Att2_Bracket_CDRL_Package_Final_5Dec23b.pdf
PDF 728 KB Posted
- Attached to
- F-16 Bracket Parts/Kit Assemblies Multiple Award IDIQ Acquisition Federal contract opportunity
- Solicitation number
- FA8232-24-R-3001
About this file
This document contains a Contract Data Requirements List (CDRL) for an Indefinite Delivery Indefinite Quantity (IDIQ) multiple award contract opportunity for F-16 Bracket Parts and Kit Assemblies. The CDRL outlines five required deliverables for quality assurance and status reporting, to be provided by contractors on a regular basis throughout contract performance. Deliverables include Quality Assurance Reports, Status Reports, Test/Inspection Reports, and Government Property Inventory Reports. Contractors must submit deliverables electronically to the Air Force Life Cycle Management Center at specified intervals or as required, and are subject to a five-day review period. The opportunity is issued by the Department of the Air Force Materiel Command for an IDIQ program to provide F-16 parts and assemblies in support of the F-16 fleet.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QA 1 (FA823224R3001)_Questions_1_thru_13_13Feb24_Rev1.pdf | ||
| FA823224R3001_0002_13Feb24.pdf | ||
| QA 2 (FA823224R3001)_Q14_29Jan24.pdf | ||
| QA 1 (FA823224R3001)_Questions_1_thru_13_18Jan24.pdf | ||
| Bracket Section L_18Jan24_HTRO.pdf | ||
| Bracket_Sample_Task_IDO_18Jan24.docx | DOCX document | |
| FA823224R3001_0001.pdf | ||
| Att1_SOW_Bracket IDIQ_Final_13Dec23.pdf | ||
| Section J - Attachment 1 (Self-Scoring Worksheet).docx | DOCX document | |
| Bracket Section M_13Dec23_HTRO.pdf | ||
| Att3_Packaging_Instructions.pdf | ||
| FA823224R3001 (Final)_15Dec23.pdf | ||
| Bracket_Sample_Task_IDO_15Dec23.docx | DOCX document | |
| Bracket Section L_13Dec23_HTRO.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12/4/2023 6:52:26 PM CST CDRL Table of Contents C23-02-15
RFP
CONTRACT #:
CONTRACTOR:
SET NAME: C23-02-15 SYSTEM ITEM: F-16 BRACKET PARTS AND KIT
ASSEMBLIES IDIQ
PROGRAM: F16
DATA ITEM REQUIRING OFFICE AUTHORITY/TITLE/SUBTITLE SOW PARAGRAPH
A001 AFMCLC/WAMB DI-SESS-80789A para 6.3
Quality Assurance Provisions (QAP)
(Quality Assurance Report)
A002 AFMCLC/WAMB DI-MGMT-80368A/T para 9.2, 16.1
Status Report
A003 AFMCLC/WAMB DI-NDTI-80809B/T para 12.2, 14.3
Test/Inspection Report
A004 AFMCLC/WAM DI-MGMT-80441D para 21
Government Property (GP) Inventory Report
B001 AFMCLC/WAMB DI-SESS-80789A para 6.3
Quality Assurance Provisions (QAP)
(Quality Assurance Report)
B002 AFMCLC/WAMB DI-MGMT-80368A/T para 9.2, 16.1
Status Report
B003 AFMCLC/WAMB DI-NDTI-80809B/T para 12.2, 14.3
Test/Inspection Report
B004 AFMCLC/WAM DI-MGMT-80441D para 21
Government Property (GP) Inventory Report
C23-02-15
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
F-16 BRACKET PARTS AND KIT ASSEMBLIES
IDIQ F-16
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Quality Assurance Provisions (QAP)
3. SUBTITLE
(Quality Assurance Report)
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80789A
5. CONTRACT REFERENCE
para 6.3
6. REQUIRING OFFICE
AFMCLC/WAMB
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
NOTE: Changes to office symbol and/or e-mail addresses when necessary shall be made by letter through the CO/ACO without further revision to this CDRL.
ALL DELIVERIES SHALL BE SUBITTED IN ENGLISH.
1. Block 4: Contractor's electronic format is acceptable.
2. Block 9: DISTRIBUTION STATEMENT D: Authorized to Department of Defense and U.S. DoD contractors for Administrative or Operational Use Only. Date of Determinations is March 2023. Other requests for this document shall be referred to AFLCMC/WAM, Hill AFB, Utah.
