCMC/WAM, Hill AFB, Utah.

Export Control Warning: All technical documents that are determined to contain export-controlled technical data shall be marked with the following:

Warning: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec 2751 et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.) as amended. Violation of these export laws are subject to severe criminal penalties. Dissemination in accordance with provisions of DOD Directive 5230.25.

Destruction Notice: For classified documents follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents of reconstruction of the document.

When it is technically infeasible to use the entire statement, an abbreviated marking may be used and a copy of the full statement added to the “Notice to Accompany Release of Export-Controlled Data” required by DoD Directive 5230.25.

Controlled by: USAF/AFLCMC Controlled by AFLCMC/WAM CUI Category: CTI/EXPT CTRL Distribution Statement: D POC: F-16 SPO Configuration Management, AFLCMC.WWM.F- 16DataMgmt@us.af.mil

For controlled unclassified information (CUI) or controlled technical information (CTI), destroy by any method that will prevent disclosure of contents of reconstruction of the document in accordance with DoDI 5230.24, Enclosure 3, Paragraph 17.

AFLCMC/WAMB 1

BLDG 1515

ROOM 140

6137 Wardleigh

Hill AFB, UT

84056-5843

AFLCMC/WWMEJ 1

6062 Fir Ave

BLDG 1234

Hill AFB, UT

84056

See Block 16

15. TOTAL 0 2 0

G. PREPARED BY

GRIECO.STACIE.A.1269580263

Data Manager

H. DATE

2023/12/04

I. APPROVED BY

Christian LeDuc Program Manager

J. DATE

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages

17. PRICE GROUP

20231205

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

F-16 BRACKET PARTS AND KIT ASSEMBLIES

IDIQ F-16

E. CONTRACT/PR NO.

F. CONTRACTOR

16. REMARKS (Continued)

3. Blocks 10, 11, 12, 13: The Quality Assurance Provisions (QAP) (Quality Assurance Report) shall be submitted with each production delivery as requested under each delivery order. The Government will be allowed five (5) working days to review and return comments. The Contractor shall submit the updated Quality Assurance Provisions (QAP) (Quality Assurance Report), incorporating Government comments NLT five (5) working days following receipt of Government comments.

4. Block 14: Contractor Shall submit deliverable(s) to the following email addresses:

a. christian.leduc@us.af.mil

b. AFLCMC.WWM.F-16DataMgmt@us.af.mil

DD FORM 1423-1, FEB 2001 Page 2 of 2 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

F-16 BRACKET PARTS AND KIT ASSEMBLIES

IDIQ F-16

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Status Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80368A/T

5. CONTRACT REFERENCE

para 9.2, 16.1

6. REQUIRING OFFICE

AFMCLC/WAMB

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

BLK16

13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

NOTE: Changes to office symbol and/or e-mail addresses when necessary shall be made by letter through the CO/ACO without further revision to this CDRL.

ALL DELIVERIES SHALL BE SUBITTED IN ENGLISH.

1. Block 4: Contractor's electronic format is acceptable.

2. Block 9: DISTRIBUTION STATEMENT D: Authorized to Department of Defense and U.S. DoD contractors for Administrative or Operational Use Only. Date of Determinations is March 2023. Other requests for this document shall be referred to AFLCMC/WAM, Hill AFB, Utah.

Export Control Warning: All technical documents that are determined to contain export-controlled technical data shall be marked with the following:

Warning: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec 2751 et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.) as amended. Violation of these export laws are subject to severe criminal penalties. Dissemination in accordance with provisions of DOD Directive 5230.25.

Destruction Notice: For classified documents follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents of reconstruction of the document.

When it is technically infeasible to use the entire statement, an abbreviated marking may be used and a copy of the full statement added to the “Notice to Accompany Release of Export-Controlled Data” required by DoD Directive 5230.25.

Controlled by: USAF/AFLCMC Controlled by AFLCMC/WAM CUI Category: CTI/EXPT CTRL Distribution Statement: D POC: F-16 SPO Configuration Management, AFLCMC.WWM.F- 16DataMgmt@us.af.mil

For controlled unclassified information (CUI) or controlled technical information (CTI), destroy by any method that will prevent disclosure of contents of reconstruction of the document in accordance with DoDI 5230.24, Enclosure 3, Paragraph 17.

