ATT1 WI YR30-L244 - SCAFFOLDING SUPPORT.pdf
PDF 88 KB Posted
- Solicitation number
- N62664926RA042
About this file
This is a Statement of Work (SOW) for temporary scaffolding provision and installation on Ship YRB-30, Item No. YR30-L244, under COAR 18KTA, with Planner A. Petty assigned to oversee the work.
The contractor must provide and install steel tube and clamp type staging in accordance with 29 CFR Part 1915 (Occupational Safety and Health Standards) across 15 specified locations aboard the ship, including offices, passages, crew lounge, and seabag lockers. The staging must be installed within the first five days of availability and must feature multiple levels and projections to safely reach and access all elevated areas. The scaffolding assembly shall include platforms with safety life rails around the perimeter for maintenance and preservation work overhead, and must be capable of sustaining a 300-pound load at any point or level. Upon completion of work and when directed by the supervisor, the contractor shall remove all staging and accomplish finishing requirements for new and disturbed surfaces per specification 009-32 of 231. No government-furnished materials are provided; the contractor is responsible for supplying all necessary scaffolding materials and components. References to FY26 Standard Items and YRB-30 General Drawings apply to this work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHIP YRB-30 ITEM NO. YR30-L244
COAR 18KTA
PLANNER A. PETTY
1 : SCOPE
1.1 Title Temporary Scaffolding; provide
1.2 Location of Work
1.2.1 OFFICE; 1-9-0-Q
1.2.2 OFFICE; 1-11-0-Q
1.2.3 PASSAGE; 1-11-1-L
1.2.4 PASSAGE; 2-12-1-L
1.2.5 PASSAGE; 1-14-2-L
1.2.6 PASSAGE; 2-14-2-L
1.2.7 PASSAGE; 2-14-3-L
1.2.8 CREW LOUNGE; 1-14-0-L
1.2.9 PASSAGE; 2-14-3-L
1.2.10 PASSAGE; 1-17-0-L
1.2.11 PASSAGE; 2-17-2-L
1.2.12 PASSAGE; 1-20-0-L
1.2.13 PASSAGE; 2-20-4-L
1.2.14 SEABAG LOCKER; 2-7-4-Q
1.2.15 SEABAG LOCKER; 2-7-2-Q
1.3 Identification
1.3.1 Not Applicable
2. REFERENCES
2.1 FY26 Standard Items
2.2 2 9 CFR PART 1915, Occupational Safety and Health Standards
2.3 YRB-30 GEN DRAWING
3. REQUIREMENTS
3.1 Provide and install a steel tube and clamp type staging in accordance with 2.2 in the location listed in 1.2, with sufficient levels and projections to safely reach and access to all elevated areas identified.
3.1.1 Install the staging within the first 5 days of the
availability:
3.1.2 Install staging/scaffolding assembly with platform including safety life rails around platform for maintenance & preservation work overhead.
3.1.3 Staging shall be capable of sustaining a load of 300 pounds at any point or level of the staging:
3.2 Remove staging upon completion of work and when directed by the supervisor
3.3.3 Accomplish the requirements of 009-32 of 231 for new and disturbed surfaces
4. NOTES.
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL
5.1 LLTM
1. None
5.2 PUSH MATERIAL
1. None
5.3 KITTED MATERIAL
1. None
| 2. REFERENCES |
| 2.1 FY26 Standard Items |
| 3. REQUIREMENTS |
| 4. NOTES. |
| 5. GOVERNMENT FURNISHED MATERIAL |