Export Control Warning: All technical documents that are determined to contain export-controlled technical data shall be marked with the following:
Warning: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec 2751 et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.) as amended. Violation of these export laws are subject to severe criminal penalties. Dissemination in accordance with provisions of DOD Directive 5230.25.
Destruction Notice: For classified documents follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents of reconstruction of the document.
When it is technically infeasible to use the entire statement, an abbreviated marking may be used and a copy of the full statement added to the “Notice to Accompany Release of Export-Controlled Data” required by DoD Directive 5230.25.
Controlled by: USAF/AFLCMC Controlled by AFLCMC/WAM CUI Category: CTI/EXPT CTRL Distribution Statement: D POC: F-16 SPO Configuration Management, AFLCMC.WWM.F- 16DataMgmt@us.af.mil
For controlled unclassified information (CUI) or controlled technical information (CTI), destroy by any method that will prevent disclosure of contents of reconstruction of the document in accordance with DoDI 5230.24, Enclosure 3, Paragraph 17.
AFLCMC/WAMB 1
BLDG 1515
ROOM 140
6137 Wardleigh
Hill AFB, UT
84056-5843
AFLCMC/WWMEJ 1
6062 Fir Ave
BLDG 1234
Hill AFB, UT
84056
See Block 16
15. TOTAL 0 2 0
G. PREPARED BY
GRIECO.STACIE.A.1269580263
Data Manager
H. DATE
2023/12/04
I. APPROVED BY
Christian LeDuc Program Manager
J. DATE
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages
17. PRICE GROUP
20231205
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
F-16 BRACKET PARTS AND KIT ASSEMBLIES
IDIQ F-16
E. CONTRACT/PR NO.
F. CONTRACTOR
16. REMARKS (Continued)
3. Blocks 10, 11, 12, 13: The Quality Assurance Provisions (QAP) (Quality Assurance Report) shall be submitted with each production delivery as requested under each delivery order. The Government will be allowed five (5) working days to review and return comments. The Contractor shall submit the updated Quality Assurance Provisions (QAP) (Quality Assurance Report), incorporating Government comments NLT five (5) working days following receipt of Government comments.
4. Block 14: Contractor Shall submit deliverable(s) to the following email addresses:
a. christian.leduc@us.af.mil
b. AFLCMC.WWM.F-16DataMgmt@us.af.mil
DD FORM 1423-1, FEB 2001 Page 2 of 2 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
F-16 BRACKET PARTS AND KIT ASSEMBLIES
IDIQ F-16
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Status Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80368A/T
5. CONTRACT REFERENCE
para 9.2, 16.1
6. REQUIRING OFFICE
AFMCLC/WAMB
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
NOTE: Changes to office symbol and/or e-mail addresses when necessary shall be made by letter through the CO/ACO without further revision to this CDRL.
ALL DELIVERIES SHALL BE SUBITTED IN ENGLISH.
1. Block 4: Contractor's electronic format is acceptable.
2. Block 9: DISTRIBUTION STATEMENT D: Authorized to Department of Defense and U.S. DoD contractors for Administrative or Operational Use Only. Date of Determinations is March 2023. Other requests for this document shall be referred to AFLCMC/WAM, Hill AFB, Utah.
Export Control Warning: All technical documents that are determined to contain export-controlled technical data shall be marked with the following:
Warning: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec 2751 et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.) as amended. Violation of these export laws are subject to severe criminal penalties. Dissemination in accordance with provisions of DOD Directive 5230.25.
Destruction Notice: For classified documents follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents of reconstruction of the document.
When it is technically infeasible to use the entire statement, an abbreviated marking may be used and a copy of the full statement added to the “Notice to Accompany Release of Export-Controlled Data” required by DoD Directive 5230.25.
Controlled by: USAF/AFLCMC Controlled by AFLCMC/WAM CUI Category: CTI/EXPT CTRL Distribution Statement: D POC: F-16 SPO Configuration Management, AFLCMC.WWM.F- 16DataMgmt@us.af.mil
For controlled unclassified information (CUI) or controlled technical information (CTI), destroy by any method that will prevent disclosure of contents of reconstruction of the document in accordance with DoDI 5230.24, Enclosure 3, Paragraph 17.