AFLCMC/WAMB 1

BLDG 1515

ROOM 140

6137 Wardleigh

Hill AFB, UT

84056-5843

AFLCMC/WWMEJ 1

6062 Fir Ave

BLDG 1234

Hill AFB, UT

84056

See Block 16

15. TOTAL 0 2 0

G. PREPARED BY

GRIECO.STACIE.A.1269580263

Data Manager

H. DATE

2023/12/04

I. APPROVED BY

Christian LeDuc Program Manager

J. DATE

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

F-16 BRACKET PARTS AND KIT ASSEMBLIES

3. Blocks 10, 11, 12, 13: The first Status Report shall be submitted NLT the first full 30 calendar days after contract award. Subsequent submittals shall be delivered monthly NLT the last calendar day of each month through the life of the contract. Final Status Report shall be submitted within 30 calendar days following written government notification of contract completion.

4. Block 14: Contractor Shall submit deliverable(s) to the following email addresses:

a. christian.leduc@us.af.mil

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER NDTI

D. SYSTEM/ITEM

F-16 BRACKET PARTS AND KIT ASSEMBLIES

IDIQ F-16

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Test/Inspection Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80809B/T

5. CONTRACT REFERENCE

para 12.2, 14.3

6. REQUIRING OFFICE

AFMCLC/WAMB

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

BLK16

13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

NOTE: Changes to office symbol and/or e-mail addresses when necessary shall be made by letter through the CO/ACO without further revision to this CDRL.

ALL DELIVERIES SHALL BE SUBITTED IN ENGLISH.

1. Block 4: Contractor's electronic format is acceptable.

Paragraph 10.2 of DI-NDTI-80809B is clarified as follows:

a. All dimensions and tolerances specified on the manufacturing data shall be listed in a column, with the actual corresponding reading obtained from the inspection of the part listed in another column.

b. Materials utilized in the manufacture of "First Article" item shall be identified and certified along with a copy of material purchase requests as conforming to applicable data requirements.

c. Material processing, including finish requirements (plating, heat treatment, welding, inspecting, anodize, painting, etc.) utilized in the manufacture of "First Article" item shall be identified and certified as conforming to applicable requirements. A copy of the purchase order certifying the process accomplished at other than contractor facility shall be included.

d. Other requirements called out on Engineering Data Requirement (OO- ALC Form 462).

2. Block 9: DISTRIBUTION STATEMENT D: Authorized to Department of Defense and U.S. DoD contractors for Administrative or Operational Use Only. Date of Determinations is March 2023. Other requests for this document shall be referred to AFLCMC/WAM, Hill AFB, Utah.

Export Control Warning: All technical documents that are determined to contain export-controlled technical data shall be marked with the following:

Warning: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec 2751 et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.) as amended. Violation of these export laws are subject to severe criminal penalties. Dissemination in accordance with provisions of DOD Directive 5230.25.

AFLCMC/WAMB 1

BLDG 1515

ROOM 140

6137 Wardleigh

Hill AFB, UT

84056-5843

AFLCMC/WWMEJ 1

6062 Fir Ave

BLDG 1234

Hill AFB, UT

84056

See Block 16

15. TOTAL 0 2 0

G. PREPARED BY

GRIECO.STACIE.A.1269580263

Data Manager

H. DATE

2023/12/04

I. APPROVED BY

Program Manager

J. DATE

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages

20231205Christian LeDuc 20231205

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER NDTI

D. SYSTEM/ITEM

F-16 BRACKET PARTS AND KIT ASSEMBLIES

Destruction Notice: For classified documents follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents of reconstruction of the document. When it is technically infeasible to use the entire statement, an abbreviated marking may be used and a copy of the full statement added to the “Notice to Accompany Release of Export-Controlled Data” required by DoD Directive 5230.25.

Controlled by: USAF/AFLCMC Controlled by AFLCMC/WAM CUI Category: CTI/EXPT CTRL Distribution Statement: D POC: F-16 SPO Configuration Management, AFLCMC.WWM.F-16DataMgmt@us.af.mil

For controlled unclassified information (CUI) or controlled technical information (CTI), destroy by any method that will prevent disclosure of contents of reconstruction of the document in accordance with DoDI 5230.24, Enclosure 3, Paragraph 17.

3. Blocks 10, 11, 12, 13: The Test/Inspection Report shall be submitted with each production delivery as requested under each delivery order. The Government will be allowed five (5) working days to review and return comments. The Contractor shall submit the updated Test/Inspection Report, incorporating Government comments NLT five (5) working days following receipt of Government comments.

a. For Contractor Testing - submit in accordance with the current delivery schedule.

b. For Government Testing - Report to assist in "First Article" testing by the Air Force shall be submitted concurrently with the First Article item either in the packaging of the shipping container or separately if the report will not fit within the container packaging unfolded. When shipped in the first article container, the report shall be enclosed in a paper or plastic envelope.

c. SHIP TO:

Non-Accountable Bay Transportation Officer Bldg 849 West Hill AFB, UT 84056-5999

MARK FOR: 809 MXSS/MXDEB

7278 4th Street (Bldg 100 Bay D) Hill AFB, UT 84056-5205

NOTE: If report is shipped separate from first article item, send report to "MARK FOR" address listed above.

4. Block 14: Contractor Shall submit deliverable(s) to the following email addresses:

a.christian.leduc@us.af.mil

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

F-16 BRACKET PARTS AND KIT ASSEMBLIES

IDIQ F-16

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Government Property (GP) Inventory Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80441D

5. CONTRACT REFERENCE

para 21

6. REQUIRING OFFICE

AFMCLC/WAM

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

AsReq

13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

NOTE: Changes to office symbol and/or e-mail addresses when necessary shall be made by letter through the CO/ACO without further revision to this CDRL.

ALL DELIVERIES SHALL BE SUBITTED IN ENGLISH.

1. Block 4: Contractor's format acceptable using Microsoft Office compatible products (Word, Excel, PowerPoint) or Adobe Acrobat Reader.

2. Block 9: Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only CTI and Export Control November 2023. Other requests for this document must be referred to AFLCMC/WAM, Hill AFB, Utah.

Export Control Warning: All technical documents that are determined to contain export-controlled technical data shall be marked with the following:

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties.

Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

When it is technically infeasible to use the entire statement, an abbreviated marking may be used and a copy of the full statement added to the “Notice to Accompany Release of Export-Controlled Data” required by DoD Directive 5230.25.

Destruction Notice: For classified documents follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents of reconstruction of the document.

Controlled by: USAF/AFLCMC Controlled by AFLCMC/WAM CUI Category: CTI/EXPT CTRL Distribution Statement: D POC: F-16 SPO Configuration Management, AFLCMC.WWM.F- 16DataMgmt@us.af.mil

For controlled unclassified information (CUI) or controlled technical information (CTI), destroy by any method that will prevent disclosure of contents of reconstruction of the document in accordance with DoDI 5230.24, Enclosure 3, Paragraph 17.

AFLCMC/WAMB 1

BLDG 1515

ROOM 140

6137 Wardleigh

Hill AFB, UT

84056-5843

Attn:

Chris LeDuc

AFLCMC/WWMEJ 1

6062 Fir Ave

BLDG 1234

Hill AFB, UT

84056

See Block 16

15. TOTAL 0 2 0

G. PREPARED BY

GRIECO.STACIE.A.1269580263

Data Manager

H. DATE

2023/12/04

I. APPROVED BY

Program Manager

J. DATE

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages

20231205Christian LeDuc

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

F-16 BRACKET PARTS AND KIT ASSEMBLIES

3. Blocks 10, 11, 12, 13: Submittal shall be No Later Than (NLT) three (3) months after contract award.

Contractor shall submit Government Property (GP) Inventory Report for the three (3) months and as required thereafter. The government will provide comments or approval NLT five (5) working days after receipt.

4. Block 14: Contractor Shall submit deliverable(s) to the following email addresses:

a. christian.leduc@us.af.mil

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

F-16 BRACKET PARTS AND KIT ASSEMBLIES

IDIQ F-16

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

B001

2. TITLE OF DATA ITEM

Quality Assurance Provisions (QAP)

3. SUBTITLE

(Quality Assurance Report)

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80789A

5. CONTRACT REFERENCE

para 6.3

6. REQUIRING OFFICE

AFMCLC/WAMB

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

BLK16

13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

NOTE: Changes to office symbol and/or e-mail addresses when necessary shall be made by letter through the CO/ACO without further revision to this CDRL.

ALL DELIVERIES SHALL BE SUBITTED IN ENGLISH.

1. Block 4: Contractor's electronic format is acceptable.

2. Block 9: DISTRIBUTION STATEMENT D: Authorized to Department of Defense and U.S. DoD contractors for Administrative or Operational Use Only. Date of Determinations is March 2023. Other requests for this document shall be referred to AFLCMC/WAM, Hill AFB, Utah.

Export Control Warning: All technical documents that are determined to contain export-controlled technical data shall be marked with the following:

Warning: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec 2751 et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.) as amended. Violation of these export laws are subject to severe criminal penalties. Dissemination in accordance with provisions of DOD Directive 5230.25.

Destruction Notice: For classified documents follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents of reconstruction of the document.

When it is technically infeasible to use the entire statement, an abbreviated marking may be used and a copy of the full statement added to the “Notice to Accompany Release of Export-Controlled Data” required by DoD Directive 5230.25.

Controlled by: USAF/AFLCMC Controlled by AFLCMC/WAM CUI Category: CTI/EXPT CTRL Distribution Statement: D POC: F-16 SPO Configuration Management, AFLCMC.WWM.F- 16DataMgmt@us.af.mil

For controlled unclassified information (CUI) or controlled technical information (CTI), destroy by any method that will prevent disclosure of contents of reconstruction of the document in accordance with DoDI 5230.24, Enclosure 3, Paragraph 17.

AFLCMC/WAMB 1

BLDG 1515

ROOM 140

6137 Wardleigh

Hill AFB, UT

84056-5843

AFLCMC/WWMEJ 1

6062 Fir Ave

BLDG 1234

Hill AFB, UT

84056

See Block 16

15. TOTAL 0 2 0

G. PREPARED BY

GRIECO.STACIE.A.1269580263

Data Manager

H. DATE

2023/12/04

I. APPROVED BY

Christian LeDuc Program Manager

J. DATE

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

F-16 BRACKET PARTS AND KIT ASSEMBLIES

3. Blocks 10, 11, 12, 13: The Quality Assurance Provisions (QAP) (Quality Assurance Report) shall be submitted with each production delivery as requested under each delivery order. The Government will be allowed five (5) working days to review and return comments. The Contractor shall submit the updated Quality Assurance Provisions (QAP) (Quality Assurance Report), incorporating Government comments NLT five (5) working days following receipt of Government comments.

4. Block 14: Contractor Shall submit deliverable(s) to the following email addresses:

a. christian.leduc@us.af.mil

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

F-16 BRACKET PARTS AND KIT ASSEMBLIES

IDIQ F-16

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

B002

2. TITLE OF DATA ITEM

Status Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80368A/T

5. CONTRACT REFERENCE

para 9.2, 16.1

6. REQUIRING OFFICE

AFMCLC/WAMB

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

BLK16

13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

NOTE: Changes to office symbol and/or e-mail addresses when necessary shall be made by letter through the CO/ACO without further revision to this CDRL.

ALL DELIVERIES SHALL BE SUBITTED IN ENGLISH.

1. Block 4: Contractor's electronic format is acceptable.

2. Block 9: DISTRIBUTION STATEMENT D: Authorized to Department of Defense and U.S. DoD contractors for Administrative or Operational Use Only. Date of Determinations is March 2023. Other requests for this document shall be referred to AFLCMC/WAM, Hill AFB, Utah.

Export Control Warning: All technical documents that are determined to contain export-controlled technical data shall be marked with the following:

Warning: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec 2751 et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.) as amended. Violation of these export laws are subject to severe criminal penalties. Dissemination in accordance with provisions of DOD Directive 5230.25.

Destruction Notice: For classified documents follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents of reconstruction of the document.

When it is technically infeasible to use the entire statement, an abbreviated marking may be used and a copy of the full statement added to the “Notice to Accompany Release of Export-Controlled Data” required by DoD Directive 5230.25.

Controlled by: USAF/AFLCMC Controlled by AFLCMC/WAM CUI Category: CTI/EXPT CTRL Distribution Statement: D POC: F-16 SPO Configuration Management, AFLCMC.WWM.F- 16DataMgmt@us.af.mil

For controlled unclassified information (CUI) or controlled technical information (CTI), destroy by any method that will prevent disclosure of contents of reconstruction of the document in accordance with DoDI 5230.24, Enclosure 3, Paragraph 17.

