Att12_240015-Drawings.pdf
PDF 20 MB Posted
- Attached to
- WWYK240015 - Rehab Tanks 62501E & 62501W
- Solicitation number
- FA813726R0020
About this file
This file is a set of construction design drawings for the rehabilitation of two storage tanks (62501E and 62501W) at Tinker Air Force Base, Oklahoma, prepared at 35% design completion as of October 22, 2025. The project, identified as WWYK240015, is under the jurisdiction of Air Force Materiel Command's 72nd Air Base Wing Civil Engineer Directorate and involves comprehensive restoration of concrete basins and associated infrastructure.
The scope of work includes structural repairs to concrete walls and retaining structures, with repairs to monolith joints and concrete cracking performed in accordance with ACI RAP-1 and ACI RAP-6 standards. Steel structural components require complete coating removal via near-white blast cleaning (SSPC-SP 10), priming with zinc-rich primer, and painting with exterior-rated products in SW 7520 Dark Brown. Additional work encompasses removal and replacement of tank platform floor grating, steel stair tread nosing with non-corrosive slip-resistant materials, concrete-to-steel sealants using flexible polyurethane products, and six metal pipe support posts. Mechanical work includes application of three-part epoxy coating systems on both interior (20-26 mils) and exterior (8-13 mils) tank surfaces. Electrical work entails complete demolition of the existing cathodic protection system and installation of a new interior cathodic protection system meeting UFC 3-570-01 and UFGS 26 42 15 requirements, including titanium mixed metal oxide anode assemblies, reference electrodes, flotation buoys, and automatically controlled rectifiers. Environmental controls, contamination containment systems, and soluble salt testing are required prior to abrasive blasting operations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVIEWED BY:
REVIEWED BY:
USING AGENCY:
ASBESTOS EVALUATION:
SAFETY:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
INDUSTRIAL HYGIENE:
DATE:
PROJECT DRAWING INDEX SIGNATURES
CORROSION ENGINEER: (CECE)
CE OPERATIONS: (CECO)
COMMUNICATIONS: (COMM)
CHIEF ENGINEER DIR: (CECE)
CHIEF DESIGN BRANCH: (CECE)
DESIGN MANAGER: (CECE)
ZONE MANAGER:
CONSTRUCTION MANAGEMENT: (CECE)
ENVIRONMENTAL:
BASE CIVIL ENGINEER: (CE)
FIRE DEPARTMENT: (CEFP)
GENERAL1. BRAND NAMES: REFERENCE TO SPECIFIC BRAND NAMES
OR COMPANIES IS FOR THE PURPOSE OF ESTABLISHING
MINIMUM QUALITY STANDARDS, IDENTIFICATION AND
GUIDANCE AND IS NOT INTENDED TO LIMIT SELECTION OF
OTHER MANUFACTURERS THAT ARE EQUAL OR EXCEED
THE SPECIFIED ITEMS IN TERMS OF PHYSICAL
PROPERTIES, INCLUDING, COLOR RANGE, FINISH,
DURABILITY, APPEARANCE, PERFORMANCE
CHARACTERISTICS, AND OTHER FACTORS. OTHER
PRODUCTS, MATERIALS, COLORS AND SYSTEMS, MAY BE
SUBMITTED FOR EVALUATION AND
APPROVAL/DISAPPROVAL BY THE CONTRACTING OFFICER.
2. THIS SET OF CONSTRUCTION DOCUMENTS SHALL BE
CONSIDERED AS A WHOLE IN THAT THE GENERAL
CONTRACTOR AND ALL THE SUB-CONTRACTORS ARE
RESPONSIBLE FOR THE INFORMATION PRESENTED ON ALL
SHEETS ON THE SET OF DRAWINGS AND ALL SECTIONS OF
THE SPECIFICATIONS.
3. THE CONTRACTOR IS RESPONSIBLE FOR ERECTING ALL
CONSTRUCTION FENCING AND BARRICADES AS REQUIRED
TO PROTECT CONSTRUCTION MATERIAL AND TO PREVENT
ANY UNAUTHORIZED PERSONNEL FROM ENTERING THE
CONSTRUCTION SITE.
4. ANY DAMAGE TO THE EXISTING GROUNDS OR FACILITIES
CAUSED BY CONSTRUCTION TRAFFIC OR ANY
CONSTRUCTION OPERATION SHALL BE REPAIRED OR
REPLACED BY THE CONTRACTOR TO MATCH OR EXCEED
EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE
GOVERNMENT.
5. ALL WORK NOTED & LOCATED IN THESE DOCS SHALL BE
UNDERSTOOD BY THE CONTRACTOR TO REQUIRE ALL NEW
LABOR & MATERIALS UNLESS SPECIFICALLY NOTED TO BE
"EXISTING" OR "BY OTHERS".
WWYK240015
REHAB TANKS
62501E & 62501W
KEY PLAN:
GENERAL NOTES:
DISCIPLINE
PROJECT
LOCATION
1 G-101 GENERAL NOTES & VICINITY MAP
SHT.SEQ. SHEET TITLE
OF
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
DESIGN
W W
YK
RE
HA
B
TA
NK
S
1E
1W
O C
T
TE
PA
-S R
M
G-101
P G
O U
C H
ER
D S
H
AN
N O
N
En gr
\D es ig n\ s\
\2
5\
0_ Su pp or t\0 _3
_D ra w in gs
GE
NE
RA
L N
OT
ES
AN
D
VI
CI
NI
TY
M
AP
01 12
G-102 AERIAL IMAGE OF 62501E AND 62501W WITH UTILITIES2
ED-101 ELECTRICAL ASBUILT OF CATHODIC PROTECTION SYSTEM
ED-102 ELECTRICAL ASBUILT CATHODIC PROTECTON DETAILS
S-101 STRUCTURAL ASBUILT PLAN OF RETAINING WALL AND JOINT LAYOUT
S-102 STRUCTURAL ASBUILT PLAN OF TANK STAIR AND WALKWAY
MD-101 MECHANICAL DEMOLITION PLAN
M-101 MECHANICAL NEW WORK PLAN
E-101 ELECTRICAL PLAN
E-102 ELECTRICAL PLAN
E-103 ELECTRICAL WORK PLAN
S-100 STRUCTURAL GENERAL NOTES
62528
62516
62515
62501W 62501E
R U
N W
AY
8/
RUNWAY 13/31
TA
XI
W
AY
G
TAXIW
AY H
TAXIWAY B
TAXIWAY C
TAXIWAY M
TA
XI
W
AY
K
TAXIWAY E
TAXIWAY A
TA
XIW
AY E
E
TAXIWAY F
TAXIWAY D
TAXIWAY E
TAXIWAY J
TA
XI
W
AY
G
TAXIWAY A
TAXIW
AY H
TAXIWAY C
TAXIWAY D
TAXIWAY EE
TAXIWAY F
Elm C reek
Crutcho Creek
Kuhlman Creek
Soldier Creek
Kuhlman Creek
Elm C reek
East Crutcho Creek
Elm Creek
El m
C re ek
Elm Creek
Elm C reek
Elm CreekElm C reek
Ku hlm an C re ek
Ea st
C ru tc ho
C re ek
Elm C ree k
West Crutcho Creek
W es t C ru tc ho
C re ek
Elm Creek
Soldier Creek
Elm C reek
Soldier CreekSoldier Creek
Ea st
C ru tc ho
C re ek
Elm Creek
Ea st
C ru tc ho
C re ek
East C rutcho C reek
Soldier Creek
So ld ie r C re ek
East C rutch o Creek
Soldier C reek
Soldier C reek
So ld ie r C re ek
East Crutcho Creek
416506
21222121
59475946
11401128
62540
61089
838837
62509
62528
62523
62501X
43774
62512
62516
62525
3592135916
99999
62543
32101
71086
53902
50414
55300
56601
930G
948-E
911-E
948-W
61019
911-W
33001
35913
62501
65672
930S
45134
43609
42116
62517
62515
62526
62527
62503
62513
61289
62542
62501OK
11289
62501
15930
15908
15904
15904
15908
15908
15904
15904
15908
62502
41046
62501
62514
62501
61018
71089
45134
96022
43120
41157
44045
45815
40592
43610
62522
41163
15930
15930
11824
Arnold St.