AFLCMC/WAMB 1
BLDG 1515
ROOM 140
6137 Wardleigh
Hill AFB, UT
84056-5843
AFLCMC/WWMEJ 1
6062 Fir Ave
BLDG 1234
Hill AFB, UT
84056
See Block 16
15. TOTAL 0 2 0
G. PREPARED BY
GRIECO.STACIE.A.1269580263
Data Manager
H. DATE
2023/12/04
I. APPROVED BY
Christian LeDuc Program Manager
J. DATE
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
F-16 BRACKET PARTS AND KIT ASSEMBLIES
3. Blocks 10, 11, 12, 13: The first Status Report shall be submitted NLT the first full 30 calendar days after contract award. Subsequent submittals shall be delivered monthly NLT the last calendar day of each month through the life of the contract. Final Status Report shall be submitted within 30 calendar days following written government notification of contract completion.
4. Block 14: Contractor Shall submit deliverable(s) to the following email addresses:
a. christian.leduc@us.af.mil
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM
F-16 BRACKET PARTS AND KIT ASSEMBLIES
IDIQ F-16
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Test/Inspection Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80809B/T
5. CONTRACT REFERENCE
para 12.2, 14.3
6. REQUIRING OFFICE
AFMCLC/WAMB
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
NOTE: Changes to office symbol and/or e-mail addresses when necessary shall be made by letter through the CO/ACO without further revision to this CDRL.
ALL DELIVERIES SHALL BE SUBITTED IN ENGLISH.
1. Block 4: Contractor's electronic format is acceptable.
Paragraph 10.2 of DI-NDTI-80809B is clarified as follows:
a. All dimensions and tolerances specified on the manufacturing data shall be listed in a column, with the actual corresponding reading obtained from the inspection of the part listed in another column.
b. Materials utilized in the manufacture of "First Article" item shall be identified and certified along with a copy of material purchase requests as conforming to applicable data requirements.
c. Material processing, including finish requirements (plating, heat treatment, welding, inspecting, anodize, painting, etc.) utilized in the manufacture of "First Article" item shall be identified and certified as conforming to applicable requirements. A copy of the purchase order certifying the process accomplished at other than contractor facility shall be included.
d. Other requirements called out on Engineering Data Requirement (OO- ALC Form 462).
2. Block 9: DISTRIBUTION STATEMENT D: Authorized to Department of Defense and U.S. DoD contractors for Administrative or Operational Use Only. Date of Determinations is March 2023. Other requests for this document shall be referred to AFLCMC/WAM, Hill AFB, Utah.
Export Control Warning: All technical documents that are determined to contain export-controlled technical data shall be marked with the following:
Warning: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec 2751 et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.) as amended. Violation of these export laws are subject to severe criminal penalties. Dissemination in accordance with provisions of DOD Directive 5230.25.
AFLCMC/WAMB 1
BLDG 1515
ROOM 140
6137 Wardleigh
Hill AFB, UT
84056-5843
AFLCMC/WWMEJ 1
6062 Fir Ave
BLDG 1234
Hill AFB, UT
84056
See Block 16
15. TOTAL 0 2 0
G. PREPARED BY
GRIECO.STACIE.A.1269580263
Data Manager
H. DATE
2023/12/04
I. APPROVED BY
Program Manager
J. DATE
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages
20231205Christian LeDuc 20231205
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM
F-16 BRACKET PARTS AND KIT ASSEMBLIES
Destruction Notice: For classified documents follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents of reconstruction of the document. When it is technically infeasible to use the entire statement, an abbreviated marking may be used and a copy of the full statement added to the “Notice to Accompany Release of Export-Controlled Data” required by DoD Directive 5230.25.
Controlled by: USAF/AFLCMC Controlled by AFLCMC/WAM CUI Category: CTI/EXPT CTRL Distribution Statement: D POC: F-16 SPO Configuration Management, AFLCMC.WWM.F-16DataMgmt@us.af.mil
For controlled unclassified information (CUI) or controlled technical information (CTI), destroy by any method that will prevent disclosure of contents of reconstruction of the document in accordance with DoDI 5230.24, Enclosure 3, Paragraph 17.