AFLCMC/WAMB 1

BLDG 1515

ROOM 140

6137 Wardleigh

Hill AFB, UT

84056-5843

AFLCMC/WWMEJ 1

6062 Fir Ave

BLDG 1234

Hill AFB, UT

84056

See Block 16

15. TOTAL 0 2 0

G. PREPARED BY

GRIECO.STACIE.A.1269580263

Data Manager

H. DATE

2023/12/04

I. APPROVED BY

Christian LeDuc Program Manager

J. DATE

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

F-16 BRACKET PARTS AND KIT ASSEMBLIES

3. Blocks 10, 11, 12, 13: The first Status Report shall be submitted NLT the first full 30 calendar days after contract award. Subsequent submittals shall be delivered monthly NLT the last calendar day of each month through the life of the contract. Final Status Report shall be submitted within 30 calendar days following written government notification of contract completion.

4. Block 14: Contractor Shall submit deliverable(s) to the following email addresses:

a. christian.leduc@us.af.mil

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP TM OTHER NDTI

D. SYSTEM/ITEM

F-16 BRACKET PARTS AND KIT ASSEMBLIES

IDIQ F-16

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

B003

2. TITLE OF DATA ITEM

Test/Inspection Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80809B/T

5. CONTRACT REFERENCE

para 12.2, 14.3

6. REQUIRING OFFICE

AFMCLC/WAMB

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

BLK16

13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

NOTE: Changes to office symbol and/or e-mail addresses when necessary shall be made by letter through the CO/ACO without further revision to this CDRL.

ALL DELIVERIES SHALL BE SUBITTED IN ENGLISH.

1. Block 4: Contractor's electronic format is acceptable.

Paragraph 10.2 of DI-NDTI-80809B is clarified as follows:

a. All dimensions and tolerances specified on the manufacturing data shall be listed in a column, with the actual corresponding reading obtained from the inspection of the part listed in another column.

b. Materials utilized in the manufacture of "First Article" item shall be identified and certified along with a copy of material purchase requests as conforming to applicable data requirements.

c. Material processing, including finish requirements (plating, heat treatment, welding, inspecting, anodize, painting, etc.) utilized in the manufacture of "First Article" item shall be identified and certified as conforming to applicable requirements. A copy of the purchase order certifying the process accomplished at other than contractor facility shall be included.

d. Other requirements called out on Engineering Data Requirement (OO- ALC Form 462).

2. Block 9: DISTRIBUTION STATEMENT D: Authorized to Department of Defense and U.S. DoD contractors for Administrative or Operational Use Only. Date of Determinations is March 2023. Other requests for this document shall be referred to AFLCMC/WAM, Hill AFB, Utah.

Export Control Warning: All technical documents that are determined to contain export-controlled technical data shall be marked with the following:

Warning: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec 2751 et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.) as amended. Violation of these export laws are subject to severe criminal penalties. Dissemination in accordance with provisions of DOD Directive 5230.25.

AFLCMC/WAMB 1

BLDG 1515

ROOM 140

6137 Wardleigh

Hill AFB, UT

84056-5843

AFLCMC/WWMEJ 1

6062 Fir Ave

BLDG 1234

Hill AFB, UT

84056

See Block 16

15. TOTAL 0 2 0

G. PREPARED BY

GRIECO.STACIE.A.1269580263

Data Manager

H. DATE

2023/12/04

I. APPROVED BY

Christian LeDuc Program Manager

J. DATE

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP TM OTHER NDTI

D. SYSTEM/ITEM

F-16 BRACKET PARTS AND KIT ASSEMBLIES

Destruction Notice: For classified documents follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents of reconstruction of the document. When it is technically infeasible to use the entire statement, an abbreviated marking may be used and a copy of the full statement added to the “Notice to Accompany Release of Export-Controlled Data” required by DoD Directive 5230.25.

Controlled by: USAF/AFLCMC Controlled by AFLCMC/WAM CUI Category: CTI/EXPT CTRL Distribution Statement: D POC: F-16 SPO Configuration Management, AFLCMC.WWM.F-16DataMgmt@us.af.mil

For controlled unclassified information (CUI) or controlled technical information (CTI), destroy by any method that will prevent disclosure of contents of reconstruction of the document in accordance with DoDI 5230.24, Enclosure 3, Paragraph 17.

