This is a Statement of Work (SOW) for thermal insulation (lagging) replacement work on the U.S. Navy ship YRB-30, managed by the Naval Sea Systems Command (NAVSEA).

The contractor is required to remove up to 1,500 square feet of existing damaged or deteriorated thermal insulation from piping, ducting, and associated systems located in various interior hull compartments aboard YRB-30, then install new thermal insulation in those same areas. All removal and installation work must comply with NAVSEA Standard Item 009-11. The contractor must obtain Government approval of all materials prior to installation and coordinate with the Government during a pre-performance ship check to identify specific work locations and access requirements, which may also be provided as Government Furnished Information (GFI). Additionally, the contractor shall perform surface preparation and touch-up painting on all new and disturbed surfaces resulting from the removal and installation work in accordance with NAVSEA Standard Item 009-32, applicable paint schedules, and environmental controls. No Government-furnished materials, push materials, or kitted materials are being provided for this work. The contract reference identifier is Item No. YR30-L246, COAR 18KTA, with planner A. Petty.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHIP: YRB-30 ITEM NO: YR30-L246

COAR: 18KTA PCN: YR30-L246

PLANNER: A. PETTY

1. S C OP E :

1.1 Title: Lagging; replace

1.2 Location of Work:

1.2.1 INTERIOR HULL; YRB-30

1.3 Identification:

1.3.1 Quantity 1500 Square feet: Lagging

2. REFERENCES:

2.1 Standard Items F Y26

2.2 YRB-30 General Arrangement DWG.

3. REQUIREMENTS:

3.1 Accomplish the requirements of NAVSEA STANDARD ITEM 009-11 of 2.1

3.1.1 Remove up to 1,500 square feet of existing damaged or deteriorated thermal insulation (lagging) from piping, ducting, and associated systems located in various compartments onboard YRB-30.

Specific locations and access requirements shall be identified by the Government during the pre-performance ship check or provided as Government Furnished Information (GFI) prior to the start of work.

3.1.2 Install up to 1,500 square feet of new thermal insulation (lagging) in the areas where removal was performed under 3.1.1. Installation shall conform to the requirements of NAVSEA Standard Item 009-11 and applicable specifications. All materials shall be approved by the Government prior to installation.

3.2 The Contractor shall accomplish the requirements of NAVSEA Standard Item 009-32 of reference 2.1 to perform surface preparation and touch-up painting on all new and disturbed surfaces resulting from the work described in 3.1.1 and 3.1.2. Coatings shall be applied in accordance with the applicable paint schedule and environmental controls.

4. NOTES:

4.1 None.

5. GOVERNME NT FURNISHED MATERIAL ( GF M):

5.1 LLT M:

1. None

5.2 PUSH MATERIAL:

1. None

5.3 KITTED MATERIAL:

1. None

1. S C OP E :
1.2.1 INTERIOR HULL; YRB-30
1.3 Identification:
2. REFERENCES:
3. REQUIREMENTS:
3.1 Accomplish the requirements of NAVSEA STANDARD ITEM 009-11 of 2.1
4. NOTES:
4.1 None.
5. GOVERNME NT FURNISHED MATERIAL (GF M):
5.1 LLT M:
5.2 PUSH MATERIAL:
5.3 KITTED MATERIAL: