Summary of Construction Drawings for HVAC System Replacement, Building 285, Tinker Air Force Base
This document is a set of construction drawings for a project to replace the HVAC system in Building 285 at Tinker Air Force Base, Oklahoma (Project WWYK210116). The drawings are dated 29 May 2025 and were prepared by the Air Force Materiel Command, 72nd Air Base Wing Civil Engineer Directorate. The project includes architectural demolition and renovation, mechanical HVAC demolition and installation, electrical power and lighting demolition and renovation, and fire protection system demolition. The work area encompasses portions of Building 285, including rooms 202, 215, 284, and 285, with the contract haul routes and access points clearly marked on the base vicinity map through designated gates and roads.
Key demolition requirements include removal of the existing packaged HVAC unit and associated controls, all HVAC equipment in the original building footprint (air handler, condenser, variable air boxes, ductwork, exhaust fans, controls, and thermostat), mechanical room louvers and unit heaters, existing acoustical tile ceiling systems, and all fire alarm devices and panels. The renovation work includes installation of a new HVAC system with water treatment for any hydronic components, commissioning by an independent contractor, new LED lighting fixtures (wall pack and troffer models specified), replacement electrical panelboards (upgrading Panel A from 150A to 200A), new 2' x 2' Armstrong Dune acoustical tile ceilings with white grid, carbon monoxide detection in the mechanical room, and replacement of fire protection system devices. The contractor is responsible for field verification of existing conditions, protection of construction materials, repair of any damage to existing facilities, and removal of all demolition debris from the site.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVIEWED BY:
REVIEWED BY:
USING AGENCY:
ASBESTOS EVALUATION:
SAFETY:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
INDUSTRIAL HYGIENE:
DATE:
PROJECT DRAWING INDEX SIGNATURES
CORROSION ENGINEER: (CECE)
CE OPERATIONS: (CECO)
COMMUNICATIONS: (COMM)
CHIEF ENGINEER DIR: (CECE)
CHIEF DESIGN BRANCH: (CECE)
DESIGN MANAGER: (CECE)
ZONE MANAGER:
CONSTRUCTION MANAGEMENT: (CECE)
ENVIRONMENTAL:
BASE CIVIL ENGINEER: (CE)
FIRE DEPARTMENT: (CEFT)
GENERAL1. BRAND NAMES: REFERENCE TO SPECIFIC BRAND NAMES
OR COMPANIES IS FOR THE PURPOSE OF ESTABLISHING
MINIMUM QUALITY STANDARDS, IDENTIFICATION AND
GUIDANCE AND IS NOT INTENDED TO LIMIT SELECTION OF
OTHER MANUFACTURERS THAT ARE EQUAL OR EXCEED
THE SPECIFIED ITEMS IN TERMS OF PHYSICAL
PROPERTIES, INCLUDING, COLOR RANGE, FINISH,
DURABILITY, APPEARANCE, PERFORMANCE
CHARACTERISTICS, AND OTHER FACTORS. OTHER
PRODUCTS, MATERIALS, COLORS AND SYSTEMS, MAY BE
SUBMITTED FOR EVALUATION AND
APPROVAL/DISAPPROVAL BY THE CONTRACTING OFFICER.
2. THIS SET OF CONSTRUCTION DOCUMENTS SHALL BE
CONSIDERED AS A WHOLE IN THAT THE GENERAL
CONTRACTOR AND ALL THE SUB-CONTRACTORS ARE
RESPONSIBLE FOR THE INFORMATION PRESENTED ON ALL
SHEETS ON THE SET OF DRAWINGS AND ALL SECTIONS OF
THE SPECIFICATIONS.
3. THE CONTRACTOR IS RESPONSIBLE FOR ERECTING ALL
CONSTRUCTION FENCING AND BARRICADES AS REQUIRED
TO PROTECT CONSTRUCTION MATERIAL AND TO PREVENT
ANY UNAUTHORIZED PERSONNEL FROM ENTERING THE
CONSTRUCTION SITE.