Ea st
D r.
SE 74th St
SE 59th St.
Ai r D ep ot
Patrol Rd.
St af f D r.
Reserve Rd.
5th Ave
"A " A ve
M un iti on s R d.
W ar eh ou se R d.
"B " A ve
7th St.
"H " A ve
M cN ar ne y Av e.
Mitchell Ave
Al er t R d.
Co ok
A ve
W es t D r.
"E "A ve
Extender Dr.
Sentry Rd.
34th St.
Twining Dr.
5th Ave.
Jo ne s
Globemaster Dr.
To w er R d.
Vanaman Rd.
In du st ria l B lv d.
So ut h St
1st St.
Do ol itt le
A ve
Pi cn ic R d.
Ja m es D r.
W ol fe D r.
Ai r D ep ot
Ai r D ep ot
"D " A ve
Perimeter Rd.
Rapcon Rd.
Reserve Rd
"L " A ve
Mercury Rd.
1st St.
Br ow n Dr
Po nd
R d.
O ld
A ir
De po t
Airey Dr.
Bradley Dr.
Entrance Road "C"
Entrance Road "A"
"C " A ve
"C " A ve
Vandenberg Dr.
Hi llt op R d.
Do rm ito ry
R d.
Dormitory Rd.
"M " A ve
Chennault Dr.
M itc he ll A ve
Spaatz Dr.
Co m m od ity D r.
Doolittle Ave
W hi te D r.
3rd Ave.
"D " D riv e
Ba ll
Pa rk
R d.
Joint STARS Dr.
Ai r D ep ot
B lv d
Turbine Dr. Turbine Dr.
Central Plant Dr.
6th St.6th St.
Falco n Dr.
Blackb ird
Dr.
W ey la nd
L oo p
Pegasus Dr.
Thunderbolt D r.
Munitions Rd. Ext.
Codding Rd.
Starlifter Dr.
Chidlaw Ct.
Co rs ai r D r.
Ra pt or Ct
N ig ht H aw k
Ct
Ph an to m
D r.
Fr an kl in
Po w er ho us e
Dr
Sk ym as te r D r.
Spaatz Ct.
La w re nc e
M un de ll
Nabors Dr.
In tr ud er
D r.
M cN ic kl e
M ill er D r.
Ta il
Fe at he r D r.
Holden Dr.
Ai re y C ir.
Smith Ct.
Ra ve n Ct
Air Dep ot Ai r D ep ot
Vanaman Rd.
1st St.
1st St.
TAXIWAY F
Ra w li ng s A ve
Mitc he ll A ve
Mercury Rd.
Ra ily ar d
Rd
He rc ul es
R d.
"F " A ve
Pr op ul sio n Dr
Stratofortress Dr.
96021
Arnold St.
62501W 62501E
PROJECT
LOCATION
TINKER AFB, OK
VICINITY MAP
BASE
OPERATIONS
B240
CONTRACTING
B3
GOTT
GATE
TINKER GATE
PASS & ID B6611
HRUSKOCY
GATE
EAKER GATE
FIRE DEPARTMENT
B117
VANCE
GATE
LIBERATOR GATE
HOPE
GATE
LEGEND
CONTRACTOR
HAUL ROUTE
LANCER
GATE
TRUCK GATE
PIAZZA GATE
BASE CIVIL
ENGINEER
B400
(FUTURE
HAUL ROUTE)
(F
UT
UR
E
HA
UL
R
OU
TE
FUTURE
TRUCK GATE
FUTURE
HAUL ROUTE
OF
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
DESIGN
W W
YK
RE
HA
B
TA
NK
S
1E
1W
O C
T
TE
PA
-S R
M
G-102
P G
O U
C H
ER
D S
H
AN
N O
N
En gr
\D es ig n\ s\
\2
5\
0_ Su pp or t\0 _3
_D ra w in gs
AE
RI
AL
IM
AG
E
OF
1E
A
ND
1W W
IT
H
UT
ILI
TI
ES
02 12
GENERAL NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
G-102
AERIAL IMAGE OF 62501E AND 62501W WITH UTILITIES
SCALE: 1/16" = 1'-0"
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
DESIGN
W W
YK
RE
HA
B
TA
NK
S
1E
1W
O C
T
TE
PA
-S R
M
L
LU
KE
S-100
P G
O U
C H
ER
D S
H
AN
N O
N
En gr
\D es ig n\ s\
\2
5\
0_ Su pp or t\0 _3
_D ra w in gs
ST
RU
CT
UR
AL
GE
NE
RA
L N
OT
ES
03 12
TANK PREPARATION AND COATING REQUIREMENTS
EXTERIOR SURFACE PREPARATION:
INSPECT ALL SURFACES FOR OIL AND/OR GREASE CONTAMINATION.
CLEAN OIL AND/OR GREASE CONTAMINATED SURFACES IN ACCORDANCE WITH
SSPC-SP 1, AND RECHECK FOR CONTAMINATION UNTIL SURFACES ARE FREE OF OIL
AND GREASE.
TEST SURFACES FOR SOLUBLE SALTS, AND WASH AS REQUIRED, PRIOR TO
ABRASIVE BLASTING.
ABRASIVE BLAST EXTERIOR TANK STEEL SURFACES INCLUDING ALL INTEGRATED
MANWAYS AND FLANGES, TO NEAR-WHITE METAL IN ACCORDANCE WITH SSPC-SP
10/NACE NO. 2. PREPARED SURFACES SHALL CONFORM TO SSPC-VIS 1 AND SHALL
MATCH THE PREPARED TEST-PANELS.
CONTAIN SAND BLASTING PROPERLY TO PREVENT EXPOSURE TO NEARBY
BUILDING PERSONNEL.
EXTERIOR COATING SYSTEM:
APPLY NEW EXTERIOR COATING SYSTEM TO ALL EXTERIOR TANK STEEL SURFACES
THAT HAVE HAD THEIR COATING REMOVED.
ZINC-RICH EPOXY PRIMER COAT - EPOXY POLYAMIDE, MIL-DTL-24441/19 (FORMULA
159, TYPE III)
EPOXY INTERMEDIATE COAT - EPOXY POLYAMIDE, MIL-DTL-24441/31(FORMULA 152,
TYPE IV, WHITE TINTED)
POLYURETHANE TOPCOAT - POLYURETHANE COATING TOPCOAT OF MIL-PRF-85285,
TYPE II, SW 9102 - QUINOA
INTERIOR SURFACE PREPARATION:
INSPECT ALL SURFACES FOR OIL AND/OR GREASE CONTAMINATION.