3. Blocks 10, 11, 12, 13: The Test/Inspection Report shall be submitted with each production delivery as requested under each delivery order. The Government will be allowed five (5) working days to review and return comments. The Contractor shall submit the updated Test/Inspection Report, incorporating Government comments NLT five (5) working days following receipt of Government comments.
a. For Contractor Testing - submit in accordance with the current delivery schedule.
b. For Government Testing - Report to assist in "First Article" testing by the Air Force shall be submitted concurrently with the First Article item either in the packaging of the shipping container or separately if the report will not fit within the container packaging unfolded. When shipped in the first article container, the report shall be enclosed in a paper or plastic envelope.
c. SHIP TO:
Non-Accountable Bay Transportation Officer Bldg 849 West Hill AFB, UT 84056-5999
MARK FOR: 809 MXSS/MXDEB
7278 4th Street (Bldg 100 Bay D) Hill AFB, UT 84056-5205
NOTE: If report is shipped separate from first article item, send report to "MARK FOR" address listed above.
4. Block 14: Contractor Shall submit deliverable(s) to the following email addresses:
a.christian.leduc@us.af.mil
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
F-16 BRACKET PARTS AND KIT ASSEMBLIES
IDIQ F-16
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Government Property (GP) Inventory Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80441D
5. CONTRACT REFERENCE
para 21
6. REQUIRING OFFICE
AFMCLC/WAM
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
AsReq
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
NOTE: Changes to office symbol and/or e-mail addresses when necessary shall be made by letter through the CO/ACO without further revision to this CDRL.
ALL DELIVERIES SHALL BE SUBITTED IN ENGLISH.
1. Block 4: Contractor's format acceptable using Microsoft Office compatible products (Word, Excel, PowerPoint) or Adobe Acrobat Reader.
2. Block 9: Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only CTI and Export Control November 2023. Other requests for this document must be referred to AFLCMC/WAM, Hill AFB, Utah.
Export Control Warning: All technical documents that are determined to contain export-controlled technical data shall be marked with the following:
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties.
Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
When it is technically infeasible to use the entire statement, an abbreviated marking may be used and a copy of the full statement added to the “Notice to Accompany Release of Export-Controlled Data” required by DoD Directive 5230.25.
Destruction Notice: For classified documents follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents of reconstruction of the document.
Controlled by: USAF/AFLCMC Controlled by AFLCMC/WAM CUI Category: CTI/EXPT CTRL Distribution Statement: D POC: F-16 SPO Configuration Management, AFLCMC.WWM.F- 16DataMgmt@us.af.mil
For controlled unclassified information (CUI) or controlled technical information (CTI), destroy by any method that will prevent disclosure of contents of reconstruction of the document in accordance with DoDI 5230.24, Enclosure 3, Paragraph 17.
AFLCMC/WAMB 1
BLDG 1515
ROOM 140
6137 Wardleigh
Hill AFB, UT
84056-5843
Attn:
Chris LeDuc
AFLCMC/WWMEJ 1
6062 Fir Ave
BLDG 1234
Hill AFB, UT
84056
See Block 16
15. TOTAL 0 2 0
G. PREPARED BY
GRIECO.STACIE.A.1269580263
Data Manager
H. DATE
2023/12/04
I. APPROVED BY
Program Manager
J. DATE
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages
20231205Christian LeDuc
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
F-16 BRACKET PARTS AND KIT ASSEMBLIES
3. Blocks 10, 11, 12, 13: Submittal shall be No Later Than (NLT) three (3) months after contract award.
Contractor shall submit Government Property (GP) Inventory Report for the three (3) months and as required thereafter. The government will provide comments or approval NLT five (5) working days after receipt.
4. Block 14: Contractor Shall submit deliverable(s) to the following email addresses:
a. christian.leduc@us.af.mil
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
F-16 BRACKET PARTS AND KIT ASSEMBLIES
IDIQ F-16
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
B001
2. TITLE OF DATA ITEM
Quality Assurance Provisions (QAP)
3. SUBTITLE
(Quality Assurance Report)
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80789A
5. CONTRACT REFERENCE
para 6.3
6. REQUIRING OFFICE
AFMCLC/WAMB
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
NOTE: Changes to office symbol and/or e-mail addresses when necessary shall be made by letter through the CO/ACO without further revision to this CDRL.