4. ANY DAMAGE TO THE EXISTING GROUNDS OR FACILITIES
CAUSED BY CONSTRUCTION TRAFFIC OR ANY
CONSTRUCTION OPERATION SHALL BE REPAIRED OR
REPLACED BY THE CONTRACTOR TO MATCH OR EXCEED
EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE
GOVERNMENT.
5. ALL WORK NOTED & LOCATED IN THESE DOCS SHALL BE
UNDERSTOOD BY THE CONTRACTOR TO REQUIRE ALL NEW
LABOR & MATERIALS UNLESS SPECIFICALLY NOTED TO BE
"EXISTING" OR "BY OTHERS".
WWYK210116
REPLACE HVAC SYSTEM,
B285
KEY PLAN:
GENERAL NOTES:
DISCIPLINE
PROJECT
LOCATION
1 G-101 GENERAL NOTES & VICINITY MAP
SHT.SEQ. SHEET TITLE
OF
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
MD-101 MECHANICAL HVAC DEMOLITION PLAN
ED-101 POWER DEMOLITION PLAN
E-101 LIGHTING RENOVATION PLAN
CONCEPT
W W
YK
R
EP
LA
CE
H
VA
C
SY
ST
EM
B2
M
AY
TE
PA
-S R
M
G-101
F
BA
KE
R
L
SE
LH
O
R
ST
En gr
\D es ig n\ s\
\2
6\
0_ Su pp or t\0 _3
_D ra w in gs \M od el
GE
NE
RA
L N
OT
ES
AN
D
VI
CI
NI
TY
M
AP
1 6
A-101 ARCHITECTURAL DEMOLITION / RENOVATION PLAN
FD-101 FIRE PROTECTION - DEMOLITION PLAN
PROJECT
LOCATION
TINKER AFB, OK
VICINITY MAP
BASE
OPERATIONS
B240
GOTT
GATE
TINKER GATE
PASS & ID B6611
HRUSKOCY
GATE
EAKER GATE
FIRE DEPARTMENT
B117
VANCE
GATE
LIBERATOR GATE
HOPE
GATE
LEGEND
CONTRACTOR
HAUL ROUTE
LANCER
GATE
TRUCK GATE
PIAZZA GATE
BASE CIVIL
ENGINEER
B400
(FUTURE
HAUL ROUTE)
(F
UT
UR
E
HA
UL
R
OU
TE
FUTURE
TRUCK GATE
FUTURE
HAUL ROUTE
TINKER AFB, OK
VICINITY MAP
BASE
OPERATIONS
B240
CONTRACTING
B3
GOTT
GATE
TINKER GATE
PASS & ID B6611
HRUSKOCY
GATE
EAKER GATE
FIRE DEPARTMENT
B117
VANCE
GATE
LIBERATOR GATE
HOPE
GATE
LEGEND
CONTRACTOR
HAUL ROUTE
LANCER
GATE
TRUCK GATE
PIAZZA GATE
BASE CIVIL
ENGINEER
B400
(FUTURE
HAUL ROUTE)
(F
UT
UR
E
HA
UL
R
OU
TE
FUTURE
TRUCK GATE
FUTURE
HAUL ROUTE 9001
R U
N W
AY
8/
RUNWAY 13/31
TA
XI
W
AY
G
TAXIW
AY H
TAXIWAY B
TAXIWAY C
TAXIWAY M
TA
XI
W
AY
K
TAXIWAY E
TAXIWAY A
TA
XIW
AY E
E
TAXIWAY F
TAXIWAY D
TAXIWAY E
TAXIWAY J
TA
XI
W
AY
G
TAXIWAY A
TAXIW
AY H
TAXIWAY C
TAXIWAY D
TAXIWAY EE
TAXIWAY F
Elm C reek
Crutcho Creek
Kuhlman Creek
Soldier Creek
Kuhlman Creek
Elm C reek
East Crutcho Creek
Elm Creek
El m
C re ek
Elm Creek
Elm C reek
Elm CreekElm C reek
Ku hlm an C re ek
Ea st
C ru tc ho
C re ek
Elm C ree k
West Crutcho Creek
W es t C ru tc ho
C re ek
Elm Creek