CLEAN OIL AND/OR GREASE CONTAMINATED SURFACES IN ACCORDANCE WITH
SSPC SP 1, AND RECHECK FOR CONTAMINATION UNTIL SURFACES ARE FREE OF OIL
AND GREASE.
TEST SURFACES FOR SOLUBLE SALTS, AND WASH AS REQUIRED, PRIOR TO
ABRASIVE BLASTING.
ABRASIVE BLAST INTERIOR TANK STEEL SURFACES INCLUDING ALL INTEGRATED
MANWAYS AND FLANGES, TO NEAR-WHITE METAL IN ACCORDANCE WITH SSPC SP
10/NACE NO. 2. PREPARED SURFACES SHALL CONFORM TO SSPC VIS 1 AND SHALL
MATCH THE PREPARED TEST-PANELS.
CONTAIN SAND BLASTING PROPERLY TO PREVENT EXPOSURE TO NEARBY
BUILDING PERSONNEL.
INTERIOR COATING SYSTEM:
APPLY NEW INTERIOR COATING SYSTEM TO ALL INTERIOR STEEL TANK SURFACES
THAT HAVE HAD THEIR COATING REMOVED.
AWWA D102-21 (ICS-2) - THIS IS A THREE-COAT TWO-COMPONENT EPOXY SYSTEM
FOR EXTENDED SERVICE WITH NON-POTABLE WATER. ALTERNATE SYSTEMS OR
PRODUCTS WILL NOT BE CONSIDERED. ALL PRIMER, INTERMEDIATE, AND TOPCOAT
MATERIALS SHALL BE MANUFACTURED BY ONE MANUFACTURER.
EPOXY PRIMER COAT - EPOXY POLYAMIDE, MACROPOXY (240, BUFF)
EPOXY INTERMEDIATE COAT - FLAKE FILLED NOVOLAC EPOXY, COR-COTE (B62-420,
HAZE GRAY)
EPOXY TOPCOAT - FLAKE FILLED NOVOLAC EPOXY, COR-COTE (B62-420, HAZE
GRAY)
CONTAIN PAINT OVERSPRAY PROPERLY TO PREVENT EXPOSURE OF NEARBY
BUILDING PERSONNEL.
STRUCTURAL GENERAL NOTES
ACI RAP-1 REPAIRS
SURFACE PREPARATION:
CLEAN THE SURFACE AREA 1/2 IN. WIDE ON EACH SIDE OF THE CRACK WITH WIRE
BRUSH. REMOVE CONTAMINANTS BY HIGH-PRESSURE WATER, “OIL-FREE”
COMPRESSED AIR, OR POWER VACUUMS. WHEN USING WATER TO CLEAN OUT THE
CRACK, BLOW OUT THE CRACK WITH OIL-FREE, COMPRESSED OR HEATED AIR TO
ACCELERATE DRYING. WHERE CONCRETE SURFACES ADJACENT TO THE CRACK ARE
DETERIORATED, “V”-GROOVE THE CRACK UNTIL SOUND CONCRETE IS REACHED. “V”
GROOVES CAN ALSO BE USED WHEN HIGH INJECTION PRESSURES REQUIRE A
STRONGER CAP SEAL.
REPAIR PROCEDURE:
PORT INSTALLATION:
INSTALL THE ENTRY PORTS ONLY AFTER PROPER SURFACE PREPARATION. TWO
TYPES OF ENTRY PORTS MAY BE USED FOR THE INJECTION PROCESS:
SURFACE-MOUNTED; OR SOCKET-MOUNTED. ENTRY PORTS CAN BE ANY TUBELIKE
DEVICE THAT PROVIDES FOR THE SUCCESSFUL TRANSFER OF THE EPOXY RESIN
UNDER PRESSURE INTO THE CRACK. PORT SPACING IS TYPICALLY 8 IN. ON CENTER,
WITH INCREASED SPACING AT WIDER CRACKS. PORT SPACING MAY ALSO BE
ADJUSTED BASED ON THE THICKNESS OF THE CONCRETE ELEMENT.
SURFACE-MOUNTED ENTRY PORTS ARE NORMALLY ADEQUATE FOR MOST CRACKS,
BUT SOCKET-MOUNTED PORTS ARE USED WHEN CRACKS ARE BLOCKED, SUCH AS
WHEN CALCIFIED CONCRETE IS ENCOUNTERED. ENTRY PORTS CAN ALSO BE
CONNECTED BY A MANIFOLD SYSTEM WHEN SIMULTANEOUS INJECTION OF MULTIPLE
PORT LOCATIONS IS ADVANTAGEOUS.
INSTALL THE CAP SEAL:
THE CAP SEAL CONTAINS THE EPOXY AS IT IS INJECTED UNDER PRESSURE INTO THE
CRACK. WHEN CRACKS PENETRATE COMPLETELY THROUGH A SECTION, CAP SEALS
PERFORM BEST WHEN INSTALLED ON BOTH SIDES OF THE CRACKED ELEMENT,
ENSURING CONTAINMENT OF THE EPOXY. CAP SEALS SHALL BE INSTALLED USING
EPOXIES, POLYESTERS, PARAFFIN WAX, OR SILICONE CAULK. THE SELECTION OF THE
CAP SEAL MATERIAL SHOULD CONSIDER THE FOLLOWING CRITERIA, SUBJECT TO THE
TYPE OF CRACK TO BE REPAIRED: NON-SAG CONSISTENCY (FOR VERTICAL OR
OVERHEAD); MOISTURE TOLERANCE; WORKING LIFE; AND RIGIDITY (MODULUS OF
ELASTICITY). CONCRETE TEMPERATURE CHANGES AFTER INSTALLATION OF THE CAP
SEAL BUT PRIOR TO INJECTION MAY CAUSE THE CAP SEAL TO IF THIS OCCURS, THE
CAP SEAL MUST BE REPAIRED PRIOR TO RESIN INJECTION. PRIOR TO PROCEEDING
WITH INSTALLATION OF THE CAP SEAL, MARK THE LOCATION OF THE WIDEST
PORTION OF THE CRACK AND PAY CLOSE ATTENTION TO THE FOLLOWING: USE ONLY
MATERIALS THAT HAVEN'T EXCEEDED THEIR SHELF LIFE; ACCURATE BATCHING OF
COMPONENTS; SMALL BATCHES TO KEEP MATERIAL FRESH, AND DISSIPATE HEAT;
PORT SPACING; AND CONSISTENT APPLICATION OF THE MATERIAL (1 IN. WIDE X
3/16IN. THICK) OVER THE LENGTH OF THE CRACK.