3. Blocks 10, 11, 12, 13: The Test/Inspection Report shall be submitted with each production delivery as requested under each delivery order. The Government will be allowed five (5) working days to review and return comments. The Contractor shall submit the updated Test/Inspection Report, incorporating Government comments NLT five (5) working days following receipt of Government comments.

a. For Contractor Testing - submit in accordance with the current delivery schedule.

b. For Government Testing - Report to assist in "First Article" testing by the Air Force shall be submitted concurrently with the First Article item either in the packaging of the shipping container or separately if the report will not fit within the container packaging unfolded. When shipped in the first article container, the report shall be enclosed in a paper or plastic envelope.

c. SHIP TO:

Non-Accountable Bay Transportation Officer Bldg 849 West Hill AFB, UT 84056-5999

MARK FOR: 809 MXSS/MXDEB

7278 4th Street (Bldg 100 Bay D) Hill AFB, UT 84056-5205

NOTE: If report is shipped separate from first article item, send report to "MARK FOR" address listed above.

4. Block 14: Contractor Shall submit deliverable(s) to the following email addresses:

a.christian.leduc@us.af.mil

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

F-16 BRACKET PARTS AND KIT ASSEMBLIES

IDIQ F-16

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

B004

2. TITLE OF DATA ITEM

Government Property (GP) Inventory Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80441D

5. CONTRACT REFERENCE

para 21

6. REQUIRING OFFICE

AFMCLC/WAM

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

BLK16

12. DATE OF FIRST SUBMISSION

BLK16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

AsReq

13. DATE OF SUBSEQUENT

SUBMISSION

BLK16

Draft

Final

Reg Repro

16. REMARKS

NOTE: Changes to office symbol and/or e-mail addresses when necessary shall be made by letter through the CO/ACO without further revision to this CDRL.

ALL DELIVERIES SHALL BE SUBITTED IN ENGLISH.

1. Block 4: Contractor's format acceptable using Microsoft Office compatible products (Word, Excel, PowerPoint) or Adobe Acrobat Reader.

2. Block 9: Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only CTI and Export Control November 2023. Other requests for this document must be referred to AFLCMC/WAM, Hill AFB, Utah.

Export Control Warning: All technical documents that are determined to contain export-controlled technical data shall be marked with the following:

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties.

Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

When it is technically infeasible to use the entire statement, an abbreviated marking may be used and a copy of the full statement added to the “Notice to Accompany Release of Export-Controlled Data” required by DoD Directive 5230.25.

Destruction Notice: For classified documents follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents of reconstruction of the document.

Controlled by: USAF/AFLCMC Controlled by AFLCMC/WAM CUI Category: CTI/EXPT CTRL Distribution Statement: D POC: F-16 SPO Configuration Management, AFLCMC.WWM.F- 16DataMgmt@us.af.mil

For controlled unclassified information (CUI) or controlled technical information (CTI), destroy by any method that will prevent disclosure of contents of reconstruction of the document in accordance with DoDI 5230.24, Enclosure 3, Paragraph 17.

AFLCMC/WAMB 1

BLDG 1515

ROOM 140

6137 Wardleigh

Hill AFB, UT

84056-5843

Attn:

Chris LeDuc

AFLCMC/WWMEJ 1

6062 Fir Ave

BLDG 1234

Hill AFB, UT

84056

See Block 16

15. TOTAL 0 2 0

G. PREPARED BY

GRIECO.STACIE.A.1269580263

Data Manager

H. DATE

2023/12/04

I. APPROVED BY

Program Manager

J. DATE

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages

20231205Chris LeDuc

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

F-16 BRACKET PARTS AND KIT ASSEMBLIES

3. Blocks 10, 11, 12, 13: Submittal shall be No Later Than (NLT) three (3) months after contract award.

Contractor shall submit Government Property (GP) Inventory Report for the three (3) months and as required thereafter. The government will provide comments or approval NLT five (5) working days after receipt.

4. Block 14: Contractor Shall submit deliverable(s) to the following email addresses:

a. christian.leduc@us.af.mil

File details come from the government source that posted it. Updated .