Soldier Creek
Elm C reek
Soldier CreekSoldier Creek
Ea st
C ru tc ho
C re ek
Elm Creek
Ea st
C ru tc ho
C re ek
East C rutcho C reek
Soldier Creek
So ld ie r C re ek
East C rutch o Creek
Soldier C reek
Soldier C reek
So ld ie r C re ek
East Crutcho Creek
416506
21222121
59475946
11401128
62540
61089
838837
62509
62528
62523
62501X
43774
62512
62516
62525
3592135916
99999
62543
32101
71086
53902
50414
55300
56601
930G
948-E
911-E
948-W
61019
911-W
33001
35913
62501
65672
930S
45134
43609
42116
62517
62515
62526
62527
62503
62513
61289
62542
62501OK
11289
62501
15930
15908
15904
15904
15908
15908
15904
15904
15908
62502
41046
62501
62514
62501
61018
71089
45134
96022
43120
41157
44045
45815
40592
43610
62522
41163
15930
15930
11824
Arnold St.
Ea st
D r.
SE 74th St
SE 59th St.
Ai r D ep ot
Patrol Rd.
St af f D r.
Reserve Rd.
5th Ave
"A " A ve
M un iti on s R d.
W ar eh ou se R d.
"B " A ve
7th St.
"H " A ve
M cN ar ne y Av e.
Mitchell Ave
Al er t R d.
Co ok
A ve
W es t D r.
"E "A ve
Extender Dr.
Sentry Rd.
34th St.
Twining Dr.
5th Ave.
Jo ne s
Globemaster Dr.
To w er R d.
Vanaman Rd.
In du st ria l B lv d.
So ut h St
1st St.
Do ol itt le
A ve
Pi cn ic R d.
Ja m es D r.
W ol fe D r.
Ai r D ep ot
Ai r D ep ot
"D " A ve
Perimeter Rd.
Rapcon Rd.
Reserve Rd
"L " A ve
Mercury Rd.
1st St.
Br ow n Dr
Po nd
R d.
O ld
A ir
De po t
Airey Dr.
Bradley Dr.
Entrance Road "C"
Entrance Road "A"
"C " A ve
"C " A ve
Vandenberg Dr.
Hi llt op R d.
Do rm ito ry
R d.
Dormitory Rd.
"M " A ve
Chennault Dr.
M itc he ll A ve
Spaatz Dr.
Co m m od ity D r.
Doolittle Ave
W hi te D r.
3rd Ave.
"D " D riv e
Ba ll
Pa rk
R d.
Joint STARS Dr.
Ai r D ep ot
B lv d
Turbine Dr. Turbine Dr.
Central Plant Dr.
6th St.6th St.
Falco n Dr.
Blackb ird
Dr.
W ey la nd
L oo p
Pegasus Dr.
Thunderbolt D r.
Munitions Rd. Ext.
Codding Rd.
Starlifter Dr.
Chidlaw Ct.
Co rs ai r D r.
Ra pt or Ct
N ig ht H aw k
Ct
Ph an to m
D r.
Fr an kl in
Po w er ho us e
Dr
Sk ym as te r D r.
Spaatz Ct.
La w re nc e
M un de ll
Nabors Dr.
In tr ud er
D r.
M cN ic kl e
M ill er D r.
Ta il
Fe at he r D r.
Holden Dr.
Ai re y C ir.
Smith Ct.
Ra ve n Ct
Air Dep ot Ai r D ep ot
Vanaman Rd.
1st St.
1st St.
TAXIWAY F
Ra w li ng s A ve
Mitc he ll A ve
Mercury Rd.
Ra ily ar d
Rd
He rc ul es
R d.
