Att12_210116_Submittal Register.pdf

PDF 159 KB Posted

Attached to
Tinker AFB MACBOA WWYK210116 Replace HVAC System, B285
Solicitation number
FA813726R0024
Issued by

About this file

This is a Submittal Register for a federal construction contract (WWYK210116) for replacing an HVAC system in Building B285. The document tracks 83 required contractor submittals organized by specification section, submittal type, and approval status, establishing a comprehensive control system for managing documentation throughout the contract lifecycle.

The register encompasses preconstruction, design, construction, and closeout phases. Preconstruction submittals include health and safety plans, environmental compliance documentation (storm water pollution prevention, hazardous materials management, environmental training), quality control plans, and scheduling documents. Asbestos abatement procedures are extensively detailed with requirements for step-by-step procedures, glovebag and negative pressure enclosure construction, respirator protection programs, and encapsulation procedures, each requiring government approval (marked "G"). Design-phase submittals cover baseline construction and design schedules, design quality control plans, and interim/final design documents with various approval classifications (G for government, R for review, C for compliance, A for acknowledgment). Construction-phase requirements include monthly progress reports, debris management reports, and refrigerant technical certifications. Closeout submittals require operation and maintenance manuals, working as-built and record drawings, EPA and USDA item certifications, and training documentation including training plans, content outlines, video recordings, and completion validation. The register tracks submission deadlines, approval timelines, material needed dates, and specific remarks such as providing weekly updates with contract progress reports or submitting certain items 30 days prior to scheduled events. Multiple submittals require both electronic (optical media) and hard copy formats, with quantities specified for delivery.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Line

Acti vity

Transm ittal # Specification Section

SD

# Submittal Description Item Submitted Paragraph #

Classification:

GOVT or A/E

Reviewer Submit

Approval Needed

By

Material Needed

By Action Code

Date Of Action

Date FWD to APPR / Auth

Date RCD From

CONTR

Date FWD To Other Revwr

Date RCD From Other Reviewer

Action Code

Date Of Action

Mailed To CONTR/ Date

RCD From

APPR

Authority Remarks

1 00 70 00 01 Preconstruction Submittals Key Issue Receipt 1.3.12.1

2 00 70 00 06 Test Reports Pre-Construction Testing Record 1.3.11 G

3 00 70 00 07 Certificates Welding, Cutting and Brazing Permit 1.4 G

4 00 70 00 07 Certificates Framed Instructions 1.8

5 00 70 00 11 Closeout Submittals Key Return Receipt 1.3.12.1

6 00 71 00 01 Preconstruction Submittals Health and Safety Plan 1.3 G

7 00 71 00 01 Preconstruction Submittals Internal Combustion Engines Plan 1.3.5 G

8 00 71 00 07 Certificates Safety Meetings 1.3

00 71 00 07 Certificates FOD Awareness and Prevention Training 1.4

10 00 72 00 01 Preconstruction Submittals Storm Water Pollution Prevention Plan 1.3.3.2 G

11 00 72 00 01 Preconstruction Submittals AF Form 3952 Chemical/Hazardous Material Request/Authorization 1.4 G

12 00 72 00 01 Preconstruction Submittals Environmental Management System Awareness Training 1.1

13 00 72 00 03 Product Data Affirmative Procurement Documentation or Green Statement 1.3.10 G Provide only one. Reference specification for additional information

14 00 72 00 07 Cerificates Fire Ant Federal Compliance Agreement or state phyto-sanitary certificate 1.3.4.1

15 00 72 00 07 Cerificates Monthly Hazardous Material Usage Report 1.4 G Provide 1st week of each month during construction

16 00 72 00 07 Cerificates Refrigerant Technical Certifications 1.5 G

17 00 72 00 07 Cerificates Refrigerant Installation 1.5 G

18 00 72 00 08 Manufacturer's Instructions Safety Data Sheets/Material Safety Data Sheets 1.4

19 00 72 00 11 Closeout Submittals Notice of Termination (ODEQ Form 640-572) 1.3.3.2 G

20 00 72 00 - Attch 2 01 Preconstruction Submittals Documentation of Training/ Experience C.2 C.13