ALL DELIVERIES SHALL BE SUBITTED IN ENGLISH.
1. Block 4: Contractor's electronic format is acceptable.
2. Block 9: DISTRIBUTION STATEMENT D: Authorized to Department of Defense and U.S. DoD contractors for Administrative or Operational Use Only. Date of Determinations is March 2023. Other requests for this document shall be referred to AFLCMC/WAM, Hill AFB, Utah.
Export Control Warning: All technical documents that are determined to contain export-controlled technical data shall be marked with the following:
Warning: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec 2751 et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.) as amended. Violation of these export laws are subject to severe criminal penalties. Dissemination in accordance with provisions of DOD Directive 5230.25.
Destruction Notice: For classified documents follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents of reconstruction of the document.
When it is technically infeasible to use the entire statement, an abbreviated marking may be used and a copy of the full statement added to the “Notice to Accompany Release of Export-Controlled Data” required by DoD Directive 5230.25.
Controlled by: USAF/AFLCMC Controlled by AFLCMC/WAM CUI Category: CTI/EXPT CTRL Distribution Statement: D POC: F-16 SPO Configuration Management, AFLCMC.WWM.F- 16DataMgmt@us.af.mil
For controlled unclassified information (CUI) or controlled technical information (CTI), destroy by any method that will prevent disclosure of contents of reconstruction of the document in accordance with DoDI 5230.24, Enclosure 3, Paragraph 17.
AFLCMC/WAMB 1
BLDG 1515
ROOM 140
6137 Wardleigh
Hill AFB, UT
84056-5843
AFLCMC/WWMEJ 1
6062 Fir Ave
BLDG 1234
Hill AFB, UT
84056
See Block 16
15. TOTAL 0 2 0
G. PREPARED BY
GRIECO.STACIE.A.1269580263
Data Manager
H. DATE
2023/12/04
I. APPROVED BY
Christian LeDuc Program Manager
J. DATE
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
F-16 BRACKET PARTS AND KIT ASSEMBLIES
3. Blocks 10, 11, 12, 13: The Quality Assurance Provisions (QAP) (Quality Assurance Report) shall be submitted with each production delivery as requested under each delivery order. The Government will be allowed five (5) working days to review and return comments. The Contractor shall submit the updated Quality Assurance Provisions (QAP) (Quality Assurance Report), incorporating Government comments NLT five (5) working days following receipt of Government comments.
4. Block 14: Contractor Shall submit deliverable(s) to the following email addresses:
a. christian.leduc@us.af.mil
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
F-16 BRACKET PARTS AND KIT ASSEMBLIES
IDIQ F-16
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
B002
2. TITLE OF DATA ITEM
Status Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80368A/T
5. CONTRACT REFERENCE
para 9.2, 16.1
6. REQUIRING OFFICE
AFMCLC/WAMB
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
NOTE: Changes to office symbol and/or e-mail addresses when necessary shall be made by letter through the CO/ACO without further revision to this CDRL.
ALL DELIVERIES SHALL BE SUBITTED IN ENGLISH.
1. Block 4: Contractor's electronic format is acceptable.
2. Block 9: DISTRIBUTION STATEMENT D: Authorized to Department of Defense and U.S. DoD contractors for Administrative or Operational Use Only. Date of Determinations is March 2023. Other requests for this document shall be referred to AFLCMC/WAM, Hill AFB, Utah.
Export Control Warning: All technical documents that are determined to contain export-controlled technical data shall be marked with the following:
Warning: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec 2751 et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.) as amended. Violation of these export laws are subject to severe criminal penalties. Dissemination in accordance with provisions of DOD Directive 5230.25.
Destruction Notice: For classified documents follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents of reconstruction of the document.
When it is technically infeasible to use the entire statement, an abbreviated marking may be used and a copy of the full statement added to the “Notice to Accompany Release of Export-Controlled Data” required by DoD Directive 5230.25.
Controlled by: USAF/AFLCMC Controlled by AFLCMC/WAM CUI Category: CTI/EXPT CTRL Distribution Statement: D POC: F-16 SPO Configuration Management, AFLCMC.WWM.F- 16DataMgmt@us.af.mil
For controlled unclassified information (CUI) or controlled technical information (CTI), destroy by any method that will prevent disclosure of contents of reconstruction of the document in accordance with DoDI 5230.24, Enclosure 3, Paragraph 17.