"F " A ve
Pr op ul sio n Dr
Stratofortress Dr.
96021
Arnold St.
OF
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
CONCEPT
W W
YK
R
EP
LA
CE
H
VA
C
SY
ST
EM
B2
M
AY
TE
PA
-S R
M
M N
O
EL
A-101
K
FR
EE
M
AN
L
SE
LH
O
R
ST
En gr
\D es ig n\ s\
\2
6\
0_ Su pp or t\0 _3
_D ra w in gs \M od el
AR
CH
IT
EC
TU
RA
L
DE
MO
LIT
IO
N
RE
NO
VA
TI
ON
PL
AN
2 6
GENERAL NOTES
KEYED NOTES
DEMOLISH THE ENTIRE ACOUSTICAL TILE CEILING SYSTEM INCLUDING GRID.
PROVIDE AND INSTALL NEW 2' X 2' ACOUSTICAL TILE CEILING AND GRID.
TYPE ARMSTRONG DUNE WITH WHITE GRID.
ANY PAINTED WALL PLANES THAT ARE DAMAGED SHALL BE REPAIRED TO
MATCH THE EXISTING WALL FINISH AND THE FULL WALL PLANE SHALL BE
PAINTED TO MATCH EXISTING.
A-101
ARCHITECTURAL DEMOLITION / RENOVATION PLAN
SCALE: 1/8" = 1'-0"
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
1WORK AREA
LEGEND:
= NOT IN CONTRACT (NIC)
NIC
AutoCAD SHX Text
OPEN
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
AutoCAD SHX Text
COMM/ELEC
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
AutoCAD SHX Text H/S
AutoCAD SHX Text H/S
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-1728
AutoCAD SHX Text
CHESAPEAKE
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text
OPEN
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
OPEN
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
CONCEPT
W W
YK
R
EP
LA
CE
H
VA
C
SY
ST
EM
B2
M
AY
TE
PA
-S R
M
A
AR
M
ST
R O
N G
MD-101
K
FR
EE
M
AN
L
SE
LH
O
R
ST
En gr
\D es ig n\ s\
\2
6\
0_ Su pp or t\0 _3
_D ra w in gs \M od el
ME
CH
AN
IC
AL
H
VA
C
DE
MO
LIT
IO
N
PL
AN
3 6
GENERAL NOTES
KEY NOTES
DEMOLISH AND REPLACE THE EXISTING PACKAGED UNIT AND ITS
ASSOCIATED CONTROLS.
ALL OTHER COMPONENTS OF THE EXISTING HVAC SYSTEM IN THE WEST
ADDITION OF THE BUILDING ARE TO REMAIN.
DEMOLISH ALL HVAC EQUIPMENT IN THE ORIGINAL BUILDING FOOTPRINT,
INCLUDING BUT NOT LIMITED TO THE AIR HANDLER, CONDENSER, VARIABLE
AIR BOXES, CONTROLS, THERMOSTAT, DUCTWORK, HOT WATER REHEAT
PIPING, EXHAUST FANS, AND THE SUPPLY / RETURN AIR DEVICES. DESIGN
AND INSTALL A NEW HVAC SYSTEM IN ACCORDANCE WITH THE STATEMENT
OF WORK.
EXISTING BOILER TO REMAIN PROVIDED LOAD ANALYSIS SHOWS SUFFICIENT
CAPACITY.
DEMOLISH THE EXISTING MECHANICAL ROOM LOUVERS, DAMPERS, AND UNIT
HEATER. DESIGN AND INSTALL REPLACEMENTS TO PROVIDE MECHANICAL
ROOM VENTILATION AND FREEZE PROTECTION.
MD-101
MECHANICAL HVAC DEMOLITION PLAN
SCALE: 1/8" = 1'-0"
1. THIS DRAWING WAS PREPARED FROM THE EXISTING AS-BUILT DRAWINGS FOR
PROJECT WWYK070335. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS
FOR ACCURACY.
2. IF CONTAMINANTS SUCH AS CHEMICAL VAPORS OR WELDING FUMES, ETC. ARE
GENERATED DURING CONSTRUCTION, THE CONTRACTOR SHALL USE CONTROLS
TO PREVENT IMPACT TO BUILDING OCCUPANTS.
3. INSTALL A WATER TREATMENT SYSTEM FOR ANY NEW HYDONIC WATER SYSTEM,
SUCH AS A BOILER, USED IN THE NEW HVAC DESIGN. ANY REHEAT HYDRONIC
PIPING THAT IS REUSED IN THE NEW DESIGN IS TO BE FLUSHED PRIOR TO
INSTALLING THE WATER TREATMENT SYSTEM.
4. PROVIDE AND INSTALL A CARBON MONOXIDE DETECTION SYSTEM IN THE
MECHANICAL ROOM IN ACCORDANCE WITH UFC 3-600-01.
5. ALL NEW HVAC EQUIPMENT; PACKAGED EQUIPMENT, AIR HANDLER, CONDENSER,
BOILER, ETC., SHALL BE COMMISSIONED BY A CONTRACTOR INDEPENDENT FROM
THE PRIME. CONTRACTOR SHALL PROVIDE SUBMITTALS TO THE GOVERNMENT
FOR THE COMMISSIONING AGENT AND COMMISSIONING REPORTS.
33 TYP.
TYP.
TYP.
TYP.
3 TYP.
WEST ADDITION
1WORK AREA
LEGEND:
= NOT IN CONTRACT (NIC)
AutoCAD SHX Text
OPEN
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
AutoCAD SHX Text
COMM/ELEC
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
AutoCAD SHX Text H/S
AutoCAD SHX Text H/S
AutoCAD SHX Text K-4330
AutoCAD SHX Text
KINGSTON
AutoCAD SHX Text
C_TOILETS
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text K-1728
AutoCAD SHX Text
CHESAPEAKE
AutoCAD SHX Text
C_LAVATORY
AutoCAD SHX Text
VITREOUS CHINA
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
OPEN
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
OPEN
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
T
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
CONCEPT
W W
YK
R
EP
LA
CE
H
VA
C
SY
ST
EM
B2
M
AY
TE
PA
-S R
M
C B
AR
BO
ZA
ED-101
K
FR
EE
M
AN
L
SE
LH
O
R
ST
En gr
\D es ig n\ s\
\2
6\
0_ Su pp or t\0 _3
_D ra w in gs \M od el
PO
W
ER
LIG
HT
IN
G
DE
MO
LIT
IO
N
PL
AN
4 6
GENERAL NOTES
KEYED NOTES
1. CONTRACTOR MUST VERIFY THE ELECTRICAL FIELD REQUIREMENTS AND INSTALL
THE NEW EQUIPMENT IN A NEAT AND WORKMANSHIP MANNER PER CODE, UFC
SPECIFICATIONS AND TINKER AFB ELECTRICAL STANDARDS.
2. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
3. THE CONTRACTOR SHALL VERIFY THE EXACT LOCATION AND QUANTITIES OF
EXISTING ELECTRICAL FIXTURES, EQUIPMENT, DEVICES AND COMPONENTS
AFFECTED BY THE PROJECT WORKS INCLUDING BUT NOT LIMITED TO ELECTRICAL
PANELBOARDS, DISCONNECTS, RECEPTACLES, SWITCHES, LIGHT FIXTURES,
CABLES, CONDUITS, AND DEDICATED RACEWAYS, ETC.
4. ANY ELECTRICAL FIXTURE, DEVICES, EQUIPMENT AND COMPONENTS
ENCOUNTERED DURING THE DEMOLITION IN AREAS AFFECTED BY THE
REPLACEMENT WORK (INCLUDING ANY ELECTRICAL FIXTURE, DEVICES,
EQUIPMENT OR COMPONENT NOT SHOWN ON THIS DRAWINGS) SHALL BE
PROTECTED FROM PHYSICAL DAMAGE DURING THE DEMOLITION AND
CONSTRUCTION PHASES OF WORK AND SHALL BE RETURN TO THEIR ORIGINAL
OPERABLE STATE (BASED AT TIME OF PROJECT COMMENCEMENT) UPON THE
COMPLETION OF THIS RENOVATION PROJECT.
5. CONTRACTOR SHALL REMOVE AND DISCARD ALL DEMOLISH ITEMS OFF SITE.
6. CONTRACTOR TO REPLACE EXISTING CONDUCTORS AND CONDUIT BACK TO THE
PROTECTIVE DEVICE WITHIN A PANELBOARD OR TO AN EXISTING SPLICE WITHIN AN
EXISTING J-BOX.
7. UNLESS NOTED OTHERWISE, ALL EXISTING EQUIPMENT SHALL REMAIN
OPERATIONAL.
8. REFER TO MECHANICAL DRAWINGS FOR DEMOLITION EQUIPMENT INFORMATION.
9. COORDINATE WITH OTHER TRADES FOR ADDITIONAL DEMOLITION WORK WITHIN
RENOVATED AREA.
DISCONNECT EXISTING POWER CONNECTION FOR THE HVAC UNITS FROM
PANELBOARDS AND/OR SAFETY SWITCHES. REMOVE ALL ASSOCIATED
ELECTRICAL COMPONENTS, PROTECTIVE DEVICES, DISCONNECTING MEANS,
CONTROL, POWER CONDUCTORS, AND CONDUITS.
DISCONNECT AND REMOVE THE EXISTING LIGHT FIXTURES INCLUDING EXIT
SIGNS, EMERGENCY LIGHTS AND ANY OTHER ASSOCIATED COMPONENT
BACK TO THE NEAREST J-BOX FOR FUTURE REINSTALLATION.
PANEL "A" WILL BE REPLACED FROM 150A. TO 200A. PANEL. ALL EXISTING
CIRCUITS WILL BE DISCONNECTED.
ED-101
POWER - LIGHTING DEMOLITION PLAN
SCALE: 1/8" = 1'-0"
2 2 2
2 2
2 2 2 2
2 2 2 2
2 2
2 2
2 2
2 2 2 2 2
2 2
2 2
2 2
2 2
2 22
2 2 2 2
2 2
2 2
2 2
2 2
LEGEND:
= NOT IN CONTRACT (NIC)
"MDP"
PAVILION
"A"
AC-1
CU-1
AHU-1
FC-2
FC-3
FC-1
FC-4
NIC
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
CONCEPT
W W
YK
R
EP
LA
CE
H
VA
C
SY
ST
EM
B2
M
AY
TE
PA
-S R
M
C B
AR
BO
ZA
E-101
K
FR
EE
M
AN
L
SE
LH
O
R
ST
En gr
\D es ig n\ s\
\2
6\
0_ Su pp or t\0 _3
_D ra w in gs \M od el
PO
W
ER
LIG
HT
IN
G
RE
NO
VA
TI
ON
P
LA
N
5 6
GENERAL NOTES
ELECTRICAL KEYED NOTES
1. CONTRACTOR MUST VERIFY THE ELECTRICAL FIELD REQUIREMENTS AND INSTALL
THE NEW EQUIPMENT IN A NEAT AND WORKMANSHIP MANNER PER CODE, UFC
SPECIFICATIONS AND TINKER AFB ELECTRICAL STANDARDS.
2. REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION. VERIFY ALL
POWER CONNECTIONS AND INSTALLATION REQUIREMENTS WITH MANUFACTURERS
PRIOR TO ROUGH-IN.
3. THE CONTRACTOR SHALL VERIFY THE EXACT LOCATION AND QUANTITIES OF
EXISTING ELECTRICAL FIXTURES, EQUIPMENT, DEVICES AND COMPONENTS
AFFECTED BY THE PROJECT WORKS INCLUDING BUT NOT LIMITED TO ELECTRICAL
PANELBOARDS, DISCONNECTS, RECEPTACLES, SWITCHES, LIGHT FIXTURES,
CABLES, CONDUITS, AND DEDICATED RACEWAYS, ETC.
4. CONTRACTOR SHALL REPLACE EXISTING CONDUCTORS FOR THE LIGHTING
EQUIPMENT AND CONDUIT BACK TO THE POWER SOURCE OR TO EXISTING
JUNCTION BOX. NEW LIGHTING ANALYSIS WILL DETERMINE THE LIGHTING
DISTRIBUTION AND LUMENS REQUIRED PER UFC SPECIFICATIONS WITHIN THE
CONSTRUCTION AREA (EACH OFFICE AND HALLWAYS).
5. UNLESS NOTED OTHERWISE, ALL EXISTING EQUIPMENT SHALL REMAIN
OPERATIONAL.
6. CONTRACTOR MUST COORDINATE WITH THE FACILITY MANAGER AND/OR USER
FOR ANY POWER OUTAGES THAT COULD AFFECT THE NORMAL OPERATION OF THE
FACILITY.
7. ALL NEW EQUIPMENT MUST BE TESTED TO VERIFY THE PROPER FUNCTIONALITY
AND OPERATION. REFER TO ANSI/NETA ATS AND PROVIDE A WRITTEN REPORT FOR
GOVERNMENT REVIEW AND APPROVAL.
DESIGN NEW LIGHTING LAYOUT PER UFC AND BASE STANDARDS.
PROVIDE AND INSTALL NEW WALL PACK LIGHTING FIXTURE EQUAL TO
LITHONIA, MODEL TWH LED. MOUNT AT THE NORTH WALL AND CONNECT TO
THE EXISTING EXTERIOR LIGHTING CIRCUIT.
PROVIDE AND INSTALL NEW LED LIGHT FIXTURE EQUAL TO LITHONIA MODEL
UFIT, 4000K, 80 CRI, 5000LM, (TWO WITH INTEGRAL BATTERY BACKUP).
PROVIDE AND INSTALL NEW LED TROFFER LIGHT FIXTURE EQUAL TO LITHONIA
MODEL 2BLT4 (OR 2BLT2 ACCORDINGLY, 4000K, 80CRI, 5000LM.
PROVIDE AND INSTALL NEW AHU PER MANUFACTURER SPECIFICATIONS. NEW
RGS CONDUIT, HEAVY DUTY DISCONNECT AND ANY OTHER ASSOCIATED
COMPONENT MUST BE WEATHERPROOF RATED.
PROVIDE AND INSTALL NEW AHU PER MANUFACTURER SPECIFICATIONS. NEW
RGS CONDUIT, HEAVY DUTY DISCONNECT, VFD, SUPPORS AND ANY OTHER
ASSOCIATED COMPONENT MUST BE WEATHERPROOF RATED.
PROVIDE AND INSTALL NEW PANELBOARD "MDP" PER UPDATED LOAD
CALCULATIONS. "MDP" TO BE RATED AT 208Y/120V., 3-PHASE, 4-WIRE.
PROVIDE AND INSTALL NEW PANELBOARD "A" PER UPDATED LOAD
CALCULATIONS. "A" TO BE RATED AT 208Y/120V., 3-PHASE, 4-WIRE.
E-101
POWER - LIGHTING RENOVATION PLAN
SCALE: 1/8" = 1'-0"
3 3
TYP.
TYP.
TYP.