INJECT THE EPOXY:
FOR A SUCCESSFUL EPOXY INJECTION, START WITH THE PROPER BATCHING AND
MIXING OF THE EPOXY COMPONENTS IN STRICT ACCORDANCE WITH THE
MANUFACTURER'S REQUIREMENTS. PRIOR TO STARTING THE ACTUAL INJECTION, BE
SURE THAT THE CAP SEAL AND PORT ADAPTER ADHESIVE HAVE PROPERLY CURED
SO THEY CAN SUSTAIN THE INJECTION PRESSURES. START THE INJECTION AT THE
WIDEST SECTION OF A HORIZONTAL CRACK. (BE SURE TO LOCATE AND MARK THESE
AREAS BEFORE INSTALLING THE CAP SEAL.) VERTICAL CRACKS ARE TYPICALLY
INJECTED FROM THE BOTTOM UP. CONTINUE THE INJECTION UNTIL REFUSAL. IF AN
ADJACENT PORT STARTS BLEEDING, CAP THE PORT BEING INJECTED AND CONTINUE
INJECTION AT THE FURTHEST BLEEDING PORT. HAIRLINE CRACKS ARE SOMETIMES
NOT WELL SUITED TO “PUMPING TO REFUSAL.” IN THOSE CASES, TRY INJECTING THE
EPOXY AT INCREASED PRESSURE (APPROXIMATELY 200 PSI) FOR 5 MIN. CLOSER
PORT SPACING CAN ALSO BE CONSIDERED. WHEN INJECTION INTO A PORT IS
COMPLETE, CAP IT IMMEDIATELY. HIGHER PRESSURE CAN BE USED FOR INJECTING
VERY NARROW CRACKS OR INCREASING THE RATE OF INJECTION. USE OF HIGHER
PRESSURE SHOULD BE MANAGED WITH CARE TO PREVENT A BLOWOUT OF THE CAP
SEAL OR PORTS.
REMOVE PORTS AND CAP SEAL:
UPON COMPLETION OF THE INJECTION PROCESS, REMOVE THE PORTS AND CAP
SEAL BY HEAT, CHIPPING, OR GRINDING. COMPLETE REMOVAL IS REQUIRED FOR A
SUBSEQUENT APPLICATION OF A COSMETIC COATING, PREPARE THE CONCRETE
SURFACE BY GRINDING.
QUALITY ASSURANCE:
TO ENSURE THAT THE INJECTION HAS BEEN SUCCESSFUL, QUALITY ASSURANCE
MEASURES INCLUDE TEST CORES OR NON-DESTRUCTIVE EVALUATION (NDE).
ACI RAP-1 REPAIRS CONTINUE
TEST CORES:
CORE LOCATIONS SHOULD BE CHOSEN TO AVOID CUTTING
REINFORCING STEEL, DRILLING CORES IN AREAS OF HIGH STRESS, OR
CREATING CORE HOLES BELOW THE WATERLINE. THE ENGINEER
SHOULD DETERMINE CORE LOCATIONS WHEN THESE TYPES OF
CONDITIONS EXIST; BE SURE THE EPOXY HAS SET BEFORE EXTRACTING
A CORE; TAKE CORES (NORMALLY 2 IN. DIAMETER) TO CHECK THAT THE
PENETRATION OF THE EPOXY IS ADEQUATE; INSPECT THE CORE
VISUALLY TO DETERMINE THE PENETRATION OF THE EPOXY INTO THE
CRACK; CORES CAN BE FURTHER TESTED FOR COMPRESSIVE AND
SPLIT TENSILE STRENGTH PER ASTM C 42; AND SUBSEQUENTLY, PATCH
THE REMOVED-CORE AREA (AFTER PROPER SURFACE PREPARATION)
WITH AN EXPANSIVE CEMENTITIOUS OR EPOXY GROUT COMPATIBLE
WITH THE EXISTING SUBSTRATE CONCRETE AND THE SURROUNDING
ENVIRONMENT.
METHODS FOR NONDESTRUCTIVE EVALUATION:
IMPACT ECHO (IE); ULTRASONIC PULSE VELOCITY (UPV); AND SPECTRAL
ANALYSIS OF SURFACE WAVES (SASW).
ACI RAP-6 REPAIRS
SURFACE PREPARATION:
CONCRETE REMOVAL AND EDGE CONDITIONING:
LOOSE, DELAMINATED CONCRETE SHOULD BE REMOVED UNTIL THE SUBSTRATE
CONSISTS OF SOUND CONCRETE. WHERE CORROSION OF THE REINFORCEMENT
EXISTS CONTINUE CONCRETE REMOVAL ALONG THE REINFORCING STEEL AND
ADJACENT AREAS WITH EVIDENCE OF CORROSION INDUCED DAMAGE THAT WOULD
INHIBIT BONDING OF REPAIR MATERIALS. CONCRETE REMOVAL SHOULD INCLUDE
UNDERCUTTING THE CORRODED REINFORCING STEEL BY APPROXIMATELY 3/4 IN.
THE SHAPE OF THE PREPARED CAVITY SHOULD BE KEPT AS SIMPLE AS POSSIBLE,
GENERALLY SQUARE OR RECTANGULAR IN SHAPE. REPAIR CONFIGURATIONS WITH
RE-ENTRANT CORNERS SHOULD BE AVOIDED TO PREVENT STRESS CONCENTRATION
THAT COULD CAUSE CRACKING OF THE REPAIR MATERIAL CRACKING. THE EDGES OF
THE PATCHES SHOULD BE SAWCUT PERPENDICULAR TO THE SURFACE TO A DEPTH
OF 1/2 IN. TO AVOID FEATHER EDGING THE REPAIR MATERIAL. AVOID CUTTING INTO
REINFORCING STEEL WHEN SAW CUTTING.
FINAL SURFACE CLEANING:
USE ABRASIVE BLASTING WHERE POSSIBLE OR OTHER MECHANICAL MEANS TO
REMOVE RESIDUAL DUST, DEBRIS, FRACTURED CONCRETE, AND OTHER
CONTAMINANTS THAT PREVENT PROPER BONDING. IF ABRASIVE BLASTING IS NOT
FEASIBLE, LOW-PRESSURE WATER CLEANING USING A MINIMUM 3000 PSI MAY BE
ACCEPTABLE DEPENDING ON THE BOND STRENGTH REQUIRED. IF REMOVAL OF
MICROCRACKING OR BRUISING CAUSED BY CONCRETE REMOVAL IS NECESSARY,
ABRASIVE BLASTING OR HIGH-PRESSURE WATER BLASTING (MINIMUM 5000 PSI) IS
REQUIRED. BLOWING WITH OIL-FREE COMPRESSED AIR OR, ALTERNATELY, THE USE
OF A VACUUM, MAY BE APPROPRIATE IF DUST IS STILL PRESENT AFTER THE
BLASTING. THE FINAL SURFACE TEXTURE SHOULD BE ROUGH, WITH A 1/8 TO 1/4 IN.
AMPLITUDE (CONCRETE SURFACE PROFILE NO. 6 TO 10 PER ICRI TECHNICAL
GUIDELINE NO. 310.1R); ALSO REFER TO ACI 364.7T-02. IT IS HIGHLY RECOMMENDED
TO FOLLOW MANUFACTURER'S GUIDELINES FOR SURFACE PROFILE AND
PREPARATION PRIOR TO THE INSTALLATION OF THE MATERIAL.