21 00 72 00 - Attch 2 01 Preconstruction Submittals Employee Physicals C.2 C.13

22 00 72 00 - Attch 2 01 Preconstruction Submittals Regulatory Agency Notification C.3

23 00 72 00 - Attch 2 01 Preconstruction Submittals Security Documentation C.4

24 00 72 00 - Attch 2 01 Preconstruction Submittals Communications C.5

25 00 72 00 - Attch 2 01 Preconstruction Submittals Step-by-Step Abatement Procedures C.6 G

26 00 72 00 - Attch 2 01 Preconstruction Submittals Glovebag Procedures C.7 G

27 00 72 00 - Attch 2 01 Preconstruction Submittals Negative Pressure Enclosure Construction Procedures C.8 G

28 00 72 00 - Attch 2 01 Preconstruction Submittals Respirator Protection Program C.9

29 00 72 00 - Attch 2 01 Preconstruction Submittals Encapsulation Procedures C.11 G

30 00 72 00 - Attch 2 01 Preconstruction Submittals Landfill Qualifications C.14

31 00 72 00 - Attch 2 01 Preconstruction Submittals Work Schedule C.16

32 00 72 00 - Attch 2 01 Preconstruction Submittals Emergency Plans and Fire Prevention Plans C.17 G

33 00 72 00 - Attch 2 01 Preconstruction Submittals Written Hazardous Communication Program C.18

34 00 72 00 - Attch 2 01 Preconstruction Submittals Rental Equipment C.19

35 00 72 00 - Attch 2 07 Cerificates Manufacturer’s Certifications C.10

36 00 72 00 - Attch 2 07 Cerificates Laboratory and Monitoring Qualifications/Certifications C.12

(d)

CONTRACTOR

ACTION

CONTRACTOR SCHEDULE

DATES APPROVING AUTHORITY

TITLE: WWYK210116

SUBMITTAL REGISTER

JOB NAME: REPLACE HVAC SYSTEM

LOCATION: B285

CONTRACT NO:

CONTRACTOR:

Submittal Register_v3_03/07/22

Acti vity

Transm ittal # Specification Section

SD

# Submittal Description Item Submitted Paragraph #

Classification:

GOVT or A/E

Reviewer Submit

Approval Needed

By

Material Needed

By Action Code

Date Of Action

Date FWD to APPR / Auth

Date RCD From

CONTR

Date FWD To Other Revwr

Date RCD From Other Reviewer

Action Code

Date Of Action

Mailed To CONTR/ Date

RCD From

APPR

Authority Remarks

(d)

CONTRACTOR

ACTION

CONTRACTOR SCHEDULE

DATES APPROVING AUTHORITY

37 00 72 00 - Attch 2 07 Cerificates Asbestos Waste Transporter Certification of Insurance C.13

38 00 72 00 - Attch 2 08 Manufacturer's Instructions Safety Data Sheets/Material Safety Data Sheets C.15

39 00 72 00 - Attch 2 11 Closeout Submittals Waste Disposal Receipt M.1(1) G

40 00 72 00 - Attch 2 11 Closeout Submittals Air Sampling Results M.1(2) G

41 00 72 00 - Attch 5 01 Preconstruction Submittals Construction Debris Analysis Plan 1.2.3 G

42 00 72 00 - Attch 5 07 Certificates Monthly Debris Management Report 2 G Provide 1st week of each month during construction

43 01 32 16.00 20 01 Preconstruction Submittals Baseline Construction Schedule 1.2 G Provide within 10 days of NTP.

44 01 32 16.00 20 01 Preconstruction Submittals Baseline Design Schedule 1.2 G Provide within 10 days of NTP.