1 TYP.
"MDP"
PAVILION
F
F
E
E
E E
"A"
E
AC-1
H/S
H/S
E
E
E E
E
CU-1
AHU-1
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
CONCEPT
W W
YK
R
EP
LA
CE
H
VA
C
SY
ST
EM
B2
M
AY
TE
PA
-S R
M
R R
EY
N
O
LD
S
FD-101
R R
EY
N
O
LD
S
L
SE
LH
O
R
ST
En gr
\D es ig n\ s\
\2
6\
0_ Su pp or t\0 _3
_D ra w in gs \M od el
FI
RE
P
RO
TE
CT
IO
N
DE
MO
LIT
IO
N
PL
AN
6 6
GENERAL NOTES
KEYED NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. NOT ALL FLOOR TO CEILING SYSTEMS FURNITURE
WALLS SHOWN. ALL FIRE ALARM DEVICES MAY NOT BE SHOWN ON THIS DRAWING.
CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS.
2. THE CONTRACTOR SHALL VERIFY THE EXACT LOCATION AND QUANTITIES OF
EXISTING FIRE ALARM EQUIPMENT, DEVICES AND COMPONENTS INCLUDING BUT
NOT LIMITED TO CONTROL PANELS, ALARM TRANSCEIVER, PULL STATIONS,
NOTIFICATION APPLIANCES, SMOKE DETECTORS, HEAT DETECTORS, AND DUCT
SMOKE DETECTORS, ETC.
3. ALL FIRE ALARM SYSTEM DEVICES AND PANELS SHALL BE REMOVED AND
RETURNED TO THE GOVERNMENT. THEY SHALL BE PROTECTED FROM PHYSICAL
DAMAGE DURING THE DEMOLITION . THE REMAINDER OF THE SYSTEM IS TO BE
DEMOLISHED.
4. CONTRACTOR SHALL REMOVE AND DISCARD ALL DEMOLISH ITEMS OFF SITE.
5. REFER TO MECHANICAL DRAWINGS FOR DEMOLITION EQUIPMENT INFORMATION.
6. COORDINATE WITH OTHER TRADES FOR ADDITIONAL DEMOLITION WORK WITHIN
AREA OF RENOVATION.
EXISTING FIRE SPRINKLER RISER.
CONCEALED DUCT DETECTR
FD-101
FIRE PROTECTION - DEMOLITION PLAN
SCALE: 1/8" = 1'-0"
LEGEND:
= NOT IN CONTRACT (NIC)
"MDP"
PAVILION
"A"
AC-1
H/S
H/S
CU-1
AHU-1
"MDP"
PAVILION
"A"
AC-1
H/S
H/S
F
F
F
F
F
MECH
BOILER
MECH
BREAK ROOM
JANITOR
MENS
ROOM
WOMENS
ROOM
VESTIBULE
CO
RR
ID
OR
VESTIBULE
CORRIDOR
OPEN
OFFICE
OPEN
OFFICE
TOILET
COMM/ELEC
CLOSET
C.O.'S
OFFICE
ASS'T &
RECP
OPEN
OFFICE
OFFICE
OFFICE
CONFERENCE
ROOM
CHIEF'S
OFFICE
OFFICE
A/V CLOSET
OFFICE
OFFICE
RTS
NIC
F
RTS
FIRE ALARM CONTROL PANEL
FA TRANSCEIVER PANEL
MANUAL PULL STATION
WATER FLOW SWITCH
VALVE TAMPER SWITCH
SPOT SMOKE DETECTOR
DUCT SMOKE DETECTOR
REMOTE TEST STATION
NOTIFICATION HORN/STROBE
FIRE ALARM LEGEND
AutoCAD SHX Text
TRAN
AutoCAD SHX Text
FACP
AutoCAD SHX Text
TRAN
FACP
| Sheets and Views |
| G101 |
| 02-210116-A101-A101.pdf |
| Sheets and Views |
| A101 |
| 03-210116-MD101-MD101.pdf |
| Sheets and Views |
| MD101 |
| 04-210116-ED101-ED101.pdf |
| Sheets and Views |
| ED101 |
| 05-210116-E101-AE101.pdf |
| Sheets and Views |
| AE101 |
| 06-210116-FD101-FD101.pdf |
| Sheets and Views |
| FD101 |
File details come from the government source that posted it. Updated .