TREATMENT OF EXPOSED REINFORCEMENT:
ALL CEMENT, SCALE, AND BOND-INHIBITING CORROSION SHOULD BE REMOVED FROM
THE REINFORCING STEEL BY ABRASIVE BLASTING OR HIGH-PRESSURE WATER
BLASTING. IF THE CROSS-SECTIONAL AREA OF THE REINFORCING STEEL HAS BEEN
SIGNIFICANTLY REDUCED, A STRUCTURAL ENGINEER SHOULD BE CONSULTED
(REFER TO ACI 364.10T). IF A REINFORCING STEEL COATING, SUCH AS AN EPOXY OR
ZINC-RICH COATING, AND/OR TYPE 1 EMBEDDED GALVANIC ANODES ARE SPECIFIED,
INSTALL THE PROTECTIVE SYSTEMS ACCORDING TO MANUFACTURER INSTRUCTIONS
AFTER THE REINFORCING STEEL HAS BEEN CLEANED.
SUBSTRATE SATURATION:
MOST PORTLAND CEMENT-BASED MATERIALS REQUIRE THE BASE CONCRETE TO BE
IN A SATURATED SURFACE-DRY (SSD) CONDITION PRIOR TO APPLICATION TO
PREVENT A RAPID LOSS OF MOISTURE FROM THE REPAIR MATERIAL INTO THE
SUBSTRATE. SSD CONDITION IS ACHIEVED WHEN THE BODY OF THE CONCRETE IS
SATURATED AND FREE SURFACE WATER AND PUDDLES HAVE BEEN REMOVED FROM
THE SURFACE OF THE CONCRETE. SSD SURFACE IS NOT RECOMMENDED IF A
POLYMER BONDING AGENT IS TO BE USED. WHEN USING POLYMER BONDING
AGENTS, FOLLOW THE MANUFACTURER'S RECOMMENDED SURFACE PREPARATION
REQUIREMENTS. THE GENERAL RECOMMENDATIONS PREVIOUSLY GIVEN MAYBE
INFLUENCED BY SEVERAL FACTORS, INCLUDING: DESIRED ROUGHNESS PROFILE OF
THE PREPARED SURFACE (THIS MAY BE SPECIFIED BY THE MANUFACTURER OF THE
REPAIR PRODUCT); METHOD OF SURFACE PREPARATION, INCLUDING CHIPPING
HAMMERS, ABRASIVE BLASTING, HIGH-PRESSURE WATER-BLASTING, OR HYDRO
DEMOLITION; POSSIBLE CONTAMINATION OF THE SURFACE BY CHEMICALS, OILS, OR
GREASE; POSSIBLE CARBONATION; AND METHODS OF REMOVING CONTAMINANTS OR
CARBONATED CONCRETE; REPAIR MATERIAL MANUFACTURER'S RECOMMENDATIONS
(ASK FOR TECHNICAL DATA SHEETS AND INSTALLATION BULLETINS AND READ THE
PRINTED INSTRUCTIONS ON THE PACKAGING); AND TREATMENT OF EXISTING CRACKS
AND JOINTS. FOR ADDITIONAL INFORMATION, CONSULT THE RECOMMENDATIONS OF
ICRI GUIDELINES NO. 310.2 AND 310.1R, AND U.S. BUREAU OF RECLAMATION (USBR)
ST-2016-2886-01 (VAYSBURD ET AL.2016).
ACI RAP-6 REPAIRS CONTINUED
REPAIR PROCEDURE:
APPLY THE REPAIR MATERIAL:
MIX THE MATERIAL FOLLOWING THE MANUFACTURERS'
RECOMMENDATIONS: SCRUB A THIN BOND COAT OF THE REPAIR
MORTAR INTO THE SSD SUBSTRATE, THUS FILLING PORES TO ENSURE
INTIMATE CONTACT AND TO HELP PREVENT SLOUGHING OR SAGGING
OF REPAIR MATERIALS ON VERTICAL AND OVERHEAD SURFACES. THE
BOND COAT SHOULD BE A THIN LAYER OF THE SAME REPAIR MATERIAL;
ADDING ADDITIONAL LIQUID TO MAKE A SLURRY CAN NEGATIVELY
AFFECT THE BOND STRENGTH. ALTERNATIVELY, A BONDING AGENT
MAY BE APPLIED IF IT IS REQUIRED BY THE MANUFACTURER OR
REQUIRED BY THE REPAIR SPECIFICATION. BEFORE THE BOND COAT
DRIES, APPLY THE REPAIR MATERIAL WITH THE ADEQUATE PRESSURE
TO ACHIEVE INTIMATE CONTACT WITH THE PREPARED SUBSTRATE.
THOROUGHLY CONSOLIDATE THE REPAIR MATERIAL INTO THE
CORNERS OF THE PATCH AND AROUND ANY EXPOSED REINFORCEMENT
IN THE REPAIR ZONE. FULL ENCAPSULATION OF THE REINFORCEMENT
IS IMPORTANT FOR LONG-TERM DURABILITY. IF A SECOND LIFT IS
REQUIRED, THOROUGHLY ROUGHEN THE SURFACE OF THE FIRST LIFT
BY SCORING THE SOFT MORTAR TO ACHIEVE AN AGGRESSIVE FINISH,
SIMILAR IN PROFILE TO THE PREPARED CONCRETE SUBSTRATE TO
PROMOTE MECHANICAL BOND BETWEEN LIFTS. IF THE SECOND LIFT
WILL NOT BE IMMEDIATELY APPLIED, KEEP THE FIRST LIFT MOIST UNTIL
APPLICATION OF THE SECOND LIFT. AFTER THE FIRST LIFT HAS
REACHED THE FINAL SET, MOISTEN THE SURFACE OF THE FIRST LIFT,
SCRUB IN A THIN LAYER OF FRESH MORTAR, AND APPLY THE SECOND
LIFT OF MATERIAL. ONCE THE DESIRED THICKNESS HAS BEEN
ACHIEVED, STRIKE OFF LEVEL WITH THE ADJACENT CONCRETE.
FINISH AND CURE THE REPAIR:
FINISH THE REPAIR MATERIAL TO PRODUCE A FINAL FINISHED
APPEARANCE AS REQUIRED BY THE PROJECT SPECIFICATIONS.
BECAUSE OF THE NONBLEEDING, STICKY NATURE OF MANY OF THESE
MATERIALS, THE USE OF AN EVAPORATION REDUCER FOR
INTERMEDIATE CURING MAY BE HELPFUL. AS WITH ALL PORTLAND
CEMENT-BASED MATERIALS, PROPER CURING WILL PROVIDE
ENHANCED PHYSICAL PROPERTIES. GOOD CURING PROCEDURES
PREVENT RAPID MOISTURE LOSS AT EARLY AGES. CONSULT THE
PRODUCT MANUFACTURER TO CURE INSTRUCTIONS. CURING WILL
GENERALLY BE CONDUCTED IN ACCORDANCE WITH ACI 308R. THE USE
OF CURING COMPOUNDS THAT COMPLY WITH THE MOISTURE
RETENTION REQUIREMENTS OF ASTM C309 OR ASTM C1315, OR MOIST
CURING ARE COMMON CURING METHODS.