AFLCMC/WAMB 1
BLDG 1515
ROOM 140
6137 Wardleigh
Hill AFB, UT
84056-5843
AFLCMC/WWMEJ 1
6062 Fir Ave
BLDG 1234
Hill AFB, UT
84056
See Block 16
15. TOTAL 0 2 0
G. PREPARED BY
GRIECO.STACIE.A.1269580263
Data Manager
H. DATE
2023/12/04
I. APPROVED BY
Christian LeDuc Program Manager
J. DATE
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
F-16 BRACKET PARTS AND KIT ASSEMBLIES
3. Blocks 10, 11, 12, 13: The first Status Report shall be submitted NLT the first full 30 calendar days after contract award. Subsequent submittals shall be delivered monthly NLT the last calendar day of each month through the life of the contract. Final Status Report shall be submitted within 30 calendar days following written government notification of contract completion.
4. Block 14: Contractor Shall submit deliverable(s) to the following email addresses:
a. christian.leduc@us.af.mil
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM
F-16 BRACKET PARTS AND KIT ASSEMBLIES
IDIQ F-16
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
B003
2. TITLE OF DATA ITEM
Test/Inspection Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80809B/T
5. CONTRACT REFERENCE
para 12.2, 14.3
6. REQUIRING OFFICE
AFMCLC/WAMB
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
BLK16
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
NOTE: Changes to office symbol and/or e-mail addresses when necessary shall be made by letter through the CO/ACO without further revision to this CDRL.
ALL DELIVERIES SHALL BE SUBITTED IN ENGLISH.
1. Block 4: Contractor's electronic format is acceptable.
Paragraph 10.2 of DI-NDTI-80809B is clarified as follows:
a. All dimensions and tolerances specified on the manufacturing data shall be listed in a column, with the actual corresponding reading obtained from the inspection of the part listed in another column.
b. Materials utilized in the manufacture of "First Article" item shall be identified and certified along with a copy of material purchase requests as conforming to applicable data requirements.
c. Material processing, including finish requirements (plating, heat treatment, welding, inspecting, anodize, painting, etc.) utilized in the manufacture of "First Article" item shall be identified and certified as conforming to applicable requirements. A copy of the purchase order certifying the process accomplished at other than contractor facility shall be included.
d. Other requirements called out on Engineering Data Requirement (OO- ALC Form 462).
2. Block 9: DISTRIBUTION STATEMENT D: Authorized to Department of Defense and U.S. DoD contractors for Administrative or Operational Use Only. Date of Determinations is March 2023. Other requests for this document shall be referred to AFLCMC/WAM, Hill AFB, Utah.
Export Control Warning: All technical documents that are determined to contain export-controlled technical data shall be marked with the following:
Warning: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec 2751 et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.) as amended. Violation of these export laws are subject to severe criminal penalties. Dissemination in accordance with provisions of DOD Directive 5230.25.
AFLCMC/WAMB 1
BLDG 1515
ROOM 140
6137 Wardleigh
Hill AFB, UT
84056-5843
AFLCMC/WWMEJ 1
6062 Fir Ave
BLDG 1234
Hill AFB, UT
84056
See Block 16
15. TOTAL 0 2 0
G. PREPARED BY
GRIECO.STACIE.A.1269580263
Data Manager
H. DATE
2023/12/04
I. APPROVED BY
Christian LeDuc Program Manager
J. DATE
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM
F-16 BRACKET PARTS AND KIT ASSEMBLIES
Destruction Notice: For classified documents follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents of reconstruction of the document. When it is technically infeasible to use the entire statement, an abbreviated marking may be used and a copy of the full statement added to the “Notice to Accompany Release of Export-Controlled Data” required by DoD Directive 5230.25.
Controlled by: USAF/AFLCMC Controlled by AFLCMC/WAM CUI Category: CTI/EXPT CTRL Distribution Statement: D POC: F-16 SPO Configuration Management, AFLCMC.WWM.F-16DataMgmt@us.af.mil
For controlled unclassified information (CUI) or controlled technical information (CTI), destroy by any method that will prevent disclosure of contents of reconstruction of the document in accordance with DoDI 5230.24, Enclosure 3, Paragraph 17.