45 01 32 16.00 20 07 Certificates Monthly Updates 1.4 Provide 1st week of each month during construction, or as directed by CO

46 01 32 16.00 20 07 Certificates 3-Week Look Ahead Schedule 1.6 Provide weekly with the Contract Progress Report

47 01 33 00 01 Preconstruction Submittals Submittal Register 1.8 G

48 01 33 16.00 10 01 Preconstruction Submittals Design Quality Control Plan 1.5.1 G

49 01 33 16.00 10 01 Preconstruction Submittals Initial Design Conference 1.5.2.2

50 01 33 16.00 10 01 Preconstruction Submittals Preconstruction Conference 1.5.2.3

51 01 33 16.00 10 01 Preconstruction Submittals DCM Procedures 3.5.1 G

52 01 33 16.00 10 01 Preconstruction Submittals Submittal Register 3.8.4 G

53 01 33 16.00 10 05 Design Data Design and Code Checklists 1.7.1 C

54 01 33 16.00 10 05 Design Data Interim Design Submittals 3.2.1 R

55 01 33 16.00 10 05 Design Data Conference Documentation 3.7.3

56 01 33 16.00 10 05 Design Data Final Design Submittals 3.8 R

57 01 33 16.00 10 05 Design Data Design Complete Documents 3.9 C

58 01 33 16.00 10 11 Closeout Submittals DD Form 1354 3.8.5 A

59 01 45 00.00 10 01 Preconstruction Submittals Quality Control (QC) Plan 3.2 G

60 01 45 00.00 10 01 Preconstruction Submittals Additional Requirements for Design Quality Control (DQC) Plan 3.2.2 G

61 01 45 00.00 10 05 Design Data Discipline-Specific Checklists 3.2.2

62 01 45 00.00 10 05 Design Data Design Quality Control 3.9.1

63 01 45 00.00 10 06 Test Reports QC Documentation 3.9 Provide weekly with the Contract Progress Report

64 01 50 00 01 Preconstruction Submittals Request for Contractor Staging Area 1.1 G

65 01 50 00 01 Preconstruction Submittals Photographic Record 1.3

66 01 78 00 03 Product Data Warranty Letter 1.7.1

67 01 78 00 03 Product Data Warranty Tags 1.7.3

68 01 78 00 03 Product Data Spare Parts Data 1.5

69 01 78 00 08 Manufacturer's Instructions Instructions 1.7.1

70 01 78 00 10 Operation and Maintenance Data Operation and Maintenance Manuals 3.4 G Provide (2) electronic sets (optical media) and (1) hard copy

71 01 78 00 11 Closeout Submittals Working As-Built Drawings 3.1 G Provide (2) electronic sets (optical media) and

(2) hard copies

72 01 78 00 11 Closeout Submittals Record Drawings 3.3 G Provide (2) electronic sets (optical media) and (1) hard copy

73 01 78 00 11 Closeout Submittals Certification of EPA Designated Items 2.3 G

74 01 78 00 11 Closeout Submittals Certification Of USDA Designated Items 2.4 G

75 01 78 00 11 Closeout Submittals Checklist for DD FORM 1354 3.6 G

76 01 78 23 10 Operation and Maintenance Data Operation and Maintenance Data 1.2 G Provide 30 days prior to scheduled Training

77 01 78 23 10 Operation and Maintenance Data O&M Database 1.3 G

78 01 78 23 10 Operation and Maintenance Data Training Plan 3.1.1 G Provide 30 days prior to scheduled Final Inspection

Acti vity

Transm ittal # Specification Section

SD

# Submittal Description Item Submitted Paragraph #

Classification:

GOVT or A/E

Reviewer Submit

Approval Needed

By

Material Needed

By Action Code

Date Of Action

Date FWD to APPR / Auth

Date RCD From

CONTR

Date FWD To Other Revwr

Date RCD From Other Reviewer

Action Code

Date Of Action

Mailed To CONTR/ Date

RCD From

APPR

Authority Remarks

(d)

CONTRACTOR

ACTION

CONTRACTOR SCHEDULE

DATES APPROVING AUTHORITY

79 01 78 23 10 Operation and Maintenance Data Training Content 3.1.2 G Provide 14 days prior to scheduled Training

80 01 78 23 10 Operation and Maintenance Data Training Outline 3.1.3 G Provide 14 days prior to scheduled Training

81 01 78 23 11 Closeout Submittals Training Video Recording 3.1.4 G

82 01 78 23 11 Closeout Submittals Validation of Training Completion 3.1.6 G

83 SOW 07 Certificates Contract Progress Report(s) 2.4 G Provide weekly throughout life of contract. Utilize AF Form 3065, Contract Progress Report (or equal)

Submittal Register_General Requ