QUALITY ASSURANCE:
REQUIREMENTS:
MEASURING THE AREA OR VOLUME OF REPAIR; DOCUMENTATION WITH
BEFORE AND AFTER PHOTOS; CONFIRMATION OF ACCEPTABLE
SURFACE PREPARATION. INCLUDES OBSERVING THE SURFACE
AMPLITUDE PROFILE. ALTERNATIVELY, DIRECT TENSION TESTING OF
THE PREPARED SURFACE WILL PROVIDE QUANTITATIVE DATA
REGARDING THE LEVEL OF SURFACE PREPARATION ACHIEVED;
MATERIAL TESTING PERFORMED BY A QUALIFIED TESTING AGENCY;
SOUNDING THE CURED REPAIR FOR LACK OF BONDING; AND IN-PLACE
DIRECT TENSILE BOND TESTING OF THE HARDENED, CURED REPAIR TO
THE BASE CONCRETE USING METHODS SIMILAR TO THOSE DESCRIBED
IN ICRI TECHNICAL GUIDELINE NO.210.3 OR ASTM C1583/C1583M.
IMPORTANT OBSERVATIONS INCLUDE MAXIMUM STRESS, EXPRESSED IN
PSI, AND FAILURE MODE (BASE CONCRETE, BOND LINE, OR COHESIVE
FAILURE OF THE MORTAR).
AutoCAD SHX Text
CONCRETE TEMPERATURE CHANGES AFTER INSTALLATION OF THE CAP
AutoCAD SHX Text
A RAPID LOSS OF MOISTURE FROM THE REPAIR MATERIAL INTO THE
AutoCAD SHX Text
MATERIAL. ONCE THE DESIRED THICKNESS HAS BEEN
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
DESIGN
W W
YK
RE
HA
B
TA
NK
S
1E
1W
O C
T
TE
PA
-S R
M
L
LU
KE
S-101
P G
O U
C H
ER
D S
H
AN
N O
N
En gr
\D es ig n\ s\
\2
5\
0_ Su pp or t\0 _3
_D ra w in gs
ST
RU
CT
UR
AL
A
SB
UI
LT
PL
AN
O
F
RE
TA
IN
IN
G
W
AL
L
AN
D
JO
IN
T
LA
YO
UT
04 12
GENERAL NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
2. SCOPE OF WORK PERTAINS TO RESTORATION CONFINED WITHIN THE CONCRETE
BASIN.
S-101
STRUCTURAL ASBUILT PLAN OF RETAINING WALL AND JOINT LAYOUT
NTS
KEYED NOTES
REMOVE AND REPLACE SEALANT AT CONCRETE TO STEEL COLUMN BASE AND
STEEL TANK BASE. REFER SPECIFICATIONS 03 30 00 AND 07 92 00 FOR
FLEXIBLE POLYURETHANE SEALANT. PAINT TO MATCH STEEL WITH EXTERIOR
RATED PRODUCT.
REMOVE AND REPLACE STEEL STAIR TREAD NOSING. NOSING SHALL BE
NON-CORROSIVE, SLIP RESISTANT, AND CONTAIN CHECKERED PATTERN.
MECHANICALLY FASTEN TO TREADS WITH NON-CORROSIVE FASTENERS PER
THE MANUFACTURERS RECOMMENDATIONS.
REMOVE ALL EXISTING EXPOSED STRUCTURAL STEEL MEMBERS COATING BY
NEAR-WHITE BLAST CLEANING (SSPC-SP 10). PRIME WITH ZINC-RICH PRIMER
COMPATIBLE WITH PAINT FINISH. PAINT COLOR SHALL BE SW 7520 “DARK
BROWN ” AND RATED FOR EXTERIOR. INCLUDES STAIRS, HANDRAILS,
SUPPORT STRUCTURE, CRANE SUPPORTS, CRANE EQUIPMENT, LADDERS, AND
GRATING.
REMOVE AND REPLACE TANK PLATFORM FLOOR GRATING. MATCH EXISTING
GRATING PROFILE, ATTACHMENT METHOD, AND LOADING REQUIREMENTS
(REFER AS-BUILT DRAWING S-1), OR EQUAL. ALL NEW GRATING SHALL BE
CONNECTED WITH NEW CONNECTORS IF WELDING IS NOT UTILIZED. GRATING
SHALL BE NON-CORROSIVE.
REPAIR MONOLITH JOINT IN ACCORDANCE WITH ACI RAP-6, REFER NOTES
S-100. DO NOT DAMAGE THE EXISTING WATER STOP. FILL THE JOINT AND SEAL
THE JOINT, REFER SPECIFICATIONS 03 30 00 AND 07 92 00 FOR FILLER AND
SEALANT. PAINT THE ENTIRE EXPOSED CONCRETE WALL WITH EXTERIOR
RATED PRODUCT TO MATCH EXISTING WALL.
WELD NEW 1/2” STEEL PLATE TO THE STEEL TANK BASE SHELL WHERE STEEL
THICKNESS < 3/8”. (ANTICIPATED AREAS ARE SHADED)
TANK PREPARATION AND COATING, REFER NOTES ON S-100.
REPAIR CONCRETE WALL CRACKING IN ACCORDANCE WITH ACI RAP-1, REFER
NOTES S-100. PAINT THE ENTIRE EXPOSED CONCRETE WALL WITH EXTERIOR
RATED PRODUCT TO MATCH EXISTING WALL.
REMOVE AND REPLACE (6) METAL PIPE SUPPORT POSTS. ATTACH TO
CONCRETE SLAB-ON-GRADE. POSTS SHALL BE CAPABLE OF SUPPORTING
ANTICIPATED PIPE LOADS. PAINT TO MATCH PLATFORM AND STAIR
STRUCTURES WITH EXTERIOR RATED PRODUCT.
S-101
STRUCTURAL ASBUILT WALL JOINT DETAIL
NTS
(TYP)
8 2 (TYP) 3
5 (TYP) 2(TYP)
3 (TYP)
8 (TYP) 5 (TYP)
8 (TYP)
1(TYP)
7 5 (TYP)
(TYP) (TYP)
(TYP)
7 (TYP)
8 (TYP)
7 (TYP)
(TYP)
(TYP)
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
DESIGN
W W
YK
RE
HA
B
TA
NK
S
1E
1W
O C
T
TE
PA
-S R
M
L
LU
KE
S-102
P G
O U
C H
ER
D S
H
AN
N O
N
En gr
\D es ig n\ s\
\2
5\
0_ Su pp or t\0 _3
_D ra w in gs
ST
RU
CT
UR
AL
A
SB
UI
LT
PL
AN
O
F
TA
NK
S
TA
IR
AN
D
W
AL
KW
AY
05 12
GENERAL NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
2. SCOPE OF WORK PERTAINS TO RESTORATION CONFINED WITHIN THE CONCRETE
BASIN.
S-102
STRUCTURAL ASBUILT PLAN OF TANK STAIR AND WALKWAY
NTS
KEYED NOTES
REMOVE AND REPLACE SEALANT AT CONCRETE TO STEEL COLUMN BASE
AND STEEL TANK BASE. REFER SPECIFICATIONS 03 30 00 AND 07 92 00 FOR
FLEXIBLE POLYURETHANE SEALANT. PAINT TO MATCH STEEL WITH EXTERIOR
RATED PRODUCT.
REMOVE AND REPLACE STEEL STAIR TREAD NOSING. NOSING SHALL BE
NON-CORROSIVE, SLIP RESISTANT, AND CONTAIN CHECKERED PATTERN.
MECHANICALLY FASTEN TO TREADS WITH NON-CORROSIVE FASTENERS PER
THE MANUFACTURERS RECOMMENDATIONS.