3. Blocks 10, 11, 12, 13: The Test/Inspection Report shall be submitted with each production delivery as requested under each delivery order. The Government will be allowed five (5) working days to review and return comments. The Contractor shall submit the updated Test/Inspection Report, incorporating Government comments NLT five (5) working days following receipt of Government comments.
a. For Contractor Testing - submit in accordance with the current delivery schedule.
b. For Government Testing - Report to assist in "First Article" testing by the Air Force shall be submitted concurrently with the First Article item either in the packaging of the shipping container or separately if the report will not fit within the container packaging unfolded. When shipped in the first article container, the report shall be enclosed in a paper or plastic envelope.
c. SHIP TO:
Non-Accountable Bay Transportation Officer Bldg 849 West Hill AFB, UT 84056-5999
MARK FOR: 809 MXSS/MXDEB
7278 4th Street (Bldg 100 Bay D) Hill AFB, UT 84056-5205
NOTE: If report is shipped separate from first article item, send report to "MARK FOR" address listed above.
4. Block 14: Contractor Shall submit deliverable(s) to the following email addresses:
a.christian.leduc@us.af.mil
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
F-16 BRACKET PARTS AND KIT ASSEMBLIES
IDIQ F-16
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
B004
2. TITLE OF DATA ITEM
Government Property (GP) Inventory Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80441D
5. CONTRACT REFERENCE
para 21
6. REQUIRING OFFICE
AFMCLC/WAM
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
BLK16
12. DATE OF FIRST SUBMISSION
BLK16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
AsReq
13. DATE OF SUBSEQUENT
SUBMISSION
BLK16
Draft
Final
Reg Repro
16. REMARKS
NOTE: Changes to office symbol and/or e-mail addresses when necessary shall be made by letter through the CO/ACO without further revision to this CDRL.
ALL DELIVERIES SHALL BE SUBITTED IN ENGLISH.
1. Block 4: Contractor's format acceptable using Microsoft Office compatible products (Word, Excel, PowerPoint) or Adobe Acrobat Reader.
2. Block 9: Distribution Statement D. Distribution authorized to the Department of Defense and U.S. DoD contractors only CTI and Export Control November 2023. Other requests for this document must be referred to AFLCMC/WAM, Hill AFB, Utah.
Export Control Warning: All technical documents that are determined to contain export-controlled technical data shall be marked with the following:
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties.
Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.
When it is technically infeasible to use the entire statement, an abbreviated marking may be used and a copy of the full statement added to the “Notice to Accompany Release of Export-Controlled Data” required by DoD Directive 5230.25.
Destruction Notice: For classified documents follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD 5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents of reconstruction of the document.
Controlled by: USAF/AFLCMC Controlled by AFLCMC/WAM CUI Category: CTI/EXPT CTRL Distribution Statement: D POC: F-16 SPO Configuration Management, AFLCMC.WWM.F- 16DataMgmt@us.af.mil
For controlled unclassified information (CUI) or controlled technical information (CTI), destroy by any method that will prevent disclosure of contents of reconstruction of the document in accordance with DoDI 5230.24, Enclosure 3, Paragraph 17.
AFLCMC/WAMB 1
BLDG 1515
ROOM 140
6137 Wardleigh
Hill AFB, UT
84056-5843
Attn:
Chris LeDuc
AFLCMC/WWMEJ 1
6062 Fir Ave
BLDG 1234
Hill AFB, UT
84056
See Block 16
15. TOTAL 0 2 0
G. PREPARED BY
GRIECO.STACIE.A.1269580263
Data Manager
H. DATE
2023/12/04
I. APPROVED BY
Program Manager
J. DATE
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 2 Pages
20231205Chris LeDuc
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
B
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
F-16 BRACKET PARTS AND KIT ASSEMBLIES
3. Blocks 10, 11, 12, 13: Submittal shall be No Later Than (NLT) three (3) months after contract award.
Contractor shall submit Government Property (GP) Inventory Report for the three (3) months and as required thereafter. The government will provide comments or approval NLT five (5) working days after receipt.
4. Block 14: Contractor Shall submit deliverable(s) to the following email addresses:
a. christian.leduc@us.af.mil
File details come from the government source that posted it. Updated .