REMOVE ALL EXISTING EXPOSED STRUCTURAL MEMBERS STEEL COATING BY
NEAR-WHITE BLAST CLEANING (SSPC-SP 10). PRIME WITH ZINC-RICH PRIMER
COMPATIBLE WITH PAINT FINISH. PAINT COLOR SHALL BE SW 7520 “DARK
BROWN” AND RATED FOR EXTERIOR. INCLUDES STAIRS, HANDRAILS,
SUPPORT STRUCTURE, CRANE SUPPORTS AND CRANE EQUIPMENT.
REMOVE AND REPLACE TANK PLATFORM FLOOR GRATING. MATCH EXISTING
GRATING PROFILE, ATTACHMENT METHOD, AND LOADING REQUIREMENTS
(REFER AS-BUILT DRAWING S-1), OR EQUAL. ALL NEW GRATING SHALL BE
CONNECTED WITH NEW CONNECTORS IF WELDING IS NOT UTILIZED.
GRATING SHALL BE NON-CORROSIVE.
(TYP)
(TYP)
1 (TYP)
3(TYP)
(TYP)
4 (TYP)
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
DESIGN
W W
YK
RE
HA
B
TA
NK
S
1E
1W
O
C T
TE
PA
-S R
M
Q G
AU
N
A
MD-101
P G
O U
C H
ER
D S
H
AN
N O
N
En gr
\D es ig n\ s\
\2
5\
0_ Su pp or t\0 _3
_D ra w in gs
ME
CH
AN
IC
AL
DE
MO
LIT
IO
N
PL
AN
06 12
GENERAL NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
2. INSPECT ALL INTERIOR SURFACES FOR OIL AND/OR GREASE CONTAMINATION.
3. REJECT OIL OR GREASE CONTAMINATED SURFACES, CLEAN IN ACCORDANCE WITH
SSPC SP 1, AND RECHECK FOR CONTAMINATION UNTIL SURFACES ARE FREE OF
OIL AND GREASE.
4. CONTRACTOR SHALL FURNISH A CONTAINMENT SYSTEM THAT PROTECTS PEOPLE
AND AREAS OUTSIDE THE SCOPE OF WORK FROM BOTH ABRASIVE BLASTING AND
PAINT OVERSPRAY IAW UFGS 09 97 13.27.
MD-101
MECHANICAL DEMOLITION PLAN
SCALE: 1/16" = 1'-0"
KEYED NOTES
TEST INTERIOR & EXTERIOR TANK SURFACES FOR SOLUBLE SALTS AND
WASH AS REQUIRED PRIOR TO ABRASIVE BLASTING.
REMOVE AND PROTECT SUBMERSIBLE SUMP PUMPS, SUBMERSIBLE MIXERS,
CRANE, AND ANY OTHER GOVERNMENT EQUIPMENT STORED IN OR AROUND
THE TANKS PRIOR TO BEGINNING ABRASIVE BLASTING.
ABRASIVE BLAST INTERIOR & EXTERIOR TANK SURFACES & WALL FITTINGS
TO NEAR-WHITE METAL IN ACCORDANCE WITH SSPC SP 10/NACE NO. 2.
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
DESIGN
W W
YK
RE
HA
B
TA
NK
S
1E
1W
O C
T
TE
PA
-S R
M
Q G
AU
N
A
M-101
P G
O U
C H
ER
D S
H
AN
N O
N
En gr
\D es ig n\ s\
\2
5\
0_ Su pp or t\0 _3
_D ra w in gs
ME
CH
AN
IC
AL
NE
W W
OR
K
PL
AN
07 12
GENERAL NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
2. CONTRACTOR SHALL FURNISH A CONTAINMENT SYSTEM THAT PROTECTS AREAS
OUTSIDE THE SCOPE OF WORK FROM BOTH ABRASIVE BLASTING AND PAINT
OVERSPRAY IAW UFGS 09 97 13.27.
3. ENVIRONMENTAL CONTROL SYSTEM SHALL PROPERLY CONTROL HUMIDITY OF
TANK STEEL SURFACES DURING ALL INTERIOR SURFACE PREPARATION AND
COATING IAW SECTIONS 3.4.3 & 3.4.4 OF UFGS 09 97 13.16.
M-101
MECHANICAL NEW WORK PLAN
SCALE: 1/16" = 1'-0"
KEYED NOTES
APPLY EXTERIOR THREE PART EPOXY COATING SYSTEM PER SPECIFICATION
SECTION 09 97 13.27.
EXTERIOR TANK COATING SHALL HAVE A TOTAL SYSTEM THICKNESS
BETWEEN 8 - 13 MILS.
APPLY INTERIOR THREE PART EPOXY COATING SYSTEM PER SPECIFICATION
SECTION 09 97 13.16.
INTERIOR TANK COATING SHALL HAVE A TOTAL SYSTEM THICKNESS
BETWEEN 20 - 26 MILS.
3 4
3 4
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
DESIGN
W W
YK
RE
HA
B
TA
NK
S
1E
1W
O C
T
TE
PA
-S R
M
M T
O W
N
SE
LL
ED-101
P G
O U
C H
ER
D S
H
AN
N O
N
En gr
\D es ig n\ s\
\2
5\
0_ Su pp or t\0 _3
_D ra w in gs
EL
EC
TR
IC
AL
A
SB
UI
LT
OF
C
AT
HO
DI
C
PR
OT
EC
TI
ON
S
YS
TE
M
08 12
GENERAL NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
2. DEMOLISH AND REMOVE ALL COMPONENTS OF EXISTING CATHODIC PROTECTION
SYSTEM TO INCLUDE BUT NOT LIMITED TO: RECTIFIER, DISCONNECTS, CONDUIT,
CABLE, INTERIOR ANODE RINGS, SUPPORTING MEANS, ETC.
ED-101
ELECTRICAL ASBUILT OF CATHODIC PROTECTION SYSTEM
NTS
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
DESIGN
W W
YK
RE
HA
B
TA
NK
S
1E
1W
O C
T
TE
PA
-S R
M
M T
O W
N
SE
LL
ED-102
P G
O U
C H
ER
D S
H
AN
N O
N
En gr
\D es ig n\ s\
\2
5\
0_ Su pp or t\0 _3
_D ra w in gs
EL
EC
TR
IC
AL
A
SB
UI
LT
CA
TH
OD
IC
PR
OT
EC
TO
N
DE
TA
ILS
09 12
ED-102
ELECTRICAL ASBUILT CATHODIC PROTECTON DETAILS
NTS
GENERAL NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
2. THE CONTRACTOR MUST VERIFY THE CONDITION OF THE EXISTING GROUNDING
SYSTEM (INCLUDING THE TEST WELLS) AROUND THE TANKS. REPLACEMENT IS
REQUIRED IF DEFICIENCIES ARE FOUND.
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
DESIGN
W W
YK
RE
HA
B
TA
NK
S
1E
1W
O C
T
TE
PA
-S R
M
M T
O W
N
SE
LL
E-101
P G
O U
C H
ER
D S
H
AN
N O
N
En gr
\D es ig n\ s\
\2
5\
0_ Su pp or t\0 _3
_D ra w in gs
EL
EC
TR
IC
AL
P
LA
N
10 12
GENERAL NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS FOR
FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS
FOR ACCURACY.
2. PROVIDE AND INSTALL NEW INTERIOR CATHODIC PROTECTION SYSTEM MEETING THE
REQUIREMENTS OF UFC 3-570-01, CATHODIC PROTECTION; AND UFGS 26 42 15,
CATHODIC PROTECTION SYSTEM FOR THE INTERIOR OF STEEL WATER TANKS.
SYSTEM COMPONENTS INCLUDE, BUT ARE NOT LIMITED TO:
(1. TITANIUM MIXED METAL OXIDE IMPRESSED CURRENT ANODE ASSEMBLIES.
(2. SUBMERGED ANODE SUPPORT SYSTEM
(3. PERMANENT REFERENCE ELECTRODES.
(4. FLOTATION BUOYS
(5. PRESSURE ENTRANCE FITTING WITH JUNCTION (HOFFMAN) BOX.
(6. AUTOMATICALLY CONTROLLED TASC RECTIFIER.
(7. STEEL ANCHORS WELDED TO SIDEWALL
(8. CONDUIT AND ASSOCIATED WIRING/CABLING.
PERFORM TESTING AND PROVIDE REPORTS IN ACCORDANCE WITH UFGS 26 42 15.
3. THE CONTRACTOR MUST VERIFY THE CONDITION OF THE EXISTING GROUNDING
SYSTEM (INCLUDING THE TEST WELLS) AROUND THE TANKS. REPLACEMENT IS
REQUIRED IF DEFICIENCIES ARE FOUND.
E-101
ELECTRICAL PLAN
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
DESIGN
W W
YK
RE
HA
B
TA
NK
S
1E
1W
O C
T
TE
PA
-S R
M
M T
O W
N
SE
LL
E-102
P G
O U
C H
ER
D S
H
AN
N O
N
En gr
\D es ig n\ s\
\2
5\
0_ Su pp or t\0 _3
_D ra w in gs
EL
EC
TR
IC
AL
P
LA
N
11 12
GENERAL NOTES
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
2. THE CONTRACTOR MUST VERIFY THE CONDITION OF THE EXISTING GROUNDING
SYSTEM (INCLUDING THE TEST WELLS) AROUND THE TANKS. REPLACEMENT IS
REQUIRED IF DEFICIENCIES ARE FOUND.
E-102
ELECTRICAL PLAN
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
DESIGN
W W
YK
RE
HA
B
TA
NK
S
1E
1W
O C
T
TE
PA
-S R
M
M T
O W
N
SE
LL
E-103
P G
O U
C H
ER
D S
H
AN
N O
N
En gr
\D es ig n\ s\
\2
5\
0_ Su pp or t\0 _3
_D ra w in gs
EL
EC
TR
IC
AL
W
OR
K
PL
AN
12 12
GENERAL NOTES INTERNAL
1. THE DRAWING WAS PREPARED FROM EXISTING DRAWINGS AND LIMITED ACCESS
FOR FIELD OBSERVATIONS. CONTRACTOR SHALL FIELD VERIFY EXISTING
CONDITIONS FOR ACCURACY.
2. ALL CONTROL AND ELECTRICAL CONDUCTORS ARE TO BE PROTECTED DURING
DEMOLITION.
E-103
ELECTRICAL WORK PLAN
NTS
KEYED NOTES
DEMOLISH THE DISCONNECT TO RETURN PUMP 3 AND 4 ALONG WITH THE
CONDUIT AND CONDUCTORS TO THE JUNCTION BOX B.
DEMOLISH THE LIGHT AND LIGHT POLE ALONG WITH THE CONDUIT AND
CONDUCTORS BACK TO THE JUNCTION BOX B.
DEMOLISH THE DISCONNECT TO MIXER 1 AND 2 ALONG WITH THE CONDUIT AND
THE CONDUCTOR BACK TO THE JUNCTION BOX B.
DEMOLISH THIS JUNCTION BOX WITH BOTH THE POWER AND CONTROL
CONDUCT AND BACK TO JUNCTION BOX A
DEMOLISH ALL THE CONDUCTORS THAT WAS ABANDONED IN PLACE TO
JUNCTION BOX A
480/277 (5) SETS THHN/THWN #6 AWG THHN/THWN #12 AWG GND. 2 CONDUIT
PROVIDE AND INSTALL A 3-POLE 480/277-VOLT 50-AMP DISCONNECT FOR PUMPS
3 AND 4.
PROVIDE AND INSTALL A 3-POLE 480/277-VOLT 100-AMP DISCONNECT FOR
MIXERS 1 AND 2.
PROVIDE AND INSTALL A 10 FOOT LIGHT POLE LITHONIA PART NUMBER SSS 10
5C DM28AS DDBXD OR EQUIVALENT
PROVIDE AND INSTALL A 10 FOOT LIGHT POLE LITHONIA PART NUMBER RSS 10
5C DM28AS DDBXD OR EQUIVALENT.
EXISTING CRANE TO REMAIN
PROVIDE AND INSTALL A NEMA 4X JUNCTION BOX. REPLACE THE JUNCTION
WITH ONE OF THE SAME SIZE AND A GROUNDING BAR.
PROVIDE AND INSTALL A 2 1/2 INCH STAINLESS STEEL WEATHERPROOF
CONDUIT FROM JUNCTION BOX A TO JUNCTION BOX B.
PROVIDE AND INSTALL ASI TERMINAL BLOCK ASSEMBLY FOR THE SIGNAL AND
CONTROL CABLES.
PROVIDE AND INSTALL FIVE (5) MINIATURE DISTRIBUTION BLOCKS THREE (3)
POLE 175-AMP 600V
PROVIDE AND INSTALL BOTH THE POWER AND CONTROL CONDUCTORS FROM
JUNCTION BOX A TO ALL THE MOTORS, CONTROL AND SIGNALS ON THE
CATWALK THROUGH JUNCTION BOX B.
ADAL MOTOR CONTROL CENTER BUILDING 62501-MCC-C11.
THE MAIN JUNCTION BOX FROM BOTH MOTOR CONTROL CENTER
62501-MCC-C11 AND PLC CONTROL SIGNALS COMING FROM THE LOCAL SCL
CONTROL PANELS.
THE LOCAL SCL CONTROL PANELS.
STAIRS TO PLATFORM PICTURE
11 1111
30 CONTROL CABLE 1 12" C
2 CONTROL CABLE 34" C
(6) 1 12" C 15 #6 4 #12g
1415 A
B
7 7
4 2
2 2
3 3
| 01-240015-G101 |
| Sheets and Views |
| G101 |
| 02-240015-G102 |
| Sheets and Views |
| G102 |
| 03-240015-S100-S100 |
| Sheets and Views |
| S100 |
| 04-240015-S101-S101 |
| Sheets and Views |
| S101 |
| 05-240015-S102-S102 |
| Sheets and Views |
| S102 |
| 06-240015-MD101-MD101 |
| Sheets and Views |
| MD101 |
| 07-240015-M101-M101 |
| Sheets and Views |
| M101 |
| 08-240015-ED101-ED101 |
| Sheets and Views |
| ED101 |
| 09-240015-ED102-ED102 |
| Sheets and Views |
| ED102 |
| 10-240015-E101-E101 |
| Sheets and Views |
| E101 |
| 11-240015-E102-E102 |
| Sheets and Views |
| E102 |
| 12-240015-E103-E103 |
| Sheets and Views |
| E103 |
File details come from the government source that posted it. Updated .